Behind the scenes in PERI‘s Fabrication Workshop with Workshop Manager - Steve Wightman

Set up by one PERI employee in 1998, our fabrication workshop has evolved to become an integral part of our formwork business. Over the years, Workshop Manager Steve Wightman has built up the function’s expertise and knowledge to deliver the unique and fast-paced requirements of construction projects today, which once involved over 20 carpenters operating in the workshop to meet demand.

Experts at our craft

Benefits of fabrication

Customers choose PERI for fabrication because we can build almost any requirement. If there’s a detailed drawing behind it from our technical team, it’s possible.

When we first decided to provide a fabrication service 23 years ago, it was down to me to set the workshop up ready to serve customers who were becoming accustomed to the PERI brand. As the business started to grow, it was important to build a team with the right skills and expertise to meet the demand for bespoke formwork and climbing systems across the UK.

The projects we have worked on are proof of what we are capable of. We’ve fabricated formwork shutters and systems for some of the most iconic projects in the UK, from the London Aquatics Centre to the V&A Museum in Scotland, where we were challenged to produce 1000m2 of bespoke shutters per month. With each project, we’ve learnt something new and improved our craft, ready for the next challenge.

Today, we have a team of seven skilled carpenters that check designs, assess buildability, fabricate, and ensure deliveries are loaded safely. With the expertise across the team, we can help reduce the pressure on site labour and the requirement for these specialist skills because it can all be achieved successfully in-house. Fabricating off-site at our depot means that we can offer our customers a distinct advantage on their projects.

14

We can provide ready-to-use systems that can be erected as soon as it’s delivered to site. This means kit can be delivered in line with the customer’s desired construction sequence which saves space and time. A lot of the fabrication projects we work on are based in and around central London where land is limited and at a premium, so the just-in-time delivery service that we’re able to offer plays a big part in reducing equipment hire periods and the cost of renting additional space. One of the biggest advantages is that our production process isn’t affected by external factors like bad weather and the availability of the crane. As there’s no downtime, we can get the job done to meet the programme on time without increases in cost and uncertainty.