Everything we do — from 30 feet below the ground to 30 floors above — is about people.

In our more than 70 years of being in business, we’ve had the opportunity to work closely with owners, developers, general contractors, and subcontractors to ensure that every project we complete is built by relationship first.

WE ARE ...

BUILT BY

Attheheartofourcompanyisa passiontomakeaprofound,positive impactonourco-workers,clients,and community Westrivetocultivatean environmentthatcreatessuccess fromtheinsideout,bysupportingour teamsotheycansupportourclients.

BUILT BY

People

Forourpeople,growthistheonly option.Weprideourselvesinhiring highperformingprofessionalswho thriveinateamenvironmentand matchingthemwithpositionswhere theycanexcel.Theresultofthis approachisfulfilledemployeeswho bringtheirbesttoourclients.

B U I L T B Y R E L A T I O N S H I

COMPANYINFORMATION

Form of Ownership

State of Residency/Incorporation

Number of Years in Business

Founded in LLC

OURHISTORY

GA, TN, SC, FL 70+

Founded in 1952, Reeves Young is a fully integrated construction company made up of four business units: Water Resources, Heavy Civil, Commercial, and Industrial. Each group stands independent as their respective scopes of work are different, however each group ’ s ability to perform at a high level is bolstered by the experience and expertise of the other’s. Reeves Young’s approach to each project is “Built by Relationship” which means everything we build – from 30 ft below the ground to 30 floors above it – is about people. With a team of more than 600+ employees and offices in Atlanta, Nashville, and Greenville, Reeves Young is positioned to deliver a diversity of building services to clients throughout the Southeast.

SELFPERFORMING

We own 900 pieces of heavy equipment enabling us to selfperform large portions of our projects, which adds a level of reliability for our clients including mitigating owner risk.

TRUSTED ADVISORS

We utilize our more than 70 years of project experience to offer you a construction partner you can trust to advise you with straight talk, transparency, and respect.

OWNERSHIP MENTALITY

We offer our employees the opportunity for ownership in the company ensuring that we are as invested in your projects as you are.

DIVERSE PROJECTS

We have the depth of talent and resources to provide diverse perspectives to help you meet your unique project needs, with the flexibility of approach to pivot quickly when things change

OUR PRECONSTRUCTION

PROGRAM MANAGEMENT

SELF PERFORM

PROJECT MANAGEMENT

CONSTRUCTION MANAGEMENT

GENERAL CONTRACTING

SUBCONTRACTING

DESIGN ASSIST

DESIGN BUILD

OUR

WATER RESOURCES HEAVY CIVIL INDUSTRIAL

WORK SAFE. Home Safe.

SAFETY PROGRAM

Built from the ground up, our safety program provides guidance on every OSHA requirement, as well as industry best practices Our program protects our workforce and safeguards the public.

It includes responsibilities and accountability for the field laborer to the Project Executive and includes an advisement committee comprised of field and management members.

Safety on your jobsite and the safe interface of our project with the community is non-negotiable.

Our program has been very successful resulting in an EMR of .71. We have a full time Safety Director who administers the program at the corporate level and multiple Safety Managers who will audit your project on a regular basis for compliance. Our safety program ensures the Superintendent, Project Manager, Foreman, Subcontractors, and Field Technicians are trained for safety as it relates to your specific scope, communicate safe procedures, and monitor results on a daily basis.

Jobsite orientations and weekly jobsite safety meetings ensure safety information is communicated. The site will also have the appropriate safety signage to communicate with the public.

Our Safety Plan is customized for each project prior to mobilization. We have been successful at creating a Safety Culture on our projects by defining safety responsibility for each individual and making the safety of the project as a whole everyone ’ s responsibility. Everyone, employees, subcontractors, consultants that work on-site are required to complete Reeves Young’s safety orientation and comply with the program.

SAFETY PLANNING & IMPLEMENTATION

Safety is the first consideration given as we plan our work Hazards are identified and methods to address them are developed Project leadership ensures that the correct processes are in place to mitigate risk and that they are being executed throughout the duration of the project.

Zero injuries, zero accidents, and zero near misses is our goal. We strive every day to train, create awareness, record, and improve our safety performance so that our employees and clients are confident that our projects are safe.

