Sample Bid Package

Page 1


4. Introduction

6. Preliminary Budget

16. Architectural Drawings/Take-Offs

100. MMC Concrete Quote

118. MultiVista Quote

123. Structural Steel Quote

128. Insulation Quote 135. Roofing Quote

139. RoofingInformation

146. Gutter & Downspout Quote

147. Blomberg Window& Door Quote

155. Blomberg Installation Quote

156. Interior Door Quote

162. Mid Fold Garage Door Quote

165. Mid Fold Garage Door Information

168. Drywall Quote

170. Tile Quote

172. Motorized Shade Quote

190. Pool & Spa Quote

195. Plumbing Quote

202. Fire Sprinkler Quote

205. Radiant Heat Quote

207. HVAC Quote

210. Electrical Quote Includes New Service, Rough and trim, Allowance for fixtures, and Lighting Control System

INTRODUCTION

This Updated Preliminary Budget for 5242 Vista Grande Drive was derived from the updated drawing set “Arnon Residence—50% Construction Documents” (46 pages), from Axelrod Design, dated 6/9/2022. Other drawings from Axelrod Design include Mechanical, CD Progress (14 pages) dated 1/6/2023, and Structural (20 pages) dated 12/21/2020, from Strandberg Engineering.

MurphyMcKenna Construction (MMC) calculated the costs using written proposals from subcontractors as well as our own internal cost estimating. All items should be considered allowances. Each line item (materials, labor, supervision) has a 15% markup added, with a 2% insurance surcharge added to the bottom subtotal.

This project is expected to take 16 months to complete. Management consists of Project Managers, Project Coordinators, and a Project Supervisor that works entirely on site.

As indicated in the Preliminary Budget, management’s hours are calculated by week and tied to the duration of the job. Note that supervision hours are calculated at 40h/week. The value represented in the cost code 1700 (Supervision) is the remaining balance after we distribute the hours across specific line items based on our understanding of how much time will be needed to supervise particular trades. Each line item includes allowances for material, labor, and supervision.

Best Regards,

Wereceivedwri enproposalsfromsubcontractorsforthefollowingtrades:

PhotographicDocumenta on

StructuralSteel

Roofing

Insula on Gu ersandDownspouts

Metaldoors/windows—Blomberg

Installa onofBlombergdoors/windows

Interiorwooddoors

Drywall

Stucco

Tile

WindowTreatments/MotorizedPocketShades

SwimmingPool&Spa

RoughPlumbing&Trim

FireSprinklers

RadiantHea ng

HVAC

ElectricalRough&Trim

Ligh ngControls

ServiceUpgrade

MidFoldGarageDoor

AyeletandYoramArnon 894ColoradoAvenue PaloAlto,CA94303

SanFrancisco,California94103 T.415.778.8726

SECTION2

SECTION3

EnergyDesignRating(EDR)isanalternatewaytoexpresstheenergyperformanceofabuildingusingascoringsystemwhere100representstheenergyperformanceoftheResidential EnergyServices(RESNET)referencehomecharacterizationofthe2006InternationalEnergyConservationCode(IECC)withCaliforniamodelingassumptions.Ascoreofzerorepresents theenergyperformanceofabuildingthatcombineshighlevelsofenergyefficiencywithrenewablegenerationto"zeroout"itsTDVenergy.BecauseEDRincludesconsiderationof componentsnotregulatedbyTitle24,Part6(suchasdomesticappliancesandconsumerelectronics),itisnotusedtoshowcompliancewithPart6butmayinsteadbeusedbylocal jurisdictionspursuinglocalordinancesunderTitle24,Part11(CALGreen). AsaStandardDesignbuildingunderthe2016BuildingEnergyEfficiencyStandardsissignificantlymoreefficientthanthebaselineEDRbuilding,theEDRoftheStandardDesignbuilding isprovidedforInformation.Similarly,theEDRscoreoftheProposedDesignisprovidedseparatelyfromtheEDRvalueofinstalledPVsothattheeffectsofefficiencyandrenewable energycanbothbeseen EDRofStandardEfficiency EDRofProposedEfficiency EDRValueofProposedPV+Battery

DesignmeetsTier1requirementof15%orgreatercodecompliancemargin(CALGreenA4.203.1.2.1)andQIIverificationprerequisite. DesignmeetsTier2requirementof30%orgreatercodecompliancemargin(CALGreenA4.203.1.2.2)andQIIverificationprerequisite. DesignmeetsZeroNetEnergy(ZNE)DesignDesignationrequirementforSingleFamilyinclimatezoneCZ2(CALGreenA4.203.1.2.3)includingon-sitephotovoltaic(PV) renewableenergygenerationsufficienttoachieveaFinalEnergyDesignRating(EDR)ofzeroorless.ThePVSystemandQIImustbeverified.

Notes: ExcessPVGenerationEDRCredit:BypassingPVsizelimitmayviolateNetEnergyMetering(NEM)rules

REQUIREDSPECIALFEATURES

Thefollowingare featuresthatmustbeinstalledas conditionformeetingthemodeledenergyperformanceforthiscomputeranalysis.  Windowoverhangsand/orfins Non-standardductlocation(anylocationotherthanattic) Recirculationwithnon-demandcontrol

HERSFEATURESUMMARY

Thefollowingisasummaryofthe featuresthatmustbefield-verifiedbyacertifiedHERSRater asa conditionformeetingthemodeledenergyperformanceforthiscomputeranalysis.  Additionaldetail is provided inthebuildingcomponentstablesbelow.

Building-levelVerifications: IAQmechanicalventilation HighR-valueSprayFoamInsulation CoolingSystemVerifications: MinimumAirflow VerifiedEER VerifiedSEER FanEfficacyWatts/CFM HVACDistributionSystemVerifications: DuctSealing Ductslocatedentirelyinconditionedspaceconfirmedbyductleakagetesting Low-leakageAirHandlingUnit DomesticHotWaterSystemVerifications: --None--

TABLE45042-SEALANTVOCLIMIT

TABLE45043-VOCCONTENTLIMITSFOR ARCHITECTURALCOATINGS2,3 GRAMSOFVOCPERLTEROFCOATNG LESSWATER&LESS EXEMPTCOMPOUNDS

TABLE45045-FORMALDEHYDELMITS1

MAXMUMFORMALDEHYDEEMSSONS NPARTSPERMLLON PRODUCT CURRENTLMT

HARDWOODPLYWOODVENEERCORE 005 HARDWOODPLYWOODCOMPOSTE CORE 005

PARTCLEBOARD 009

MEDUMDENSTYFBERBOARD 011

THNMEDUMDENSTYFBERBOARD2 013 1 VALUES NTHSTABLEAREDERVEDFROMTHOSE SPECFEDBYTHECALF ARRESOURCESBOARD AR TOXCSCONTROLMEASUREFORCOMPOSTEWOODAS TESTED NACCORDANCEWTHASTME1333 FOR ADDTONAL NFORMATON SEECALF CODEOF REGULATONS TT E17 SECTONS93120THROUGH9312012 2 THNMEDUMDENSTYFBERBOARDHASAMAXMUM THCKNESSOF516 8MM

CHAPTER7

pa ce adandmed mdens y beboad compo ewoodpoduc usedon he ne o o e e o o hebu dng sha mee he equ emens o omadeh deas pec ed nARB ArT xc Con o Measue o Compos eWood

Concrete Construction Scope & Pricing

Date: February 9, 2023

Project: 5242 Vista Grande Drive, Santa Rosa, 95403

1. Drilling Piers $ 114,293

 Page 1, 2, 3

2. Footing & Grade Beam Excavation$ 104,559

 Page 4, 5

3. Structural Concrete $ 656,811

 Page 6, 7, 8

4. Waterproofing $ 59,629

 Page 9, 10

5. Foundation Drainage $ 32,739

 Page 11, 12

Total Cost of work as listed: $ 997,499

1) DRILLING PIERS:

$ 114,293.00

 Based on S1.2 Dated 12/21/20

 Based on S2.0 Dated 12/21/20

 Based on 53 Piers – P1

 Based on 9 Piers – P2

 Based on 9 Piers – P3

 Based on 1,200 Total Lineal Feet

 Based on MMC, Inc. Page 2, 3

#1 DRILLING PIERS

# 1 DRILLING PIERS

2) Footing & Grade Beam Excavation: $ 104,559.00

 Based on S2.0 Dated 12/21/20

 Based on MMC, Inc. Page 5

# 2 FOOTING & GRADE BEAM EXCAVATION

3) Structural Concrete: $ 656,811.00

 Based on S2.0 Dated 12/21/20

 Based on S2.2 Dated 12/21/20

 Based on A0.03 Dated 6/09/22

 Based on MMC, Inc. Page 7, 8, 9

# 3. STRUCTURAL CONCRETE

# 3. STRUCTURAL CONCRETE

# 3. STRUTURAL CONCRETE

4) Waterproofing: $ 59,629.00

 Based on S2.0 Dated 12/21/20

 Based on 2002 Square Feet

 Based on $25.00 per Square Foot

 Based on MMC, Inc. Page 11

# 4. WATERPROOFING

5) Foundation Drainage: $ 32,739.00

 Based on S2.0 Dated 12/21/20

 Based on S3.1 Dated 12/21/20, Detail 4, 7

 Based on MMC, Inc. Page 13, 14, 15

# 5. FOUNDATION DRAINAGE

# 5. FOUNDATION DRAINAGE

# 5. FOUNDATION DRAINAGE

Scope of Work:

The Scope of Work is limited to the listed work above, and subject to the terms, conditions, and exclusions of this proposal.

This estimate includes installation of reinforcing steel, placing concrete, form removal and job clean up. Concrete price is based on natural color, light broom/hand trowel finish, and standard plywood, lumber form finish (non-architectural). Note: concrete color can vary naturally without being a defect. Also, shrinkage cracks are normal and not a defect. Architectural concrete finishes are not included.

Pier Depth:

Pier depth is based on structural and geotechnical engineer specifications, and it is assumed that there are no solid rock formations where piers are located. If the inspecting engineer is not satisfied that we have reached “competent material” and requires additional depth, or we encounter solid rock, a change order will be created based on the hourly rates listed in our contract and the equipment rates listed in this package below.

Exclusions:

 All bonds

 Piers more than 15’ unless otherwise noted.

 To date material rates

 Encroachment permits.

 Engineering, fees

 Observations, Observation Reports

 Permits

 Plans and Design

 Revisions to Scope of Work, absent a signed change order

 Road closures, K rail and traffic control

 Special Inspections

 Survey work including construction staking.

 Testing of concrete or other materials

 Excavation of hazardous materials

 Dewatering for excavation

 Wood and steel framing

 Framing hardware and all other embeds

 Plumbing and mechanical work

 Utilities are not included. Owner is responsible for onsite water and electrical, including any temporary power or utilities.

 Pavers, asphalt paving, and “finishes”

 Sidewalk, curb, and gutter

 Driveway approaches

 Any work not included in contract description or scope of work.

Machine Rates:

 Mobilization for Delivery and Pick-Up of equipment, materials, off-haul, etc. $700.00 each way to and from jobsite.

 Excavator: $280.00 per hour

 Skid Steer - $220.00 per hour

 Truck - $200.00 per hour

 Concrete Pump - $95.00 per hour – 3 hour minimum + $9.00 per yard – 8 yards

CLIENT: MurphyMcKennaConstruction

PROJECT: 5242VistaGrandeDrive,SantaRosaCA

DURATION: 14Months

DATE: June28th,2022

MULTIVISTA is pleased to provide MurphyMcKenna Construction with superior photographic documentation of the 5242 Vista Grande Drive project under the following terms and conditions.

1.0 ProjectDocumentation

Existing ConditionDocumentation Multivistaphotographerswill takedetaileddigitalimages of the complete Interior and Exterior of the residence, memorializing existing conditions priorto demo commencing. Interior documentation will capture all walls, ceilings and floors of the residence.Exteriordocumentationwillcaptureallbuildingelevationsandroof(aspossible).

o Imageswillbeindexed,bybothdateandlocation,todigitalversionsoftheplansprovided byClient.

o Light site documentation of the area immediately surrounding the buildings will also be capturedduringthisdocumentation.

