Perkins&Will_Northeast Adaptive Transformations

Page 1


Northeast Adaptive Transformations

Front Cover: The Exchange, Boston, Massachusetts
Left: View Boston, Boston, Massachusetts
80% of the buildings that will exist in 2050 have already been built.

Repurposing

The

Adaptive Transformation

Our Approach

The most sustainable building is often one that already exists.

We believe in the renewal of buildings and landscapes that have lost their way—not simply because it is the most cost-effective thing to do, but because it is the most sustainable way to build. Environmental vulnerability, carbon neutrality, and supply chain volatility require that our cities reconsider contemporary development. For us, this is a call to reconsider adaptive reuse; we need to expand our ambitions and challenge our preconceptions. Beyond adaptive reuse is a design approach with a broader reach towards placemaking and place keeping. This is Adaptive Transformation.

Historic buildings captivate our imagination. We are passionate about restoring vibrant places that came before us and revealing hidden potential. We approach existing buildings with precision and boldness, rigor and invention, finding the beauty behind the decay and preserving their quality and craft. We aim to breathe life into forgotten places and design meaningful civic, cultural, and community destinations.

Existing conditions offer us productive constraints that reposition distressed assets into active, site-specific design solutions.

More than just a design ethos, Adaptive Transformation presents a number of financial and operational incentives. Building renewal creates opportunities to pursue historic tax credits, minimize energy demands, and lower operational and embodied carbon. Compared to new buildings, construction timelines are often truncated, expediting occupancy, compressing carrying costs, and maximizing financial returns.

Behind every Adaptive Transformation project is an enthusiastic and dedicated team. We love partners who share in our aspirations and believe that great buildings and landscapes need inspired caretakers. The process of adaptive transformation takes time and patience, creativity and perseverance.

However, like every worthwhile endeavor, these buildings deserve our boundless energy and undivided attention.

Scales of Intervention

Any project can find opportunities to reuse materials, but there’s no one-size-fits-all solution. Reuse strategies are inherently flexible and can be tailored to each project’s context, goals, and constraints. From repurposing structural elements to salvaging finishes or fixtures, the possibilities are broad and adaptable.

Light Intervention Reposition

Maintaining and protecting a building in its current form without making significant alterations. The primary focus is preventing deterioration and preserving the building’s historic, architectural, and cultural significance for future generations.1

Envelope Performance Reclad

Returning a building to a specific time period, often its original or historically significant condition. Restoration can include repairing or replacing certain features based on historical documentation or evidence to match the original. 1

2.

1. Parks Canada. (2010). Standards and Guidelines for the Conservation of Historic Places in Canada (2nd ed.). Parks Canada.
The American Institute of Architects (AIA) (2020). Adaptive Reuse Guide - A Framework for Creating CommunityCentered Architecture. The American Institute of Architects.

Adaptive Transformation

Systems Compliance & Energy Upgrade

Repairing and making a building usable again while allowing for some updates and alterations to meet modern requirements. The goal is to retain the building’s historical features while incorporating elements that allow it to serve contemporary uses.1

Major Intervention Addition

Projects may retain and reuse materials in situ where feasible or procure reclaimed materials from offsite sources to reduce material demand, minimize waste, and support circular resource strategies.

Change of Use, Program, & Market Overbuild

Repurposing an existing building for a use other than its original design while maintaining its structural integrity and character. The goal is to extend the life of the building by giving it new functionality.2

8 Critical Insights

Conduct due diligence.

Assess all capital costs, immediate, deferred, and operational. Understand the full financial picture.

Anticipate the unexpected.

Explore the existing structure thoroughly to uncover and mitigate hidden conditions, code issues, or irregularities.

Define the potential.

Commission a Zoning and ‘bestuse’ feasibility study to compare as-of-right yield with what’s possible through entitlement.

Set building expectations.

Catalog the building’s inherent traits (i.e. floor-to-floor heights, bay sizing, structural grid) for analysis with reuse program types.