Our Safety Program includes:

Safety orientation for all new hires, and everyone new to a jobsite regardless of employer

Weekly site-wide safety meetings

Training for our workforce

Verification of subcontractor safety training

Regular, documented safety audits

3rd party insurance inspections

Evaluation of our employees based on safety performance

Conducting pre-employment and random drug testing

Each week we will conduct a site safety meeting with the entire jobsite. Activities pending for the week, logistical changes, and a segment on task specific training will be included. This meeting is an opportunity to discuss with the field team any concerns you may have or any new processes for the jobsite.

Preconstruction Safety Meeting Agenda:

Introduction of Team Members

Review of Contractor’s Safety Experience

Review of Site-Specific Safety and Health Program

Review of Emergency Action Plan

Review of Authority Safety Requirements

Open Discussion

HEAVY CIVIL Overview

ReevesYoungHeavyCivilhasbeendiggingdeepforclientsformorethan70 years.Since1952,wehaveprovidedturnkeysitedevelopmentandutility infrastructureservicesonhigh-profiletechnicalprojectsthathavesupported stateandlocalmunicipalities,owners,developers,andgeneralcontractors throughouttheSoutheast Withourfleetof200+piecesofheavyequipmentanda dynamicteamofoperators—manywhohavebeenwithus20yearsormore— wehavethecapabilityandexperiencetostartyourprojectonastrongfoundation.

HEAVY CIVIL Markets

Blasting

DataCenters

Dewatering

MassGrading

Parks&Trails

SpeculativeWarehouse

Shoring

Transportation

TurnkeySiteDevelopment

UtilityInfrastructure

HEAVY CIVILMarkets

BLASTING

Safetyisourpriorityoneveryconstructionprojectwemanage,butit’sevenmoreimportantwhen you’redealingwithexplosives.WithReevesYoung,youhaveateamofhighlyskilledandtrained techniciansthatcanassessyouroverallsiteconditionsandassistwithanyrockremovalneedsyou have—bigorsmall

DATACENTERS

Formissioncriticalprojects,speedandsecurityareessential ReevesYoung’sexperienced infrastructureteamswillefficientlyanalyzeyourprojectsiteforpotentialthreats,offersitework solutionsformaximizingyourscheduleandbudget,andeffectivelymitigateyourrisk.

DEWATERING

Removingwaterfromyourjobsiteisacrucialstepforprojectsuccess.Itisalsooneofthemosthighly regulatedprocessesyouwillencounterduetoitspotentialtonegativelyimpactlocalwatersupplyand theenvironment.UtilizingourdepthofexperienceinbothHeavyCivilandWaterResources,Reeves Youngoffersahighlyspecializedteamthatcanidentifythepotentialhazardsonyoursiteandmitigate themeffectively

MASSGRADING

Themostcrucialpartofanyprojectisthebeginning makingsureyouhaveacleanslateandasolid foundation Fromlandfillstohigh-risefoundations,ruraltourban,hotelstoparks,expansiveto congested,theReevesYoungteamwillmanageyourentiresiteworkpackagesoyoucanfocuson finishingstrong.

PARKS&TRAILS

Community.Connectivity.Progress.Preservation.ReevesYoungknowstheuniquechallengesof connectingoldwithnew,enhancingnaturalsurroundingswithoutdamagingthem,mergingprogress withprotection.Foryears,ourteamhasbeentrustedtodeliverprojectsthatpavethewayfor communitiestoenjoytheoutdoors.

SHORING

Restrictivesitesandsoftfoundationscanmakeforadifficultstarttoanyproject.ReevesYoung understandsthecomplexitiesofshoringanddeepexcavationsandwillworkcloselywithyourteamto ensurethatyourprojectgetsstartedsafelyandsuccessfully.

TRANSPORTATION

Growthisinevitable,soimprovementisnecessary.Highways,roadways,bridges,andtracksall eventuallyneedrepairoradditions.Weknowtheseprojectsarevitaltokeepourcountryand economyvibrant,andyouneedapartneryoucantrusttodeliver.ReevesYoungisconfidentthatno matterhowyouchoosetoarrive—bicycle,car,ortrain—ourprojectteamcanhelpyougetthere

TURNKEYSITEDEVELOPMENT

Beginningwiththeendinmind,ourteamcanprovidethefullscopeofsiteworkservicesthatwill ensureyourprojectstartsstrong.Fromearthworkandgradingtoutilitiesandstormwater,Reeves Younghastheuniquequalificationstoprovideturnkeysitedevelopmentsolutionsthatwillensure safety,stability,andsuccessforyourproject