Exterior Progressions - Photos are taken on a monthly basis from key perspectives and 360 degreesaroundtheResidenceduringconstruction.Exteriorprogressionstracktheconstructionof building elevations and all work within the immediate vicinity of the exterior of the building, providingatime-lapseviewoftheprojectcomingtogetherovertime.

o Multivistaphotographerswillcompletefourteen(14)monthlyExteriorProgressionshoots.

o Client may select traditional 2D Photography or 360° Photography for this phase of work.

InteriorProgressions - Photos are taken on amonthly basis capturing allmajor interior areasof the residence. Monthly images will begin once the project is substantially framed. Interior Progressions are designed to provide comprehensive coverage of the various trades coming togetherovertimeandarecoordinatedwiththepaceoferection.

o Multivista photographers expect to complete a minimum of eight (8) monthly Interior Progressionshoots.

o Client may select traditional 2D Photography or 360° Photography for this phase of work.

Pre-Slab Exact- Multivista photographers will take overlapping digital images of all roughinstallationsandsystemspostinspectionandpriortotheplacementofconcreteforallmajor horizontal slab pours within digital As Builtrecordofactualinstallationconditions.

o Includes:Foundation/Footings,Slab-on-Grade,Slab-on-DeckandPoolpours (as applicable)

MEPExact- -ThismilestoneshootcapturesallMechanical,Electrical&Plumbinginthe interiorwallsandceilingsafterrough-insarecomplete,priortoinsulation/drywall.TheMEPshoot createsapermanentrecordandphotographicas-builtoftheresidencetobeusedasamaintenance toolpost-construction.

o Radiant Heat installation will be captured with 2D photography during this phase of documentation.

Exterior Elevation Exact- - Designed for specific needs to capture exterior skin details oftheelevations.

o Elevation visits will capture post-installation of waterproofing membrane, window flashingsandpreandpostwindowinstallation

TurnoverConditionExact- AtCertificateofOccupancy,orothermilestonedesignated by Client, all walls, ceilings and floors of the residence will be documented in their completed condition.

2.0 Documentation Fees:

ThefollowingDocumentationFeeisinclusiveofalltheservicessetforthinSection1above:

MultivistaFee: $15,400 Invoicedasfollows:

MonthlyInvoice: $ 1,100 (assuming 14-monthduration)

2.1AdditionalAlternatives:

Pre-Slab Exact- Multivista photographers will take overlapping digital images of all roughinstallationsandsystemspostinspectionandpriortotheplacementofconcreteforallmajor horizontal slab pours within each bui Builtrecordofactualinstallationconditions.

o Includes:Foundation/Footings,Slab-on-Grade,Slab-on-DeckandPoolpours (as applicable)

2DTraditionalPhotographyFee: $2,400

3DMeasurableImagesFee:$3,200

LaserScanningFee:$3,600

MEPExact- -ThismilestoneshootcapturesallMechanical,Electrical&Plumbinginthe interiorwallsandceilingsafterrough-insarecomplete,priortoinsulation/drywall.TheMEPshoot createsapermanentrecordandphotographicas-builtoftheresidencetobeusedasamaintenance toolpost-construction.

o Radiant Heat installation will be captured with 2D photography during this phase of documentation.

2DTraditionalPhotographyFee: $4,400

3DMeasurableImagesFee:$5,800

LaserScanningFee:$6,600

Monthly Progressions -Photos are taken on a monthly basis capturingall major interior areas andexteriorsoftheresidence.Monthlyimageswillbeginoncetheprojecthascompletedthedemo portion of the project and will continue through to completion. Interior progress will begin once the project is substantially framed. Monthly Progressions aredesigned to provide comprehensive coverage of the various trades coming together over time and are coordinated with the pace of erection.

o Multivista photographers expect to complete a minimum of fourteen (14) Monthly Progressionshoots.

o Client may select traditional 2D Photography or 360° Photography for this phase of work

MultivistaFee:$8,400 ($600/monthx14months)

Webcam Services: Multivista will lease and professionally install one (1) webcam which will streamlivevideooftheprojectwithrelevantdataaccessiblebyClientviatheInternet.

o Primary service includes one (1) High Definition PTZ Webcam with vandal-resistant housing unit. Additional materials will include: Cellular Internet (via Verizon) and all additional posts, brackets and materials required for webcam equipment installation on adjacentrooforClient-providedpole.Clientwillprovideliftifnecessaryforinstallation.

MultivistaFee:$8,400 ($600/monthx 14months)

SolarKitFee:$4,500 (Ifnecessary)

Inadditiontotheforegoing,alldocumentationpackagesinclude:

Pre-documentation consultation(s) with the Client identifying project-specific needs, appropriatedocumentationintervalsandcommonorcustomelementsrequiringdetailedphoto sets.

plans and building floor plansprovided by the Client orhis Agent(s)and designed to capture thetotalprogressofconstructionattheagreeduponintervalsand/ormilestones.

Ahighlyrepresentativenumberofdigitalphotographsatsuchintervalsandforsuchdurations, andatthespecifiedmilestones,asrequestedbytheClientandsetforthinSection1.0above.

Linkingeachphotosetto theappropriatelocationonthesiteplansand/orfloorplans.

Online, password protected, web hosting of the documentation on the Multivista website for the construction period covered by the documentation, and for a minimum period of 1-year thereafter,accessiblefromanywheretheInternetisaccessible.

One (1) External Hard Drive or Flash Drive copy of the entire Documentation upon completion.

2.3EarlyCompletionandAdditionalBuildTimeFees

Invoicingisbasedonabuildperiodofthirty(14)months.IfthescopeofworksetforthisSection1above iscompletedpriortothattime,thebalanceoftheTotalFeesunpaidatthecompletionofthescopeofwork shallbedueandpayable within(30)thirtydaysofthefinalshoot.

Shouldtheprojectexceedthenumberofprojectedmonthsofduration(14),additionalfeeswillbecharged asfollows:

$1,100foreachadditionalmonthofwork(ifrequestedbyClient)

2.4 ReimbursableExpenses

Multivista will invoice for actual expenses incurred that are directly related to the Project. Back-up for allsuchexpenseswillbeprovidedwithinvoicing.OnthisProject, reimbursableexpensesarecurrently estimatedtobe$0,astimeandtravel,mileage,etc inSection2.0.

3.0StandardTermsandConditions

1) SERVICES: Multivista shall provide professional services in accordance with the above agreedupon Scope. Multivistawill beginaProjectSet-Uponlyafterreceipt of(a)electronic plans from the Architect of the Project in an acceptable format and (b) a fully executed Agreement Thereafter, Multivista requires at least four (4) business days for Project Set-Up prior to the first shoot contemplatedbytheScope.

2) EXECUTION: This Agreement becomes effective upon signatures by the authorized representative,oftheClientandMultivistaanduponreceiptbyMultivistaofasignedoriginal or facsimile transmittal. Multivista is authorized to proceed with services upon receipt of an executed Agreement or written Notice to proceed. If facsimile transmittal is initially sent to Multivista,ClientwillprovideMultivistawithasignedoriginalforrecordassoonaspractical.

3) COMPLETION/TERMINATION: This Agreement shall remain in force until terminated. This contract may be terminated by the Client and/or Multivista, upon fourteen (14) days written notice. In the eventof such termination Multivista will be paid the portion of the compensation (and fixed fee, if applicable) earned for services properly performed through the termination date including any retention held by the Client. Continuing Service Agreementsshall bereviewedannuallyforratesandshallremaininforceuntil terminatedin writingbyeitherparty.

4) STANDARD OF CARE: Services provided by Multivista under this Agreement will be performed in a manner consistent with that degree of care and skill ordinarily exercised by members ofthesame professioncurrently practicing under similar circumstances. Multivista makes no warranties or guarantees, either expressed or implied, of the fitness of its documentationforanyparticularuse.

5) INDEPENDENTCONSULTANT: Multivistaisandshallbeat alltimesduringthetermof theAgreementanindependentconsultantandnotanagent oftheClient.Clientacknowledges andagreesthat,notwithstandingthisAgreementoranyprovisioncontainedherein,Multivista may provide its services, including, but not limited to, those services contained in the Scope of this Agreement, to any other party authorized to contract for services relating to, in connection with or on behalf of the Project, including, but not limited to, the Contractor(s), claim of conflict of interest, estoppel or business interference arising out of any such thirdparty agreement(s) to provide services relating to, in connection with or on behalf of the Project.

6) COMPLIANCEWITHLAWS: Multivista will comply withFederal, State, and local laws applicabletotheservicestobeprovidedunderthisAgreement.

7) PAYMENT&COLLECTIONPaymentsaredueinfullwithinthirty(30)daysfromdateof invoice, or according to other terms as agreed to expressly in writing. The Client will be invoiced for work completed. A finance charge of 1-1/2% per month, equivalent to 18% per annum, will be assessed on any amounts outstanding beyond 30-day payment terms. In the event legal action is necessary to enforce the payment provisions of this Agreement if the Client fails to make payment within thirty (30) days of the invoice date, Multivista shall be entitledtocollectfromtheClientanyjudgmentorsettlement sumsdue,reasonableattorney's fees,courtcostsandexpensesincurredbyMultivistainconnectiontherewithand,inaddition, the reasonable value of Multivista's time and expenses spent in connection with such collectionaction,computedatMultivista'sprevailingfeescheduleandexpensepolicies.

8) CONFIDENTIALITY; OWNERSHIP OF DOCUMENTS; INTELLECTUAL

PROPERTY: Specifications, drawings, personal information, or other information given to Multivista by the Client is disclosed in confidence. They shall not be reproduced, copied, disclosed,orusedexceptinconnectionwiththeservicesthatarethesubjectoftheAgreement. Alldocuments,digitalandelectronicmediapreparedundertheAgreementareinstrumentsof service and are, and shall remain, the property of Multivista or Multivista Systems LLC udingallintellectualpropertyrightstosaiddocumentsandmedia, until such time as they are paid for in full by the Client at which time their ownership, exceptingConfidential,TradeSecretandProprietaryInformationofMultivistaSystems,shall passtotheClient.MultivistaandMultivistaSystemsmakenowarrantiesastotheprofessional natureofthemediaotherthantocaptureconstructionconditionsorevents. Notwithstanding theforegoing,theunderlyingproprietarysoftware,indexing,navigationandviewingsystems, processes, procedures, databases, information and any other content of Multivista Systems that is housed in the software, and all other proprietary information used to create these instruments of service, including all intellectual property rights associated therewith remainthesolepropertyofMultivistaSystems.ClientagreesnottodisclosetheConfidential, TradeSecretandProprietaryInformation.

Clientalsoagreesnottoreproduce,copyorusetheConfidential,TradeSecretandProprietary Information except as expressly permitted in the Agreementand only in connectionwith the services which are the subject matter of the Agreement. Notwithstanding the foregoing, Multivista Systems reserves the right to use and Client hereby consents to the use of limited samplesofthemediaandsystemservicepreparedforClient(nottoexceed1%oftotalproject media)forMultivistaSystemsmarketingandpromotionalpurposes. MultivistaSystemsmay

9) NOPUBLICACCESS: OnlineaccesstoClient'sdocumentationshallberestrictedtoClient approved personnel only, each of whom will be provided with a unique username and password. Making access credentials publicly available shall be prohibited and Client shall make its approved personnel aware of this and that Client's confidentiality and restricted accessobligationsundertheAgreement extendtoallapprovedpersonnel.

10) SITEVISITS/OBSERVATION:Multivistashallvisittheprojectand/orconstructionsiteat appropriateintervalsandtakephotosoftheconstructionprogress.Visitstotheprojectsiteand observations made by Multivista as part of services provided during construction under this Agreement shall not make Multivista responsible for monitoring of the work. Multivista employees will report to the site office prior to working onsite. Thesitesuperintendent shall be the designated person granting permission onto the site in order to ensure safe access for Multivistaemployees.

11) CHANGES IN WORK SCOPE: From time to time, the Client may wish to increase the scopeofthedocumentation,orenroll furtherprojects.Anychangesinscopeofworkshallbe boundbythisagreement,subject toany furtheragreementsmadeinwritingandsignedbyall partiestothisagreement.

