10+ Years 12 Projects $1.0+ Billion
Our experience includes transforming communities through comprehensive renovations and innovative new facilities, utilizing CM at-Risk and Design-Build delivery methods
• Chatham County Schools
• Guilford County Schools
• Horry County Schools, SC
• Wake County Public School System
• Wayne County Public Schools
• Sampson County Schools












T. A. Loving Company is a leading construction company known for construction excellence and client advocacy.
T. A. Loving Company takes a proactive approach to preconstruction. Our teams commit to open communication and cooperative teamwork, which facilitates the solving of complex challenges during the preconstruction phase of projects.
Our in-house VDC department maximizes project value by ensuring efficiency and coordination in the design, which increases the accuracy of our estimates and efficiency in construction.
Our approach to HUB/MWBE is streamlined and thorough. Our trade partners find us easy to work with and our results are consistently above the established goal. Our ultimate goal is to help our trade partners gain experience and grow their companies.

We believe that the construction phase is all about execution. The plan, developed during preconstruction, is executed by our operations team, utilizing our best-in-class people, processes, and resources. T. A. Loving does not believe in a project turnover from preconstruction to operations. Instead, we provide a single point of contact involved in all project phases to ensure consistency throughout the life of the project.





Wake County Public School System, Raleigh, NC
Stough Magnet Elementary School is one of Wake County Public School System’s newest facilities providing 44 teaching spaces and a student capacity of 644. The school serves kindergarten through fifth grade, pre-K and students receiving adaptive curriculum. Built on a 14 acre-site, the 103,000 sq ft school also includes ample carpool and bus loading, covered pickup and play areas, a screened loading and service area, improved outdoor gathering spaces and play surfaces with unique play spaces for different age groups.
Stough was originally a renovation project. The owner decided to instead demolish the existing school, and construct a new, larger school that would accommodate more students. The school was constructed within ADA compliance and came in five days ahead of schedule.
DELIVERY METHOD
CM at-Risk
YEAR OF COMPLETION
2020
ARCHITECT
LS3P
SIZE OF PROJECT 103,000 SF



Wake County Public School System, Fuquay-Varina, NC
T. A. Loving Company constructed a new 136,000 SF elementary school located on the former Crooked Creek Golf Course in Fuquay-Varina. The site is shared between the elementary school and a newly completed community center. The school has 56 classrooms and a core capacity of 800 students serving students pre-K through fifth grade.
The design emphasizes an immersive learning scape where the building and site work in conjunction to establish an environment for active and engaged learning. The school nestles into the landscape on the southern portion of the site with the classroom wings aligned along the east-west axis and play fields to the south. The grade levels are organized into three bars that extend into the landscape, creating learning courtyards adjacent to the classrooms, in addition to outdoor play spaces.
DELIVERY METHOD
CM at-Risk
YEAR OF COMPLETION 2024
ARCHITECT
Little Diversified
SIZE OF PROJECT
136,000 SF

The Morrisville High School project is a major success for T. A. Loving and Wake County Public Schools. Initially planned as a combined Middle/High School, it transitioned mid-project into a dedicated High School to better meet educational needs. T. A. Loving collaborated with the design team and WCPSS to adjust the scope, maintain the original Fall 2025 completion date, and implement cost-saving measures. A delivery approach resembling Design-Build facilitated phased bidding, early procurement, and fast-tracked mobilization.
The high school will now include a 600-space parking deck, upgraded track & field facilities, and high school programming modifications to the interior. The 44-acre site required significant grading, earthwork, and five large retaining walls. A vertical commons links double-height spaces and the building’s design integrates technology labs and outdoor educational areas with the surrounding landscape.
DELIVERY METHOD
CM at-Risk
YEAR OF COMPLETION
2026
ARCHITECT
EVOKE Studio Architecture
SIZE OF PROJECT
300,000 SF
CM AT-RISK
Elementary School
Wake County Public School System
Raleigh, NC
YEAR OF COMPLETION 2020
SIZE 103,000 SF
DESIGN-BID-BUILD
Chatham County Schools
Pittsboro, NC
YEAR OF COMPLETION 2023
SIZE 38,000 SF
DESIGN-BUILD
Horry County Schools
Horry County, SC
YEAR OF COMPLETION 2017
SIZE 800,000 SF*
*project included the building of five schools