UTILITYINFRASTRUCTURE

Complicatedprojectsdon’tscareus.FromhelpingtheCityofAtlantareplacecombinedsewerlines forEPAcomplianceto40-feetdeeputilitytie-insthatallow30-storybuildingstobebuilt,we’vedone itall ReevesYounghasbroughtutilityinfrastructuretohundredsofhigh-profileprojectsthroughout theSoutheast

CITY OF ATLANTA WATER SUPPLY

BELLWOOD QUARRY

LOCATION

Atlanta,GA

CLIENT

CityofAtlanta

ThisprojectatBellwoodQuarryfortheCityofAtlantaWaterSupplyfeature turnkeyheavycivilservicesthatincludeda3,800SFpermanentsoilnailwall, 3,500SFofmodularblockwalls,4816”diameteraugercastpilesvaryingin lengthfrom29’–38’,andsitegrading Utilityinfrastructureincluded1,300 LFof36”ductileironpipe,3,000LFof8”andbelowwaterline,1,500LFof sanitarysewer;3,700LFof24”andbelowreinforcedconcretepipeand high-densitypolyethylenepipeforstormsewer,andyardpipingforthe pumpstations(2,500LFof36”ductileironpipe,280LFof30”ductileiron pipe,140LFof48”ductileironpipe,140LFof84”fiberglassreinforced epoxypipe) Thesitefinishesconsistedof12,000SYofasphaltpaving; 12,700SFofpermeableconcretepaving;6,500LFofcurbandgutter, 13,000SFofconcreteflatwork,landscapingandirrigation,fenceand guardrails,sitefurnishings,andarainwaterharvestingpond.

12,450 LFOFUTILITY INFRASTRUCTUREPIPE

12,000 SYOFASPHALTPAVING

STATE FARM PHASE II

LOCATION

Dunwoody,GA

CLIENT

HolderConstruction

ReevesYoungprovidedheavycivilservicesinsupportoftheconstruction ofStateFarm’snewheadquarters Theprojectincluded165,000CYofdirt hauledoffand170,000CYofrockblastingwithhauloffandutility installationfora40’deep,100,000SFfootprintforafour-story undergroundparkingdeck.Servicesprovidedalsoinvolvedearthwork, shoring,dewatering,utilities,concreteprecastculverts,MSEwalls,asphalt paving,andsignalization.InstallationoftwoofGA’slargestpre-cast culvertstobuildanewroadway.Utilityworkincluded400LFof24”sewer line,jackandboresewerlineunderasix-laneparkway,stormdrainage,and waterlines.

165,000 CYOFDIRT

170,000 CYOFROCK

760 RALPH MCGILL

LOCATION

Atlanta,GA

CLIENT Brasfield&Gorrie

ReevesYoungwasresponsiblefortheturnkeysitedevelopmentonthis 2,000,000SFprojectneartheAtlantaBeltLineforBrasfield&Gorrie

Theprojectincludedheavycivilservicessuchaserosioncontrol,site grading,dewatering,blasting,excavationof205,000CYofdirt,40,000 CYofrock,siteutilityinstallation,andintersectionimprovements.

2,000,000

205,000

NORFOLK SOUTHERN

LOCATION

Atlanta,GA

CLIENT

HolderConstruction

ReevesYoungprovidedturnkeysitedevelopmentservicesincluding erosion,dewatering,shoring,excavation,grading,stormwater,water,and sewerinfrastructureforNorfolkSouthern’snewcorporateheadquarters Thetwo-towerprojectincludesapproximately856,000SFofofficespace anda14,000SFchildcarecenterwitha3,600SFoutdoorplayarea.Three levelsofbelowgradeparkingwerealsorequiredfortheprojectandentail 77,100SFofshoring,159,270CYofsoilexcavation,including29,000CYof impactedsoils,atemporarydewateringsystemwithover100wells,anda permanentunderdrainsystem.