12) DELAYS: Multivista shall not be liable for delays in performing or failure to perform its obligations under this Agreement resulting directly or indirectly from, or contributed to by acts of God; acts or failures to act by the Client; acts or failures to act by civil or military authority; governmental priorities; fires; strikes; or labor disputes; accidents; floods; epidemics; failure of the worldwide web, or any other circumstances beyond Multivista's reasonablecontrol.

13) EQUAL OPPORTUNITY EMPLOYMENT: Multivista will comply with federal regulations pertaining to Equal Opportunity Employment. Multivista will comply with applicable local, state, and federal regulations concerning minority hiring. Multivista's equal opportunityemploymentpolicyappliestoallphasesofemployment.

14) INSURANCE:Multivistawillmaintain$2,000,000generalliabilityinsurance. Multivistais currently covered by a policy with The Hartford. Multivista will maintain workers compensation insurance coverage and is currently covered by a policy with Republic Indemnity.

15) INDEMNIFICATION/HOLD-HARMLESS: Multivista shall indemnify and defend the them from claims based on intentional misconduct or gross negligence by Multivista, its employees and agents. Client shall indemnify and defend Multivista for any claims related directly or indirectly to the project that do not result from the sole anddirect intentional misconduct or gross negligence ofMultivista,itsemployeesandagents.

16) LIMITATIONOFLIABILITY:ClientagreestolimittheliabilityofMultivistaforanyand allclaims,losses,costs,damagesofanynaturewhatsoeverorclaimsexpensesfromanycause or causes so that the total aggregate liability of Multivista to the Client shall not exceed

17) DISPUTES:Anyactionfor claimsarisingout of orrelating tothis Agreement ortheproject that is thesubject of this Agreement shall be governedbythelaws oftheState ofCalifornia. Mediationisanexpressconditionprecedenttothefilingofanylegalaction.Unlesstheparties agree otherwise, the mediation shall be conducted pursuant to the Construction Mediation rules oftheAmericanArbitration Association.

18) ATTORNEYFEES:Shouldtherebeanysuitoractioninstitutedtoenforceanyrightgranted in the contract, the substantially prevailing party shall be entitled to recover its costs, disbursement and reasonable attorney fees from the other party. The party who is awarded a net recovery against the other shall bedeemed the substantially prevailing party unless such otherpartyhaspreviouslymadeabonafideofferof payment insettlementandtheamountof recovery is the same or less than the amount offered in settlement. Reasonable attorney fees mayberecoveredregardlessoftheforum inwhichthedisputeis heard,includinganappeal.

Multivista will perform all work per the selected option for scope of services, standard terms and conditions. UponacceptanceofthisProposal,Multivistawillworkdiligentlytopursueitsworkuntilthe completionofthisproject,consistentwiththeabovereferenced ScopeofServices.

Theforegoingproposalisacceptedby:

PinePacificServicesLLC,dba:Multivista MurphyMcKennaConstruction

SanFranciscoLBECertification#CMD071917203

CaliforniaSBESupplier#1754187 Signature

Murphy McKenna

125 Park Place, Suite 200

Point Richmond, CA 94801

PROJECT: 5242 Vista Grande Drive

DESCRIPTION

Structural Steel

APPLICABLE TAX INCLUDED (Sonoma County, 8.500%)

DESCRIPTION

DATE: 8/12/2022

Estimate in accordance with Axel Rod Design's plans for "Arnon Residence" dated December 21, 2020 APN 039-110-012

Estimate in accordance with Strandberg Engineering plans dated December 21, 2020, project 1959

JOB CLARIFICATIONS

Price includes materials and labor for fabrication

Material prices contained in this quote are subject to escalation

Materials are subject to availability

Structural Steel

Installation included

One coat of shop primer (Dunn Edwards Bloc-Rust BRPROO-2-RO)

Anchor bolts and base plate templates included (others to place)

Embed Plates - 10/S4.1 (others to place)

Qty: 4

Beams: Total Qty: 50

W8x35 - ASTM A992

Qty: 14

W8x58 - ASTM A992

Qty: 4

W8x67 - ASTM A992

Qty: 1

W10x30 - ASTM A992

Qty: 3

W10x60 - ASTM A992

Qty: 3

W10x88 - ASTM A992

Qty: 3

W10x112 - ASTM A992

Qty: 1

W12x30 - ASTM A992

Qty: 1

Structural Steel (continued)

W12x50 - ASTM A992

Qty: 3

W12x58 - ASTM A992

Qty: 4

W12x96 - ASTM A992

Qty: 1

W14x82 - ASTM A992

Qty: 3

W14x120 - ASTM A992

Qty: 2

W18x60 - ASTM A992

Qty: 7

All beams to have 5/8"Ø threaded studs welded on (3) sides

Columns: Total Qty: 32

5x5x0.375 Sq Tube - ASTM A500 Grade B

Qty: 19

4-1/2 Round Tube - ASTM A500 Grade B

Qty: 11

5x5x0.250 Sq Tube - ASTM A500 Grade B - Hanging Columns

Qty: 2

All square tube columns to have 5/8"Ø threaded studs welded on (2) sides. No studs on round tube columns.

Moment Frame Connections Qty: 4

Ledgers - 8/S4.0

5x4x3/8 HR Anlge - ASTM A36

Ledger only between A/5 & B/5

Pan Decking:

PLW3 Formlok Composite Deck

Qty: 510 square feet +/-

G-60

18 Gauge

Excluded: Rebar, Shear Studs

Equipment for installation included

Assumption: A gradeall will be able access all sides of the residence to place all columns and beams

All steel will be able to be place within one month of mobilizing to the site

Project Specific Exclusions:

Utility Holes in steel members - All utility holes will be performed at a time and material basis

Rotating Metal Louvers and Doors

Handrails and Guardrails

Grouting under base plates

GENERAL CLARIFICATIONS

This proposal is only for those items specifically called out in the above clarifications

Any changes in quantities will require this proposal to be revised

Wellander Steel Built shall be consulted on all job schedules

All field work hours: 7:00 A.M. to 3:30 P.M., Monday to Friday, unless otherwise noted in this proposal

Shop drawings are based upon approved contract documents and are submitted for the General Contractor to

review prior to the start of any fabrication. All shop drawings will be submitted in PDF format only.

General Contractor is responsible for existing site conditions

General Contractor is responsible for grid lines, elevations and deviations from plans

General Contractor is responsible for the layout of top of steel, center line of steel and steel connecting embeds

General Contractor is responsible for setting anchor bolts

General Contractor is responsible for final elevations and plumbing all free standing columns

General Contractor is responsible for all temporary bracing/shoring of any columns during the erection process

Wood, cold formed light gauge framing, masonry and concrete connections are done by others

General Contractor is responsible for public safety including but not limited to barricades, trench covers,

traffic control and/or overhead protection

Adequate space will be provided adjacent to building for material laydown and handling

Adequate space will be provided adjacent to building for all necessary erection equipment to be used during the erection process

GENERAL EXCLUSIONS

Unless specifically listed in this bid proposal, all items and services are excluded from this bid proposal

Special Inspections - to be arranged and paid for by others including to but not limited to overtime

Special Insurance - beyond required to conduct regular course of business

Public Safety, flagging, and traffic/public detours

Professional Engineering

Permits, Fees, Bonds, including Encroachment Permits

Delegated Design and Thermal Movements Performance Requirements

Design-Build Certificates

LEED Certificates

Field Survey

Paint Inspections

Paint Compatibility Certificates

Costs of testing including but not limited to charpy V-notch & QC testing lab costs of FEMA 353 Code

Installation (unless called out in our bid proposal)

Equipment for off loading and handling FOB materials on site

Paint, Primer, Finish Coatings, etc. (unless called out in our bid proposal)

Primer beyond first coat

Hot Dip Galvanize

Base Plate Templates (unless called out in our bid proposal)

Anchors and fasteners (unless called out in our bid proposal)

Non pre-qualified joints in accordance to AWS D1.1

Metal less than 1/8" thick (0.125")

Sandblasting

Core drilling, concrete work, rebar, etc.

Layout and installation of embedded items

Grout and placement of grout

Epoxy and the placement of epoxy

Steel to masonry or concrete connections

Steel to wood connections

Shelf hardware and manufactured items

Parking costs

Offhauling spoils

Temporary Bracing and Shoring

Temporary Safety Railings

Stair nosings and/or handrail backing plates

Grounding

Lintels

All items shown on civil, landscaping, electrical, mechanical, or plumbing drawings

Hazardous material removal, replacement or determination including but not limited to coatings, galvanize,

paint and fireproofing

Demolition

Waterproofing

Murphy McKenna

5242 Vista Grande Drive

TERMS AND CONDITIONS

Payment for raw materials shall be due and payable at the time of delivery to fabrication shop. Raw material

invoices are the amount of supplier invoice plus 24% for shipping and handling

Material prices contained in this quote are subject to mill increase

No changes or modifications to the proposal shall be performed until written direction, including accepted

costs of change, is executed and submitted to Wellander Steel Built by an authorized representative of the contractor.

Ownership of F.O.B. products passes to the General Contractor or Owner once delivered to the jobsite

Wellander Steel Built is an open shop and as such is not subject to any labor agreements. (I.E. separate gate)

Wellander Steel Built will indemnify others only to the extent that damage is caused in whole by any negligent

act or omission by anyone directly employed by or under the control of Wellander Steel Built.

Progressive billings due 30 days from date of invoice

This estimate is valid for 10 calendar days

Page 5 of 5

Quote Number: 56601

Quote Name: 5242 Vista Grande Dr, Santa Rosa

Date of Quote: 02/01/2023

Valid Until: 03/31/2023

Project Manager Ike Sample 415-465-4100

Bill To

Murphy McKenna Construction

Job Address

Murphy McKenna Construction 125 Park Place, Suite 200 5242 Vista Grande Dr Richmond, CA 94801 Santa Rosa, CA 95403

Dale Mossberger 415-725-2431

-- PROPOSAL NOTES

Quoted Line Item

1 NOTE - SPRAY FOAM: OCCUPANCY, COMPATIBILITY, UVAS OCCUPANCY GUIDELINES : *** CUSTOMER/BUYER ACKNOWLEDGES OCCUPANCY GUIDELINES BELOW BY ACCEPTING WORK IN THIS PROPOSAL. ***

Spray foam areas are to be vacated of all non SDI personnel at time of installation. Time to re-occupancy for an occupied home is at least 24 hours, and 12 hours for re-entry in general construction work areas. Even if the work area is not in the occupied area, SDI strongly suggests that occupants not remain in building during application due to possible airborne material or odor. Largest amount of airborne material or odor can occur at application due to the nature of spray application, and then will significantly lower after application stops, and then will dissipate over time. An EXHAUST FAN should be set up by OTHERS such that air is removed from the work area and away from living areas for at least 24 hours or until all air has been changed and any odor is gone. Refer to details in Manufacturer's re-occupancy & re-entry guidelines. OTHERS are responsible for coordinating with building occupants to control access to areas where SDI work may affect occupants, etc. This may include OTHERS having to create a sealed off area to allow spray application.

