FERC Project No. 14787
Black Canyon Hydro, LLC January 2023
Final License Application Exhibit F: General Design Drawings and Supporting Information Seminoe Pumped Storage Project
Contents
Appendices
Attachment
Application – Exhibit F
January 2023 | i
Final License
Seminoe Pumped Storage Project
................................................................................................................
.................................................................................
1.0 General Drawings
1 2.0 Preliminary Supporting Design Report
2
A – Project Drawings – Filed as CEII
Attachment B – Preliminary Supporting Design Report – Filed as CEII
–
F
January 2023 | 1
Final License Application
Exhibit
Seminoe Pumped Storage Project
The drawings
will be
Exhibit Number Title 1 Cover Sheet, Location Plan and Index 2 Project Site Plan 3 Upper Reservoir and Spillway Plan 4 Upper Reservoir Sections 5 Upper Reservoir Dam Sections and Typical Details 6 Upper Reservoir Intake Structure - Plans and Sections 7 Longitudinal Profile of Waterways 8 Upper and Lower Gate Shafts 9 Steel Headrace Section 10 Headrace and Tailrace Surge Shafts 11 Underground Power Facilities Location Plan 12 Underground Power Facilities Plan at Main Floor level 13 Underground Power Facilities Plan at Turbine and Generator Levels 14 Underground Power Facilities Transverse section 15 Underground Power Facilities Longitudinal Section 16 Underground Power Facilities Typical Rock Support 17 Tunnel Cross sections 18 Typical Tunnel Support 19 Lower Reservoir Intake 20 Lower Reservoir Intake Structure Plan and Sections 21 Single Line Diagram 22 Main Access Bridge Plan, Sections and Details 23 Typical Road Cross Section and Main Access Tunnel Long, Section 24 Access Road Plan to Upper Reservoir Sheet 1 25 Access Road to Upper Reservoir Sheet 2
1.0 General Drawings
submitted in this Exhibit F are preliminary design drawings. Final Exhibit F drawings
submitted to the Federal Energy Regulatory Commission for approval prior to commencement of any construction of the Project. Preliminary general design drawings of the principal Project works are attached as Attachment A to this Exhibit.
Exhibit
Title
Access Road to Upper Reservoir Sheet 3
Access Road to Upper Reservoir Sheet 4
Access Road to Upper Reservoir Sheet 5
Access Road to Upper Reservoir Sheet 6
Contractors Areas
Cable Shaft and Typical 500 kV Transmission Towers and WAPA Reroute
500 kV Transmission Line Sheet 1
500 kV Transmission Line Sheet 2
500 kV Transmission Line Sheet 3
500 kV Transmission Line Sheet 4
500 kV Transmission Line Sheet 5
500 kV Transmission Line Sheet 6
500 kV Transmission Line Sheet 7
500 kV Transmission Line Sheet 8
500 kV Transmission Line Sheet 9
WAPA Reroute – SE Option Sheet 1
WAPA Reroute – SE Option Sheet 2
WAPA Reroute – SE Option Sheet 3
WAPA Reroute – NW Option Sheet 1
WAPA Reroute – NW Option Sheet 2
WAPA Reroute – NW Option Sheet 3
WAPA Reroute – NW Option Sheet 4
License Application – Exhibit F Seminoe
Storage Project January 2023 | 2
45
46
47
2.0 Preliminary Supporting Design Report The Exhibit F drawings provided are preliminary and subject to refinement upon completion of geotechnical, seismic, and hydrogeological exploration data A Preliminary Supporting Design Report is attached as Attachment B to this Exhibit.
Final
Pumped
Number
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
License Application – Exhibit F Seminoe Pumped Storage Project Attachment AProject Drawings (Filed as CEII) Enter Divider Name
Final
Seminoe Pumped Storage Project
This section of the Final License Application has been redacted because it contains Critical Energy Infrastructure Information (CEII). This section contains engineering drawings and schematics and the preliminary supporting design report. Procedures for obtaining access to Critical Energy Infrastructure Information (CEII) may be found at 18 CFR § 388.113. Requests for access to CEII should be made to the Commission's CEII Coordinator.
F
Final License Application – Exhibit
License Application – Exhibit F Seminoe Pumped Storage Project Attachment BPreliminary Supporting Design Report (Filed as CEII) Enter Divider Name
Final
Seminoe Pumped Storage Project
This section of the Final License Application has been redacted because it contains Critical Energy Infrastructure Information (CEII). This section contains engineering drawings and schematics and the preliminary supporting design report. Procedures for obtaining access to Critical Energy Infrastructure Information (CEII) may be found at 18 CFR § 388.113. Requests for access to CEII should be made to the Commission's CEII Coordinator.
F
Final License Application – Exhibit