100

WELLDEWATERING SYSTEM

29,000 CYOFIMPACTED SOILS

BEACON MUNICIPAL COMPLEX

LOCATION

Decatur,GA

CLIENT

CityofDecatur

TheBeaconMunicipalCourtComplexwasanadaptivere-useandnew constructionofahistoric,three-buildingcitymunicipalcomplex The project,totaling84,377SF,includedapoliceandmunicipalcourtfacility withcourtroom,holdingcellsand911communications,anactiveliving buildingwithclassrooms,agymnasium,andaCityofDecaturSchools AdministrationBuilding.TheLEEDSilverprojectalsoincludedthe constructionofaplazatoconnectthethreebuildings.Threeadditional projectscopeswereaddedmid-project:re-routingamajorarteryofthe city’sactivestormsewer,buildingatwoandone-halfacrewaterretention vaultbelowasoccerfieldtomanagesiteflooding,andexpandingand renovatinganadjoiningcommunitypool.

2.5 ACREWATER RETENTIONVAULT

84,377 SFBUILDINGSIZE

ATLANTA UNITED TRAINING CENTER

HEAVY CIVIL/LANDSCAPE

LOCATION

Marietta,GA

CLIENT

HolderConstruction

This30-acrenewsoccertrainingcomplexinvolvedtheconstructionof threeartificialandthreenaturalturffields.ReevesYoungself-performed thegrading,movingover200,000CYofdirtonthesite.Theprojectalso includedtheinstallationofstorm,sanitary,andwaterlines,10,000LFof8”–36”pipe,and1,000LFof48”–60”stormdrainagepipe Hardscapeand landscapedesignswerealsoimplemented,includingwalls,sidewalks,a fountain,anirrigationsystem,andparkinglotpaving

SEMINOLE LANDFILL

LOCATION

Atlanta,GA

CLIENT DeKalbCounty

ReevesYoungcompletedtwoprojectsforthelandfill,whichreceivesall residentialtrashforDekalbCounty,Georgia Thefirstprojectincluded 4,200LFofaccessroadgradingandpaving84”and96”diameterstorm draininstallation,customerdrop-offareaimprovements,aseven-acre stormwaterdetentionpond,officetrailer,picnicshelter,vehicletirewash, storageshedsiteentranceway,andlandscaping.Thesecondproject involvedmoving1.6millioncubicyardsofsoiltofillandlevelthe27-acre area,andthedevelopmentoftwonewlandfillcellstoreceivethetrash. Bothrequiredalandfilllinersystemandsandlayer.

1.6

MILLIONCYOF DIRTMOVED

42,000 LFOFACCESSROAD GRADINGANDPAVING

WESTSIDE PARK

LOCATION

Atlanta,GA

TheReevesYoung/CERM/HGOR/Portmandesign-buildteamwaschosen bytheCityofAtlantatocompletetheWestsideParkatBellwoodQuarry andrelatedsitework Theprojectconsistedofconceptualmasterplanning, design,prescribingecologicalrestorativetreatmentsforhighlydegraded industrialsites,permitting,andconstructionforPhaseIimprovementsand amenities.Thefirstphaseofthe$26.5million36-acreprojectincludeda gatewayentranceattheintersectionofJohnsonRoadandGrovePark Place.Setonthepark’snorthside,thegatewayhaslighting,signage,and graphics.TherestorationofGroveParkPlaceincludedresurfacingtheroad andimprovementofthegreeneryalongthecorridor.Theparkcontains trails,apedestrianconnectiontotheProctorCreekGreenway,andan ADA-accessibleoverlook.

DH STANTON PARK

LOCATION

Atlanta,GA

CLIENT

AtlantaBeltLineInc.

ThisprojectinvolvedtherenovationandexpansionofanexistingCityof Atlantaparklocatedonaformerlandfill ReevesYoungwascontractedby theCityofAtlantatocreatethefirst-of-its-kindenergycost-neutralpark Photovoltaicsolarpanelsthatactasashadestructureatoneofthepark’s entrancesproduceenergy,whichissoldbacktoGeorgiaPower,offsetting theentiretyofthepark’senergycosts.Parkamenitiesincludedasplash pad,anenhancedplaygroundwithinteractiveplayelements,walkingpaths thatencirclethepark,aLittleLeaguebaseballfield,apavilion,andrestroom facilities.