Acceptance and Date: ______________________________

01 - ROOFS, WALLS, FLOORS - EXTERIOR THERMAL ENVELOPE

Quoted Line Item

1 NOTES

-Roof eaves / overhangs are not included in scope -Tapered rigid on top side of roof is not included in scope AND must be a minimum of R10 everywhere

2 R38 Open Cell (0.8lb Nominal Density) Spray Foam LOCATION : Install @ Roof Areas, exterior thermal envelope

Areas Included:

-Lower Level Flat Roofs

MATERIAL THICKNESS (inches +/-) : 8-3/8

INSTALL METHOD : spray applied, partial fill

FRAMING SIZE : 2x10 TJI ON CENTERS (inches) : 16

WORKING HEIGHT RANGE : 10 ft

ACCESSORIES : none

3 R-21 HD Unfaced Fiberglass LOCATION : Install @ 2x6 Exterior Walls, exterior thermal envelope

MATERIAL THICKNESS (inches) : 5-1/2

INSTALL METHOD : friction fit - full fill double framed walls

FRAMING SIZE : 2x6, nominal wood ON CENTERS (inches) : 16

WORKING HEIGHT RANGE : 12 ft

ACCESSORIES : none

4 R06.9 Closed Cell Spray Foam

LOCATION : Install @ Concrete Furred Walls, exterior thermal envelope

MATERIAL THICKNESS (inches +/-) : 1-1/8

INSTALL METHOD : spray applied, partial fill ONLY

Quote Number: 56601

Quote Name: 5242 Vista Grande Dr, Santa Rosa

Date of Quote: 02/01/2023

Valid Until: 03/31/2023

Project Manager Ike Sample 415-465-4100

FRAMING SIZE : TBD -- ASSUMED TO BE 2" FURRING STRIPS OR FLAT FRAMED 2X4'S ON CENTERS (inches) : 16

WORKING HEIGHT RANGE : 10 ft

ACCESSORIES : none

5 R-30 Unfaced Fiberglass

LOCATION : Install @ Roof Areas, exterior thermal envelope

Areas Included: -Upper Level Roofs

MATERIAL THICKNESS (inches) : 10

INSTALL METHOD : friction fit

FRAMING SIZE : 2x10 TJI ON CENTERS (inches) : 24

WORKING HEIGHT RANGE : 12 ft

ACCESSORIES : none

6 R-19 Unfaced Fiberglass

LOCATION : Install @ Exterior Floors, exterior thermal envelope

Areas Included: -Crawl Floors -Floors Overhangs

MATERIAL THICKNESS (inches) : 6-1/4

INSTALL METHOD : friction fit -- rod in place

FRAMING SIZE : 2x12 TJI ON CENTERS (inches) : 16

WORKING HEIGHT RANGE : 4-6 ft

ACCESSORIES : none

7 Poly Cell Can Foam

LOCATION : OPEN FRAMING BETWEEN CONDITIONED AND UNCONDITIONED SPACES WHERE NEW INSULATION IS INSTALLED - Orange Foam (fire rated) : Annular spaces around penetrations at bottom and top plates. - White Foam : Junction between bottom plate and floor substrate, and at jambs around windows and doors.

Gaps at jambs must be 3/4 inch or less. Gaps at plate lines must be 1 inch or less. Larger gaps will be an ADDED COST. In order to achieve good adhesion, OTHERS must have areas clean and sufficiently free of dust and debris prior to work by SDI. Does NOT include any window or door sill pan areas that require drainage. These areas can be added at ADDITIONAL COST if it is possible to install a backer rod system and inner side air seal.

Additional air sealing, draftstopping, fire blocking or fire stopping, or Rodent Protection can be required to meet Energy, Building, or Cal Green code. This additional work must be installed by OTHERS, unless otherwise separately listed and included in work by SDI. Acceptance and Date:

02 - RODENT PROTECTION ( CalGreen )

Quoted Line Item

Quote Number: 56601

Quote Name: 5242 Vista Grande Dr, Santa Rosa

Date of Quote: 02/01/2023

Valid Until: 03/31/2023

Project Manager Ike Sample 415-465-4100

1 Rodent Protection, Ext. Wall Bottom Plate LOCATION: OUTER WALLS OVER CRAWL SPACE AT OPEN FRAMING WHERE NEW INSULATION IS INSTALLED

CalGreen mandatory requirement, Chapter 4, Residential mandatory measures 4.406.1 RODENT PROOFING:

Protect Annular spaces around pipes, electric cables, conduits, or other openings in sole/bottom plates at EXTERIOR WALLS ONLY, against the passage of rodents by closing such openings with cement mortar, concrete masonry or a similar material such as caulkable mortar. NOTE: Interior walls are not included.

2

03 - WALLS, FLOORS - INTERIOR

1 R-13 Unfaced Fiberglass LOCATION : Install @ Interior Separation Walls

(inches) : 3-1/2

METHOD : friction fit FRAMING SIZE : 2x4 / 2x6, nominal wood ON CENTERS (inches) : 16 WORKING HEIGHT RANGE : 10 ft ACCESSORIES : none

2 R-19 Unfaced Fiberglass LOCATION : Install @ Interior Floors

MATERIAL THICKNESS (inches) : 6-1/4

INSTALL METHOD : friction fit FRAMING SIZE : 2x12 TJI ON CENTERS (inches) : 16

WORKING HEIGHT RANGE : 10 ft

ACCESSORIES : none

3

04 - ROOFS, WALLS - GARAGE

1 R19 Open Cell Spray Foam LOCATION : Install @ Garage & Mechanical Roofs

MATERIAL THICKNESS (inches +/-) : 5

INSTALL METHOD : spray applied, partial fill FRAMING SIZE :2x10 TJI ON CENTERS (inches) : 24

WORKING HEIGHT RANGE : 10 ft ACCESSORIES : none

2 R-19 Unfaced Fiberglass LOCATION : Install @ Garage & Mechanical Walls

MATERIAL THICKNESS (inches) : 6-1/4

INSTALL METHOD : friction fit FRAMING SIZE : 2x6, nominal wood ON CENTERS (inches) : 16

WORKING HEIGHT RANGE : 10 ft ACCESSORIES : none 3

Quote Number: 56601 Quote Name: 5242 Vista Grande Dr, Santa Rosa

Date of Quote: 02/01/2023

Valid Until: 03/31/2023

Project Manager Ike Sample 415-465-4100

Note: A mobilization is defined as continuous activity in a specified area, with a reasonable amount of work for efficient use of a crew day. All areas must be insulation ready. Additional cost for any extra Mobilizations to be added by Change Order or can be provided in a revised proposal.

Acceptance and Date: ______________________________

Quote Number: 56601

Quote Name: 5242 Vista Grande Dr, Santa Rosa

Date of Quote: 02/01/2023

Valid Until: 03/31/2023

Project Manager Ike Sample 415-465-4100

Quote Number: 56601

Quote Name: 5242 Vista Grande Dr, Santa Rosa

Date of Quote: 02/01/2023

Valid Until: 03/31/2023

Project Manager Ike Sample 415-465-4100

10

- TERMS & CONDITIONS

Quoted Line Item

1 TERMS & CONDITIONS - PART 1 of 2

Per square foot areas from plans Dated 12-21-2020

Per JOB SITE inspection XXXXXXXXXXX

Per TITLE 24 Report dated 12-14-2020

PRICE BASED ON:

--OTHERS to obtain any required permits or building department acceptance of work done by SDI.

--Exterior Thermal Envelope means living areas that are conditioned. It is the same as Title 24 conditioned space.

--No fixed scaffolding is included unless otherwise listed in this quote.

--All areas being ready for work and free of obstructions prior to SDI arrival. Stocked material such as drywall or other Trades in work areas shall be considered obstruction to access and will be an EXTRA charge. Floors must be level and acceptable for efficient set up, use, and moving of rolling scaffolding. Openings such as heat registers must be covered for safety.

--On all areas being ready at the same time so that SDI can progress in a continuous and efficient manner unless otherwise agreed. Price will increase if SDI crews must move from area to area in a discontinuous manner and if SDI must start and stop work due to delays, or work not ready by OTHERS.

--Spray foam areas are to be vacated of all non SDI personnel at time of installation. See Occupancy Guidelines.

--FRAMING SHIMS at framing face are to be LEFT OFF until after spray foam application to WALLS. Shims will be damage by spray foam application.

--RECESSED FIXTURES, JUNCTION BOXES, SPEAKERS, SHADE POCKETS, STEEL FRAMING, ETC. - Unless otherwise included:

1.--Others are responsible for installation of rigid board backing above recessed fixtures to control condensation where needed.

2.--Others are responsible for adjusting electrical and other junction boxes/fixtures at the correct depth before spray foam locks them in place. Open back junction boxes are not recommended as they require additional masking to keep spray foam out of the boxes.

3.--Others to box out open back speakers as needed.

4.--Others to confirm that fixtures such as speakers can be in contact with insulation if they are not boxed out.

5.--Price based on efficient access to cavities such as created at shade pocket details, and I-Beam cavities. Cavity locations such as these, can be become inaccessible due to the typical sequence of work. Construction sequence should be coordinated with insulation installation to allow access to these locations.

6.--Thermal short circuits, such as steel framing, can allow condensation to occur. Others are responsible for suitable design that allows enough of, and proper type of insulation, and air sealing to control condensation over these, and other potential condensation locations.

--OTHERS to have ALL wires stapled and pulled tight per code, and sufficiently secured in each framing bay prior to work by SDI so that wires cannot be moved beyond face of framing.

--Inaccessible rim or wall cavity areas can be insulated for an additional cost if OTHERS provide drilling of sufficient access holes to allow injection of spray foam.

--CRAWL SPACE CLEARANCE : Any spray foam work at Crawl Areas is restricted to areas with access clearances equal to, or greater than 24 inches only. Any batt installation is restricted to areas with access clearances equal to, or greater than 18 inches only. Areas with lesser clearance may not be sufficiently accessible and will only be installed on a Best Effort Basis.

--OTHERS to make parking arrangements, supply flagman, if required, supply parking permits, and have parking ready when SDI crew arrives. In addition, OTHERS to plan and coordinate site conditions in order that SDI trucks, hoses and other equipment do not have to move during work by SDI. Moving SDI trucks, hoses and other equipment delays SDI work flow and shall generate an extra cost.

--Cavities to be clean, dry (below 18% moisture content) and ready and all backing to be in place as needed prior to mobilization by SDI. Substrate temperatures must be high enough to insure proper adhesion and spray foam yield.

--OTHERS to install covering such as drywall as soon as possible so as to prevent insulation from falling out of place, and protect installed insulation from damage due to harmful weather exposures, physical abuse, and other causes.

--OTHERS to provide proper combustion air supply, and make up air, and air exchange rates as required.

NO WORK INCLUDED FOR DRAFTSTOPPING, FIRE BLOCKING OR FIRE STOPPING UNLESS OTHERWISE INCLUDED, (with the exception of Poly Cell Can Foam as specified if included) :

Note that Fire Blocking is required between elements such as but not limited to crawl to wall, wall to floor, and wall to attic. Fire Stopping is typically required at penetrations in fire rated assemblies to maintain the specific fire rating of the assembly. Draftstopping can include requirements to provide draft stops at floors or ceilings such as at dropped lids, strapped lids, suspended ceilings, or open web framing. Draftstopping is typically required where these spaces are 1000 square feet or greater, but could be less depending on local requirements.

BEFORE INSTALLATION OF OTHER BUILDING ELEMENTS, PLEASE DISCUSS PLANNING AND SEQUENCE OF INSULATION AROUND

Quote Number: 56601

Quote Name: 5242 Vista Grande Dr, Santa Rosa

Date of Quote: 02/01/2023

Valid Until: 03/31/2023

Project Manager Ike Sample 415-465-4100

MECHANICAL, ELECTRICAL, AND PLUMBING EQUIPMENT (lighting, supply and return ducts, exhaust flues, etc...) WITHIN ROOF, CRAWL FLOOR, OR OTHER FRAMING CAVITIES IN ORDER TO ENSURE THAT AN EFFICIENT AND CONTINUOUS THERMAL ENVELOPE CAN BE INSTALLED.

ADDITIONAL CONDITIONS & REQUIRED NOTICES

1.--Price subject to change after 30 days or a lesser time if listed above.

2.--The following documents, if any, attached as Exhibit A shall be incorporated into this Contract.

3.--SDI’s work is to be done in accordance with the best developed industry techniques to complete job(s) in a good workmanlike manner as described in specification noted within the proposal.

4.--SDI carries commercial liability insurance and workman’s compensation insurance.

5.--SDI reserves the right to modify our bid if not accepted within 10 days from bid date.

6.--Any contract created as a result if this bid, or amendment thereto concerning scope of work and pricing, shall not supersede or nullify the terms and conditions stated herein.

7.--The work performed shall be warranted against defects in material and workmanship for a period of two years from date of application.

8.--Our payment terms are net 7 days on completion of work [Cal.Bus.&Prof. §7108.5]. There is a 1.5% service charge added to all sums which become past due.

