Reeves Young Full Brochure

Page 1


SouthCarolina Georgia

Tennessee

Everything we do — from 30 feet below the ground to 30 floors above — is about people.

In our more than 70 years of being in business, we’ve had the opportunity to work closely with owners, developers, general contractors, and subcontractors to ensure that every project we complete is built by relationship first.

WORK SAFE. Home Safe.

SAFETY PROGRAM

Built from the ground up, our safety program provides guidance on every OSHA requirement, as well as industry best practices Our program protects our workforce and safeguards the public.

It includes responsibilities and accountability for the field laborer to the Project Executive and includes an advisement committee comprised of field and management members.

Safety on your jobsite and the safe interface of our project with the community is non-negotiable.

Our program has been very successful resulting in an EMR of .71. We have a full time Safety Director who administers the program at the corporate level and multiple Safety Managers who will audit your project on a regular basis for compliance. Our safety program ensures the Superintendent, Project Manager, Foreman, Subcontractors, and Field Technicians are trained for safety as it relates to your specific scope, communicate safe procedures, and monitor results on a daily basis.

Jobsite orientations and weekly jobsite safety meetings ensure safety information is communicated. The site will also have the appropriate safety signage to communicate with the public.

Our Safety Plan is customized for each project prior to mobilization. We have been successful at creating a Safety Culture on our projects by defining safety responsibility for each individual and making the safety of the project as a whole everyone ’ s responsibility. Everyone, employees, subcontractors, consultants that work on-site are required to complete Reeves Young’s safety orientation and comply with the program.

SAFETY PLANNING & IMPLEMENTATION

Safety is the first consideration given as we plan our work Hazards are identified and methods to address them are developed Project leadership ensures that the correct processes are in place to mitigate risk and that they are being executed throughout the duration of the project.

Zero injuries, zero accidents, and zero near misses is our goal. We strive every day to train, create awareness, record, and improve our safety performance so that our employees and clients are confident that our projects are safe.

Our Safety Program includes:

Safety orientation for all new hires, and everyone new to a jobsite regardless of employer

Weekly site-wide safety meetings

Training for our workforce

Verification of subcontractor safety training

Regular, documented safety audits

3rd party insurance inspections

Evaluation of our employees based on safety performance

Conducting pre-employment and random drug testing

Each week we will conduct a site safety meeting with the entire jobsite. Activities pending for the week, logistical changes, and a segment on task specific training will be included. This meeting is an opportunity to discuss with the field team any concerns you may have or any new processes for the jobsite.

Preconstruction Safety Meeting Agenda:

Introduction of Team Members

Review of Contractor’s Safety Experience

Review of Site-Specific Safety and Health Program

Review of Emergency Action Plan

Review of Authority Safety Requirements

Open Discussion

WBUILT BY

Passion People

Attheheartofourcompanyisa passiontomakeaprofound, positiveimpactonourcoworkers,clients,and community.Westriveto cultivateanenvironmentthat createssuccessfromtheinside out,bysupportingourteamso theycansupportourclients.

BUILT BY

Forourpeople,growthistheonly option.Weprideourselvesin hiringhigh-performing professionalswhothriveina teamenvironmentandmatching themwithpositionswherethey canexcel.Theresultofthis approachisfulfilledemployees whobringtheirbesttoour clients.

SELFPERFORMING

Ourabilitytoselfperformaddsa levelofreliabilityforourclients includingmitigatingownerrisk, expeditingprojectschedules,and addingvaluetotheiroverall project.

TRUSTED ADVISORS

Weutilizeourmorethan70yearsof projectexperiencetoofferyoua constructionpartneryoucantrustto adviseyouwithstraighttalk, transparency,andrespect.

OWNERSHIP MENTALITY

Weofferouremployeesthe opportunityforownershipin thecompanyensuringthat weareasinvestedinyour projectsasyouare.

DIVERSE PROJECTS

Wehavethedepthoftalentand resourcestoprovidediverse perspectivestohelpyoumeetyour uniqueprojectneeds,withthe flexibilityofapproachtopivotquickly whenthingschange.

B U I L T B Y R E L A T I O N S H I P

COMPANYINFORMATION

Form of Ownership

State of Residency/Incorporation

Number of Years in Business

Founded in LLC GA, TN, SC, FL 70+ 1952

OURHISTORY

Founded in 1952, Reeves Young is a fully integrated construction company made up of four business units: Water Resources, Heavy Civil, Commercial, and Industrial. Each group stands independent as their respective scopes of work are different, however each group ’ s ability to perform at a high level is bolstered by the experience and expertise of the other’s. Reeves Young’s approach to each project is “Built by Relationship” which means everything we build – from 30 ft below the ground to 30 floors above it – is about people. With a team of more than 600+ employees and offices in Atlanta, Nashville, and Greenville, Reeves Young is positioned to deliver a diversity of building services to clients throughout the Southeast

COMMERCIAL Overview

ReevesYoungistrustedbyprivateandpublicclientstodeliverhigh-profile, technicallychallengingprojectswithprecisionandexpertise.Withourmeticulous planning,scheduling,andexecution,ReevesYoungconsistentlytransformsvisions intoreality.Withoversevendecadesofexperience,theteamexcelsin collaboratingwithowners,architects,andengineerstoensurecostcertainty, scheduleefficiency,andexceptionaloutcomes.Whethercreatingplaceswhere peoplelive,work,andplayorenvironmentsforlearning,publicsafety,and communitygathering,ReevesYoungbringsauniquevaluetoeveryproject.

COMMERCIAL Markets

Arts&Entertainment

Community

FaithBased

ParkingStructures

Parks&Recreation

ProgramManagement

Government&Administration

HigherEducation

Hospitality

PublicSafety

SeniorLiving

Transit

Justice&Corrections

Multi-Family

Office&Interiors

CHASTAIN AMPHITHEATER

LOCATION

Atlanta,GA

CLIENT LiveNation

ReevesYoungwaschosenbyLiveNationandJLLtocompleteconstruction servicesfortheChastainParkAmphitheaterFacilityandrelatedsitework

ThisprojectincludedtherenovationoftheEastPlazaatChastain Amphitheater,includinganewplazawithlandscaping,aVIPdeck,andthree newstructures.Theexistingconcessionsandpublicrestroomswere replacedbyatwo-storyconcessions/commissarybuilding,publicwomen’s restroom,andpublicmen’srestroom.Additionally,twonewexterior elevatorsthatprovidedADAaccessfromAlexCooleyParkwaytotheplaza andADAaccessfromtheVIPdecktotheseatingbelowwerealsoinstalled.

3 STRUCTURES

72,630 SF

THE ROXY THEATRE

LOCATION

Atlanta,GA

CLIENT LiveNation

ReevesYoungcompletedpreconstructionandconstructionservicesfor thenew58,245SF,two-storystructuralsteel/masonryRoxyTheater entertainmentvenue Servicesalsoincludedtheinteriorbuildoutofthe spaceforLiveNationEntertainmentfeaturingafullstage,auditorium seating,concessionsarea,andhospitalityareaswithseatingandwaiting areas.

58,245 SF

3,600 SEATS

THE BATTERY: REGUS SPACES

LOCATION

Atlanta,GA

CLIENT

JonesLangLaSalle&RegusGroupNetwork

ReevesYoungprovidedpreconstructionandconstructionservicesforthis mixed-useprojectinalive-work-playcommunityadjacenttotheAtlanta BravesTruistPark Workcompletedincludedthe58,245SFtwo-story structuralsteelandmasonryRoxyTheatre,a97,000SFfour-story concretetilt-upcoreandshellofficebuildingincludinginteriorbuildout,and asix-level380-carprecastparkingdeck.

100 DAYSAHEADOF SCHEDULE

50,000 SF

ATLANTA BRAVES MANAGEMENT

LOCATION

Atlanta,GA

CLIENT

AtlantaBraves

Locatedintheloftofficebuildingintheentertainmentblockadjacenttothe exposedstructureofTruistPark(formerlySunTrustPark),thisspecialty projectfortheAtlantaBravesManagementTeamconsistedofa2,927SF interiorofficebuild-out Theofficewastailoredtoaccommodatesixoffices total,includingacustomCEOoffice,conferenceroom,andkitchenette. Theprojectalsoincludedanarchitecturalfeaturewall.

2,927

THE BATTERY: ORANGE DECK

LOCATION

Atlanta,GA

AccommodatingTruistParkpatronsaswellasthesurroundingbusinesses, thissix-story,140,000SFparkingdeckprovides393parkingspaces In additiontotheparkingdeck,ReevesYoungprovidedconstructionservices forthemixed-usedevelopment’sofficebuildingandperformancetheater inthesamearea.

393 SPACES

140,000

EVEN HOTEL COBB GALLERIA

LOCATION

Atlanta,GA

ReevesYoungwasselectedasConstructionManagerforthissix-story hotelfeaturing133rooms,1,500SFofflexiblemeetingspace,anonsite restaurant,anda1190SFathleticstudio Thehotelalsoincorporatedthe brand’sin-roomfitnesselementsandabalanceofhealth-consciousfood andbeverageoptionstohelpguestsmaintaintheirwellnesslifestylewhile travelingawayfromhome.

6 STORIES

133 ROOMS

HYATT PLACE CENTENNIAL OLYMPIC

LOCATION

Atlanta,GA

CLIENT

SongyHighroads&HyattHotels

ReevesYoungconstructedthis182,000SF175-roomHyattPlacehotel locatedintheheartofAtlanta This11-story,post-tensionhigh-rise includedanelevatedpool,afitnesscenter,alobbybar/foodservicespace, 2,500SFofmeetingspace,retail,and93parkingspaces ReevesYoung providedProgramManagement,ConstructionManagement,andHeavy Civilservicesonthisproject.Thisprojectwasconstructedontwoofthe busieststreetsinAtlanta,LuckieStreetandMariettaStreet.TheHotelis front-facingLuckieStreet,whilethetwo-storyretailspacefrontMarietta Street.TheReevesYoungteamutilizedSWSpanelizedEIFSskininorderto savetheownerandclientfiveweeksontheprojectedschedule.

11 STORIES

175 ROOMS

HYATT HOUSE NASHVILLE

LOCATION

Nashville,TN

CLIENT

SongyHighroads&HyattHotels

ReevesYoungservedastheProgramManagerandGeneralContractorfor this15-story,200-roomHyattHousehotelandparkinggaragein

Nashville’sMidtowndistrictjuststepsfromVanderbiltUniversityand Nashville’smedicalcorridor Thehotelreplacedthevacant29,980SF21st Plazaofficebuilding.Designedtoembracethesoundof“MusicCity”

ReevesYoungutilizedSWSpanelizedEIFSsystemstoprovideseven shadesofwhiteandgrayinan“equalizer”fashionofcolorchange.Ourteam self-performedallfoundationandconcretestructure,buildingskin,roof, andbuildingenvelopework.

15 STORIES

200 ROOMS

HYATT CENTRIC BUCKHEAD

LOCATION

Atlanta,GA

CLIENT

SongyHighroads&HyattHotels

ReevesYoungwaschosenastheConstructionManagerforthis15-story, 141,000SF,upscaleboutiquehotel ItsdesignembodiesBuckhead’sunique legacyandwasinspiredbyGeorgia’sancientpotteryheritage Itfeatures 218rooms,includingsevensuites,twodiningconcepts,andmorethan 3,700SFofmeetingandeventspaces.Locatedonthe15thfloor,the hotel’srooftoploungeiscalledSpacemanandfeaturesinventivecocktails andgreatviewsoftheBuckheadskyline.

15 STORIES

218 ROOMS

KIMPTON SYLVAN HOTEL

LOCATION

Atlanta,GA

CLIENT PortmanHoldings

ReevesYoungperformedasConstructionMangerfortherenovationand transformationofa1950’sresidentialcondominiumbuildingintoasleek, modernhotelforKimptonHotels LocatedinAtlanta’slivelyBuckheadarea, theeight-storyhotelfeatures216rooms,arooftoplounge,outdoorbeer garden,groundlevelbar,andaresortstylepool.Specialattentiontosafety, noiseminimization,andcoordinatedconstructiontrafficlogisticswerepaid tothesiteduetothenumerousresidencesandbusinessesthatsurrounded theproperty.