KATHRYN JOHNSTON MEMORIAL PARK

LOCATION

Atlanta,GA

CLIENT ParkPride

ReevesYoungservedastheprimecontractorforthisbrand-newparkinthe UpperProctorCreekarea Thiswatershedprojectmanagespersistent stormwaterfloodingissuesinthearea Avacantpropertywithblighted structureswastransformedintoavibrantcommunityasset The approximatelytwo-acreparkincludesaraingarden,constructedwetlands, andothergreeninfrastructurethatmanages3.5Mgallonsofstormwater runoffannually.Heavycivilservicesincludedself-performeddemolition, installationofundergrounddetentionsystems,utilities,lighting, landscaping,andhardscapes.

3.5

MILLIONGALLONSOF STORMWATERMANAGEMENT

2 ACRES

HISTORIC FOURTH WARD – ATLANTA

LOCATION

Atlanta,GA

CLIENT

CityofAtlanta

TheAtlantaBeltLineprojectisthemostcomprehensivetransportationand economicdevelopmentefforteverundertakeninthecityofAtlantaandis amongthelargest,mostwide-rangingurbanredevelopmentprogramsin theUnitedStates AsGeneralContractor,ReevesYoungdeveloped significantpiecesofoneofthemostvisiblecomponentstotheproject the17-acre,multiactivityHistoricFourthWardPark Workcompleted includedbuildingtherecirculatingstream,asplashpad,waterfalls, amphitheater/plaza,andrestroomfacilitiesonthefive-acresouthparcelas wellasthelargeoutdoortrellis,eventlawn,andsculpturegardenonthe northparcel ReevesYoungalsobuiltthethirdparcel,whichincludes Atlanta’sfirstpublicskatepark,withover15,000SFofbowls,curbs,and smoothrollingconcretemounds.Theparcelalsoincludesasportsfield,a shadetrellistoppedwithsolarpanels,andpublicrestroomfacilities.

17 ACRES

15,000 SFOFBOWLS,CURBS,AND SMOOTHROLLING CONCRETEMOUND

EASTSIDE TRAIL – ATLANTA BELTLINE

LOCATION

Atlanta,GA

CLIENT

AtlantaBeltLineInc.

PartofthesecondexpansionofAtlantaBeltLine’sEastsideTrail,this projectcontinuedthetrailfromKirkwoodAvenuetoMemorialDrive,over FultonTerrace/MauldinStreet Thescopeoftheprojectincludedaramp andstairconnectionattheFultonTerracebridgeandpedestrian intersectionimprovementsatKirkwoodAvenue,MemorialDrive,andBill KennedyWay.

0.25 MILES

2 ACRES

AVONDALE TOWN GREEN

LOCATION

AvondaleEstates,GA

CLIENT

TheCityofAvondaleEstates

ReevesYoungRecentlycompletedtheconstructionofanewTownGreen fortheCityofAvondaleEstates AvondaleEstatesisbuildingonits reputationasagreencity,andthetwo-acreTownGreenwillserveasan economicdriverforthedowntown,aswellasaplaceforthecommunityto gather.Thescopeofworkincludeddemolishingexistingstructures,grading forfuturemixed-useBuildings,roadimprovements,pavilion,andTown Greenlandscapeandhardscape.Theprojectincludeswalkingpaths, intimategardens,openfieldsforpassiverecreation,apavilionforoutdoor performances,spaceforevents,provisionsforfoodtrucks,achildren’s area,adogplayground,andotheramenitiesforresidents,businesses,and visitorstoenjoy. 300 PERSONAMPHITHEATER

2 ACRES

CENTENNIAL OLYMPIC PARK

LOCATION

Atlanta,GA CLIENT

GeorgiaWorldCongressCenterAuthority

ReevesYoungwaschosenbytheGeorgiaWorldCongressCenter AuthoritytoprovideConstructionManagementatRiskservicesforthe CentennialOlympicParkrenovations Therenovationsandimprovements weredesignedtoincreasecommunityaccess,strengthenitsOlympic heritage,enhancethevisitorexperience,andexpandprogramming opportunities.Ahistoricpreservationeffortwasalsomadetoremove, clean,andrelocatecommemorativebricksinthepark.