9.--We shall have the right to stop work on any of the contractors/owners job(s) if any payment due has not been made under this agreement. We may keep all jobs unmanned until payments are received without being in violation of any contractual arrangements.

10.--Any alteration, modification, or deviation from this proposal, or specifications involving extra cost, shall be executed only upon written change orders or purchase orders, signed by Customer & SDI which shall become an extra charge or deletion, respectively, in addition this bid and/or subcontract.

11.--Note About Extra Work and Change Orders: Extra Work and Change Orders become part of the contract once the order is prepared in writing and signed by the parties prior to the commencement of work covered by the new change order. The order must describe the scope of the extra work or change, the cost to be added or subtracted from the contract, and the effect the order will have on the schedule of progress payments.

12.--SDI’s ability to perform shall not be subject to delays due to fires, industry strikes, extreme weather conditions, labor disputes, material availability, civil disturbances or other conditions which are beyond our control.

13.--In the event the job site is not freely accessible to SDI’S personnel and equipment because of obstructions, weather conditions, or other causes beyond our control for a period of 5 consecutive days, SDI may give notice of withdraw from this contract and be released from all further obligations unless a new quotation can be agreed upon in writing by both parties. If work has commenced and then is withdrawn because of such job conditions, SDI shall be entitled to payment for reasonable value of labor and/or materials supplied to the date of withdrawal.

14.--Membrane work, which is applied according to plans and specifications, proceeding with overlayment or any other function, constitutes acceptance of work as applied and releases subcontractor from all responsibility with regard to the membrane work performed.

15.--If any work is to be charged on an hourly basis, the starting rate will be a minimum of $171.00 (SPF), $163.00 (NONSPF) per person hour on a Portal to Portal basis. Materials will be calculated as the cost of materials with Tax, then plus 10% for miscellaneous materials and other direct costs, and then at a minimum MARGIN of 38%.

16.--Any tax excise duty or levy hereafter enacted or imposed by any governmental authority shall be additional to the prices quoted.

17.--Disputes: Any controversy between Customer & SDI arising out of this contract, only, or regarding the interpretation of this contract shall be subject to a good faith mediation. Mediation shall take place prior to the commencement of filing a lawsuit, but in no event later than sixty (60) days after the first demand for mediation is requested by one of the parties. Mediation shall be governed by the confidentiality requirements contained in California Evidence Code and costs associated with mediation shared equally. Thereafter, should mediation fail, the parties may seek other remedies available to resolve their dispute and the non-prevailing party agrees to pay reasonable attorney’s fees. Venue proper in the County of the project or San Mateo County.

18.--You, the Customer, have the right to cancel within three (3) business days. Please see attached documents detailing this right.

TERMS & CONDITIONS - PART 1 of 2 Continued See TERMS & CONDITIONS - PART 2 of 2 Acceptance and Date:

Total $33,100.00

BERKELEY ROOF SERVICES – WESTCO

A California joint venture company Since 1976

Complete roofing services – Consulting - Leak analysis – Waterproofing – Gutters – Inspections

2700 E. 7th Street Oakland CA 94601 (510) 524-2352 Fax (510) 533-5274 State License: 760340/906108

January 31, 2023

Murphy McKenna Construction 38 Washington Ave. Suite B Point Richmond, CA 94801 510-778-9964 Anthony@murphymckenna.com

Job address: 5242 Vista Grande Santa Rosa, CA

Berkeley Roof Services – WestCo Roofing is pleased to respond to your request for pricing information at the address above based on the plans dated 12.21.20

SCOPE OF WORK: Installation of a new roofing system. Materials pricing is subject to change.

SPECIFICATIONS: New construction.

Prepare the worksite for safe delivery of roofing materials and crewmembers. Keep a clean and safe work environment through the duration of the installation.

Roof sheathing and structural considerations, including vent holes/penetrations by others.

Architectural/fascia metal by others. Initials____

Take all necessary precautions to neighboring areas and clean debris as necessary.

Flat roof: New APPeX modified. (4,200 sq. ft.)

Furnish and install Base Sheet: #28lb fiberglass reinforced base sheet, nailed into wood deck.

Furnish and install a new layer of ¼” Dens-Deck roof board.

Cap Sheet: APPeX granule cap sheet, heat welded with all standard fittings and flashings.

Flash and seal the new skylight curbs with the new membrane.

Flash and seal all roof vents with new GSM units.

Integrate 12 roof drains into the new membrane. Units are not provided.

Furnish and install new 2” rigid insulation, with ¼” tapered insulation on top of 2” base.

Labor and materials………………………………………………………… $93,586.00

• Flash solar stanchions with new roof jack………………………… $70.00 ea.

• Install an additional inter-ply membrane………………………… $11,200.00 add

• Install a ‘Cool’ rated cap sheet…………………………………….. $4,480.00 add

Roof alternate:

• Use IB Roof PVC membrane in lieu of APPeX…………………… $113,950.00

Exclusion to temporary protection: Berkeley Roof Services – WestCo Roofing is not responsible for protecting the roofing assemblies for any scaffold installation. Any damage to the membrane and/or its components, is solely of the general contractor’s liability.

Full specifications will be provided upon request. If BRS is asked to stop work and return to accommodate for other trades, there will be a $700.00 charge per occurrence.

Note: Components not specified in this document are not included in scope. Changes to the work outlined in the plans will be re-estimated and/or change-orders will be supplied using a time ($115.00 per hour/per man) and materials basis.

Berkeley Roof Services – WestCo Roofing is fully insured and holds all the appropriate state and city contracting and business licenses. Copies of certificates of liability insurance and worker’s compensation insurance will be provided to you at your request.

Berkeley Roof Services – WestCo Roofing is proud to offer a contractor guarantee on all new and complete roofing systems for a period of ten (10) years. The roofing materials are subject to the warrantee specifications supplied by the manufacturer.

If you have any questions regarding this proposal or if you would like to proceed with the work outlined above please call me, Miles Morris Walker at the office number listed above or directly at 510-812-6678.

If you wish to proceed with the work described, please initial your choices and sign and date both copies of this contract. Return one copy to us and keep the one copy for your records. Please include a deposit payment of 10% (up to $1,000.00) with the contract. An additional payment of 30% will be due on the first day of work. A payment of 40% is due on the last day of work and the balance will be due upon completion of work or receipt of final invoice. A 2.5% surcharge will be applied to all credit card payments. Past due invoices after 30 days will be charged interest. Invoices that are unpaid or delinquent will be subject to a mechanics lien placed on the property and the fees associated with the lien will be passed on to the property owner/signee addressed above.

Please call us if you wish to arrange an alternative payment schedule.

Signature:

Signature:

Miles Morris Walker for Berkeley Roof Services

Date:

Date: January 31, 2023

Once signed by both parties this document becomes a legally binding contract. You, the buyer, may cancel this transaction at any time prior to midnight of the third business day after the date this contract was signed.

Attention: Both parties, signatories to this contract, agree that should litigation be instituted to enforce the provisions of this agreement, the prevailing party in such litigation shall be entitled to payment of attorney's fees by the other party.

Why IB PVC?

LIFETIME OF PROTECTION

Shielding your home from the elements is essential for your comfort and protection. IB Roof Systems provides complete system solutions coupled with the confidence of a Lifetime Limited Material Residential Warranty.

VALUE DRIVEN

IB Roof System’s PVC provides the best quality membrane and complete roofing solutions.

STRENGTH

IB Roof System’s products are specifically engineered for strength and our PVC roofing membranes far surpass the minimum ASTM standard (200 lbf/in. rating), having a minimum typical breaking strength of 332 lbf/in. or higher. Not all PVC is built like IB PVC.

DURABILITY

IB Roof System’s membranes use heat-welded seams, forming a permanent, watertight bond that is actually stronger than the membrane itself. Other roofing systems rely on adhesives, tapes, and caulks to seal the seams, and are inherently less durable.

FIRE RESISTANCE

IB PVC roofing membranes can be used in many UL Class A roof assemblies. These membranes show excellent resistance to spread of flame and self-extinguish when the source of the flame is removed. IB PVC roofing membranes have passed stringent fire testing standards at both UL and FM, and are approved for use in Low, Steep and Unlimited slope assemblies.

WIND RESISTANCE

With their engineered strength and heat-welded seams, IB Roof System’s PVC roofs have superior wind uplift resistance. An IB PVC roof is the best choice for many homes located in challenging climate zones and in regions prone to strong winds.

HIGH PERFORMANCE

IB PVC membranes stand up to constant dampness and ponding water, and resist the effects of severe weather extremes. There is no exclusion in our warranty for ponding water.

ENVIRONMENTALLY FRIENDLY

IB PVC’s high solar reflectivity reduces energy waste, lowering monthly heating and cooling costs. Additionally, it is one of the few building materials that can be fully recycled into new roofing products, even after decades of service life.

A white IB Roof Systems membrane can reduce your energy consumption and your rising electric bills, by reflecting up to 90% of the heat that normally enters a home through the roof. An IB Roof Systems roof will lower your home’s heat gain, and possibly pay for itself.

What Makes IB Different?

IB Roof Systems is made for you, the home-owner looking for the highest quality products and longest and strongest warranties. With so many energy saving benefits, safety provisions and eco-friendly options, IB Roof Systems is the right choice.

We Bring Value to Your Residence.

From the day you have your IB PVC Roof System installed, you’ll have the confidence of knowing that a better product means a better value for today and for the long-term. At IB Roof Systems, the integration of time-proven products with tried and true best rooing practices employed by quality driven IB Authorized Installers adds up to a roof with better durability, better efficiencies and potential savings through reduced utility and maintenance costs.

Peace of Mind

You can rest easy knowing that IB products have undergone significantly more quality control and testing than typical roofing products. Our authorized professionals will provide the most appropriate energy-efficient, lasting roof solution for your home.

LIFETIME WARRANTY

IB membrane is backed by a Lifetime Limited Material Residential Warranty. We also offer labor and material warranties and Total System warranties.

MORE COLORS - MORE OPPORTUNITIES

The largest spectrum of in-stock color membranes provides a better selection for custom projects.

CUSTOM FABRICATED PRODUCTS

At IB, we take great pride being a solution provider. Our custom fabrication capabilities provide for the unique details of your project to be pre-manufactured and ready for installation.

Quality Products

IB Roof Systems has been producing top-tier PVC roofing materials since 1978.

Complete System Solutions

Membranes

Flashings/Drains/Vents

Metal/Termination Bar

Exceptional Service & Support

Whether you have a single-story or a multi-level residence, we’re invested in the success of your project. IB's commitment to excellence is exemplified by providing exceptional customer service, technical support and training to our IB Authorized installers.

Separation Sheets

Fire Sheets/Vapor Retarders

Insulation/Cover Board

Adhesives/Sealants/Primers

Fasteners/Plates

Technical Expertise

Our professional in-house and field technical representatives share invaluable expertise with your contractor and provide tested and approved assemblies. From recommending solutions for complex details, to providing on-site training, to performing Total Systems warranty inspections, we are there.

Meets the requirements of ASTM D 6222, Type I, Grade S

Features and Components

APPeX 4S is used as a cap or base sheet in APP multi-ply roofing systems.

Premium APP (Atactic Polypropylene) Polymer and Asphalt Blend:

Provides an extremely durable sheet with excellent weathering characteristics, flexibility and dimensional stability for ease of handling and quick installations.

Polyester Reinforcement Mat: Provides bidirectional glass-scrim reinforcement and offers robust tear strength and puncture resistance, allowing for high wind performance and excellent hail rating. The sheet also exhibits strong dimensional stability and enhanced elongation.

Surfacing: Fine mineral parting agent on the top of the sheet. A polyolefin burn-off film on the bottom side enables the product to be applied using heat-welding techniques.

Premium Polyester-Reinforced, APP Smooth Cap, Ply, or Flashing Sheet,

Energy and the Environment

Peak Advantage® Guarantee Information

Systems

Guarantee Term

Dependent on system* Up to 20 years

*Contact JM Technical Services for specific system requirements or guarantee terms.

Codes and Approvals

• UL Class A ratings may be obtained in numerous constructions, both new and re-roof at slopes up to 1" per foot (83 mm/m).