216 ROOMS

143,242 SF

NATCHEZ TRACE STATE PARK INN

LOCATION

Wildersville,TN

CLIENT

StateofTennessee

Thisprojectincludesdemolishingtheexistinginnandconstructinganew, three-story,40,000SFinn Thenewinnwillincludealobby,48guestrooms withinteriorcorridoraccessandexteriorbalconies,restaurant/diningroom withbar,3,000SFbanquetroomdivisibleintofourcompartments,a20 personboardroom,commercialkitchen,laundry,lounge/recreationroom, infinityedgeswimmingpool,administrativeoffices,supportspaces, infrastructurerelatedtolakeaccess,parking,andsidewalks.Thesitewill alsohaveaplaygroundandanewtwo-laneboatrampwithadock.

48 ROOMS

40,000

SF

CORSO SENIOR LIVING

LOCATION

Atlanta,GA

CLIENT

CorsoAtlanta

This465,000SFindependentliving,assistedliving,andmemorycarefacility wasinspiredbygothicFrencharchitecture Featuringsixbuildings,the projectincluded212luxuryapartmentunitsoverasharedtwo-level undergroundparkinggarage Theproperty’sextensiveamenitiesincludea flowershop,salon,bistro,dininghall,elevatedpatio,twocourtyards, outdoorswimmingpool,theater,library,fitnesscenter,andmassage studio.Thecommercial-gradekitchenalsoincludesahigh-endappliance packageincludingSubzero,Wolff,andBoschappliancesthroughout.

2 LEVELUNDERGROUND PARKING

212 LUXURY APARTMENTS

TOWN LAUREL CROSSING

LOCATION

Buford,GA

CLIENT RelatedGroupDevelopment,LLC

ReevesYoungwasselectedasthebuilderforthisgarden-styleapartment developmentlocatedinBuford,GeorgianeartheMallofGeorgia’sbusy retailandentertainmentdistrict The360-unitdevelopmentincludesnine three-story,4|3splitapartmentbuildings,fivetwo-storycarriagehouses, 24privategarages,andinanindependentclubhousewithamenities, landscape,hardscape,andpool.

24 PRIVATEGARAGES

360 UNITS

THE HOWELL

ReevesYoungwaschosentobuildthis243,000SFmulti-family/mixeduse projectfeaturing210unitsovertwostoriesofparking Theprojectwill featureone-bedroomthroughthree-bedroomspaces,aswellasroughly 2,000SFofcoworkingspaceandabout3,700SFofretailandfoodand beveragespace.Theprojectwill362parkingspacesand52bicyclespaces.

243,000

210 UNITS

TOWN KENNESAW

LOCATION

Kennesaw,GA

CLIENT RelatedGroupDevelopment,LLC

This545,000SF,wood-framedmultifamilyresidentialprojectconsists three-storygardenapartments,4|3gardensplitsandthree-storytown homesforatotalof395units Exteriordesignfeaturesincludebrick,stone, andpaintedsidingwithpicketedbalconyrails Interiordesignfinishes includeLVPflooring,stainlesssteelappliances,paintedceilingsandwalls, paintedwoodcabinets,andquartzcountertops.

545,000 SF

395 UNITS

VILLAGE PARK ALPHARETTA

LOCATION

Alpharetta,GA

CLIENT VillageParkSeniorLiving

ReevesYoungservedasthecontractorforthis95,000SFfour-story projectcontaining63unitsofI-1cInstitutionalOccupancy Thebuildingis constructedofaload-bearingsteelframewithmetalstudinfill Exterior wallsareprimarilybrickveneerswithEIFSaccents Interiorwallsandfloor constructionareratedgypsumboardassemblies.Thebuildingalso containsthenecessarymechanical,electrical,plumbing,andfireprotection systems.

63 UNITS

95,000 SF

VILLAGE PARK MILTON

LOCATION

Alpharetta,GA

ReevesYoungconstructedthis157,401SF117-unitseniorlivingfacilityon sevenacresinAlpharetta,Georgia Thebuilding,whichincludedthree-, four-,andfive-storysections,requiredtheuseofpost-tensionconcrete, residentialMEPSsystems,installationofthreeelevators,ClassBfinishes forfireprotection,andtheuseofatowercrane.

7 ACRES

157,401 SF

SOARING HEIGHTS

SoaringHeightsisadevelopmentprojectthatincludestheconstructionof threeapartmentbuildings,totaling20residentialunits Inadditiontothe apartmentbuildings,acommunityclubhousewasestablishedtoenhance thelivingexperienceforresidents Theprojectalsoencompasses associatedsitework,utilities,asphaltandconcretepaving,andlandscaping, alldesignedtocreateawelcomingandfunctionalenvironmentforthe community.

20

4

FREE CHAPEL

LOCATION

Gainesville,GA

CLIENT FreeChapel

ReevesYoungbuiltthis157,000SFworshipfacilityona154-acresite The modernexteriorismasonrywithEIFSaccentswithafour-storytowerthat featuresa25'diameterroundornamentalmetalstructureatop Spanning thefrontofthebuildingare10curtainwallwindowunitsthatbringthe outdoorsintothetwo-storylobby.Thelobbyfeaturesporcelaintilefloors, aloungearea,andasecond-floorbalconywithglassrailingtocontinuethe flowofnaturallight.Thefacilityaccommodatesa3,500-seatconcerthallstylesanctuarywithastagearea,largeprojectionscreens,theater-style lighting,andstate-of-the-artaudio-visualproductioncapabilities.The children’sministryareaconsistsofa400-seatchildren’sworshiptheater with24classrooms,anindoorplayground,pre-schoolchapel,andlarge activityroom.Thelowerlevelincludesanorchestrarehearsalroom,sound studio,videoeditingroom,videostudio,choirrehearsalroom,several storagerooms,andoffices

3,500 SEATSANCTUARY

157,000 SF

FIRST BAPTIST CHURCH OF CONYERS

LOCATION

Conyers,GA

CLIENT

FirstBaptistChurchofConyers

ReevesYoungcompletedthenewconstructionofthis1,200seatsanctuary withlightingandsoundsystems,choirareaandbalcony Thestainedglass windowsandsteeplearefromtheoriginalhistoricchurchandwerecarefully removedandplacedintothenewbuildingtopreservethechurch’slong history.Theprojectalsoincludesafullservicekitchenand750seatdining area.

1,200 SEATSANCTUARY

160,000

FIRST BAPTIST CHURCH OF WINDER

LOCATION

Winder,GA

CLIENT

FirstBaptistChurchofWinder

ReevesYoungprovidedconstructionservicesforthisnewworshipspace includingsanctuary,educationalspaceandfellowshiphall Construction includedafullservicekitchenand450seatdiningarea

450 SEATDININGHALL

62,000 SF

CITY OF CHAMBLEE CITY HALL

LOCATION

Chamblee,GA

CLIENT

CityofChamblee

ReevesYoungprovidedConstructionManageratRiskservicesonthenew 29,769SFCityHall,thesecondbuildingconstructedfortheCityof Chamblee Thebuildingservesasthecenterpieceforthecity’sdeveloping downtownmasterplanandhousesofficespacefortheCityManager,City Clerk,Council,andanumberofthecitydepartments,CouncilChambersto accommodate186,29offices,conferencerooms,acommunityroomto accommodate247persons,outdoorbalconiesandmultipurposespacesfor publicandprivateuse.ReevesYoungHeavyCivilself-performedsitework, includingdemolition,clearing,excavation,earthwork,water,sanitation,and stormutilities.

26,769

CITY OF CONYERS CITY HALL

LOCATION

Conyers,GA

CLIENT

CityofConyers

ReevesYoungprovidedfullpreconstructionandconstructionservicesfor this28,000SF,two-story,municipalbuildingtohousepublicmeeting rooms,spaceforcitydepartmentsincludingPlanningandInspections, Administration,Finance,HumanResources,CodeEnforcement,Conyers SecurityAlert,PublicRelationsandTourism,Technology,CityClerk’s Office,Mayor’sOffice,andtheCityManager’sOffice.Theprojectincludes anundergroundparkinggarage.

2 STORIES

38,000 SF

SANDY SPRINGS FIRE STATION NO.2

LOCATION

SandySprings,GA

CLIENT

CityofSandySprings

Thisprojectconsistedofanew2-story,21,143SF,three-bayfirestation

Thebuildingincludesseveralnewfeaturesfocusedonsafetyand firefighter’shealth A1,000SFgymnasiumonthesecondfloorhelpskeep firefightersinshape AdecontaminationareawithaseparateHVACand airlocksystemallowsfirefighterstochangeoutofandcleandirtyturnout gear.Aninfraredsaunawasinstalledtohelpwiththefirefighters’ detoxificationprocess.Thefacilityincludesatrainingstairwaywitha rappellingwall,tunnelrescuetraining,andaconfinedspacesimulator, providingfirefighterswithcriticaltrainingin-house.Italsoincludesapublic lobby,decontaminationshower,gearwasharea,gearstorage,equipment storage,livingareas,kitchenanddining,conference/communityroom, offices,storageroomwithadjacentsupportareas,sleepingquarters, restrooms,andotherassociatedspaces

21,143

1,000

GWINNETT COUNTY FIRE STATION NO.

LOCATION

Suwanee,GA

CLIENT

GwinnettCounty

ReevesYoungservedasConstructionManageratRiskprovidingfull preconstructionandconstructionservicesforthissinglestoryfirestation housingafireengine,ambulance,andfivefirefightersandparamedicseach day Theprojectfeaturesthreedrive-throughapparatus bays,gearand equipmentroom,mudroom,industrialgradekitchen,individualbunkroom cubicles,separateshowerfacilities,BattalionCommandersuite,fitness room,dayroom,diningroom,administrativeofficespaceandothersupport areas.Thestationcanaccommodateupto11personnelatatime.Itwas constructedtomeetEarthCraftLightCommercialgreenbuilding standards.

21,143

1,000

CARTERSVILLE PUBLIC SAFETY

LOCATION

Cartersville,GA

CLIENT

BartowCounty

This55,000SFpublicsafetycomplexincludesfireandpoliceadministration offices,evidencestorage,booking,policedispatch,fitnesscenter,locker room,andvehiclebay ThepublicsafetycomplexalsoincludesCartersville FireStationNo 4withthreedrive-throughbays,dayroom,andsleeping quartersfor15.Thebuildingwasdesignedtoprovideaback-uplocationfor theemergencyoperationscenterwithatrainingroom,watchroom,and redundantpowersupply.ThenewfacilitywasconstructedtobeLEED Certified,utilizingsustainablesitedesign,waterandenergyefficiency,and byrecyclingover95%oftheconstructionwaste.

95% RECYCLED CONSTRUCTIONWASTE

55,000

CHAMBLEE PUBLIC SAFETY HEADQUARTERS

LOCATION

Chamblee,GA

CLIENT CityofChamblee

ReevesYoungservedasConstructionManageratRiskforthenew constructionoftheirtwo-storypublicsafetybuildingwhichhousesthe ChambleePoliceDepartmentincludingK-9units,MunicipalCourt operations,apubliclyaccessiblecommunityroom,K-9holdingkennels, sallyport,intakeandholdingareas,specimencollectionlabs,andoffice suites Thesitealsofeaturesa17-acrepublicparkwithadogrecreation area

17

48,516

DEKALB COUNTY PUBLIC SAFETY HEADQUARTERS

LOCATION

Decatur,GA

CLIENT

DekalbCounty

ThisprojectfortheDeKalbCountyPublicSafetyDepartmentinvolvedthe interiorrenovationoftwofive-storybuildingstotaling250,000SF.Both buildingswerecompletelyrenovatedincludingfinishes,mechanical systems,andstructuralelementstoaccommodatethenewheadquarters forthecountypoliceandfiredepartmentsaswellasthecounty911Center thethirdlargestinthecountrybehindLosAngelesandMiami Thepolice headquartershousestheDeKalbPoliceprecinct,holdingcells,crimescene investigationunit,investigatoroffices,chiefofpoliceoffice,conference rooms,andtrainingrooms Thesophisticated20,000SF911Center includes42callstations,threesupervisorstations,anemergency managementagencyroom,ITstorageandrepair,serverroom,anda trainingarea.Allareaswerebuiltutilizingthelatestincommunicationsand technology.