When we think about how to transform a building, eight critical insights emerged from our design process. These act as lessons in which some, not necessarily all, apply to each of our selected projects.

Establish brand identity.

Leverage the asset’s character and history to craft a brand narrative that aligns with market perception.

Curate first impressions.

Prioritize high-impact upgrades to yield greatest value, attractiveness, and memorability to tenants and visitors.

Differentiate the asset.

Engage brokers and prospective tenants early to identify unique amenities and spatial qualities to create a bespoke offering.

Use timeless materials.

Choose finishes that reflect authenticity and craft, minimize maintenance, and meet modern sustainability and wellness standards.

Design Process

The process requires an in depth understanding of existing conditions. Once we have accessed the these conditions and reviewed applicable “insights” the following Design Process would take place:

Establish a Collective Vision

Begin by aligning around the “8 Insights” and defining the goals that will shape a successful outcome.

Clarify Design Opportunities

Use this framework as a guide for decision-making— distilling the potential within existing building constraints to identify key design opportunities.

Iterate Together

With shared focus, we explore multiple options to uncover new possibilities for amenities, workplace performance, and the public realm.

Discover Smart, Impactful Solutions

The most effective interventions do more than just solve problems—they unlock program potential and generate distinct market value.

Advance Sustainability Goals

By examining existing conditions, we look for ways to elevate performance across sustainability, wellness, and material health.

Repurposing takes time and care. Like all meaningful work, these buildings deserve our full attention. Do you have a vision for an existing structure—something greater, more purposeful, and resonant? Let’s reimagine it together, infusing it with renewed spirit and lasting impact.

The most effective interventions solve multiple problems.

Selected Projects

Adaptive Transformation ―

View Boston

Boston, Massachusetts

Client: BXP

Size: 110,000 square feet

Completion Date: 2023

Awards: Commendation in Interior Architecture, Boston Society of Architects, 2024; Shortlist, Perkins&Will Biennale, 2024

Deference to the View

View Boston is a civic and commercial point of convergence for visitors and residents alike to encounter the city and an iconic landmark building from a new perspective. Located atop the 749-foot tall Prudential Tower in Back Bay, View Boston encompasses three floors of interior and exterior observation decks, hospitality venues, and interactive exhibits offering an unparalleled birds-eye view of the city.

Challenges inherent from the outset of the project involved working within the aging systems of a fully operational, historic office building while updating critical infrastructure to modern standards. Our longtime client BXP envisioned the space as an inclusive gathering place for the public and saw an opportunity to celebrate the architectural significance of the tower, reimagining the Pru as an essential first stop for visitors and a place that residents would return again and again.

CRITICAL INSIGHTS

Conduct Due Diligence • Anticipate the Unexpected • Create a Brand •

Curate First Impressions • Define the Potential • Set Building Expectations

Differentiate the Asset

Use Timeless Materials

Operable tracks beneath the deck serve as a guide for a new window washing rig.

The new observation deck offers 360degree views of the city.

A

universally accessible public

space at the top of Boston, in the Prudential tower.

The skyscraper’s new observation deck features an outdoor viewing area, a cocktail lounge, and immersive exhibits.

View from the city

View Boston

The Exchange at 100 Federal

Boston, Massachusetts

Client: BXP

Size: 20,000 square feet

Completion Date: 2018

Awards: Harleston Parker People’s Choice Award, BSA Design Awards, 2019; Citation, Design Excellence, BSA Design Awards, 2019; Citation, AIA New England Design Awards, 2019; IDEAS2 Merit Award, American Institute of Steel Construction, 2019; Award of Excellence, Best Practice (Small Projects), IFMA, 2019; Merit Award, Office/MixedUse Developments, ENR New England, 2018

A City’s Living Room

Critical to limiting financial exposure within existing buildings is early research and time spent onsite, uncovering the extents of remedial work necessary to bring an asset up to code, maximum efficiency, or current accessibility. At this repositioning, much of the above ground public space relied in needling through existing lower levels of original construction, the condition of which was largely unknown at the outset of the project.