Product Application

• When used as a cap sheet, the use of an approved surfacing is required.

• Refer to JM APP modified bitumen specifications and detail drawings for application and slope information.

Packaging and Dimensions

Meets the requirements of ASTM D 6222, Type I, Grade S

Tested Physical Properties

(23°C)

Longevity Low Temp. Flexibility @ 180° F Mandrel (Pass-Fail)

Low Temperature Unrolling (Pass-Fail) Unroll in 4-6s; Visual Inspection in "unrolled" position

= Machine Direction

= Cross-Machine Direction

Note: All data represents tested values.

Meets the requirements of ASTM D 6222, Type I, Grade G

Features and Components

APPeX 4.5M is used as a cap or flashing sheet in APP multi-ply roofing systems.

Ceramic-Coated Roofing Granules: Specifically engineered for optimal embedment in the APP-blended sheet. The ceramic coating promotes excellent long-term adhesion.

APP (Atactic Polypropylene) Polymer and Asphalt Blend: Provides an extremely durable sheet with excellent weathering characteristics, flexibility and dimensional stability for ease of handling and quick installations.

Polyester Reinforcement Mat: Provides bidirectional glass-scrim reinforcement and offers robust tear strength and puncture resistance, allowing for high wind performance and excellent hail rating. The sheet also exhibits strong dimensional stability and enhanced elongation.

Polyolefin Burn-Off Film: Promotes ease of heat welding.

Energy and the Environment

Peak Advantage® Guarantee Information

*Contact JM Technical Services for specific system requirements or guarantee terms.

Codes and Approvals

Colors: White, Black, Tan, Brown, Grey, Terra Cotta, Weathered Wood, Chestnut, Burnt Sienna, Red, and Slate.

Product Application

Refer to JM APP modified bitumen specifications and detail drawings for application and slope information.

Packaging and Dimensions

Ceramic-Coated Roofing Granules

Meets the requirements of ASTM D 6222, Type I, Grade G

Tested Physical Properties

(23°C)

Low Temp. Flexibility @ 180° F Mandrel (Pass-Fail)

Low Temperature Unrolling (Pass-Fail) Unroll in 4-6s; Visual Inspection in "unrolled" position

*MD = Machine Direction

**XMD = Cross-Machine Direction

Note: All data represents tested values.

DensDeck® Prime Roof Board

Enhanced Coated Glass Mat Faced Gypsum Cover Board

Meets the requirements of ASTM C 1177

Features and Components

Enhanced Face Mat: Coated fiberglass facer ideal for fully adhered systems provides a broader compatibility and higher performance with roofing adhesives.

Fire Performance: FM Class 1 for fire barrier requirements and UL Class A unlimited slope with excellent surface burning characteristics. 5/8" thickness meets the requirements of Type X per ASTM C 1177.

System

Peak Advantage® Guarantee Information Systems

When used in most multi-ply and single

* Contact JM Technical Services for specific systems or terms over 20 years.

Codes and Approvals

Installation/Application

Refer to the Application Guides and Detail Drawings for instructions.

Packaging and Dimensions

* Assumes 48' flatbed truck. Number of units per truck may vary per shipping location and can be verified at time of order placement.

DensDeck® Prime Roof Board

Enhanced Coated Glass Mat Faced Gypsum Cover Board

Meets the requirements of ASTM C 1177

Typical Physical Properties

Thermal Performance

combustible in accordance with ASTM E 136

Technical specifications as shown in this literature are intended to be used as general guidelines only. Please refer to the Safety Data Sheet and product label prior to using this product. The Safety Data Sheet is available by calling (800) 922-5922 or on the web at www.jm.com/ roofing. The physical and chemical properties of the product listed herein represent typical, average values obtained in accordance with accepted test methods and are subject to normal manufacturing variations. They are supplied as a technical service and are subject to change without notice. Check with the regional sales representative nearest you for current information.

All Johns Manville products are sold subject to Johns Manville’s standard Terms and Conditions, which includes a Limited Warranty and Limitation of Remedy. For a copy of the Johns Manville standard Terms and Conditions or for information on other Johns Manville roofing products and systems, visit www.jm.com/terms-conditions.

2012 Gilrix Street Petaluma, CA 94954

Bill To:

Murphy McKenna Construction P.O. Box 70515

Pt. Richmond, CA 94807

Job Site Address 5242 Vista Grande Dr. Santa Rosa, CA 95403

Down Spouts Allowance

Contract Date: 2/3/2023

Contract #: 955

-- Under-Slab:

All under slab drainage to be done by other.

-- Lower Level:

- Transition supplied drainage to cast iron for (12) downspouts.

- Run (12) downspout risers to first level.

-- First Floor:

- Run (12) downspout risers to designed roof location.

- Provide connection for (12) roof drains.

Notes:

All piping to be run in cast iron. Roof drains to be installed by other. 28,200.00

Pricing is subject to change after 30 days of the submittal of this bid.

PHONE:

EMAIL:

PREPARED BY: VERSION:

(415) 290-4745

SHIPPING ADDRESS:

CONTRACTOR: BILLING ADDRESS:

PHONE:

(510) 778-9964 ALEX HOMS

DALE MOSSBERGER

PURCHASER: CONTACT: EMAIL:

DALE@MURPHYMCKENNA.COM

* CUSTOMER TO VERIFY COMPLIANCE WITH TITLE 24 AND BUILDING PERMIT GLAZING OPTIONS

COMMENTS / NOTES:

GLAZING PACKAGE INCLUDED: $5,292.00

XL OPERABLES INCLUDE FSB LEVER AND MULTI-POINT LOCKING, NO SCREEN

BLOMBERG 450N PIVOT DOOR: INCLUDES FSB HANDLE, ROLLER-CATCH & FRITZJURGENS CLOSER

***PIVOT DOOR IS NOT WEATHER RATED*** BLOMBERG SLIM LINE DOOR (SLD): SCREENS NOT INCLUDED

GLASS: SOLARBAN 60 LOW-E | INSULATED | TEMPERED

PENDING TITLE 24 REPORT

FINISH: STANDARD BLOMBERG POWDER COAT OR CLEAR/ BRONZE ANODIZED, TBD

HARDWARE: STANDARD HARDWARE INCLUDED, TBD

25% DEPOSIT REQUIRED TO START SHOP DRAWINGS, 25% TO START PRODUCTION

BALANCE DUE AT OR BEFORE DELIVERY

PRODUCTION LEAD TIME STARTS WITH SIGNED SHOP DRAWINGS

PRODUCTION LEAD TIME: 18-20 WEEKS SHOP DRAWINGS: 3-5 WEEKS FOR FIRST ROUND

$6,700.00 SHOP DRAWINGS:

DELIVERY: OPTIONS: ALL PRODUCTS WILL BE MANUFACTURED TO THE NET DIMENSIONS (WIDTH x

FRITSJURGENS PIVOT DOOR HARDWARE

THIS IS NOT A CONTRACT. THIS IS AN ESTIMATE FOR PRELIMINARY PRICING ONLY AND IS VALID FOR (30) THIRTY DAYS FROM

DATE ABOVE. EXPIRES: 03/02/2023 ALL ORDERS ARE SUBJECT TO BLOMBERG TERMS AND CONDITIONS. LEAD TIMES VARY AND WILL BE DETERMINED AFTER A PRODUCTION

Pre-Order Notifications

PRODUCT DISCLAIMERS AND NOTIFICATIONS

1. All unit sizes and operations to be verified and approved by Customer prior to ordering.

2. All handing is from the outside looking in. "X" is the operable unit / "O" is the fixed unit.

3. ALL ORDERS ARE NET FRAME SIZE. Rough-Framing requirements are determined by others.

4. Code compliance must be determined by others including Title24, ADA, WUI, Egress, etc.

5. All units will be fabricated to R15 (DP20) unless otherwise requested.

6. Door hardware specs are provided by Customer and affect lead-times, pricing, and product specs.

Field Glazing by Others

1. Field glazing is required by others on all assemblies over 250 lbs. - units weigh approx. 7 lbs./sf.

2. OPEN FRAMES MUST BE INSPECTED and water tested prior to installation of glass.

3. All sealants must be compatible with Schnee-Morehead Acryl-R.

4. Shim under each vertical mullion and setting block.

5. Do not overlap Butyl glazing tape in corners.

6. Glass supplied by others is not NFRC-certified in Blomberg products.

Warranty Exclusions and Disclaimers

1. Oversized glass (over 60sf) is sold as is, visual defects and/or distortions are not cause for rejection.

2. Anodized finishes can be expected to have subtle imperfections and color variations.

3. Drilling through the frame voids the Blomberg warranty for air or water intrusion.

4. Field assembled units are not warrantied for air or water intrusion at joints.

5. The 250F frame system is not warrantied for weathering.

6. ADA low-rise sills are not warrantied for air or water intrusion through the sill.

7. Blomberg products are not STC/OITC rated.

8. Hardware is subject to the supplier's warranty at the time of purchase by Blomberg - not Customer.

9. Glass imperfections are subject on ASTM standards 1036 and 1048.

10. Aluminum frames are prone to condensation, thermal-break frames have higher resistance.

11. The contract Terms and Conditions are available by request at time of estimate.

Delivery Notifications

1. All lead times are approximate and may change without notice.

2. All deliveries are curbside only. The customer must provide personnel/equipment to unload.

3. LaCantina Door products may require a customer supplied forklift to unload.

T450N - FF - FIXED

SB60|CLEAR - TEMPERED

W-W1- BATHROOM 12

[A1]-W2- HOME OFFICE 4

W-[A-W2- HOME OFFICE 4].1

W-[A-W2- HOME OFFICE 4].2

[END ASSEMBLY]

[A2]-W3 + W4- LIVING ROOM 3

W-[A-W3 + W4-

ROOM 3].1

W-[A-W3 + W4- LIVING ROOM 3].2

ASSEMBLY - T450N

CONFIGURATION: STANDARD

POWDER COAT - FLAT BRONZE

T450N - XL-CSMT-TT - RIGHT HINGE

SB60|CLEAR - TEMPERED

POWDER COAT - FLAT BRONZE

U-VALUE: 0.39 SHGC: 0.23

T450N - FF - FIXED

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

NOT INCLUDED IN ESTIMATE

ASSEMBLY - T450N

CONFIGURATION: B-GROUP

POWDER COAT - FLAT BRONZE

T450N - FF - CORNER

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

T450N - FF - CORNER

SB60|CLEAR - TEMPERED

POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

T450N - FF - FIXED

W-[A-W3 + W4- LIVING ROOM 3].3

W-[A-W3 + W4- LIVING ROOM 3].4

19SF ETCHED GLASS NOTES

XLCSMT/ FF

XL OUTSWING CASEMENT, NO SCREEN

FF-C-FF-FF-FF-FF, FIELD MULL TO D3

OVERLAPPED IG CORNER, FG REQ'D

OVERLAPPED IG CORNER, FG REQ'D

SB60|CLEAR - TEMPERED

POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

T450N - FF - FIXED

SB60|CLEAR - TEMPERED

POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

REQ'D

W-[A-W3 + W4- LIVING ROOM 3].5 1 35.25 x 126

[END ASSEMBLY]

D-D3- LIVING ROOM 1 56 x 126

T450N - FF - FIXED

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

NOT INCLUDED IN ESTIMATE

450N - PD - RIGHT HINGE [IN]

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.61 SHGC: 0.30

ADDITIONAL NOTES

ADDITIONAL NOTES

D-W5 + W6- LIVING + DINING 1 812 x 126

SLD - 12-PANEL BI-PART - XXXXXXXXXZXXX

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.46 SHGC: 0.34

ADDITIONAL NOTES

ADDITIONAL NOTES

D-W7- MASTER BEDROOM 1 199 x 126

[A3]-W8 + W9- MBR + CLOSET 257 x 24

W-[A-W8 + W9- MBR + CLOSET].1 1 72 x 24

SLD - 3-PANEL - XXX[R]

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.46 SHGC: 0.34

ASSEMBLY - T450N CONFIGURATION: STANDARD POWDER COAT - FLAT BRONZE

T450N - PIT - HOPPER

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.44 SHGC: 0.28

- 5242

FG REQ'D

PIVOT DOOR, INCL FRITSJURGENS PIVOT DOOR CLOSER

FIELD MULL TO W3 + W4, STRUCTURE (BY OTHERS)