2

STORYMULTI-USE EVENTFACILITY

22 ACRES

SANDY SPRINGS CITY CENTER

LOCATION

SandySprings,GA

CLIENT

HolderConstruction

ThisroadwayimprovementprojectwasperformedforHolderConstruction andsupportedtheconstructionofthenewCityCenterfortheCityof SandySprings ReevesYoung’sscopeincludedthedemolitionofexisting roadwaysandcorrespondingsignalizationattwointersections Services included250LFof36”jackandboreutilityinstallation;3,300LFof18” reinforcedconcretepipe;1,000LFof12”ductileironpipewatermain;9,000 LFofcurbandgutter;and27,000SYofasphaltpaving.Theprojectalso contained1.2milesofwalkingtrailsandpaths.

9,000 LFOFCURBANDGUTTER

27,000 SYOFASPHALTPAVING

MERCEDES-BENZ STADIUM

LOCATION

Atlanta,GA

CLIENT HHRM,JV

ReevesYoungwasawardedmultipleworkscopesforthishighlytechnical projectfortheHolder,Hunt,Russell,Moodyjointventureinchargeof buildingMercedes-BenzStadium Theprojectincludedgradingthe40-acre site,whichrequiredremoving200,000CYofsoil,equaling100dumptrucks aday.Italsorequiredcreatinginternalaccessroads;placementof294,000 SFofsoilcementformultiplecranepads;demolitionoftheexisting roadwaybridgeandretainingwall;installationofwater,sewerandutility lines;andinstallationofsitework,utilities,andtrafficsignalstosupportthe newentranceroad.

200,000 CYOFSOILREMOVED

294,000

HOME DEPOT BACKYARD

LOCATION

Atlanta,GA

CLIENT

HolderConstruction

ReevesYoungperformedturnkeysitedevelopmentservicesforTheHome DepotBackyardproject,aredevelopmentofthe13-acregreenspaceon thesiteoftheformerGeorgiaDomeandwhatisnowMercedes-Benz Stadium Theuniqueprojectisbeingusedforgame-dayparking,events, andentertainment.Theprojectincludedmassgradingandinstallationof6″ ofwater,8″ofsewer,andupto42″ofstormdrainutilitylines.ReevesYoung alsoperformedasPrimeContractorfortheinstallationofa268,000CF undergroundcast-in-placestormwaterdetentionvault.

13 ACRES

268,000

CFCASTINPLACE UNDERGROUND STORMWATERVAULT

INFINITE ENERGY CENTER EXPANSION AND RENOVATION

LOCATION

Duluth,GA

CLIENT

HolderConstruction

ThisprojectforHolderConstructionincludedturnkeysitedevelopmentfor theimprovementstoInfiniteEnergyCenter.Servicesinvolvedinstallation ofaprecastundergrounddetentionsystem(668precastpiecesthatequal 571,535CFofstorage),excavationof100,000CYofdirt,shoringwithI Beamandlagging,atemporarydewateringsystemwithpermanent underdrainsystem,7,068SYofpaving,12,784SYofmillandoverlay,and sitedemolition Theundergrounddetentionsystemisoneofthelargestin theSoutheast

571,535

CFOFSTORAGEFOR UNDERGROUND DETENTIONSYSTEM

100,000 CYOFDIRTEXCAVATED

CLEMSON UNIVERSITY: DOUTHIT HILLS

STUDENT COMMUNITY

LOCATION

Clemson,SC

CLIENT

HolderConstruction

Thisprojectinvolvedturnkeysitedevelopmentservicesincludinggrading, utilities(storm,sanitary,water,chilledwater),treeremoval,retainingwalls, roads,andparkinglotpavingforaneweight-buildingstudenthousing complex Thescopealsoincludedsewerlineinstallation,someasmuchas 25’deep Theprojectutilizedfourcrewsand25piecesofReevesYoung ownedheavyequipmenttocompletetheprojectontime 25

FTDEEPSEWERLINE INSTALLATION

65 ACRES

PROJECT STARBELT

LOCATION

Huntsville,AL

CLIENT

HolderConstruction

ThisprojectforHolderConstructioninvolvedtheinstallationofafull sanitarysewersystemona300-acresitewhichwillbecomealargedata center Theheavycivilscopeconsistedofover10,000SFofpipe installation:2,621LFof6”PVCpipe,4,469LFof8”ductileironpipe,and 4,672LFof12”ductileironpipe.