3RD LARGESTFACILITY INTHECOUNTRY

250,000

GWINNETT-SNELLVILLE LIBRARY AND BUSINESS CENTER

LOCATION

Snellville,GA

CLIENT CityofSnellville

ReevesYoungwasawardedthis22,000SF,two-storybuildingwhichwill housealibraryonthefirstfloorwithadult,teenandchildren’sareas,20 computerworkstations,andamultipurposeroom.Thesecondfloorwillbe operatedbythecityforco-workingspace,collegeclassesandotherpublic oreducationaluses

22,000 SF

20 COMPUTER WORKSTATIONS

JIM R. MILLER EXHIBIT HALL

LOCATION

Marietta,GA

CLIENT

CobbCountyParks&Recreation

ReevesYoungwaschosenbyCobbCountytocompleteconstruction servicesfortheJimRMillerExhibitHallandrelatedsitework Thisproject includeddemolitionoftheexistingA&Bexhibithallsandreplacementwith anewexhibithall Thenewexhibithallincludedalargeopenexhibitarea withmovablepartitionstoallowthespacetobedividedforsmaller activities,officespaceforparkstaff,staffrestroomsincludingashower, officeforeventstaff,aconferenceroomsharedbetweenparkstaffand eventstaff,aconcessionareawithexhausthoodandservingwindowsto allowconcessionstobepurchasedinsideandoutsidethebuilding,public restroomsincludingfamilychangingareas,andmaintenance/storageareas.

41,000 SF

25,000 SFOFEVENT SPACE

GGC STUDENT CENTER

LOCATION

Lawrenceville,GA

CLIENT

GeorgiaGwinnettCollege

ReevesYoungwasselectedasConstructionManagerforthisnew79,000 SF,LEEDSilverfacility TheprojectincludedanE-SportsGamingRoom, departmentalareasforStudentAffairsandStudentLife,acampus bookstore,studyandloungeareas,FoodServices,dininghallwithservery, meetingrooms,multi-purposeballroom,andlecturehallwithauditorium seating.

3 STORIES

79,000 SF

EMORY UNIVERSITY CLIFTON TOWER

STUDENT HOUSING

LOCATION

Atlanta,GA

CLIENT EmoryUniversity

ReevesYoungwasselectedtorenovatethisformerHowardJohnsonhotel builtin1972,andconvertitintointoCliftonTowerresidencehall.Uponthe hotel’sclosurein2014,thefive-storyfacilityhadneverhadamajorupgrade untilitwasrenovatedbyReevesYoungin2019 Thepurposeofthe renovationprojectwastoincreasetheoccupancycapacityandensurethat thefacilitymetbuildingcodes Thisfast-trackprojectblendedthebest featuresofresidencehallandapartment-stylelivingandprovided140beds andamenitiessuchasstudyrooms,laundryfacilities,andacommon kitchen Exteriorrenovationsincludednewwindows,exteriorpaint,and rebuildingtheSouthElevationutilizingapanelizedEIFSwallsystemwith energyefficientwindows

5 STORIES 140 BEDS

GGC DANIEL J. KAUFMAN LIBRARY

LOCATION

Lawrenceville,GA

CLIENT

GeorgiaGwinnettCollege

ReevesYoungwaschosenasConstructionManagerforthis90,000SF, LEEDGold,modernfacilitywhichhousesspacesforbothcollaborationand individualcontemplativespace Thisfacilitycontainsbothtraditional researchandtechnicalserviceswhilealsoprovidingthelatestincomputer technologyandassociatedtechnologysupportservices.Itincludesathreestoryatriumwithcurtainwallglass,café,groupstudyrooms,classrooms, researchcommons,facultyoffices,tutoringsuite,instructionallabs,faculty workrooms,lecturehallwithpre-functionarea,conferencerooms,quiet readingareas,andthecapacitytoaccommodateover300,000volumesof material.

3 STORIES

90,000 SF

MARTHA T. NESBITT ACADEMIC

BUILDING

LOCATION

Gainesville,GA

CLIENT UniversityofNorthGeorgia

ReevesYoungperformedConstructionManagementservicesforthis 130,000SF,five-storyandfour-storytwintowerwithafive-storycurtain wallglassconnectingatrium.Thefacilityincludesclassrooms,tieredlecture halls,computerlabs,offices,conferencerooms,multi-purposeroomwith moveablepartitions,studyrooms,72seatclassroom,foreignlanguagelab, medialab,soundstagewithstudio,soundrecordingroom,facultylounges, AVcontrolroom,workroom,andlargeatrium Thenewfacilityisaconcrete structurewithstructuralsteel Theexteriorfeaturesbrick,curtainwallglass andnaturalstone TheprojectalsoreceivedaProjectAchievementAward fromtheConstructionManagementAssociationofAmerica(CMAA)

5 STORIES

130,000 SF

ACADEMIC BUILDING NORTH

FULTON CAMPUS

LOCATION

Alpharetta,GA

CLIENT

GwinnettTechnicalCollege

ReevesYoungwasselectedasConstructionManagerforthisnew93,210 SFacademicbuildingona25-acregreenfieldsite.Theprojectfeaturesa three-storyeducationalbuildingthathousestheHealth&Life Science/ComputerScience/Business/Education/CriminalJusticeand Math/Englishdepartments Specialtylearningspaceswereincludedfor anatomy/dissectionlabs,patientcareandearlychildhoodlabs,general classrooms,andTEALclassrooms,alsoincludedarethreelecturehalls, bookstore,andadministrativeoffices

25 ACRES

93,210

NORTH GEORGIA TECHNICAL COLLEGE

INDUSTRIAL TECHNOLOGY CENTER

LOCATION

Clarkesville,GA

CLIENT

NorthGeorgiaTechnicalCollege

ReevesYoungwasselectedasConstructionManageratRiskforthisnew 45,872SFIndustrialTechnologyCenterforNorthGeorgiaTechnical College. ThefacilityhousesspacefortheHeatingandAirConditioning Program,CNC/MachineToolProgramaswellaseconomicdevelopment, continuingeducation,existingbusinessandindustrytraining,acatering kitchen,andaneventcenterconferenceroomthatseatsapproximately 240peoplebanquetstyle

240

SEATCONFERENCE ROOM

45,872

SF

GEORGIA INSTITUTE OF TECHNOLOGY INSTRUCTIONAL SPACE RENOVATION

LOCATION

Atlanta,GA

CLIENT

GeorgiaInstituteofTechnology

ReevesYoungcompletedthis32,460SFrenovationoftheInstructional SupportCenterincluding17classrooms,publicspaces,andrestrooms,as wellasaccessibilityupgrades.TherenovationincorporatednewAV technology,MEPsystems,furnishings,andfinishes Theinstructional centerservestheCollegeofArchitecture,Computing,Engineering,Liberal Arts,andSciences Renovationsallowedformultiplenewapproachesto teachingbyofferingflexible,informalmeetingsandteachingspaces Constructionwasstagedovertwosummerbreakswithtwomobilizations toaccommodateschoolactivitiesandminimizedisruptions

17 CLASSROOMS

32,460

WESTERN KENTUCKY UNIVERSITY

PRESSBOX AND FIELD HOUSE

LOCATION

BowlingGreen,KY

CLIENT

WesternKentuckyUniversity

Reeves Young provided construction management services on the 15,335 SF renovation and expansion of the WKU home side Press Box This project included the complete removal of the existing Club Lounge level, the installation of new structural support steel 60 feet in the air through a rear observation balcony, and hoisting it into place This allowed the previously unused interstitial mechanical mezzanine to be converted into a 5th floor plate for media, coaches, and the University President’s private gamewatching suite. The new press level features fully conditioned spaces, accessibility through two extended staircases and an elevator, new restrooms, a fire alarm, fire sprinklers, and modern technology for game reporting. Upon completion of the structural in-fill, the Club Lounge level was restored to its finished state.

15,300

5TH

GEORGIA INSTITUTE OF TECHNOLOGY INSTRUCTIONAL SPACE RENOVATION

LOCATION

Atlanta,GA

CLIENT

GeorgiaInstituteofTechnology

ThisprojectwaspartofGeorgiaInstituteofTechnology’son-goingeffort toimprovetheteachingandlearningenvironmentsintheirwell-utilized instructionalspaces.Itincludedtherenovationofa4,500SFauditoriumon thefirstflooroftheInstructionalCenter Seatingwasreplacedand reconfiguredtomeetcurrentcodesandtheentrancewasremodeledto increasecapacityfrom280to300seats Mechanicalsystemsandlighting werealsoreplaced,andfiresuppressionsystemswereextendedintothe auditorium

300 SEATS

4,500 SFAUDITORIUM

HABERSHAM COUNTY JUDICIAL

LOCATION

Clarkesville,GA CLIENT

ReevesYoungservedasConstructionManageratRiskforthenew constructionofthis72,000SFfour-storycountyjudicialfacility.Thenew buildingconsolidatedthecountyjudicialfunctionsincludingtheJuvenile Court,ProbateCourt,andSuperiorCourt Thenewfacilityalsoincludedthe solicitor’soffice,asallyport,holdingcells,clerkofcourt’soffice,judge’s chambers,juryassemblyroom,districtattorney’soffice,conference rooms,prosecutor’soffice,andadministrativeoffices

13 ACRES

75,000 SF

DEKALB COUNTY ANIMAL SHELTER

LOCATION

Decatur,GA

CLIENT

DekalbCounty

Thisnewstate-of-theartanimalshelterwithanemphasisonadoption servicesfeaturedanactiveadoptioncenterwithviewingareas,336kennels withprotectivehousing,surgerywing,outdoorexercisearea,operations areasformaintainingandfeedinganimals,privateofficespaces,two parkinglots,sidewalksandstreetpaving.TheprojectrequiredStateof Georgiaspecifiedairqualitycontrolsfortemperature,humidity,andair exchangesaswellascoordinationwiththeFAAtominimizedisruptionsto nearbyPeachtree-Dekalbairport.Servicesalsoincludederosionand sedimentcontrol,grading,bio-retentionarea,andstormwaterpond.

336 KENNELS

33,440

SF

BEACON MUNICIPAL COMPLEX

LOCATION

Decatur,GA

CLIENT

CityofDecatur

TheBeaconMunicipalCourtComplexisanadaptivere-useandnew constructionofahistoricthree-buildingcitymunicipalcomplex The project,totaling84,377SF,includedapoliceandmunicipalcourtfacility withcourtroom,holdingcellsand911communications,anactiveliving buildingwithclassrooms,agymnasium,andaCityofDecaturSchools AdministrationBuilding.TheLEEDSilverprojectalsoincludedthe constructionofaplazatoconnectthethreebuildings.Threeadditional projectscopeswereaddedmid-project:re-routingamajorarteryofthe city’sactivestormsewer,buildingatwoandone-halfacrewaterretention vaultbelowasoccerfieldtomanagesiteflooding,andexpandingand renovatinganadjoiningcommunitypool.

2.5 ACREWATER RETENTIONVAULT

84,377 SFBUILDINGSIZE

LAWRENCEVILLE PUBLIC WORKS

LOCATION

Lawrenceville,GA

CLIENT

CityofLawrenceville

ReevesYoungperformedasConstructionManageratRiskforthisnew PublicWorkscampus Thecampushousesthecity’sPublicWorks departmentsincludingGas,Electric,DamagePrevention,FleetGarage,and Streets&Sanitation Thenewcampus,locatedon24 5acresofcity-owned property,includedadministrativeofficespace,enclosedvehiclebays,parts storageandshopareas,coveredvehicleparking,equipmentandlargeparts storageareas,andequipment/materiallaydownareas.

24.5 ACRES

70,000 SF

GWINNETT

JUSTICE & ADMINISTRATION CENTER

This1,500space,pre-cast,multi-levelparkinggarageconnectstothe existingbuildingbyanewpedestrianbridgesandelevatedplaza.Locatedin closeproximitytotheexistingGwinnettCountyCourthouse,allpedestrian accesshadtoremainopenandmaintainedthroughoutconstruction

5 STORIES

1,500 PARKINGSPACES

GWCC ORANGE DECK

LOCATION

Atlanta,GA

Thisprojectprovided576additionalspacestothecomprehensiveparking structurethatservicestheGeorgiaWorldCongressCenter,Mercedes BenzStadium,StateFarmArena,andsurroundingareasadjacenttotheRed Deck,SilverDeck,andHomeDepotBackyardintheheartofAtlanta

CENTENNIAL OLYMPIC PARK

LOCATION

Atlanta,GA

CLIENT CityofAtlanta

ReevesYoungwaschosenbytheGeorgiaWorldCongressCenter AuthoritytoprovideConstructionManagementatRiskservicesforthe CentennialOlympicParkrenovations Therenovationsandimprovements weredesignedtoincreasecommunityaccess,strengthenitsOlympic heritage,enhancethevisitorexperience,andexpandprogramming opportunities.