REQ'D TO ADJACENT SLD

XXXXXXXXX-Z-XXX SLD, 2 TRACKS, NO

SCREEN, STRUCTURE (BY OTHERS) REQ'D BY OTHERS

XXX SLD, 2 TRACKS, NO SCREEN TO ADJACENT PIVOT

POLE OPERATED

POB-FF-FF-FF

W-[A-W8 + W9- MBR + CLOSET].2

W-[A-W8 + W9- MBR + CLOSET].3

x 24

W-[A-W8 + W9- MBR + CLOSET].4

[END ASSEMBLY]

[A4]-W10 + W10BBATHROOM 12

W-[A-W10 + W10BBATHROOM 12].1

W-[A-W10 + W10BBATHROOM 12].2

x 24

T450N - FF - FIXED

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

T450N - FF - FIXED

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

T450N - FF - FIXED

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE U-VALUE: 0.33 SHGC: 0.36

FIELD MULL REQ'D

MULL REQ'D NOT INCLUDED IN ESTIMATE

ASSEMBLY - T450N

CONFIGURATION: STANDARD POWDER COAT - FLAT BRONZE

T450N - FF - FIXED

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

T450N - PIT - HOPPER

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.44 SHGC: 0.28

[END ASSEMBLY]

[A5]-W11- BEDROOM 15

W-[A-W11- BEDROOM 15].1

W-[A-W11- BEDROOM 15].2

NOT INCLUDED IN ESTIMATE FF-PIT

ASSEMBLY - T450N

CONFIGURATION: STANDARD POWDER COAT - FLAT BRONZE

T450N - XL-CSMT-TT - LEFT HINGE

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.39 SHGC: 0.23

T450N - FF - FIXED

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

POLE OPERATED XL TILT & TURN, SCREENED

TNT-FF-FF-XL TNT

FG REQ'D

W-[A-W11- BEDROOM 15].3

W-[A-W11- BEDROOM 15].4

[END ASSEMBLY]

30.25 x 102

T450N - FF - FIXED

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

T450N - XL-CSMT-TT - RIGHT HINGE

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.39 SHGC: 0.23

NOT INCLUDED IN ESTIMATE

[A6]-W12- BEDROOM 17 199 x 102

W-[A-W12- BEDROOM 17].1

30.25 x 102

W-[A-W12- BEDROOM 17].2

W-[A-W12- BEDROOM 17].3

69.25 x 102

W-[A-W12- BEDROOM 17].4 1 30.25 x 102

ASSEMBLY - T450N CONFIGURATION: STANDARD POWDER COAT - FLAT BRONZE

T450N - XL-CSMT-TT - LEFT HINGE

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.39 SHGC: 0.23

T450N - FF - FIXED

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

T450N - FF - FIXED

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

T450N - XL-CSMT-TT - RIGHT HINGE

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.39 SHGC: 0.23

[END ASSEMBLY]

[A7]-W13- BEDROOM 19 199 x 102

W-[A-W13- BEDROOM 19].1

REQ'D

TILT & TURN, SCREENED

TNT-FF-FF-XL TNT

TILT & TURN, SCREENED

TILT & TURN, SCREENED

NOT INCLUDED IN ESTIMATE

ASSEMBLY - T450N CONFIGURATION: STANDARD POWDER COAT - FLAT BRONZE

T450N - XL-CSMT-TT - LEFT HINGE

30.25 x 102

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.39 SHGC: 0.23

TILT & TURN, SCREENED

W-[A-W13- BEDROOM 19].2

W-[A-W13- BEDROOM 19].3

W-[A-W13- BEDROOM 19].4

[END ASSEMBLY]

[A8]-W14- BEDROOM 19

W-[A-W14-

19].1

19].2

[END ASSEMBLY]

BATHROOM

[A9]-W16- BATHROOM 20

W-[A-W16- BATHROOM 20].1

T450N - FF - FIXED

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

T450N - FF - FIXED

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

T450N - XL-CSMT-TT - RIGHT HINGE

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.39 SHGC: 0.23 FG REQ'D

TILT & TURN, SCREENED

NOT INCLUDED IN ESTIMATE

ASSEMBLY - T450N

CONFIGURATION: STANDARD POWDER COAT - FLAT BRONZE

T450N - FF - FIXED

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

T450N - FF - FIXED

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36 FF-FF

NOT INCLUDED IN ESTIMATE

T450N - PIT - HOPPER

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.44 SHGC: 0.28

ASSEMBLY - T450N CONFIGURATION: STANDARD POWDER COAT - FLAT BRONZE

T450N - PIT - HOPPER

SB60|CLEAR - TEMPERED POWDER COAT - FLAT BRONZE

U-VALUE: 0.44 SHGC: 0.28

[END ASSEMBLY]

T450N - FF - FIXED

SB60|CLEAR - TEMPERED

POWDER COAT - FLAT BRONZE

U-VALUE: 0.33 SHGC: 0.36

NOT INCLUDED IN ESTIMATE

ADDRESS SHIP TO

Murphy McKenna

125 Park Place, Suite 200

Point Richmond, CA 94801

Vella Glass, Inc.

214 Firethorn Drive Rohnert Park, CA 94928 US (415) 259-4111 admin@vellaglass.com www.vellaglass.com

5242 Vista Grande Dr Santa Rosa, CA 95403

Item Budget Number to install Blomberg products per Blomberg Window Systems Quote dated 1/31/2023

W-W1 Bathroom 12: Fixed 20" x 138"

A1-W2 Home Office 4: XLCasement/ Fixed 34" x 126"

A2-W3+ W4 Living Room 3: FF-C-FF-FF-FF-FF, Field

Mull to D3 310" x 126"

D-D3 Living Roo,: Pivot Door 56" x 126"

D-W5+W6 Living + Dining: XXXXXXXXX-Z-XXX SLD 812" x 126"

D-W7 Master Bedroom: XXX SLD 199" x 126"

A3-W8+ W9 Mbed+ Closet: POB-FF-FF-FF 257" x 24"

A4-W10+ W10B Baathroom 12 FF-PIT 77" x 24"

A5-W11-Bedroom 15: XL TNT-FF-FF-XL TNT 199" x 102"

A6-W12 Bedroom 17: XL TNT-FF-FF-XL-TNT 199" x 102"

A7-W13 Bedroom 19: XL TNT-FF-FF-XL-TNT 4199" x 102"

A8-W14 Bedroom 19: FF-FF 124" x 24"

A9-W16 Bathroom 20: PIT/FF 54" x 102"

Estimate Specific Notes:

General Note:

1. Glass quote only valid for 60 days. Re-quote required if past 60 days even if contract is in place. Vella Glass will not be held responsible for glass cost increase.

1. Price to be finalized when shop drawing is available. 2. Please review the Term of Installation sheet TOTAL

2. If any layout/ illustration drawing is needed for glass, first copy will be free at charge. Each revision or additional drawing is subject to a fee charge at $125.

3.Glass Samples: Samples are typically provided in sizes of 12”x12”. While samples are good representations of what the finished goods will look like, it is important to note that samples may look somewhat different from final goods produced. When glass gets larger the light will alter the appearance simply due to

$89,600.00

THANK YOU.

Invoice Address

Murphy McKenna Construction 125 Park Place, Suite 200 Point Richmond, California, 94801

Delivery Address

Murphy McKenna Construction 5242 Vista Grande Drive Santa Rosa, California, 95403

Invoice Address

Murphy McKenna Construction 125 Park Place, Suite 200 Point Richmond, California, 94801

Pacific Sash and Design

934 Washington Street

San Carlos, California 94070

Phone: 650-264-9000

Delivery Address

Murphy McKenna Construction 5242 Vista Grande Drive Santa Rosa, California, 95403

DISCLOSURES

- All Special Orders are Non-Returnable and Non-Refundable. - Pacific Sash & Design sells products know to the State of California to cause Cancer and Reproductive Harm - www.p65warnings.ca.gov

Phone: +1707-542-4949 Email: alan@overheaddoorsantarosa.com

Overhead Door Company of Santa Rosa

1805 Empire Industrial Ct

Santa Rosa, CA 95403-1979

Contact: Alan Cullumber

Phone: +1707-542-4949

Email: alan@overheaddoorsantarosa.com

Job:

Vista Grande Project

PreparedFor:

Dale Mossberger

510-778-9964 ext. 115

Murphy McKenna Construction

Email:dale@murphymckenna.com

Description: The Full View Door Company

Details: 1 - 13'10'' x 11'6'' Full View Door Company.

Urban Mid-Fold Door in Two Sections.

Clad Face Material Marine Grade Okoume Plywood.

G.C. to Add Wood to Face of Door.

All Interior Frame and Track Traffic Black RAL 9017.

Full Perimeter Weather Seal.

Counterweight Covers with Seismic Restraints.

Solid Aluminum Threshold.

Redd Motor with Touchscreen Wall Control & Transmitters.

Total (USD): $84,181.00

Furnish, Install & Taxes Included.

Lead Time 8 - 12 Weeks. New Construction Pricing.

Terms and Conditions

Payment to be made as follows: Per Contract. Prices subject to change if not accepted in 30 days.

BY OTHERS: Jambs, spring pads, all line voltage, conduit wiring to motors and control stations, unless otherwise stated above, are not included. Floor, jambs and header must be level for an appropriate seal. The area around the opening must be cleared out prior to our arrival on the day of installation. A good generalization for the area we need cleared out is; the width of your garage door opening with an additional foot on each side is to be cleared back twelve feet into the opening and those two sizes go up two feet above your opening height making a cleared out cube shape. If this area cannot be cleared back, we cannot install our door and motor system.

TERMS AND CONDITIONS: Purchaser agrees that material(s) shall remain in Seller's possession until paid in full. In the event Purchaser breaches or defaults under the terms and provisions of this Agreement, the Purchaser shall be responsible for the costs of collection, including reasonable attorneys' fees. There is a $100.00 re-scheduling fee if we arrive at the job site and cannot perform the installation due to the site not being ready or we are unable to gain access to the site. In such an event our next installation opening may be 2-3 weeks out and an invoice will be made at 80% of the total job cost and will be due and payable immediately.

A waiver of subrogation is issued upon request and has a $200.00 processing fee. Insurance form CG2010-1185 is not available. If you or your company requires a W-9, insurance certificates, or any other customer/contractor specific forms it must be made known at the time you place your order. Not informing Overhead Door Company of Santa Rosa, Inc. that you the customer need specific forms on hand prior to submitting a payment is not a valid cause to withhold payment. Payments made late as a result of

Overhead Door Company of Santa Rosa

1805 Empire Industrial Ct

Santa Rosa, CA 95403-1979

Contact: Alan Cullumber

Phone: +1707-542-4949

Email: alan@overheaddoorsantarosa.com

a customer not having a form that was not requested in a timely manner will have our service charge applied. There is a $35.00 returned check fee if payment is returned for NSF or not being signed.

Acceptance:

Terms, price, and specifications on all pages of this proposal are hereby accepted.

Authorized By (Seller): Date: _____________________

Authorized By (Buyer): Date: _____________________

Print Name (Buyer):

Purchase Order:

Design life without limits. Unique, custom, architecturally designed doors and operable walls transcend traditional boundaries and transform interior and exterior spaces. Fully customizable openings expand design for architectural, commercial, and residential projects. More light, more air, more options, more space.

Luxury Enlightened

Reimagine garage doors, operable window walls, and storefront designs:

Access more light and airflow

Expand indoor/outdoor living

Achieve better sight lines

Design forward with no unsightly overhead tracks

Quieter, safer door operation with exclusive motorized technology system

EXPAND SPACES WITHOUT LIMITS

Work with our design team to transform your vision and ideas into a concept plan that brings them to life.

DESIGN CREATE

Your custom opening project is carefully handcrafted with only the finest materials by a team of specialized artisans here in the USA. Our engineering team takes the concept plan you created and creates engineered drawings just for your project.

