Architecture portfolio eng JOUSSELME QUENTIN

Page 1

ARCHITECTURE PORTFOLIO

JOUSSELME QUENTIN


PROFESSIONAL EDUCATION EXPERIENCE FR

2015 Sept / Oct

Temporary worker at University of MONTPELLIER Programation / Plan design of the new building of Montpellier University Intendance located in the botanical garden

FR

2015 June / July

Internship in the association «Saving the Queen’s garden and the intendance building of the botanical garden in Montpellier» Planning and 3D / pre-programation

FR

CV JOUSSELME QUENTIN quentinjousselme@gmail.com 0033 (0)6.08.68.65.89 101 bis Allée Georges Brassens 84700 SORGUES / FRANCE born on 7th november 1990 in ORANGE (FR)

PERMIS B SINCE 2009 WEBSITE

QUALITIES MOTIVATED / HELPFUL SMILING / KEEN TO LEARN

2

FR

2010 / 2016

FR

2010

Master’s degree in ARTS & ARCHITECTURE at l’Ecole Supérieure Nationale d’Architecture de Montpellier French Litterature

baccalaurate in with honours

FR

2005 / 2010

High school studies. Optional subjects : Drama / Engineering Science / Art History / Further english

SKILLS

Softwares July VectorWorks / Sketchup /

2013

Administrative and form filler for post construction insurance at CG84. Building and architecture department. Site meeting / working damage files / executed work files Advertising and display for Avignon theatre festival (OFF)

C4D (V-RAY) / Suite Adobe / Pack Office / AutoCAD

REVIT

Training course in preparation

Team management

& meeting organisator July Event with associations Receptionist / Welcoming agent Construction for Avignon theatre festival (IN)

FR

2012

Lightweight architecture design and building / furniture design and building / Scenography 2011 July / Sept

Advertising and display for Avignon theatre festival (OFF)

ARG.

Internship at Francisco Lopez Bustos architecture studio (Buenos Aires). Plan / bill of specifications / administrative work

FR

2011

July

Administrative and form filler at CG84. Roads and territory department. Road mapping / Site meeting. Advertising and display for Avignon theatre festival (OFF) Receptionist / Welcoming agent for Avignon theatre festival (IN)

AWARDS

FR

2016

Modeling

Hand and laser cutting skills

LANGUAGES

FRENCH

Mothertongue

ENGLISH

Fluent : C1 level Moderate : A2 level

SPANISH GERMAN

Learning / training courses

OTHERS

March President of associations

K’FET : retauration and meeting

Laureate of ARCHITEKTONIK organisation from 2012 to 2013 student workshop (Clermont F.) (active member between 2010

FR Laureate des architecture Languedoc

2016 of

May

and 2016) Effective : 40 volunteers LEZARD : music from 2011 to 2012 (active member between 2009 and 2019) Effective : 15 volunteers

«Ordre Architects» contest in Roussillon Instruments

/

Music

MC


SUMMARY : CONTESTS p4 ... Les dessous de Pennautier p8 ... Une bouteille à la Terre

STUDIES p12 ... Environmental friendly school p18 ... Electro-acoustical center p22 ... Eight houses on the hill

BLENDS p26 ... LIGHT p28 ... GOT SEAT ? P30 ... K’BAHN 3


Les dessous de Pennautier AVEC F.HENRY & M. NOUHEN

Pennautier Castle is a major part of the nation’s heritage because of its architecture and its garden. Keeping in mind this essential link, it was intended to create a continuity with Le Notre’s garden all the while keeping the connection between the castle and the land. The reflection about the impact of a volume built in this place was the starting point of our approach. The prints realised on the surface echo Michael Heizer’s work, «Landart» artist. A smooth circulation serves a functionnal repartition around some patios and allows a dialogue between the overground and underground levels. The inside path is animated by the zenithal light and the different elements decorating the empty spaces. The immaterial link created by the perpetual mouvement of the fountains, in the central patio, connects the Pennautier castle with the underground.

4

FIRST PRIZE


5


6


7


Une bouteille Ă la Terre AVEC M. NOUHEN

CONCOURS DE LA FOND The recycling unit is the entrace point of raw material. This factory treats the plastics gathered in the sea and conserves the PEHD. After washing and grinding, the matter is stocked for future use. 8


DATION BENETEAU 2016 A grand format floating printer (25 x 25 x 17) is trailed to the supporting platform. This 3D printer uses PHED to process the building within 24 hours. Once finished, the printing unity is moved away to a new project. Houses can evolute with the inhabitants needs (add a room / a floor ...) 9


Global warming implies several changes within the world, nature and inhabitat. This heat made by atmospheric pollution grows since the industrial revolution. Tho whole way of living and producting brings insalubrity at the scale of the planet, the atmosphere and the ocean.

processings like 3D printing brings new answers to this stake. Using those becomes a plus when talking about today’s environment.