Tracing existing utilities through the basement levels, and discovering early on which were critical for maintenance during and after construction was instrumental to lowering downtime to the tower during construction, and lowering risks associated with unknown conditions.

CRITICAL INSIGHTS

Conduct Due Diligence

Anticipate the Unexpected

Create a Brand

Curate First Impressions

Define the Potential

Set Building Expectations

Differentiate the Asset

Use Timeless Materials

Building entrance and plaza before renovation

Renovation includes a new Congress Street entry that slips into the atrium to receive people traveling from the South, while the reflecting the distinctive geometry of the tower in a modern way.

238 Main Street, SoMa Site 3

Cambridge, Massachusetts

Client: Massachusetts Institute of Technology

Investment Management Company (MITIMCo)

Size: 451,000 square feet

Completion Date: 2021

Sustainability: LEED Gold ®

Awards: Finalist, Mixed Use, The Plan Awards, 2023; Design Excellence Awards Citation of Merit, Large Project Category, AIA Chicago, 2022; Design Awards Citation, AIA New England, 2022

Welcoming Change

The building’s design reinforces the scale and character of its neighborhood. By preserving the existing 238 Main Street Building and creating a connector through a 5-story glass atrium, the design will preserve the pedestrian scale of Kendall Square.

The design team welcomed a challenge during construction to tie the buildings together “with a bridge.” The unexpected design opportunity become a catalyst for how the existing building and new building formed a new architectural dialogue. Together they reflect both the particular and the whole, creating a community of scholars that fits comfortably into the community of Kendall Square, MIT and Cambridge.

CRITICAL INSIGHTS

Conduct Due Diligence

Anticipate the Unexpected

Create a Brand

Curate First Impressions

Define the Potential

Set Building Expectations

Differentiate the Asset

Use Timeless Materials

Site 3 Approach from Main Street, Glass Atrium interfaces with existing 238 Main Street building

New connecting bridge creates a dynamic interface between old and new, while vertical conveying systems become a structurally expressive element.

A unique case study in designing a research community within a multi-tenant lab/office building.
238 Main Street, SoMa Site 3
Efficient Floor Plate
Rotate Upper Mass
Gateway between Green Spaces
Site 3 Massing Diagram

191 Spring Street

Lexington, Massachusetts

Client: BXP

Size: 200,000 square feet

Completion Date: 2018

Sustainability: LEED Gold ®

Narrating the First Impression

Essential to a successful repositioning is understanding where to devote resources to maximum effect. In the case of 191 Spring Street, creating a new tenant entrance and drop-off brings a new address, presence and personality to the building, all geared towards a wow-factor first impressions for tenants and visitors alike.

Similar with a lot of existing structures, this building was not originally designed to address the way in which current occupants would engage the facility, and in opening a new entrance to the building, the design narrates your first impression as a welcoming, fresh, new building for its next generations.

CRITICAL INSIGHTS

Conduct Due Diligence

Anticipate the Unexpected

Create a Brand

Curate First Impressions

Define the Potential

Set Building Expectations

Differentiate the Asset

Use Timeless Materials

new and improved facade carries it’s design aesthetic to the outdoors with the creation of the front courtyard.

Carbon Case Study

Transformation through Transparency

A Carbon Sequestration Story

The building and the tenant spaces are transformed through transparency. Conversion of the building’s opaque, exterior mechanical shafts into multi-story glazing, presents improved interior workspace and a new identity for both building and tenants alike.

Baseline

6,253.5 Total

3,245.8

While

In these projects, operational decarbonization becomes a top priority—reducing emissions not just through design innovation, but by extending the life of buildings and minimizing the carbon costs of demolition and new construction.

1.

225

Boston, Massachusetts 02110

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.