The 000-085 practice exam is written and formatted by Certified Senior IT Professionals working in today's prospering companies and data centers all over the world! The 000-085 Practice Test covers all the exam topics and objectives and will prepare you for success quickly and efficiently. The 000-085 exam is very challenging, but with our 000-085 questions and answers practice exam, you can feel confident in obtaining your success on the 000-085 exam on your FIRST TRY! IBM 000-085 Exam Features - Detailed questions and answers for 000-085 exam - Try a demo before buying any IBM exam - 000-085 questions and answers, updated regularly - Verified 000-085 answers by Experts and bear almost 100% accuracy - 000-085 tested and verified before publishing - 000-085 exam questions with exhibits - 000-085 same questions as real exam with multiple choice options Acquiring IBM certifications are becoming a huge task in the field of I.T. More over these exams like 000-085 exam are now continuously updating and accepting this challenge is itself a task. This 000-085 test is an important part of IBM certifications. We have the resources to prepare you for this. The 000-085 exam is essential and core part of IBM certifications and once you clear the exam you will be able to solve the real life problems yourself.Want to take advantage of the Real 000-085 Test and save time and money while developing your skills to pass your IBM 000-085 Exam? Let us help you climb that ladder of success and pass your 000-085 now!


000-085

QUESTION: 1 What components are needed to access the internal storage on a BladeCentre S ?

A. Optical Pass-Thru Module and one SFF FC adapter per blade B. OneiSCSI adapter per blade C. SAS Connectivity Module and one SAS expansion card per blade D. Intergrated internal storage adapter Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=1 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 2 A customer deploys an IBM BladeCentre chassis with one Brocade 4GB SAN switch module. The customer requires a 4GB uplink or higher. Which configuration will meet this request?

A. Brocade 20-port 4GB SAN switch module and Brocade ISLTrunking for IBM BladeCentre B. Brocade 20-port 4GB SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCentre C. Brocade 10-port 4GB SAN switch module and Full Ports on Demand License D. Brocade 10-port 4GB SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCentre Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=2 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 3 A customer wants to implement the following solution: - Seven HS22 Blades - Six LS42 HE Blades with Multi-processor Expansion Unit - One 1U external Fibre Channel switch - Two 3U Fibre Channel storage devices with fourteen 146BG drives Which of the following is the minimum amout of rack space required to implement the solutions?

A. 13U B. 16U C. 22U D. 24U Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=3 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 4 A customer wants to deploy around 8TB integrated storage on a BladeCentre


A. WithiSCSI B. WithiSCSI external storage C. With SATA internal storage D. With SAS internal storage Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=4 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 5 Which option is a good reason to implement the IBM BladeCenter H chassis over IBM BladeCenter E chassis?

A. Support for 10GB internal network B. Better rack space density per blade C. Lower power consumption per chassis D. Support for 4GBFibre Channel Switch Modules Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=5 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 6 How can you update the firmware on the Advanced Management Module using UpdateXpress?

A. BootUpdateXpress from the blade B. Use the scripting tools onUpdateXpress C. Launch theRemoteUX utility from the Advanced Management Module D. Attach a USB CDROM to the Advanced Management Module and boot fromUpdateXpress Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=6 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 7 A customer has a rack with four BladeCentre H chassis that have been operating normally for several months. After installing a new rack of servers in the data centre, the administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem?

A. The room temperature has reached 23C (73.4F) B. A Blade within the chassis has been shut down C. The ambienttermperature in the data centre has increased D. One of the additional System X servers in theBladeCenter rack has failed Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=7 -------------------------------------------------------------------------------------------------------------------------------------


QUESTION: 8 A customer wants to deploy an IBM BladeCenter S with 7xHS21 Quad Core Intel Blades. The customer has two CFFv ethernet adapters and one CFFh Combination ethernet and fibre adapter per each blade. How can this be deployed?

A. This solution can be deployed only if the switch modules are the ones adapted to the I/O needs B. This solution can be deployed with the Nortel switch only C. The HS21 Quad Core are not supported with CFFv ethernet adapters D. You cannot deploy this solution onBladeCenter S Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=8 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 9 A business partner wants to identify risks, develop action plans to manage the risks and recommend resources required for a successful implementation of a BladeCentre solution to their customer. Which of the following addresses this situation?

A. Conduct aServerProven Opportunity Request of Evaluation (SPORE) B. Use the IBMServerProven Program C. Use IBM System X configuration and option guide (COG) D. Conduct a Technical Delivery Assessment (TDA) Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=9 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 10 A customer using IBM BladeCenter H wants redundant and separate management and production LANs. Which of the following is required to provide redundant connections to separate LANs within the BladeCenter?