300 ACRES

10,000 LFOFPIPE INSTALLATION

PROJECT MORNING HORNET

LOCATION

SocialCircle,GA

CLIENT

HolderConstruction

ReevesYoungwasresponsibleforself-performing100%oftheutility infrastructureworkforHolderConstructiononthese195undisturbed acreswhichwillbecomea900,000SFdatacenter Thisinstallationincluded 8″sewerand8″–12″waterutilityinfrastructurepiping,includingmanholes Over30,000LFofpipewasinstalled,including11,367LFof8”SDR35 sanitarysewerpiping,11,892LFof12”ductileironpipeforafireline,and 13,364LFof8”ductileironpipeforadomesticwaterline.

900,000

SF

36,000 LFOFPIPE

SK BATTERY AMERICA

LOCATION

Commerce,GA

CLIENT PlateauExcavation

ThisprojectinvolvedtheinstallationofwaterandsewerlinesforanewSK Batterymanufacturingplant Over30,000LFofpipewasinstalledonthis project:15,678LFof8”ductileironpipeforsanitarysewer,12,343LFof10” ductileironpipeforafireline,and2,740LFof6”ductileironpipefora domesticwaterline.

30,000 TOTALLFOFPIPE

12,343 LFOF10”DUCTILE IRONPIPE

NGHS BUFORD MEDICAL PLAZA

LOCATION

Buford,GA

CLIENT JEDunn

Thisprojectinvolvestheconstructionofathree-storymedicaloffice buildingspanning100,000SF,situatedonaneight-acresite The developmentwillfeaturealargestormdrainagedetentionsystemto managewaterfloweffectively

Additionally,approximately80,000CYofonsitematerialwillbeexcavated andmilledtoaccommodatethesite’sgradingandinfrastructureneeds.The projectalsoincludestheinstallationofwaterandsewerutilitiestosupport thefacility'soperationalrequirements.

100,000 SF

8

ACRES

NGMC BRASELTON MOB

LOCATION

Braselton,GA

CLIENT

TurnerConstruction

Thisprojectconsistsofathree-storyhospitalcovering218,000SFanda five-story,125,000SFmedicalofficebuilding,allsituatedona119-acre greenfieldsiteinBraselton,GA Thefacilityfeaturesanexteriordesign incorporatingstone,metalpanels,stucco,andpunchedwindows The NortheastGeorgiaMedicalCenterincludes100privatepatientroomsand offersarangeofservices,suchasImaging,Diagnostics,EmergencyCare, Orthopedics,Heart&Vascular,Surgery,Neuroscience,andCancer Treatment.Themedicalofficebuilding(MOB)wasconstructed concurrentlywiththehospitalandisdirectlyconnectedtoit.TheMOBalso includesapproximately35,000SFofinteriorspace,whichhousesimaging suites,procedurerooms,andCathLabs.

100

343,000

UCBC ATHENS MOB

LOCATION

Athens,GA

CLIENT

Brasfield&Gorrie

ReevesYoung,incollaborationwithBrasfield&Gorrie,providedsitework forthenewComprehensiveCancerCenterinAthens,GA Thescopeof workincludedclearing,erosioncontrol,demolition,grading,andthe installationofstormdrainage,sanitarysewer,andwaterlinestopreparethe siteforconstruction.

Additionally,approximately35,000CYofsoilwereexported,with2,500CY ofsoilmovedonsitetoassistwithgradingandfoundationpreparation. Theseeffortsensuredthesitewasproperlypreparedfortheconstruction ofthisvitalhealthcarefacility.

35,000 CYOFSOILEXPORTED

120,000 SF

WELLSTAR KENNESTONE HOSPITAL

LOCATION

Marietta,GA

CLIENT JEDunn

Thisprojectinvolvedacomprehensiveheavycivilscopeincluding demolitionoftheexistingparkinglotandhardscapes,massgradingandfine grading,andinstallationofundergroundwater,sanitarysewer,and stormwatersystems Theworkperformedonthissitesupportedthe developmentofa$126million62,825SFfour-storyemergency department—thestate’sbusiest—whichhasthecapacitytotreat 185,000peopleannually.

4 STORIES

62,825

SF

NS CUMBERLAND MOB

LOCATION

Atlanta,GA

CLIENT

Brasfield&Gorrie

LocatedonAtlantaRoadatCumberlandParkwayinSmyrna,thisthreestory,60,000SF,state-of-the-artmedicalofficebuildinghousesmultiple Northsideservicesandphysicianpractices Theprojectbeganwiththe demolitionofexistingasphaltandconcretestructurestopreparethesite fornewdevelopment.Erosioncontrolmeasureswereimplementedto protecttheenvironment,followedbyclearingthesitetoremovedebrisand obstacles.