2 STORYMULTI-USE EVENTFACILITY

22 ACRES

HEAVY CIVIL Overview

ReevesYoungHeavyCivilhasbeendiggingdeepforclientsformorethan70 years.Since1952,wehaveprovidedturnkeysitedevelopmentandutility infrastructureservicesonhigh-profiletechnicalprojectsthathavesupported stateandlocalmunicipalities,owners,developers,andgeneralcontractors throughouttheSoutheast Withourfleetof200+piecesofheavyequipmentanda dynamicteamofoperators—manywhohavebeenwithus20yearsormore— wehavethecapabilityandexperiencetostartyourprojectonastrongfoundation.

HEAVY CIVIL Markets

Blasting

DataCenters

Dewatering

MassGrading

Parks&Trails

SpeculativeWarehouse

Shoring

Transportation

TurnkeySiteDevelopment

UtilityInfrastructure

NORFOLK SOUTHERN

LOCATION

Atlanta,GA

CLIENT

HolderConstruction

ReevesYoungprovidedturnkeysitedevelopmentservicesincluding erosion,dewatering,shoring,excavation,grading,stormwater,water,and sewerinfrastructureforNorfolkSouthern’snewcorporateheadquarters Thetwo-towerprojectincludesapproximately856,000SFofofficespace anda14,000SFchildcarecenterwitha3,600SFoutdoorplayarea.Three levelsofbelowgradeparkingwerealsorequiredfortheprojectandentail 77,100SFofshoring,159,270CYofsoilexcavation,including29,000CYof impactedsoils,atemporarydewateringsystemwithover100wells,anda permanentunderdrainsystem.

100

WELLDEWATERING SYSTEM

29,000 CYOFIMPACTED SOILS

STATE FARM PHASE II

LOCATION

Dunwoody,GA

CLIENT

HolderConstruction

ReevesYoungprovidedheavycivilservicesinsupportoftheconstruction ofStateFarm’snewheadquarters Theprojectincluded165,000CYofdirt hauledoffand170,000CYofrockblastingwithhauloffandutility installationfora40’deep,100,000SFfootprintforafour-story undergroundparkingdeck.Servicesprovidedalsoinvolvedearthwork, shoring,dewatering,utilities,concreteprecastculverts,MSEwalls,asphalt paving,andsignalization.InstallationoftwoofGA’slargestpre-cast culvertstobuildanewroadway.Utilityworkincluded400LFof24”sewer line,jackandboresewerlineunderasix-laneparkway,stormdrainage,and waterlines.

165,000 CYOFDIRT

170,000 CYOFROCK

MERCEDES-BENZ STADIUM

LOCATION

Atlanta,GA

CLIENT HHRM,JV

ReevesYoungwasawardedmultipleworkscopesforthishighlytechnical projectfortheHolder,Hunt,Russell,Moodyjointventureinchargeof buildingMercedes-BenzStadium Theprojectincludedgradingthe40-acre site,whichrequiredremoving200,000CYofsoil,equaling100dumptrucks aday.Italsorequiredcreatinginternalaccessroads;placementof294,000 SFofsoilcementformultiplecranepads;demolitionoftheexisting roadwaybridgeandretainingwall;installationofwater,sewerandutility lines;andinstallationofsitework,utilities,andtrafficsignalstosupportthe newentranceroad.

200,000 CYOFSOILREMOVED

294,000

HOME DEPOT BACKYARD

LOCATION

Atlanta,GA

CLIENT

HolderConstruction

ReevesYoungperformedturnkeysitedevelopmentservicesforTheHome DepotBackyardproject,aredevelopmentofthe13-acregreenspaceon thesiteoftheformerGeorgiaDomeandwhatisnowMercedes-Benz Stadium Theuniqueprojectisbeingusedforgame-dayparking,events, andentertainment.Theprojectincludedmassgradingandinstallationof6″ ofwater,8″ofsewer,andupto42″ofstormdrainutilitylines.ReevesYoung alsoperformedasPrimeContractorfortheinstallationofa268,000CF undergroundcast-in-placestormwaterdetentionvault.

13 ACRES

268,000

CFCASTINPLACE UNDERGROUND STORMWATERVAULT

CITY OF ATLANTA WATER SUPPLY

BELLWOOD QUARRY

LOCATION

Atlanta,GA

CLIENT

CityofAtlanta

ThisprojectatBellwoodQuarryfortheCityofAtlantaWaterSupplyfeature turnkeyheavycivilservicesthatincludeda3,800SFpermanentsoilnailwall, 3,500SFofmodularblockwalls,4816”diameteraugercastpilesvaryingin lengthfrom29’–38’,andsitegrading Utilityinfrastructureincluded1,300 LFof36”ductileironpipe,3,000LFof8”andbelowwaterline,1,500LFof sanitarysewer;3,700LFof24”andbelowreinforcedconcretepipeand high-densitypolyethylenepipeforstormsewer,andyardpipingforthe pumpstations(2,500LFof36”ductileironpipe,280LFof30”ductileiron pipe,140LFof48”ductileironpipe,140LFof84”fiberglassreinforced epoxypipe) Thesitefinishesconsistedof12,000SYofasphaltpaving; 12,700SFofpermeableconcretepaving;6,500LFofcurbandgutter, 13,000SFofconcreteflatwork,landscapingandirrigation,fenceand guardrails,sitefurnishings,andarainwaterharvestingpond.

12,450 LFOFUTILITY INFRASTRUCTUREPIPE

12,000 SYOFASPHALTPAVING

760 RALPH MCGILL

LOCATION

Atlanta,GA

CLIENT Brasfield&Gorrie

ReevesYoungwasresponsiblefortheturnkeysitedevelopmentonthis 2,000,000SFprojectneartheAtlantaBeltLineforBrasfield&Gorrie

Theprojectincludedheavycivilservicessuchaserosioncontrol,site grading,dewatering,blasting,excavationof205,000CYofdirt,40,000 CYofrock,siteutilityinstallation,andintersectionimprovements.

2,000,000

205,000

BEACON MUNICIPAL COMPLEX

LOCATION

Decatur,GA

CLIENT

CityofDecatur

TheBeaconMunicipalCourtComplexwasanadaptivere-useandnew constructionofahistoric,three-buildingcitymunicipalcomplex The project,totaling84,377SF,includedapoliceandmunicipalcourtfacility withcourtroom,holdingcellsand911communications,anactiveliving buildingwithclassrooms,agymnasium,andaCityofDecaturSchools AdministrationBuilding.TheLEEDSilverprojectalsoincludedthe constructionofaplazatoconnectthethreebuildings.Threeadditional projectscopeswereaddedmid-project:re-routingamajorarteryofthe city’sactivestormsewer,buildingatwoandone-halfacrewaterretention vaultbelowasoccerfieldtomanagesiteflooding,andexpandingand renovatinganadjoiningcommunitypool.

2.5 ACREWATER RETENTIONVAULT

84,377 SFBUILDINGSIZE

ATLANTA UNITED TRAINING CENTER

HEAVY CIVIL/LANDSCAPE

LOCATION

Marietta,GA

CLIENT

HolderConstruction

This30-acrenewsoccertrainingcomplexinvolvedtheconstructionof threeartificialandthreenaturalturffields.ReevesYoungself-performed thegrading,movingover200,000CYofdirtonthesite.Theprojectalso includedtheinstallationofstorm,sanitary,andwaterlines,10,000LFof8”–36”pipe,and1,000LFof48”–60”stormdrainagepipe Hardscapeand landscapedesignswerealsoimplemented,includingwalls,sidewalks,a fountain,anirrigationsystem,andparkinglotpaving

WESTSIDE PARK

LOCATION

Atlanta,GA

TheReevesYoung/CERM/HGOR/Portmandesign-buildteamwaschosen bytheCityofAtlantatocompletetheWestsideParkatBellwoodQuarry andrelatedsitework Theprojectconsistedofconceptualmasterplanning, design,prescribingecologicalrestorativetreatmentsforhighlydegraded industrialsites,permitting,andconstructionforPhaseIimprovementsand amenities.Thefirstphaseofthe$26.5million36-acreprojectincludeda gatewayentranceattheintersectionofJohnsonRoadandGrovePark Place.Setonthepark’snorthside,thegatewayhaslighting,signage,and graphics.TherestorationofGroveParkPlaceincludedresurfacingtheroad andimprovementofthegreeneryalongthecorridor.Theparkcontains trails,apedestrianconnectiontotheProctorCreekGreenway,andan ADA-accessibleoverlook.

HISTORIC FOURTH WARD – ATLANTA

LOCATION

Atlanta,GA

CLIENT

CityofAtlanta

TheAtlantaBeltLineprojectisthemostcomprehensivetransportationand economicdevelopmentefforteverundertakeninthecityofAtlantaandis amongthelargest,mostwide-rangingurbanredevelopmentprogramsin theUnitedStates AsGeneralContractor,ReevesYoungdeveloped significantpiecesofoneofthemostvisiblecomponentstotheproject the17-acre,multiactivityHistoricFourthWardPark Workcompleted includedbuildingtherecirculatingstream,asplashpad,waterfalls, amphitheater/plaza,andrestroomfacilitiesonthefive-acresouthparcelas wellasthelargeoutdoortrellis,eventlawn,andsculpturegardenonthe northparcel ReevesYoungalsobuiltthethirdparcel,whichincludes Atlanta’sfirstpublicskatepark,withover15,000SFofbowls,curbs,and smoothrollingconcretemounds.Theparcelalsoincludesasportsfield,a shadetrellistoppedwithsolarpanels,andpublicrestroomfacilities.

17 ACRES

15,000 SFOFBOWLS,CURBS,AND SMOOTHROLLING CONCRETEMOUND

EASTSIDE TRAIL – ATLANTA BELTLINE

LOCATION

Atlanta,GA

CLIENT

AtlantaBeltLineInc.

PartofthesecondexpansionofAtlantaBeltLine’sEastsideTrail,this projectcontinuedthetrailfromKirkwoodAvenuetoMemorialDrive,over FultonTerrace/MauldinStreet Thescopeoftheprojectincludedaramp andstairconnectionattheFultonTerracebridgeandpedestrian intersectionimprovementsatKirkwoodAvenue,MemorialDrive,andBill KennedyWay.

0.25 MILES

2 ACRES

AVONDALE TOWN GREEN

LOCATION

AvondaleEstates,GA

CLIENT

TheCityofAvondaleEstates

ReevesYoungRecentlycompletedtheconstructionofanewTownGreen fortheCityofAvondaleEstates AvondaleEstatesisbuildingonits reputationasagreencity,andthetwo-acreTownGreenwillserveasan economicdriverforthedowntown,aswellasaplaceforthecommunityto gather.Thescopeofworkincludeddemolishingexistingstructures,grading forfuturemixed-useBuildings,roadimprovements,pavilion,andTown Greenlandscapeandhardscape.Theprojectincludeswalkingpaths, intimategardens,openfieldsforpassiverecreation,apavilionforoutdoor performances,spaceforevents,provisionsforfoodtrucks,achildren’s area,adogplayground,andotheramenitiesforresidents,businesses,and visitorstoenjoy. 300 PERSONAMPHITHEATER

2 ACRES

CENTENNIAL OLYMPIC PARK

LOCATION

Atlanta,GA CLIENT

GeorgiaWorldCongressCenterAuthority

ReevesYoungwaschosenbytheGeorgiaWorldCongressCenter AuthoritytoprovideConstructionManagementatRiskservicesforthe CentennialOlympicParkrenovations Therenovationsandimprovements weredesignedtoincreasecommunityaccess,strengthenitsOlympic heritage,enhancethevisitorexperience,andexpandprogramming opportunities.Ahistoricpreservationeffortwasalsomadetoremove, clean,andrelocatecommemorativebricksinthepark.

2

STORYMULTI-USE EVENTFACILITY

22 ACRES

SANDY SPRINGS CITY CENTER

LOCATION

SandySprings,GA

CLIENT

HolderConstruction

ThisroadwayimprovementprojectwasperformedforHolderConstruction andsupportedtheconstructionofthenewCityCenterfortheCityof SandySprings ReevesYoung’sscopeincludedthedemolitionofexisting roadwaysandcorrespondingsignalizationattwointersections Services included250LFof36”jackandboreutilityinstallation;3,300LFof18” reinforcedconcretepipe;1,000LFof12”ductileironpipewatermain;9,000 LFofcurbandgutter;and27,000SYofasphaltpaving.Theprojectalso contained1.2milesofwalkingtrailsandpaths.