A. Four Cisco systemsfibre intelligent gigabit ethernet switch modules B. Two Cisco systemsfibre intelligent gigabit ethernet switch modules and a BladeCenter gigabit SFF Ethernet card C. Two IBM Server connectivity modules anda ethernet expansion card CFFv D. Four BNT/ Nortel Layer 2-7GbE switch modules and a BladeCenter gigabit SFF ethernet expansion card Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=10 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 11 A customer is installing a Myrinet Cluster expansion card in an existing IBM LS21 Blade server. Which bay should the Optical Pass-thru module be placed?


A. 1 B. 2 C. 3 D. 4 Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=11 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 12 A prospect has an new Director of IT. They are reviewing all servers to reduce the number of operating systems in their IT operations. Which operating system is supported on an LS21 Blade?

A. Red Hat Enterprise Linux v.4 Update 4 (AS, ES, WS) B. Red Hat 9 C. Novell Netware 5.2 D. Microsoft Windows 2000 Professional Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=12 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 13 A customer has an HS21 blade with no local disk. They are attempting to set up boot from SAN using Windows 2003 CD. Which sequence is correct for this procedure?

A. Install Windows from the CD using theQlogic driver provided on the CD, configure the LUN and zone for the target server and then configure the Blades BIOS to boot from SAN. B. Configure the LUN and zone for the target server, install Windows from the CD and press F6 when prompted to supply the driver and then configure theQlogic adapter BIOS to boot from SAN C. Configure the LUN and zone for the target server, configure theQlogic adapter BIOS to boot from SAN, install Windows from the CD and then press F6 when prompted to supply the driver D. Configure the Blade BIOS to boot form SAN, configure the LUN and zone for the target server, and then install Windows from the CD using theQlogic driver provided on CD Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=13 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 14 A customer orders three IBM BladeCenter E chassis and thirty-four LS21 Blades. The customer want to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?


A. 6 B. 8 C. 10 D. 12 Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=14 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 15 A prospective customer is considering a BladeCenter S with six HS22 and one SAS Connectivity module. The data center manager asks how many ethernet switches are needed to connect all the blades ethernet ports to a network?

A. 3 B. 1 C. 2 D. 7 Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=15 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 16 A customer has a database application that is accessed by a large number of people through a web interface from multiple remote locations. Which of the following QUESTION NO:s will provide the information necessary to design the best performing storage solution?

A. How many web servers will be connected to the database? B. Will the database be run on a Windows solution? C. How many concurrent users will be accessing the database? D. What are the types of transactions run against the database? Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=16 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 17 QUESTION NO:s will provide the information necessary to design the best performing storage solution?

A. How many web servers will be connected to the database? B. Will the database be run on a Windows solution? C. How many concurrent users will be accessing the database? D. What are the types of transactions run against the database? Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=17 -------------------------------------------------------------------------------------------------------------------------------------


QUESTION: 18 How may BladeCenter HT chassis will fit in a standard 19" 42U rack?

A. 2 B. 3 C. 4 D. 6 Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=18 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 19 A client has the following network hardware: - Two separate Gb core switches - Two Cisco IGESM - Two HS21 Blades Which action on both Cisco IGESMs will define one or more upstream ports and one or more downstream ports?

A. configure the Quality of Service feature B. configure the Link State Tracking feature C. configure all the externalethernet ports to 1Gb/full D. configure all the externalethernet ports to 100Mb/full Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=19 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 20 A customer installs a BladeCenter into an existing 10/100 ethernet network. Due to cost considerations, the customers uses Copper Pass-thru modules. After installing this solutions, the customer finds that they have no network connectivity. Which of the following at is causing the problem?

A. Copper Pass-thru Modules only support 1000Mb line speeds B. Spanning Tree has been enabled on the Copper Pass-thru Module C. The customer does not have the latest firmware loaded on the Copper Pass-thru Module D. The customer is using LS21 Blades Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=20 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 21 Which tool is available for IBM BladeCenter that allows direct power monitoring by IBM Systems Director through the BladeCenter s Management Module?

A. PowerExecutive


B. PowerManager C. PowerPC D. PowerDirector Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=21 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 22 A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of ethernet ports is important to them. What is the maximum number of ethernet ports an HS22 blade server can support if the Blade does not have any expansion Blades attached?