Making a new raw material from waste is the point in this project. Mens need a clean environment to blossom in it. The waste management throwed in the oceans Throwing plastic in our nature attacks the is a preocupation and we propose a feasible oceanfauna and flaura. This actual pollution is economic way to do it and as well made the also temporary during and will be for at least steril surface of the ocean a life shelf. 1ooo years. The plastic matter is here used as a ressource for building. The progress of

MODE DE VIE CONSOMMATION IMPORTANTE DES RESSOURCES PLANETAIRES

VALORISATION DU MATERIAU CREATION D’UN NOUVEL HABITAT 10

IMPACT CLIMATIQUE POLLUTION ENVIRONNEMENTALE

CREATION D’UNE RESSOURCE NOUVELLE METHODE CONSTRUCTIVE

POLLUTION DES MERS POLLUTION NOCIVE POUR LA FAUNE ET LA FLORE

RECYCLAGE RECYCLAGE DES ELEMENTS PLASTIQUES


11


Environemental friendly school

As a new neighbourhood grows in Montpellier, it needs an elementary school to increase its potential of welcoming families. This eco friendly project aims to decrease its energy consumption by using a specific design. While disepearing by going in the ground on the north face, the south side is seen as a point of view on the landscape, overlooking the road. The two playgrounds are separated by the build entities wich gathers the classrooms.

+120

Âą0

12

They take advantage of a double exposure in order to increase the light quality during the day. Common spaces as sport facilities, cafeteria, sleeping room and library positions themselves along the retaining wall. Thanks to zenithal apertures, they always welcome the sun from the north wich provides a controled and non agressive light. The corridor makes the link between the entrace (on the east side), the commun spaces and the classrooms.


+2,5 +3

0

+300

13


+220

+160

+2

60

+ 170

+300

+140

1000

690

+120

220

0

12

30

-40

0

30

0

-32

-100 -120

-150

-200

-100

14


+300

1250

175

0

775 -20

0

+50

1000

15


Cassette en acier perforé 100*200 cm Vide de réseaux Couvertine Parement de rive en acier Fixation des cassettes Cassette en acier perforé 100*200 cm Etanchéité bitumineuse Patte de fixation IPE 400 Bac acier IPE 300 Bac acier Revêtement de sous-face en métal Poteau en acier section 20 cm

Cassette en acier perforé 100*200 cm Etanchéité bitumineuse Fixation des cassettes

Bac acier

Bac acier Faux plafond Cheneau IPE 200 Suspente metallique Isolation rigide en mousse polyuréthane Bac acier Isolation en laine minérale Bac acier Vide de réseaux

720

Faux plafond

+120

60

90

340

±0

16


Cassette en acier perforé 100*200 cm Etanchéité bitumineuse Couvertine Patte de fixation IPE 160 Parement de rive en acier Fixation des cassettes PRS Suspente metallique Revêtement de sous-face en métal Cheneau Isolation rigide en mousse polyuréthane IPE 200 Bac acier Isolation en laine minérale Bac acier Vide de réseaux Faux plafond

Couvertine Parement de rive en acier Patte de fixation Isolation rigide en mousse polyuréthane IPE 200 Revêtement de sous-face en métal Suspente metallique Faux plafond Bac acier Isolation en laine minérale Bac acier Fixation des cassettes Etanchéité bitumineuse Cassette en acier perforé 100*200 cm Vide de réseaux Couvertine Parement de rive en acier Fixation des cassettes Cassette en acier perforé 100*200 cm Etanchéité bitumineuse Patte de fixation IPE 400 Bac acier IPE 300 Bac acier Revêtement de sous-face en métal

280

340

Poteau en acier section 20 cm

150 Cassette en acier perforé 100*200 cm Etanchéité bitumineuse Fixation des cassettes

Bac acier

398

150

Bac acier Faux plafond Cheneau

600

IPE 200

+260 Suspente metallique Isolation rigide en mousse polyuréthane Bac acier 275

Isolation en laine minérale Bac acier

±0

Vide de réseaux Faux plafond

17


Electro-acoustical center

a reminder that the quays were once dedicated to the industry. The southern part of the project shelters a wine cellar as well as pop up stores. The northern part revolves around a patio enabling the organisation of receptions between the concert hall and the closed external space. The forecourt Located at the limit of the town’s historical is considered as a public space which can welcocentre, the project for the industrial centre is seen me large public events. as a polarity initiating the urbanisation and population densification of the nowadays abandoned industrial zone. The programme includes artits’ residences, documentation spaces, a cafeteria, students’ accomodation and the creation of an adjustable concert hall, in the former wine cellar. The decision to duplicate the existing building using two materials (stone and concrete) is The town of Sète has an industrial past. Nowadays, it has turned to tourism and culture as an urban development plan. The industrial wasteland located to the east of the town is bound to experience many changes.

18


19


20



Eight houses on the hill

Established in Calce (66 600, France), the project inteds to respond to the demographic expension of a 400 inhabitant village. The privileged localisation of the hill (scenery and protection from the prevailing winds) was chosen in order to connect the historical centre to the new community hall located to the south-east of the village.

the landscape. The selection of the construction materials inserts the project in the site, which is mostly composed of schist, garrigue and numerous pre-existing supporting stonewalls.

The accomodation was designed to take into account the seasonal thermal variations. The bedrooms benefit from a second natural light source The eight houses follow the site’s natural curve through the roof light. and do not impede the view of the hill nor impact

22


23


2,8 3,4

1,5 1,6 5

5,5 5

2,2

6,5

5

5 2,3 5 1,1

24

3,6

15

10,


5 1 ,4

5 3,9

0,6 1,4

2,3

2

1,2

0,6

3,5

5 1,7

2,3 1,2

3,5

7,7

1,8

8

19,

25


dim : 35 x 35 x 245 mm

dim : 25 x 25 x 17 mm

26


dim : 19o x 15o x 245 mm

27


dim : 95 x 93 x 5o mm

dim : 24o x 16o x 97 mm

28


dim : 95 x 93 x 5o mm

29


K’BAHN

30


31


32


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.