T. A. Loving K-12 Education

Page 1


» K-12 Education

K-12 EXPERIENCE

10+ Years 12 Projects

$532 Million

Our experience includes transforming communities through comprehensive renovations and innovative new facilities, utilizing CM at-Risk and Design-Build delivery methods.

K-12 Education

• Chatham County Schools

• Guilford County Schools

• Horry County Schools, SC

• Wake County Public School System

• Wayne County Public Schools

T. A. Loving Offices

p Staff photo at our Headquarters in Goldsboro, NC. We currently have 460 employees.
Fayetteville | Goldsboro | Greenville | Raleigh | Wilmington
James Wood Project Executive
John Witcher Preconstruction Director
Cara Greening VP Business Development

Construction

T. A. Loving Company believes that the construction phase is all about execution. The plan developed during preconstruction is executed by our operations team, utilizing our best-in-class people, processes, and resources. We do not believe in a project turnover from preconstruction to operations. Instead, we provide a single point of contact involved in all project phases to ensure consistency throughout the life of the project.

Pre-planning the project utilizing the model increases project safety and quality, while helping us avoid major schedule constraints.

3 BIM Modeling/Coordination with our Trade Partners

3 Quality Control/Quality Assurance, Utilizing a 3D Model

3 Shop Drawing Review and Coordination

3 Model Integration with other project tools, ie 3D Cameras, etc.

HUB

Minority Outreach and Participation is a priority for our firm. We strive to maximize participation and to engage proactively to help build capacity

3 Final As-built Documentation for HUB firms. We also believe it must begin at the highest levels of commitment and is demonstrated by action. Proactive Trade Partner outreach is an integral part of our preconstruction process.

3 Early Outreach Engagement

3 Preconstruction that supports:

• Reduced Barrier Packages

• First and Second Tier Collaboration

• Bonding Assistance and Quick Pay

K-12 Construction Processes

Preconstruction

It is through our commitment to cooperation, transparency, and open communication that our team will solve complex problems with the best solutions. Our goal is to understand and deliver on all project and owner goals, while creating an enjoyable construction experience for all.

3 Develop a Project Plan

3 Preconstruction -> Construction Schedule

3 3D Logistics Planning

3 2D and 3D Constructability Reviews

3 VDC 3 Milestone Estimates

3 Value Management

3 Outreach

3 Bid Packaging

VDC

Proactive approach to preconstruction

Through early involvement and coordination, we maximize value by ensuring efficiency and coordination in the design, which increases the accuracy of our estimates.

3 Model Review for Design Efficiencies to Maximize Programming

3 Design Drawing/Discipline Coordination

3 Assist with Conceptual Design/Modeling

3 3D Takeoffs -> More Accurate Estimates

3 Site Logistics Planning with 4D Scheduling

p Integrating 3D models for logistics planning

K-12 Project Spotlight

Morrisville High School

Wake County Public School System, Morrisville, NC

The Morrisville High School project is a major success for T. A. Loving and Wake County Public Schools. Initially planned as a combined Middle/High School, it transitioned mid-project into a dedicated High School to better meet educational needs. T. A. Loving collaborated with the design team and WCPSS to adjust the scope, maintain the original Fall 2025 completion date, and implement cost-saving measures. A delivery approach resembling Design-Build facilitated phased bidding, early procurement, and fast-tracked mobilization.

The high school will now include a 600-space parking deck, upgraded track & field facilities, and high school programming modifications to the interior. The 44-acre site required significant grading, earthwork, and five large retaining walls. A vertical commons links double-height spaces and the building’s design integrates technology labs and outdoor educational areas with the surrounding landscape.

DELIVERY METHOD

CM at-Risk

YEAR OF COMPLETION 2026

ARCHITECT

EVOKE Studio Architecture

SIZE OF PROJECT 299,332 SF

K-12 Project Spotlight

Hilltop Needmore Road Elementary School

Wake County Public Schools, Fuquay-Varina, NC

T. A. Loving Company constructed a new 136,000 SF elementary school located on the former Crooked Creek Golf Course in Fuquay-Varina. The site is shared between the elementary school and a newly completed community center. The school has 56 classrooms and a core capacity of 800 students serving students pre-K through fifth grade.

The design emphasizes an immersive learning scape where the building and site work in conjunction to establish an environment for active and engaged learning. The school nestles into the landscape on the southern portion of the site with the classroom wings aligned along the east-west axis and play fields to the south. The grade levels are organized into three bars that extend into the landscape, creating learning courtyards adjacent to the classrooms, in addition to outdoor play spaces.

DELIVERY METHOD

CM at-Risk

YEAR OF COMPLETION 2024

ARCHITECT

Little

SIZE OF PROJECT

136,000 SF

K-12 Experience Delivery Methods

CM AT-RISK

Stough Magnet

Elementary

School

Raleigh, NC

YEAR OF COMPLETION 2020

SIZE OF PROJECT 103,000 SF

DESIGN-BID-BUILD

Central Services Building

Chatham County Schools, Pittsboro, NC

YEAR OF COMPLETION 2023

SIZE OF PROJECT 38,000 SF

DESIGN-BUILD

Five ES/MS Schools

Horry County, SC

YEAR OF COMPLETION 2017

SIZE OF PROJECT ~800,000 SF*

* project included the building of 5 schools