9,000 LFOFCURBANDGUTTER

27,000 SYOFASPHALTPAVING

INFINITE ENERGY CENTER EXPANSION AND RENOVATION

LOCATION

Duluth,GA

CLIENT

HolderConstruction

ThisprojectforHolderConstructionincludedturnkeysitedevelopmentfor theimprovementstoInfiniteEnergyCenter.Servicesinvolvedinstallation ofaprecastundergrounddetentionsystem(668precastpiecesthatequal 571,535CFofstorage),excavationof100,000CYofdirt,shoringwithI Beamandlagging,atemporarydewateringsystemwithpermanent underdrainsystem,7,068SYofpaving,12,784SYofmillandoverlay,and sitedemolition Theundergrounddetentionsystemisoneofthelargestin theSoutheast

571,535

CFOFSTORAGEFOR UNDERGROUND DETENTIONSYSTEM

100,000 CYOFDIRTEXCAVATED

CLEMSON UNIVERSITY: DOUTHIT HILLS

STUDENT COMMUNITY

LOCATION

Clemson,SC

CLIENT

HolderConstruction

Thisprojectinvolvedturnkeysitedevelopmentservicesincludinggrading, utilities(storm,sanitary,water,chilledwater),treeremoval,retainingwalls, roads,andparkinglotpavingforaneweight-buildingstudenthousing complex Thescopealsoincludedsewerlineinstallation,someasmuchas 25’deep Theprojectutilizedfourcrewsand25piecesofReevesYoung ownedheavyequipmenttocompletetheprojectontime 25

FTDEEPSEWERLINE INSTALLATION

65 ACRES

PROJECT STARBELT

LOCATION

Huntsville,AL

CLIENT

HolderConstruction

ThisprojectforHolderConstructioninvolvedtheinstallationofafull sanitarysewersystemona300-acresitewhichwillbecomealargedata center Theheavycivilscopeconsistedofover10,000SFofpipe installation:2,621LFof6”PVCpipe,4,469LFof8”ductileironpipe,and 4,672LFof12”ductileironpipe.

300 ACRES

10,000 LFOFPIPE INSTALLATION

PROJECT MORNING HORNET

LOCATION

SocialCircle,GA

CLIENT

HolderConstruction

ReevesYoungwasresponsibleforself-performing100%oftheutility infrastructureworkforHolderConstructiononthese195undisturbed acreswhichwillbecomea900,000SFdatacenter Thisinstallationincluded 8″sewerand8″–12″waterutilityinfrastructurepiping,includingmanholes Over30,000LFofpipewasinstalled,including11,367LFof8”SDR35 sanitarysewerpiping,11,892LFof12”ductileironpipeforafireline,and 13,364LFof8”ductileironpipeforadomesticwaterline.

900,000

SF

36,000 LFOFPIPE

SK BATTERY AMERICA

LOCATION

Commerce,GA

CLIENT PlateauExcavation

ThisprojectinvolvedtheinstallationofwaterandsewerlinesforanewSK Batterymanufacturingplant Over30,000LFofpipewasinstalledonthis project:15,678LFof8”ductileironpipeforsanitarysewer,12,343LFof10” ductileironpipeforafireline,and2,740LFof6”ductileironpipefora domesticwaterline.

30,000 TOTALLFOFPIPE

12,343 LFOF10”DUCTILE IRONPIPE

NGHS BUFORD MEDICAL PLAZA

LOCATION

Buford,GA

CLIENT JEDunn

Thisprojectinvolvestheconstructionofathree-storymedicaloffice buildingspanning100,000SF,situatedonaneight-acresite The developmentwillfeaturealargestormdrainagedetentionsystemto managewaterfloweffectively

Additionally,approximately80,000CYofonsitematerialwillbeexcavated andmilledtoaccommodatethesite’sgradingandinfrastructureneeds.The projectalsoincludestheinstallationofwaterandsewerutilitiestosupport thefacility'soperationalrequirements.

100,000 SF

8

ACRES

NGMC BRASELTON MOB

LOCATION

Braselton,GA

CLIENT

TurnerConstruction

Thisprojectconsistsofathree-storyhospitalcovering218,000SFanda five-story,125,000SFmedicalofficebuilding,allsituatedona119-acre greenfieldsiteinBraselton,GA Thefacilityfeaturesanexteriordesign incorporatingstone,metalpanels,stucco,andpunchedwindows The NortheastGeorgiaMedicalCenterincludes100privatepatientroomsand offersarangeofservices,suchasImaging,Diagnostics,EmergencyCare, Orthopedics,Heart&Vascular,Surgery,Neuroscience,andCancer Treatment.Themedicalofficebuilding(MOB)wasconstructed concurrentlywiththehospitalandisdirectlyconnectedtoit.TheMOBalso includesapproximately35,000SFofinteriorspace,whichhousesimaging suites,procedurerooms,andCathLabs.

100

343,000

UCBC ATHENS MOB

LOCATION

Athens,GA

CLIENT

Brasfield&Gorrie

ReevesYoung,incollaborationwithBrasfield&Gorrie,providedsitework forthenewComprehensiveCancerCenterinAthens,GA Thescopeof workincludedclearing,erosioncontrol,demolition,grading,andthe installationofstormdrainage,sanitarysewer,andwaterlinestopreparethe siteforconstruction.

Additionally,approximately35,000CYofsoilwereexported,with2,500CY ofsoilmovedonsitetoassistwithgradingandfoundationpreparation. Theseeffortsensuredthesitewasproperlypreparedfortheconstruction ofthisvitalhealthcarefacility.

35,000 CYOFSOILEXPORTED

120,000 SF

WELLSTAR KENNESTONE HOSPITAL

LOCATION

Marietta,GA

CLIENT JEDunn

Thisprojectinvolvedacomprehensiveheavycivilscopeincluding demolitionoftheexistingparkinglotandhardscapes,massgradingandfine grading,andinstallationofundergroundwater,sanitarysewer,and stormwatersystems Theworkperformedonthissitesupportedthe developmentofa$126million62,825SFfour-storyemergency department—thestate’sbusiest—whichhasthecapacitytotreat 185,000peopleannually.

4 STORIES

62,825

SF

NS CUMBERLAND MOB

LOCATION

Atlanta,GA

CLIENT

Brasfield&Gorrie

LocatedonAtlantaRoadatCumberlandParkwayinSmyrna,thisthreestory,60,000SF,state-of-the-artmedicalofficebuildinghousesmultiple Northsideservicesandphysicianpractices Theprojectbeganwiththe demolitionofexistingasphaltandconcretestructurestopreparethesite fornewdevelopment.Erosioncontrolmeasureswereimplementedto protecttheenvironment,followedbyclearingthesitetoremovedebrisand obstacles.

Massandfinegradingwereperformedtoensurepropersitelevelingand drainage,creatingasolidfoundationforthenewbuilding.Theinstallationof stormwaterdrainage,sewerlines,andwaterutilitieswasalsocompleted, providingtheessentialinfrastructureneededtosupportthefacility'slongtermfunctionality Thiscomprehensivesiteworkensuredthesuccessful developmentofthemedicalofficebuilding

60,000

8 ACRES

RANA HUNTSVILLE MOB

LOCATION

Huntsville,AL

ReevesYoungprovidedthecompletesitepackageforthenewmedical officebuildinginHuntsville,AL Thescopeofworkincludedcomprehensive erosioncontrolmeasures,grading,andtheinstallationofastormdrainage system Additionally,theinstallationofwaterandsewerutilitieswas managed,curbsandgutterswereconstructed,andasphaltpavingwas completedforparkingareasandaccessroads.Theseeffortsensuredthe sitewasfullypreparedandsupportedthesuccessfulprogressionofthe building’sconstruction.

20,500

PIEDMONT MOUNTAINSIDE HOSPITAL EXPANSION

LOCATION

Jasper,GA

CLIENT JEDunn

ReevesYoungwasawardedthesiteworkandutilitiesfortheICUexpansion atPiedmontMountainsideHospitalinJasper,GA.Theprojectwaslocated onacompact1.5-acresite,wheretheexistingparkinglotwasdemolished tomakewayfortheICUbuildingexpansion Thescopeofworkincluded gradingtopreparethesiteforthenewstructure,aswellasadditional gradingfornewparkingspacestosupportthefacility Additionally, necessaryutilitieswereinstalledtoservicetheexpandedICU,ensuringthe sitewasfullypreparedforconstructionwhilemaintainingefficientaccess andfunctionalityforhospitaloperations

1.5 ACRESITE

11,000

PIEDMONT ELLIJAY MOB

LOCATION

EastEllijay,GA

CLIENT

Brasfield&Gorrie

Thisprojectinvolvedcomprehensivesitepreparationandutilityinstallation services Thescopeofworkbeganwiththeimplementationoferosion controlmeasurestopreventsoilerosionandensurecompliancewith environmentalregulations Followingthat,sitedemolitionwascarriedout toremoveexistingstructuresandcleartheareafornewdevelopment.

Sitegradingwasthenperformedtoestablishproperelevationsandensure effectivedrainageacrossthesite.Additionally,stormdrainagesystems wereinstalledtomanagewaterrunoffandpreventflooding.Essential utilities,includingwaterandsanitarysewersystems,werealso implementedtosupportthesite’sfuturedevelopmentandoperations.This workwasvitalinpreparingthesiteforconstructionwhileensuringlongtermfunctionalityandsustainability

2 STORIES

6 ACRES

AHF CHATTOOGA MOB

LOCATION

Trion,GA

CLIENT

Brasfield&Gorrie

Theprojectinvolvedperforminggradingandinstallingessentialstormwater andsanitaryutilitiesforanewstand-alonemedicaloffice Sitegradingwas carriedouttoensureproperelevationandeffectivedrainage,preparingthe sitefortheconstructionofthebuilding Thegradingworkwascriticalin establishingastablefoundationwhilefacilitatingwaterflowmanagement acrosstheproperty.

Additionally,theinstallationofstormwaterdrainagesystemswas completedtomanagerunoffandpreventflooding,ensuringthesitewould remainfunctionalandenvironmentallycompliant.Sanitarysewerutilities werealsoinstalled,providingthenecessaryinfrastructuretosupportthe medicaloffice’soperations.Theseeffortslaidthegroundworkforthe developmentofasustainable,fullyfunctionalmedicalfacility

40,000 SF

6 TREATMENTROOMS

INDUSTRIAL Overview

ReevesYoungIndustrialfocusesondeliveringcustombuildingsolutionsthatbest fitourclient’sneeds,providingearlybudgetassuranceaswellasspeedtomarket. Fromdistributionfacilitiestocomplexmanufacturingcampuses,ourteamhasthe expertisetoassistyouthrougheachphaseofyourprojectfromconceptto completion.Ourabilitytoself-performmultiplefacetsofconstructionenablesus toofferthemostcost-effectivesolutions,schedulecertainty,andahigh-quality productthroughanenjoyableexperiencethatisuniquetoworkingwithus.

INDUSTRIAL Markets

Automotive/Transportation

BuildtoSuit

SpeculativeWarehouse/Distribution&Logistics

TenantImprovements

IOS

MissionCritical

ColdStorage

Manufacturing

AUGUSTA TRANSIT OPERATIONS & MAINTENANCE FACILITY

LOCATION

Augusta,GA

CLIENT

CityofAugusta

Thisprojectconsistedofdemolishinganexisting,abandonedmovietheatre tocreateacampustooperateandsupporttheentireAugustaTransit System.Thisincludeddeepfoundationconstructiontoremediatethe unsuitablesoilsatthesite TheMaintenanceFacilityincludedfourbayswith liftsineachbay,BatteryRoom,TireShop,PartsStorageandLubeRooms AdjacenttothefacilityisaSeparateBusWashFacilityandtwoseparate fuelingstationswithadedicatedfuelingtank Inthemainbuildingthereisan OperationalwingthatincludesClassAOffices,MeetingRooms,fulllocker roomforthestaff,dispatchandbreakroom Theentirefacilityisbackedup withanonsitegeneratorasapotentialFEMAcheckpointinastateof emergency

9.25 ACRES

32,000 SQFT

ScantheQRCode totourtheprogress oftheproject.