A. 2 B. 4 C. 6 D. 8 Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=22 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 23 A customer has a firewall between their AMM and the remote console which is used to configure the chassis and blades. Due to security concerns, port 80 (HTTP) is being blocked, denying any HTTP access to the AMM. Which of the following would facilitate remote communication with the AMM using GUI interface?

A. Port 443 - SSL connection B. Port 8080 - HTTP C. Port 22 - SSH CLI D. Port 427 - SLP connection Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=23 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 24 A customer purchased an IBM BladeCenter with six blades running Microsoft Windows 2003 Server. With the additional open blade slots, they have requirement to automatically deploy images upon blade installation. Which action is required to implement this task?

A. Ensure Director Agent is installed on theBladeCenter Chassis. Then run BladeCenter configuration task on BladeCenter Chassis from IBM Systems Director Console B. Ensure ServerPlus Pack option has been installed and configured. Then run BladeCenter configuration task on BladeCenter Chassis from IBM Systems Director Console C. Ensure IBM Systems Director and RDM have been properly installed and


configured. Ensure that RDM images are created and available. Then runBladeCenter Deployment Wizard task on BladeCenter Chassis from IBM Systems Director and assign profiles to each of the slots D. RunBladeCenter Management task on the BladeCenter Chassis from IBM Systems Director Console. Then run BladeCenter Deployment Wizard task on BladeCenter Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=24 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 25 A customer has the following BladeCenter requirements: - Support direct fibre channel connections from the blades to an exisiting SAN switch - Support total of six RJ45 ethernet ports per module Which of the following module combinations will satisfy the customer s requirements?

A. BladeCenter with Optical Pass-thru Modules and Nortel Network Layer 2-7 GbE Switch Modules B. BladeCenter with Optical Pass-thru Modules and Nortel Network Layer L2/3 Copper GbE Switch Modules C. BladeCenter with Intelligent Copper Pass-thru Modules and Nortel Network Layer L2/3 Copper GbE Switch Modules D. BladeCenter with 2-port Fibre Channel Switch Modules and Nortel Network Layer 2-7 GbE Switch Modules Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=25 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 26 A customer has the following requirements for a new IBM BladeCenter E chassis: - Two quad-core 2-socket Intel blade servers configured as a Microsoft Cluster - Three 2-socket blades configured as Web servers with no SAN connectivity - Two single-core 1-socket blade servers configured as file servers connecting to the existing SAN storage. The customer wants to ensure there is no single point of failure in their LAN and SAN. Which of the following is the minimum configuration that satisfies the customer s requirement?

A. Two Cisco IGESMs, two Optical Pass-thru Modules, twoFibre Channel Expansion Cards B. Two Intelligent Copper Pass-thru Modules, twoQlogic 20-port Fibre Channel Switch Modules, nine Fibre Channel Expansion Cards C. Two Cisco IGESMs, oneQlogic 20-port SAN Switch Module, seven Fibre Channel Expansion Cards D. One Cisco IGESMs, twoQlogic 10-port SAN Switch Module, four Fibre Channel Expansion Cards Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=26 -------------------------------------------------------------------------------------------------------------------------------------


QUESTION: 27 A customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS21 XM blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel LV CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?

A. Two73gb 15K SAS HDD SFF B. One 73GB 10K SAS HDD SFF C. One 31GB solid state drive D. Two73gb 15K 3.5" HDD with SIO expansion Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=27 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 28 A customer has the following configuration: - One IBM BladeCenter H chasis with one Intelligent Copper Pass-thru Module - Eight HS22 single processor blades, single hard drive and base memory Which of the following can the customer do to provide power redundacy to the Intelligent Copper Pass-thru Module and the eight blades in the chassis?

A. Add an additional pair of 2000w power supply modules B. Add an additional pair of 2900w power supply modules C. Upgrade the pair power suppliers from 2000w to 2900w D. Move one power supply from power domain 1 to power domain 2 Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=28 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 29 A customer wants to add the following servers: - Two quad-core, AMD-based running VMware ESX Server - Two POWER based, running Linux The requirements are: - All servers require internal hard drivers to boot, and mirroring - All servers require access to the exisitng SAN storage with exisitng multi-switch Brocade fabric - The customer requires high availability to the SAN and LAN What satisfies the customer s requirements?