Massandfinegradingwereperformedtoensurepropersitelevelingand drainage,creatingasolidfoundationforthenewbuilding.Theinstallationof stormwaterdrainage,sewerlines,andwaterutilitieswasalsocompleted, providingtheessentialinfrastructureneededtosupportthefacility'slongtermfunctionality Thiscomprehensivesiteworkensuredthesuccessful developmentofthemedicalofficebuilding

60,000

8 ACRES

RANA HUNTSVILLE MOB

LOCATION

Huntsville,AL

ReevesYoungprovidedthecompletesitepackageforthenewmedical officebuildinginHuntsville,AL Thescopeofworkincludedcomprehensive erosioncontrolmeasures,grading,andtheinstallationofastormdrainage system Additionally,theinstallationofwaterandsewerutilitieswas managed,curbsandgutterswereconstructed,andasphaltpavingwas completedforparkingareasandaccessroads.Theseeffortsensuredthe sitewasfullypreparedandsupportedthesuccessfulprogressionofthe building’sconstruction.

20,500

PIEDMONT MOUNTAINSIDE HOSPITAL EXPANSION

LOCATION

Jasper,GA

CLIENT JEDunn

ReevesYoungwasawardedthesiteworkandutilitiesfortheICUexpansion atPiedmontMountainsideHospitalinJasper,GA.Theprojectwaslocated onacompact1.5-acresite,wheretheexistingparkinglotwasdemolished tomakewayfortheICUbuildingexpansion Thescopeofworkincluded gradingtopreparethesiteforthenewstructure,aswellasadditional gradingfornewparkingspacestosupportthefacility Additionally, necessaryutilitieswereinstalledtoservicetheexpandedICU,ensuringthe sitewasfullypreparedforconstructionwhilemaintainingefficientaccess andfunctionalityforhospitaloperations

1.5 ACRESITE

11,000

PIEDMONT ELLIJAY MOB

LOCATION

EastEllijay,GA

CLIENT

Brasfield&Gorrie

Thisprojectinvolvedcomprehensivesitepreparationandutilityinstallation services Thescopeofworkbeganwiththeimplementationoferosion controlmeasurestopreventsoilerosionandensurecompliancewith environmentalregulations Followingthat,sitedemolitionwascarriedout toremoveexistingstructuresandcleartheareafornewdevelopment.

Sitegradingwasthenperformedtoestablishproperelevationsandensure effectivedrainageacrossthesite.Additionally,stormdrainagesystems wereinstalledtomanagewaterrunoffandpreventflooding.Essential utilities,includingwaterandsanitarysewersystems,werealso implementedtosupportthesite’sfuturedevelopmentandoperations.This workwasvitalinpreparingthesiteforconstructionwhileensuringlongtermfunctionalityandsustainability

2 STORIES

6 ACRES

AHF CHATTOOGA MOB

LOCATION

Trion,GA

CLIENT

Brasfield&Gorrie

Theprojectinvolvedperforminggradingandinstallingessentialstormwater andsanitaryutilitiesforanewstand-alonemedicaloffice Sitegradingwas carriedouttoensureproperelevationandeffectivedrainage,preparingthe sitefortheconstructionofthebuilding Thegradingworkwascriticalin establishingastablefoundationwhilefacilitatingwaterflowmanagement acrosstheproperty.

Additionally,theinstallationofstormwaterdrainagesystemswas completedtomanagerunoffandpreventflooding,ensuringthesitewould remainfunctionalandenvironmentallycompliant.Sanitarysewerutilities werealsoinstalled,providingthenecessaryinfrastructuretosupportthe medicaloffice’soperations.Theseeffortslaidthegroundworkforthe developmentofasustainable,fullyfunctionalmedicalfacility

40,000 SF

6 TREATMENTROOMS

GEORGIA

+1 (770) 271 1159

45 Peachtree Industrial Blvd. NW Sugar Hill, GA 30518

TENNESSEE

+1 (615) 252.7766

4101 Charlotte Avenue, Suite E205

Nashville, TN 37209

SOUTH CAROLINA

+1 (864) 813.4370

201 Riverplace, Suite 300

Greenville, SC 29601

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.