BEST FRIEND ROAD/SOUTHEAST

TOYOTA DISTRIBUTION FACILITY

LOCATION

Norcross,GA CLIENT

ReevesYoungprovidedconstructionmanagementservicesforthedevelopmentofa 450,000SFbuilding,includingtenantimprovementsforSoutheastToyota’s distributionfacility,completedintwophases Theprojectalsoincludes33,000SFof ClassAofficespace,featuringprivateoffices,conferencerooms,ahealthandwellness area,andacafeteria.Thisportionrequiredsignificantdemolitionanddeepfoundation work,withtheofficespacefinishedtoaLevel5standard,incorporatingcustomwall coveringsandlightingpackages Additionally,theofficeareaincludesanamenitypatio

Extensiveupgradesweremadetothewarehouse,whichisfullyair-conditioned with22RTUs,21HVLSfans,and60aislerackingfans,maintainingaconstant temperatureof72degreesthroughoutthefacility Thewarehouseisequippedwith anASRSsystem,requiringover215pilesandahigh-performanceslabfortheAuto Storeinstallation Thescopealsoincludedoverseeingtheinstallationofconveyors andwarehouseracking Thebuildingfeatureshigh-bayLEDlighting,aBuilding ManagementSystem,andaVESDAfirealarmsystem

144 DOCKDOORS

450,000 SF

BLAIRS BRIDGE ROAD BUILD TO

LOCATION

LithiaSprings,GA

CameronPropertyCompany/ABF

CameronPropertyCompany/ABFselectedReevesYoungasConstruction Managerforthecompletionofthis33,121SFbuild-to-suittransitfacilityon a12-acresiteinDouglasCounty.Thecross-dockfacilityisapreengineeredmetalbuildingthatfeaturesa2,950SFofficespaceand maintenancegarage.

33,121 SF

12 ACRESITE

BRASELTON CROSSROADS

DISTRIBUTION CENTER

LOCATION

Braselton,GA

BraseltonCrossroadsDistributionCenter isadistributioncenterprojectthatsitsona60acresitewithadisturbedareaof39 5acres Constructionconsistsofthreetilt-wallbuildings totaling461,522SFandanadditionalbuildingpadforafuturebuilding Building1consistsof 160,746SFandBuildings2and3are150,388SFeach.Buildings200,300,and400are equippedwithanESFR(EarlySuppressionFastResponse)fireprotectionsystem.The flooringfeaturesapro-slabdesignwithextendedsawcutpatterns,enhancingboth aestheticsandfunctionality

Alsocompletedwerethreespecifictenantimprovementupgradesacrossthesebuildings: Building200wasdevelopedforChildren’sHealthcareofAtlanta(CHOA),whichincludeda 1,500SFofficeaddition,multipledockenhancements,andasecuredareaforhigh-value items InBuilding300, adedicatedsectionforAirflotekwascreated,featuringa3,500SF office,alongsideseveraladditionalmodificationswithinthewarehouse Additionally,onthe oppositeendofBuilding300,a2,500SFofficeadditionforSimpleAutomationwas constructed Tomeettheirincreasedpowerrequirements,theelectricalinfrastructurewas upgradedbyestablishingaseparateelectricalroomandcollaboratedcloselywithJackson EMCtorunanewfeed,installinganindependenttransformerfortheSimpleAutomation team.

3 BUILDINGS

461,522 SF

BRASELTON TECHNOLOGY CENTER

LOCATION

Braselton,GA

CLIENT EastGroupProperties

BraseltonTechnologyCenter(Braselton3)isa114,780SFreardock developmentthatiscomposedof1,200SFofficespaceand113,580SF warehousespace,strategicallylocatedalongtheNortheastI-85corridorin JacksonCounty Thefacilityfeatures34overheaddoorsandtwooversized doorswithconcretedrive-upramps.Itboastsaclearheightof40ft,and 120ftdeeptruckcourts.Additionally,thereareseventrailerdropspaces, and122carparkingspaces,twoofwhichhaveEVcharging.

114,780

SF

13 ACRESITE

CABIN DRIVE INDUSTRIAL OUTDOOR

STORAGE (IOS)

LOCATION

Conley,GA

TheCabinDriveIndustrialOutdoorStorage(IOS)Lotislocatedrightoffthe I-285andI-675interchangeinConley,Georgia Thesitewasbuilton26 acresandhasspaceforupto494trailers

Thisprojectincludedthedemolitionofexistingresidentialstructuresand theimplementationofthreeretainingwalls Thesitewasgradedto accommodatenewutilityinfrastructureincludingirrigationlines,afireloop, astormwatermanagementfacility,andstormwaterconveyancesystem In totalnearly70,000SYofasphaltpavingwereplaced,theequivalentof nearly11footballfields!

TRAILERSPACES

CHILDREN’S

LOCATION

Hoschton,GA

HEALTHCARE OF ATLANTA

CLIENT Ackerman&Co

ReevesYoungprovidedconstructionservicesforthistenantbuild-outwith 1,405SFofspace,159,482SFofwarehousespace,and100SFofseparate warehousebathroomspace.Theofficespacecontainstwomainoffices,a breakroomwithfurnishingconnectionsandcabinetry,anITcloset,aunisex bathroom,andawarehouse-facingunisexbathroom.Thescopeincluded addingthreehigh-poweredHVLSfansandfourmechanicaldocklevelers foreasyunloading.

159,482 SFOFWAREHOUSE SPACE

1,405 SFOF OFFICESPACE

COVINGTON COMMERCE CENTER (PHASE

I & II)

LOCATION

Covington,GA

Thisdesign-buildprojectspanstwophases,totaling469,300SFacrossa 22-acresiteinCovington,GA,neartheAlcovyRiver.PhaseIfeaturesa 210,552SFfacilitywithsectionaloverheaddockdoors,twodrive-indoors, heavy-dutytruckcourtpaving,TPOroofing,andfourstorefrontentrances protectedbyanESFRsprinklersystem.PhaseII,a258,748SFrear-load warehouse,includesa3,600SFspeculativeoffice,52dock-highdoors,two drive-indoors,a6"thick,4,000psiconcreteslab,andparkingfor56trailers andover150cars TheLEED-certifiedfacilitywascompletedinnine months,markingoneofthreeprojectsReevesYoungIndustrialhas deliveredforthesameclient

469,300

DISCOVERY PLACE BUSINESS CENTER

LOCATION

Mableton,GA

Thisdesign-buildprojectfeaturesa69,000SFtiltwallconstruction warehousefacility Thebuildingisa32ftclearheightfacilitywitha6”thick conventionalslabdesign Thesix-acresiteconsistsofa135fttruckcourt andmultipleparkingareas Theprojectalsoincludesanunderground detentionsystemwitha109,000CFcapacitytohelpwithstormwater runoffonthiscompactsite. 135

69,000 SF

FTTRUCKCOURT& PARKINGAREA

DOUGLAS HILLS LOGISTICS CENTER

LOCATION

LithiaSprings,GA

CLIENT StrategicRealEstatePartners

TheDouglasHillsLogisticsCenterislocatedinLithiaSprings,GA,offering 844,320SFofdynamicwarehousespaceacrossfourbuildings Each buildingfeaturesanESFRsprinklersystem,a277/480volt,three-phase powersupply,andagenerous54ftby60ftstagingbays The71-acresite includes161dock-highdoors,430autoparkingspots,and125trailer parkingspaces.

844,320

SF

161 DOCK-HIGHDOORS

DUNCAN 85 BUSINESS CENTER

LOCATION

Duncan,SC

Thisdesign-buildprojectconsistsofanew273,000SFindustrialspec facilitythatwillmeetLEEDrequirementsona23-acresite Asanearly partnerinthedesignprocess,ReevesYoungwasabletohelpnavigatethe reroutingofexistingrunofffromtheadjacentinterstatestormsystem,as wellasrerouteutilitiestoavoidwetlandimpactsandrockexposure.

23

273,000

ReevesYoungreceivedtheSilverAwardfromtheDesign-Build InstituteofAmerica(DBIA)fordemonstratingsuccessful applicationsofdesign-buildprinciples Thishonorrecognizes projectsfortheiradvancedandinnovativeuseoftotal integratedprojectdelivery,showcasinguniquesolutionsto projectchallenges

FALCONPARKWAYINDUSTRIAL CAMPUS(PHASEI&II)

LOCATION

FloweryBranch,GA

CLIENT CAVentures/BrookfieldProperties

ThisdesignassistandfullMEPdesign-buildprojectconsistsoftwoClassA, tiltwallconstructionwarehousesonthesamesite,totaling642,000SF Building100isa36ftclearheightcrossdockfacilitywith7”thick conventionalslabdesign Building200isa32ftclearheightfrontload facilitywitha6"conventionalslabdesign.

Thesitefeatures180fttruckcourtsandalargeautoparkingarearequiring extensivesitework,utilitywork,andseverallargeretainingwalls.Thesite locationalsorequiredaDepartmentofTransportationscopeofworkto expandandadddecelerationlanestotheadjacentstateroute.LEEDdesign andconstructionrequirementswerefollowedtoachieveLEEDcertification forbothbuildings.

DOCKDOORS

642,000

GAINESVILLE 85 BUSINESS CENTER

LOCATION

Gainesville,GA

Gainesville85BusinessCenterisatwo-buildingdevelopmenttotaling 585,000SF,strategicallysituatednearI-985inNortheastAtlanta The centeroffersdirectaccesstoHighway60andHighway129andislocated just10 8milessouthoftheNortheastGeorgiaInlandPort,whichis currentlyunderconstruction.BuildingAfeatures335,000SF,including 3,520SFofofficespace,designedwithflexibleofficelayoutsto accommodatefuturetenantneeds.Thebuildingboastsaclearheightof36 ft,63loadingdocks,andtwodrive-inramps.Italsoincludesareartruck courtmeasuring185ft,with88trailerparkingstallsand217carparking spacesavailableatthefront.BuildingBencompasses251,000SF,with 2,375SFofofficespace,alsodesignedforfutureflexibility.Thisbuildinghas aclearheightof32ft,44loadingdocks,andtwodrive-inramps.Itfeaturesa 185ftreartruckcourtwith60trailerparkingstallsand150carparking spacesatthefront TheGainesville85BusinessCenterisLEEDCertified andoffers43sharedparkingspacesbetweenthetwobuildings

585,000 SF

34 ACRESITE

GREENVILLE TRANSIT AUTHORITY BUS MAINTENANCE FACILITY

LOCATION

Greenville,SC

CLIENT

GreenvilleTransitAuthority

Locatedon26acresinGreenville,SC,this58,000SFmaintenanceoperations andadministrationfacilityserveGreenvilleTransitAuthority’sGreenlinkBus System.The40,000SFbusmaintenanceareafeaturesafleetservicearea withtwofuelingandfluidmanagementlanes,farecollection,eightservice bays,andafullyautomatedbuswash.Thefacilityalsohousesparts,tires,and toolstorage,alongwithlockerrooms,showers,trainingspace,andlaundry services.Asecond18,000SFadministrationbuildingaccommodates employeeoffices,TransitAuthorityBoardandCommunityRoom,driverreadylounge,dispatch,andconferencespace.Thesitealsoincludes infrastructurefordiesel,electric,andfuturecompressednaturalgasbuses. Thereisalsoparkingforapproximately200employeesand88busparking spacestoaccommodatefuturefleetgrowth.Siteimprovementswerealso includedinordertocreateagreenspace/parkenvironmentwithawalking trailandcommunitypavilion.

40,000

SFBUSAREA

18,000

SF ADMINISTRATION BUILDING

JEFFERSON 85 LOGISTICS CENTER

LOCATION

Jefferson,GA

CLIENT

AllianceIndustrial

Jefferson85LogisticsCenterisa497,094SFcross-dockdevelopment strategicallylocatedalongtheNortheastI-85corridorinJacksonCounty

Thefacilityfeatures101overheaddoorsandfouroversizeddoorswith concretedrive-upramps Itboastsaclearheightof40ft,60ftstaging bays,and185ftdeeptruckcourts.Additionally,thereare131trailerdrop spaces,withthepotentialtoexpandto229,and261carparkingspaces.

497,094

SF

101 OVERHEADDOORS

MAKITA TEST LAB

LOCATION

Buford,GA

CLIENT MAKITA

Theprojectinvolvestheconstructionofa7,500squarefootULTestLab tenantbuild-outforMakitaNorthAmericaattheirexistingfacilityinBuford, GA Therenovationaimstotransformonecornerofthefacilityintoa multifunctionalULtestlab,whichwillincludetestlabs,generaloffice spaces,storagerooms,andaconferenceroom.Therenovationrequired thedemolitionoftheexistingwarehouse'selectricalsystems,HVAC,and equipment,followedbytheconstructionofnewsystemsandspaces.The newtestlabincludestheinstallationofallnewelectrical,mechanical, plumbing,andfiresuppressionsystems.Additionally,soundproofmetal studframedwalls,sealedconcretefloors,anewconcreteisolationslabfor vibrationtesting,carpetflooring,andexteriorconcretemechanicalpads werealsoincludedinthescope.Thelaboratorywillbeusedforconducting productsafetytestingaccordingtoUL/CSAandANSIstandardsforelectric portableandstationarypowertools,aswellasoutdoorpowerequipment

7,500 SFTENANT IMPROVEMENT

15,000 SFBUILDING

McEVER ROAD DISTIBUTION CENTER

TheMcEverRoadDistributionCenterisa397,901SF(Building100is 221,591SFandBuilding200is176,310SF)tworear-dockbuilding developmentstrategicallylocatedalongtheNortheastI-985corridorinHall Countyona34-acresite Thefacilityfeatures88overheaddoorsandfour oversizeddoorswithconcretedrive-upramps.Itboastsaclearheightof40 ft,60ftstagingbays,andtwo185ftdeeptruckcourts.Additionally,there are92trailerspacesand235autospaces.