A. IBMBladeCenter S Chassis with one Brocade Entry SAN Switch Module, two LS22 blades, two JS22 blades, SAS drives, Fibre Channel expansion cards for all blades, two ethernet switch modules B. IBMBladeCenter E Chassis with one Brocade 20-port Enterprise FC Switch Module, two HS22 blades, two JS22 blades, SAS drives, Fibre Channel expansion cards for all blades, one ethernet switch module C. IBMBladeCenter H Chassis with two Brocade 20-port Enterprise FC Switch Modules, two LS22 blades, two JS22 blades, Fibre Channel expansion cards for all blades, SAS drives, two ethernet switch modules, two Storage I/O expansion blades D. IBMBladeCenter H Chassis with two Brocade 10-port Enterprise SAN Switch Modules, two HS22 blades, two JS22 blades, SCSI hard drives, SAS hard drives, Fibre


Channel expansion cards for all blades, two ethernet switch module Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=29 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 30 A customer has the following requirements for an IBM BladeCenter solution: - Four 4-socket Microsoft SQL server with two swap SAS drives - Two physical Mircrosoft Active Directory Servers - Twenty-two physical Citrix servers - Three physical Web servers - One physical Virtual Center Management server - Eight VMware ESX hosts What satisfies the customer s requirements?

A. four IBM BladeCenter S chassis, two Nortel Firbre modules, eight ethernet modules B. three IBM BladeCenter H chassis, four Qlogic Firbre modules, six ethernet modules C. three IBM BladeCenter E chassis, four Brocade Firbre Channel modules, eight ethernet modules D. four IBM BladeCenter H chassis, two Brocade Firbre Channel modules, eight ethernet modules Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=30 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 31 A customer has two ethernet Switch Modules installed in an IBM BladeCentre Enterprise chassis. The Modules were configured indentically. The ethernet module in bay 1 was accidentally reset to factory defaults. Which solution returns the module to the customerspecific configuration?

A. Back up the configuration fromethernet module in Bay 2 and restore it to the module in Bay1 using the switch CLI or Web interface B. Swap the modules, which will automaticallyresync the settings stored in the Advanced Management Module C. Back up the configuration fromethernet module in Bay 1 and restore it to the module in Bay1 using the Advanced Management Module D. Restore the configuration from NVRAM using the Switch Module Web interface Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=31 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 32 What is the correct procedure to update the BIOS on LS42 blades without using the AMM?

A. Insert theServerGuide CD, boot the LS42 blade and follow the prompts B. Boot the blade from the LS42 POST/BIOS flash diskette and follow the prompts C. Press F1 when the LS42 system is booting, select Update BIOS, insert the diskette into the diskette drive, and select OK


D. Use the Remote Supervisor Adaptervitual disk Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=32 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 33 A customer has the following equipment installed in their data center: - IBM BladeCenter H chassis - Two power supplies - Six LS21 blades - Two Nortel L2-7 GESMs The customer purchased a new LS22 7901 blade server and a BladeCenter Storage and I/O (SIO) Expansion blade with two 73GB SAS drives. The customer is now unable to load a supported network operating system to the LS22. What must be done so the operating system can be successfully loaded?

A. Add two additional power supplies B. Update the BIOS and firmware of the LS22 C. Use theServeRAID Manager to create the RAID array D. Use theServerGuide CD to instal the operating system Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=33 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 34 Which bays do the Multi-Switch Interconnect Module populate?

A. 3 and 4 B. 3, 4, 5 and 6 C. 7 and 9 D. 7, 8, 9 and 10 Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=34 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 35 A customer has installed HS21 8853 blades, running Red Hat Enterprise Linux3. The BMC Service processor of the blade needs to be updated to the latest firmware. The technician downloaded the BMC flash utility from the IBM support site. When the flash update script runs, an error message is received. Which of the following is the most likely cause of this error

A. The Linux flash utility does not support Red Hat Enterprise Linux 3 B. The BMC service processor can only be flashed from the Management Module C. The BMC service processor is not working properly and needs to be replaced D. The IPMI driver needs to be installed to use the Linux flash utility Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=35 -------------------------------------------------------------------------------------------------------------------------------------


QUESTION: 36 A customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required?

A. Replace the glass doors of the rack with perforated doors B. Install fans on thetope of the new rack to extract hot air out C. Call IBM Service to get the blowers in bothBladeCenters replaced D. Add more blowers to increase the cooling capabilities of theBaldeCenter Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=36 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 37 A customer has a BladeCenter chassis with a single AMM that is defective. The customer has backed up the AMM configuration using the Web interface and places a new AMM in the chassis. Upon restart, the new AMM still has the factory default settings. Why didn t the previous AMM configuration automatically load in the new AMM?