397,901 SF

NORTH85LOGISTICSCENTER

LOCATION

GravelSprings,GA

CLIENT StrategicRealEstatePartners

Thisdesign-buildprojectfeatures250,545SFoftilt-wallconstructionfora warehousefacilitywith32ftclearheightand6”thickconventionalslab design Thebuildingalsofeatures49overheaddockdoorsincludingtwo drive-indoorswithconcreteramps,aTPOroofingsystem,andthree storefrontentrances.The21.5acresiteconsistsofavariablewidthtruck courtwithadesignatedtrailerlotallowingfor116totaltrailerparkingspots.

NORTH ATLANTA COMMERCE CENTER

LOCATION

Alpharetta,GA

NorthAtlantaCommerceCenterisa ClassAlightindustrialparkin Alpharetta,GA Thispropertyfeaturestwofacilitiestotaling260,080SFof warehousinganddistributionspace

BuildingAoffers90,300SFofcustomizablespace,withadepthof150ft andatruckcourtdepthof135ft,featuring32dockdoorsand92parking spots.BuildingBprovides169,780SFofspacewithadepthof260ftanda 185fttruckcourt,with30dockdoorsandparkingfor172automobilesand 34trailers.Thisdevelopmentsupportsawiderangeoftenantneeds.

260,080 SF

279

PROJECT GXO (SPANX)

LOCATION

FloweryBranch,GA

CLIENT

BrookfieldProperties/GXO/SPANX

LocatedinBuilding100,ProjectGXO(SPANX)wasacompletetenantbuildoutofanew440,120SFdistributioncenterforSpanx Improvements consistedofincreasingfullbuildingelectricalserviceto2,500-ampservice withallnewelectricaldistributionandincreasedwarehouselighting Interior workincluded13,664SFofofficeimprovementsincludingtwosetsofnew gangrestroomsforwarehouseemployees,largewarehousebreakroom, newsecurityentranceforemployees,shippingoffice,floorscrubberdump station,batterychargingstations,andadditionaldocklevelersand equipment.Exteriorimprovementsincludednewfencingforsecureddock areawithmotorizedgatecontrols,additionalsidewalk,andrestripingfor additionalemployeeparking.

13,664

440,120

PROJECT PANDION

LOCATION FloweryBranch,GA

ProjectPandionconsistedofanew6,100SFofficespaceand153,000SFof distributionspace ReevesYoungworkedalongsidetenantsubcontractors toworkjointlywiththeirconveyorsystemteamandaddexterior improvementstotheirfacility

153,000 SFOFDISTRIBUTION SPACE

6,100 SFOF OFFICESPACE

PROJECT ZEBRA

LOCATION

FloweryBranch,GA

CLIENT JLL/ZebraTechnologies

ProjectZebrainvolvedafullTIdesignbuildforZebraTechnologiesin Building200 Thespaceincludesatotalof43,098SFofwarehousespace and4,500SFofofficespacefromthegroundup Thiswasaverycomplex project,consistingofaconditionedwarehousespacetomaintainthe temperatureof68degreesincludingadditionalinsulationontheceiling,tilt walls,anddockdoors.Weinstalledfouradditional25-tonRTU’sinthe warehousespacetoaccommodatethisneed.Thewarehousespacealso includedeightdocklocationstohavefulldockpackagesonthem-hydraulic docklevelers,dockseals,docklocks,anddocklights.

Atcompletionoftheproject,thewarehousewasfullyrackedoutfromfloor toceiling.Theinteriorofficespaceconsistedoffullmultiplepersonal functioningbathrooms,atrucker’sloungewithrestroom,offices,anda breakroom

43,098 SFOFWAREHOUSE SPACE

4,500 SFOF OFFICESPACE

ROCKDALE LOGISTICS CENTER

LOCATION Conyers,GA

CLIENT Ackerman&Co.

RockdaleLogisticsCenterBuilding500isa163,035SFindustrial speculativewarehouseinConyers,Georgia Thebuildingis46ftinheight andisdesignedtohousefourseparatetenantswith37dock-highdoors,36 ftclearheight,106carparkingspaces,and52trailerparkingspaces Reeves Youngwasabletotaketheparcelinbetweenanexistingindustrialparkand tieeverythinginthestorm,sanitary,andwater.

36

FTCLEARHEIGHT

163,035 SF

SIMPLE AUTOMATIONS

LOCATION

Hoschton,GA

CLIENT Ackerman&Co.

Thistenantbuild-outconsistedof3,952SFofofficespaceand46,294SFof warehousespace Thescopeincludesopenofficeareaentrance(lobby), 400SFconferenceroom,eightemployeeoffices,breakroom,and restrooms Thewarehousespaceincludedaddingtwoadditionalunit heaters,withanextensionofgaslinetotheseunitheaterswithan extensionofthegaslinetotheseunitheaters.Duetosignificantpowerload capacity,thebuildoutalsorequiredaseparateelectricalroomspaceanda wholenewmaintransformerinstalleddirectlyoutsideofthespace.

46,294 SFOFWAREHOUSE SPACE

3,952 SFOF OFFICESPACE

WATER RESOURCES

WATER RESOURCES Overview

ReevesYoungWaterResourcesknowshowtokeepthingsrunningsmoothly.Our teamunderstandsthatwastewaterisapreciouscommodityandutilizesits expertisetosuccessfullydeliverwaterreuseandwatertreatmentprojectsfor municipalitiesandwaterauthoritiesthroughouttheSoutheast.Asexpertsinecoengineeringandwatertechnology,ourteamisalsouniquelyqualifiedtothink outsidetheboxanddeliverspecializedprojectsthatpromoteresearch, innovation,andsustainabilityforawater-hungryworld

WATER RESOURES Markets

Dams&Reservoirs

PumpStations

TransmissionLines

Wastewater&WaterReclamation

WaterInnovation

WaterTreatment

ASHLAND CITY WWTP

LOCATION

AshlandCity,TN

CLIENT

TownofAshlandCity

The project involves the construction of a new wastewater treatment facility, which includes a new pump station and treatment plant Engineered shoring will be used to maintain the operations of the existing wastewater treatment plant until the new facility is completed. Additionally, over one mile of new 16-inch force main will be installed, running from the new pump station to the new treatment plant. More than half a mile of gravity sanitary effluent will be constructed to discharge into the Cumberland River. The new wastewater treatment plant will feature over 7,800 square feet of operational space for equipment designed to process water, meeting the growing water treatment needs of the Town of Ashland City.

30 MILLIONDOLLARS

7,800 SFOFOPERATIONAL SPACE

ATLANTA WATER SUPPLY –BELLWOOD QUARRY

LOCATION

Atlanta,GA

CLIENT CityofAtlanta

ReevesYoungprovidedthesiteworkservicestosupportthecreationofafivemiletunnelfromtheChattahoocheeRivertotheBellwoodQuarry.Thetunnel sends2.4billiongallonsofwatertothequarry–enoughtosupplythecityfor30 days.ThetunnelalsoconnectsthequarrytotheHemphillWaterTreatment Plant.ReevesYoung’sscopeincludeda3,800SFpermanentsoilnailwall,3,500 SFmodularblockwalls,and4816″ diameteraugercastpilesvaryinginlength from29-38ft.Siteutilitiesincluded1,300LFof36″ductileironpipe;3,000LFof waterlineupto8”indiameter;1,500LFofsanitarysewer;3,700LFof reinforcedconcretepipeupto24”indiameterandhigh-densitypolyethylene stormsewer.Scopealsoincludedpumpstationyardpipingwith36”-48”ductile ironpipeand140LFof 84″fiberglassreinforcedepoxypipe.Sitefinishes included12,000SYofasphaltpaving;12,700SFofpermeableconcretepaving; 6,500LFcurb&gutter;13,000SFconcreteflatworkandarainwaterharvesting pond.

38,000 SFPERMANENTSOIL NAILWALL

13,000 SFCONCRETE FLATWORK

CHATTANOOGA WET WEATHER

COMBINED SEWER STORAGE FACILITY

LOCATION

Chattanooga,TN

CLIENT

CityofChattanooga

ThishighlycomplexprojectfortheCityofChattanoogainvolvedthe constructionofthree10milliongallon,pre-stressed,concretestorage tanks,onecast-in-place40MGDpumpstationincludingfour10MGD submersiblepumps,andonecast-in-placediversionstructure incorporatinganexisting84”gravitysewer,twocarbonabsorptionodor controlunits,oneelectricalbuildingincludingswitchgear,VFDs,600KW standbygenerator,automatictransferswitch,restrooms,andHVACunits

Theprojectalsoincludedconstructionofacast-in-placevalveandflow metervaultandtworetainingwalls Installationofburiedandaboveground pipingranginginsizefrom8”to54”diameterwasalsorequiredonthesite, including680LFof36”diameterforcemainpipe,aswellasmicropilesfor construction.ReplacementofelectricalgearattheexistingInfluentRelief PumpStationwasalsorequired.Modificationswerealsomadetothe existingWestBankOutfall,includingdemolitionandanewmetalweirbox.

40 MGDPUMP STATION

3 10MGALLONCONCRETE STORAGETANKS

ScantheQRCode totourtheprogress oftheproject.

GIBSON CREEK EQUALIZATION FACILITY

This project included the construction of a 10 million gallon pre-stressed concrete tank and a 22 MGD pump station. The storage tank is utilized when sewer flows exceed the capacity of the existing sewer system. The peak flows are stored until the flows in the system recede, and the stored volume can be conveyed through the system to treatment. Before the construction of this facility, flows in excess of the system capacity resulted in sanitary sewer overflows

JOHNSON CREEK PUMP STATION

LOCATION

Lithonia,GA

CLIENT

DeKalbCountyDepartmentofWatershed Management

ReevesYoungprovidedconstructionservicesforthisnew,10MGDsewage pumpstationwhichalsorequiredanexpeditedscheduleduetoaconsent orderfromtheGeorgiaNaturalResourcesEnvironmentalProtection Division Theprojectincludedplacementofapproximately5,000CYof cast-in-placeconcrete,rockexcavation,anda48”gravitysewer Installed equipmentincludedsubmersiblepumps,slidegates,odorcontrolsystem, andafive-tonbridgecrane

10 NEWMGDSEWEAGE PUMPSTATION

5,000 CYOFCAST-IN-PLACE CONCRETE

LITHONIA PUMP STATION NO. 1

LOCATION

Lithonia,GA

CLIENT

DeKalbCountyDepartmentofWatershed Management

Thisprojectwasafast-trackdesign-buildfora10MGDpumpstation.It includeda30'excavationinsolidrock;5,000CYofcast-in-placeconcrete, 30,000CYofrockexcavation,and3,000LFofpipe Theprojectrequired workperformedinmultipleshifts,24hoursaday,sevendaysaweek Equipmentincludedsubmersiblepumps,chopperpumps,slidegates,an odorcontrolsystem,andamagnesiumhydraulicfeedsystem Atemporary bypassoftheexistingfacilityalsowasrequiredforthedurationofthe project

10 NEWMGDSEWEAGE PUMPSTATION

30,000 CYOFROCK EXCAVATION

PURRYSBURGWTPEXPANSION

LOCATION

Hardeeville,SC

CLIENT

BeaufortJasperWaterSewerAuthority

ReevesYoungwasselectedastheGeneralContractorforthismultifacetedwatertreatmentplantupgradeandexpansionproject Thescopeof workincludedinstallationofnewpumpsattheriver,reservoir,transfer,and high-pressurepumpstations Italsoincludedchemicalfeedfacility enhancements,includingtheincorporationofnewtanks,pumps,and modernsodiumhypochloriteonsitegenerationequipmentaswellasthe constructionofaweirflowsplittingfacility,aPACcontactor,andstatic rapidmixequipment Theteamwasalsoresponsibleforinstallationofanew flocculationandsedimentationbasin,fivenewdualmediafilters,and variousvalvesandpiping Keyenhancementswerealsomadetothe instrumentationandcontrols,andelectricalsystemsandcontrols.This undertakingaimstodoubletheexistingtreatmentplant’scapacityfrom15 MGDto30MGD.