A. The customer backed up the AMM configuration to a file B. The customer backed up the AMM configuration to the chassis C. The new AMM was also defective D. The chassis was also defective Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=37 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 38 A customer wants to implement the following solutions in an enviroment requiring DC power, with seven HS22 blades and three LS42 blades with Multi-Processor Expansion Unit and Combo Form Factor horizontal card. What is the minimum amount of rack space needed

A. 10U B. 12U C. 18U D. 24U Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=38 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 39 A customer has a BladeCenter H fully populated with LS21 Blades, a single AMM, and four power modules. The BladeCenter has been running flawlessly for three months. One day an administrator discovers that they cannot view video on blades 9-12 either locally or remotely even though they still appear to be running. The video works on all of the other blades. Which of the following is the cause of the video problem?


A. A power module has failed and there is not enough power to see video on all blades B. A second AMM is required to view video on blades 9-14 C. A firmware update is required on the AMM D. MUX 3 on theBladeCenter backpane has failed Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=39 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 40 What is the correct method for updating the firmware for the Qlogic Intelligent Pass-thru Module using the command line?

A. Download the new firmware file from the IBM support Web site, transfer the file to the FC module using FTP, use Telnet to the FC switch to start the update B. Download the new firmware file from the IBM support Web site, use Telnet to the FC module to transfer the file using TFTP, start the update C. Download the new firmware file from the IBM support Web site, transfer the file to the FC module using SCP, use Telnet to the FC switch to start the update D. Download the new firmware file from the IBM support Web site, start the update and enter FC module IP address when prompted Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=40 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 41 A customer has an IBM BladeCenter H chassis with three LS41 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration: - Two Brocade 20-Port SAN Switch Modules Two Nortel Networks L2-7 GbESM - A redundant Advanced Management Module - A LS41 4-socket blade What is the minimum number of power supplies needed for this configuration to have full redundancy?

A. 1 B. 2 C. 3 D. 4 Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=41 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 42 In which phase should a TDA be performed?

A. BladeCenter deployment


B. Installation and configuration C. Problem determination/resolution D. Customer needs analysis and design Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=42 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 43 Which of the following steps does a customer use to upgrade the firmware on the AMM to the latest level?

A. Open a Web browser and log on to the AMM, in the navigation frame, click MM Firmware Update under MM control, click browse, select the .exe file, click Upgrade/Update button B. TFTP to the AMM, from the Main Menu, select Update, browse to the downloaded .exe file C. Telnet to AMM, from the Main Menu, select Update, browse to the downloaded .pkt file D. Open a Web browser and log on to the AMM, in the navigation frame, click MM Firmware Update under MM control, click browse, select the .pkt file, click Upgrade/Update button Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=43 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 44 An exisiting IBM BladeCenter is configured with one Cisco IGESM and 14 HS22 blades. A new application has been installed that is extremely sensitve to latency when communicating between the blades within the IBM BladeCenter chassis. Which of the following can be done to dramatically lower the latency?

A. Enable link aggregation on the existing Cisco IGESM uplinks B. Add another Cisco IGESM C. Add a Fiber Channel switch module and aFibre Channel Expansion card to each blade D. Add anInfiniBand switch module and a host channel adapter to each blade Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=44 -------------------------------------------------------------------------------------------------------------------------------------

QUESTION: 45 A client requires that alerts generated from an IBM BladeCenter chassis and blade server be forwarded to their help desk for action. They do not use SNMP or a systems management program. How is the AMM configured so the the alerts will reach the client s help desk?

A. Forward DMI alerts to the help desk


B. Send the alerts to the help desk using e-mail C. Forward the alertstot he IBM Systems Director Management Server D. Send the alerts to the client s AIM Answer: http://www.twpass.com/twpass.com/exam.aspx?ecode=000-085&qno=45 -------------------------------------------------------------------------------------------------------------------------------------


TwPass Certification Exam Features; -

TwPass offers over 2500 Certification exams for professionals. More than 98,800 Satisfied Customers Worldwide. Average 99.8% Success Rate. Over 120 Global Certification Vendors Covered. Services of Professional & Certified Experts available via support. Free 90 days updates to match real exam scenarios. Instant Download Access! No Setup required. Price as low as $19, which is 80% more cost effective than others. Verified answers researched by industry experts. Study Material updated on regular basis. Questions / Answers are downloadable in PDF format. Mobile Device Supported (Android, iPhone, iPod, iPad) No authorization code required to open exam. Portable anywhere. Guaranteed Success. Fast, helpful support 24x7.

View list of All Exams (AE); http://www.twpass.com/twpass.com/vendors.aspx

Download Any Certication Exam DEMO. http://www.twpass.com/twpass.com/vendors.aspx