30 MGD

5 NEWMEDIAFILTERS

SCOTTCANDLERWTPTANKREPAIR ANDPUMPSTATIONREPLACEMENT

LOCATION

Atlanta,GA

CLIENT

DeKalbCountyDepartmentofWatershed Management

ReevesYoungwasselectedasthedesign-buildcontractoronthisprojectfor DekalbCounty.Forthepumprepair,servicesincludedreplacingthehighservice pumpstationNo 1intakeheader,theremovaloffoursmalltransferpumps,and theadditionoftwolargetransferpumps Forthetankrefurbishment,allthree steeltanksrequirednewvents,ladders,andmanways,aswellasremovaland replacementofallthecoatingsinsideandoutside

4 TRANSFERPUMPS REMOVED

2

LARGETRANSFERPUMPS ADDED

RIVERBEND ENVIRONMENTAL COMPLEX

LOCATION

BallGround,GA

CLIENT

CherokeeCountyWaterandSewerage Authority

Thisnew,0.5MGDWastewaterTreatmentPlantona20.2-acreproperty consistedofscreening,sequencingbatchreactors,clarification,filtration, UVdisinfection,postaeration,sludgeholding,thickeninganddewatering, plantdrainpumpstation,chemicalfeedsystems,abuildingrehabilitation, andelectricalpowerdistributionincludingstandbygenerator,newSCADA systemandtwonewliftstations TheAirportNo 1LiftStationandForce Mainconsistedofreplacementofpumps,startersandotherequipmentat theexistingpumpstationandinstallationof17,000LFofa12″highdensity polyethylenepipe SmithwickCreekLiftStationandForceMainconsistsof newsubmersiblewastewaterpumpstationandinstallationof approximately15,000LFofa10″highdensitypolyethylenepipe,2,300LFof 24″ductileironpipesanitarysewerand1,300LFof8″PVCsanitarysewer.

0.5 MGD

20.2 ACREPROPERTY

FORSYTH COUNTY WATER TREATMENT

PLANT EXPANSION

LOCATION

Cumming,GA

CLIENT ForsythCounty

Thisfast-trackedprojectconsistedoftheexpansionofanexistingplantto increasecapacityandsatisfycriticalwaterneeds.ReevesYoungcompleted theexpansionofmembranefacilitycapacityintheexistingmembrane building,constructionofanewhighservicepumpstationandassociated electricalbuilding,anewsurgetankstationandassociatedcompressor building,aCO2generatorbuildingandcontainmentarea,gravitythickener, gravitythickenerfeedpumpstation,andnewthickenedsludgepump building

33 MGD

66,000 CUSTOMERS

PERRY WATER TREATMENT PLANT

LOCATION

Perry,GA

CLIENT

TheCityofPerry

ReevesYoungservedastheDesign-Builderforthisnew,5,350SF,2MGD

WaterTreatmentPlantona6 63-acregreenfieldsiteandself-performeda significantportionofthework Theprojectincludedclearingandproviding accesstotheworkarea,constructionofWell#6,atreatmentstructure, limefeedsystem,highservice/backwashpumpstation,washwaterpond andstormwaterpond,andyardpiping.Inaddition,ReevesYoung performedclearwellexcavationbackfill,electrical,splashpad,underdrain andstandpipes,disinfection,andfoundationwork.Significantcoordination wasalsorequiredbetweenourteamandthecontractorsresponsiblefor theconstructionofthegroundwatersupplywells,clearwell,andoffsite waterline.

2 MGD

5,350 SF

WHITE WATER CREEK WPCP

LOCATION

Fayetteville,GA

CLIENT

CityofFayetteville

ReevesYoungwaschosentoupgradeanexisting5 0MGDwastewater facility,whichincludedmultipleprojectcomponentslikeconstructingnew splitterboxes,clarifiers,RAW/WASpumpstation,andconvertingexisting sequencingbatchreactor(SBR)toanA2Osewagetreatmentprocess The projectalsorequiredretrofittingexistingtertiaryfilters,replacingdigester processequipment,anexistingbeltpress,andchemicalfeedequipment,as wellasremovingtheconventionalactivatedsludge(CAS)processfrom service.

5 MGD

2 CLARIFIERS

LOOPERSWWTPDEWATERING FACILITYUPGRADES

LOCATION

Dalton,GA

CLIENT

DaltonUtilities

Thisprojectinvolvedupgradesandimprovementstoanexistingdewateringfacility thatincludedthereplacementoftwoexistingcentrifugeswithtwoFlottwegModel C5Ecentrifuges.Italsoinvolvedimprovementstothesludgeconveyorincludingthe replacementoftheverticalconveyorwithaninclinedconveyorsection,anew loadingstation,andrehabilitationoftheexistingconveyorsystem.Twonew polymerblendingunitswerealsoinstalled.Buildingimprovementsincluded replacementoftheHVACsystems,structuralmodificationsandcorrodedmetal repair,replacementofallelectricalswitchgear,panels,anddistributionwiring system,andrepaintingoftheentirebuilding.Improvementswerealsomadetothe SCADAandinstrumentationsystems.

400 GPMDRYWEATHER FLOW

800 GPMWET WEATHERFLOW

CHERRY POINT WRF IMPROVEMENTS

LOCATION

Ridgeland,SC

CLIENT

BeaufortJasperWaterSewerAuthority

ReevesYoungwasselectedastheConstructionManageratRiskforthis expansionofanexistingwastewatertreatmentplanto11 25MGD

Expansionincludestheinstallationofnewclarifiers,bioreactors,effluent filters,UVdisinfection,adewateringbuilding,cakestorage,sludgeholding, effluentpumpstationandelectricalupgrades.

11.25 MGD

24 ACRESITE

CAMP CREEK WRF IMPROVEMENTS

LOCATION

Atlanta,GA

CLIENT FultonCounty

ReevesYoungwasselectedasthebuilderforthisproject,consistingof furnishingandinstallingclarifierequipmentandmakingconcreterepairsto eightexistingclarifiers;renovatingtheprimarysludgepumpstation; replacingflowcontrolgates;consolidatingpowerfeed,remoteandlocal controlstofoursecondaryclarifiers.

8 EXISTINGCLARIFIERS

4

SECONDARYCLARIFIERS

A.SCOTTEMMONSWRFATTHE LITTLERIVER

LOCATION

SocialCircle,GA

CLIENT

NewtonCountyWaterandSewerage Authority

ReevesYoungwaschosenastheconstructionmanagerforTheWaterTower,a 55,600 waterinnovationandresearchfacilityincludingofficeandcollaboration space,classroomsandmeetingspaces,Thescopeforthisprojectconsistedof constructinganew1.25MGDwastewatertreatmentplantintheLittleRiver watershed.Preconstructionservicesincludeddesignandconstructabilityreviews, costestimating,value-engineeringrecommendations,andpreparationofa GuaranteedMaximumPrice(GMP)proposalpackage.Constructionservices includedCMARprocurement,constructionandconstructionmanagement,startup,performancetesting,commissioning,andoperatortraining.250-seatmultipurposespace,andmultiplelaboratories.Thecampus,whichispartoftheF.Wayne HillfacilityandtheGwinnettEnvironmental&HeritageCenter,alsofeaturesactive publicspacesincludingagreenwayandtrails,aswellasaDirtTrainingCenter.

1.25 MGD

65% SELF-PERFORM

TANNER’SBRIDGEWASTEWATER TREATMENTFACILITY

LOCATION

Bethlehem,GA

CLIENT

BarrowCounty

Thisprogressivedesign-buildprojectforBarrowCountyincludedprovidingdesign andconstructionservicestoexpandthecapacityoftheTanner’sBridge WastewaterTreatmentFacilityto1.0MGD.Designfeaturesincludedseptage receiving,headworks,asplitterbox,twosequencingbatchreactors,equalization basin,dewateringbuilding/boxes,digester,chlorinecontactchamber,flowmonitor, effluentpumpstationandaerationanddischargeintotheApalacheeRiver.

V.D.PARROTTJR.WTPCHEMICAL SYSTEMIMPROVEMENTS

LOCATION

Dalton,GA

CLIENT

DaltonUtilities

ThisimprovementprojectforDaltonUtilitiesincludedchemicalsystemupgrades,a newcoagulantBuilding,conversionofanexistingfiltertoapostchemicalbuilding, modificationstoanexistingrawwaterchemicalbuilding,siteworkforthree chemicalunloadingstationsandnewloadingdock,demolitionofanexisting coagulanttankandfeedpumps,limeslurrystorageandfeedsystem,fluoridefeed pumps,anddaytanks.

2 NEWCHEMICAL UNLOADINGSTATIONS

CLEAR CREEK CHEMICAL SYSTEM IMPROVEMENTS & SYSTEM WIDE FLOW

MONITORING

LOCATION

Atlanta,GA

CLIENT

CityofAtlantaDepartmentofWatershed Management

Themainpurposeofthisprojectwastoupgradeandimprovethechemical systemsatClearCreekCSCFbyreplacingthefourNaCl(sodium hypochlorite)storagefiberglasstanks,replacingthepumpsandpiping systemstoimprovesystemprocessreliability,upgradingtheFoxboro system,andrehabilitatingthedrumscreensatCusterAvenueCSCF. ReevesYoungalsoprovidedsystemwideflowmonitoringimprovementsat variousfacilitiesincludingClearCreekCSCF,NorthAvenueCSCF,Tanyard CSCF,WAWQCF,ClusterAvenueCSCF,BoulevardRegulator,andEA WQCF

7 FACILITIES

$200,000

THEWATERTOWER-GLOBAL INNOVATIONHUB@GWINNETT

LOCATION

Buford,GA

CLIENT GwinnettCounty

ReevesYoungwaschosenastheconstructionmanagerforTheWaterTower,a 55,600SFwaterinnovationandresearchfacilityincludingofficeand collaborationspace,classroomsandmeetingspaces,250-seatmulti-purpose space,andmultiplelaboratories.Thecampus,whichispartoftheF.WayneHill facilityandtheGwinnettEnvironmental&HeritageCenter,alsofeaturesactive publicspacesincludingagreenwayandtrails,aswellasaDirtTrainingCenter

55,600

SF

250

SEATMULTIPURPOSESPACE

PM USA WATERHUB

LOCATION

Richmond,VA

CLIENT PhilipMorrisUSA

ReevesYoungwasselectedastheProgramManagerforthisexpedited design-buildproject DesignedspecificallyforthePhillipMorrisUSAfacility, TheWaterHubreducesconsumedwaterby40%andeliminates55%of wastewaterdischarge Majorequipmentinstallationincludedinfluent pumps,rotarybarscreen,odorcontrolsystem,EQ/tank/pumps,fine screen,weirgates,membranesystem,UVSystem,ROsystem,fiberglass reclaimtankwithreclaimpumps,andagreenhouse.Theoverallplant capacityis710,000GPMexpandableto1.5MGD.

40% REDUCTIONINWATER CONSUMPTION

1.5 MGD

EMORY WATERHUB

LOCATION

Atlanta,GA

CLIENT

EmoryUniversity

ReevesYoungwaschosenasthedesign-builderforTheWaterHub,anonsitewaterrecyclingsystemontheEmoryUniversitycampuswhichutilizes eco-engineeringprocessestocleanwastewaterforfuturenon-potable uses ItisthefirstsystemofitskindtobeinstalledintheUnitedStates,and iscapableofrecyclingupto400,000gallons-per-day–nearly40%of Emory’stotalcampuswaterneeds.Thecleanedwateristhenusedas processmake-upwaterinEmory’ssteamandchillerplantsandtoilet flushinginselectresidencehalls.ThesystemwasbuilttoreduceEmory’s drawofwaterfromAtlanta’smunicipalwatersupplybyupto146million gallonsofwaterannually.Italsoincludesa50,000gallonemergencywater reservewhichwillallowEmory’sheatingandcoolingsystemstofunction foranaverageofsevenhoursintheeventofanydisruptioninwater availability

20 AWARDSRECIEVED FORPROJECT

400,000 GPDECOWATER RECYCLINGFACILITY

GEORGIA

+1 (770) 271 1159 45 Peachtree Industrial Blvd. NW Sugar Hill, GA 30518

TENNESSEE

+1 (615) 252.7766

4101 Charlotte Avenue, Suite E205 Nashville, TN 37209

SOUTH CAROLINA

+1 (864) 813.4370

201 Riverplace, Suite 300 Greenville, SC 29601

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.