MODELS

Vista – Bi-Fold

Size :

Maximum width: 14’

Maximum height: 12’

Finishes :

Looking for a solution where there’s no interfering with lights, HVAC, or sprinkler systems? The Metro is the answer! The Metro is a contemporary sectional door, window or wall system that opens effortlessly with vertical folding panels. Free of ceiling tracks, the Metro creates a superior environment and an efficient space management solution.

Powder coated to AAMA 2604 standard color options, RAL colors, IFS Architectural Colors, Custom color matches upon special request.

The Luxe folds along a horizontal hinge line and moves upward, while the bottom panel opens until horizontal which creates an awning effect.

Constructed from structural steel sections and suitable for residential, industrial, and commercial applications.

Size :

Maximum width: 30’

Maximum height: 20’

Finishes : Powder coated to AAMA 2604 standard color options, RAL colors, IFS Architectural Colors, Custom color matches upon special request.

Glazing : Standard glazing uses 1/4” or 1” IGU glass. Systems can be partially or fully glazed. Standard glazing uses 1/4” or 1” IGU glass.

Cladding : Wood - Glass - Metal – Stone

Customer Request

thickness 4”

15 psf

Urban – Mid-Fold

The Vista is a counterweight balanced vertical bi-folding system constructed from all aluminum and stainless steel parts and is suitable for commercial, retail, and residential applications. By eliminating the need for overhead structure, architects and customers will have more clear opening to create amazing views and access.

Size :

Max Width: 18 FT

Max Height: 12 FT

Finishes : Powder coated to AAMA 2604 standard color options, RAL colors, IFS Architectural Colors

Custom color matches upon special request.

Glazing : Systems can be partially or fully glazed. Standard glazing uses 1/4” or 1” IGU glass.

The single leaf design of the Canopy is versatile and elegant, allowing the ultimate flexibility to meet design needs. It’s suitable for: *Flush mount applications *Versatility of matching site lines* Creating an awning effect when open* Hurricane and high wind load applications

Size :

Maximum width: 30’

Maximum height: 20’

Finishes : Powder coated to AAMA 2604 standard color options, RAL colors, IFS Architectural Colors, Custom color matches upon special request

Glazing : Standard glazing uses 1/4” or 1” IGU glass. Systems can be partially or fully glazed. Standard glazing uses 1/4” or 1” IGU glass.

Cladding :

Wood - Glass - Metal – Stone

Customer Request

Max thickness 4”

Max weight 15 psf

The Urban opening solution is a counterweight balanced, vertical lift bi-folding system constructed from structural steel and is suitable for all application types. By eliminating the need for overhead structure, architects and customers will have more clear opening to create amazing views and access.

Size :

Maximum width: 90’

Maximum height: 30’

Finishes : Powder coated to AAMA 2604 standard color options, RAL colors, IFS Architectural Colors, Custom color matches upon special request.

Glazing : Standard glazing uses 1/4” or 1” IGU glass. Systems can be partially or fully glazed. Standard glazing uses 1/4” or 1” IGU glass.

Cladding :

Wood - Glass - Metal - Stone

Customer Request

Max thickness 4”

Max weight 15 psf.

Whether it is a wall of glass, wood, metal, stone or laminate, the Avalon will elegantly showcase your project. It’s designed to rise into the ceiling structure or lower into the floor structure, which gives the customer the versatility to accommodate their design needs.

Size : Maximum width: 50’

Maximum height: 20’

Finishes : Powder coated to AAMA 2604 standard color options, RAL colors, IFS Architectural Colors, Custom color matches upon special request

Glazing : Standard glazing uses 1/4” or 1” IGU glass. Systems can be partially or fully glazed. Standard glazing uses 1/4” or 1” IGU glass.

Cladding : Wood - Glass - Metal – Stone

Customer Request

Max thickness 4”

Max weight 15 psf

Luxe – Reverse Fold
Canopy – Tilt Up
Avalon – Vertical Slide

PROPOSAL

Project Information

Name Arnon

Location CA-California, United States

Proposal

Name Proposal 2

Revision # Revision 0

Created by Luke Diener

Created on 20-Jul-2022

Notes

* Sales Tax is not included at this time. * Pockets shall be installed by others. * Final fabric selection may increase pricing. * Final shade dimensions may increase pricing. * Rough wiring for shades is not included.

4

7

Line

Line Items

1, 23, 24, 28, 29, 30, 31

Product Roller

Mount Location Outside

Fabric

Basketweave 90 3% Bright White (SP84-90-3)

Top Treatment Pocket

Top Treatment Details 4.75 in x 5 in

Flap 3 in

Technology

Sivoia QS Wired

Operator Roller 100

Hembar Designer Bottom Bar

Fabric Face Fabric Face Away From Glass (Standard)

Side Channel No

Sill Angle No

Lineal Color White Tube 2.5 in

Areas > 1st Floor > Living Room

Line Items

2, 3, 8, 11, 12, 17, 18, 25

Product Roller

Mount Location Inside

Fabric

Basketweave 90 3% Bright White (SP84-90-3)

Top Treatment No Top Treatment

Technology Sivoia QS Wired

Operator Roller 100

Brackets None (will order pocket dual brackets)

Hembar Designer Bottom Bar

Line Items 2, 3, 8, 11, 12, 17, 18, 25

This fabric is not available for sale on shades to be installed in the State of Massachusetts.

Line Items 8

This shade may exhibit certain aesthetic characteristics such as waves, V's, and/or wrinkling on the tube, which may result in permanent damage to the fabric panel. Please see the Shade Aesthetics Guide for more details and consider adding a batten and/or splitting the shade to minimize these aesthetic characteristics.

*BtoB Width and Fabric Width may have deductions because inside mount is specified.

Line Items

4, 5, 13, 14, 19, 20, 26

Product Roller

Mount Location Inside

Fabric

Avila Residential* 0% White (AR-0002-0)

Top Treatment No Top Treatment

Technology Sivoia QS Wired

Operator Roller 100

Brackets None (will order pocket dual brackets)

Hembar Designer Bottom Bar

Fabric Face Fabric Face Away From Glass (Standard)

Side Channel No

Sill Angle No

in

All Areas > Lower Floor > Bed 17

Width and Fabric Width may have deductions because inside mount is specified.

Line Item 9 Product Roller Mount Location Inside Fabric Value Premiere 0% White (BP-P62-0)

Top Treatment No Top Treatment

Technology Sivoia QS Wired

Operator Roller 100

Brackets None (will order pocket dual brackets)

Hembar Designer Bottom Bar

Fabric Face Fabric Face Away From Glass (Standard)

Side Channel No Sill

Sealed hembars show the face of the fabric on both sides of the shade. On dual-sided fabrics with a different color backing, this may create an inconsistent look between the fabric on the hembar and the color on the back of the shade.

This shade may exhibit certain aesthetic characteristics such as waves, V's, and/or wrinkling on the tube, which may result in permanent damage to the fabric panel. Please see the Shade Aesthetics Guide for more details and consider adding a batten and/or splitting the shade to minimize these aesthetic characteristics.

Railroaded fabrics may curl along the edge of the shade. Selecting a railroaded configuration indicates acceptance of this aesthetic condition.

This fabric is not available for sale on shades to be installed in the State of Massachusetts.

*BtoB Width and Fabric Width may have deductions because inside mount is specified.

Product Details Large Pocket

Top Treatment 7 x 11 in Pocket (Vertical Stack)

Operator QS Roller 100/150

System Mount

JOB NAME: DATE:

ADDRESS:

PROJECT INFORMATION:

EXCAVATION/DEMO/SITE WORK: (rock, ground water, etc will result in T&M change orders)

EXCAVATION (see "ROCK CLAUSE" in contract)

EXCAVATIONACCESS

MISCELLANEOUS EXCAVATION

GRAVELPACKUNDERPOOL BETWEEN STRUCTURE AND GUNITE 3/4" CLEAN MISCEXCAVATION

PIERS &/OR GRADE BEAMS (see "ROCK CLAUSE" in contract)

STRANDBURGSTRUCTURALSHELL

PIERALLOWANCE

LENGTHOFTRENCHING18"X24" ALL BACKFILL BY OTHERS

STRUCTURAL WORK: (board finished forming, gunite flash, etc will result in T&M change orders)

UTILITIES:

POOL EQUIPMENT AREAAND MAIN UTILITIES

EQUIPMENTPAD/STRUCTURE

2"GASAND1"WATERTOEQUIPMENTPOC(sizedbyplumber)

MAINPOWERLANDEDINPOOLPANEL(sizedbyelectrician)

DRAINAGE/OVERFLOWCONNECTIONSATPOOLANDPAD

INTERNET/COMMUNICATIONCONNECTIONSTOPOOLPANEL

Plan #4 Bar

PLUMBING AND MECHANICAL:

ROUGH PLUMB

ROUGH ELECTRICAL

INSTALLED EQUIPMENT

FILTER

PENTAIR CLEAN & CLEAR 520 SQ. FT. FILTERPUMP PENTAIR INTELLIFLO MULTI-SPEED

SPAACCESSORYPUMP PENTAIR INTELLIFLO XF MULTI-SPEED

FOUNTAINPUMP NONE

INFINITYEDGEPUMP PENTAIR INTELLIFLO XF MULTI-SPEED HEATER

LETRO PRESSURE LIGHTS 5 PENTAIR MICROBRITE WHITE LED POOLCONTROL PENTAIR INTELLICENTER

PRIMARYSANITATION PENTAIR BIOSHIELD UV SECONDARYSANITATION CMP EROSION FEEDER

INDOORCONTROLLER WIRED KEYPAD SPASIDEREMOTE WILLNOTINSTALL NONE

FINISHES: (PRIOR TO ANY WORK, BUYER/OWNER MUSTAGREE TO INTERIOR FINISH DISCLAIMER)

NEW POOL PLASTER PLASTERCOLOR/STYLE

6" WATER LINE TILE MATERIALS PLASTER

PEBBLE - SIGNATURE BLUE

6" WATER LINE TILE INSTALLATION

COPING INSTALLATION

POOL SAFETY COVER

ACCESSORIES:

Accessory#1

Waterproof Lower Trough with Structural Fiberglass Grate (Decorative Cover over Grate BY OTHERS) INCLUDED Accessory#2 Stepping Platforms BY OTHERS

Estimate Total Without Options

OPTIONS & ALLOWANCES:

Permit Costs (ALLOWANCE) client to payactual cost from Building Department

Design

(ALLOWANCE)

Option#2

ADDITIONAL NECESSARYITEMS NOT INCLUDED IN THIS ESTIMATE:

PLANSFORPERMITAPPLICATION-ARCHITECTUAL/SOILS/STRUCTURAL(ENGINEERING) BUILDINGPERMITS

SAFETYBARRIERREQUIREMENTS(INCLUDINGFENCING,GATES,ALARMS,ETC) INSPECTIONS/CHANGESREQUIREDBYCITYORENGINEERORINSPECTOR WATER(TRUCKSORHYDRANT)FORINITIALFILLINGOFPOOL

WINTERIZINGSITEINCLUDINGGUNITEFLASHOFWALLSANDPLASTICPROTECTION

BUYER/OWNER: DATE:

BLUEREVOLUTION: DATE: (Authorizedagent)

(Toacceptthisestimatehereinaboveandontheprevious6pagesthereof,pleasesignabove,initialany oftheabovewantedoptionsandreturntoBLUEREVOLUTION.BLUEREVOLUTIONwillthengenerate acontractforyourreviewandacceptance.)

Bill To:

Murphy McKenna Construction P.O. Box 70515

Pt. Richmond, CA 94807

2012 Gilrix Street Petaluma, CA 94954 Terms See pay schedule below

Contract Date: 7/8/2022

Contract #: 875

Job Site Address 5242 Vista Grande Dr. Santa Rosa, CA 95403

Arnon Residence

-- FOUNDATION

Under ground:

- Run building drain though foundation with (7) waste stack risers.

-- UNDER FLOOR LOWER LEVEL

**** Bathroom # 1 ****

- Run waste, hot and cold water for (1) lavvy sink.

- Run waste, vent and cold water for (1) wall mount toilet

- Run waste and vent for (1) shower drain.

- Supply hot and cold water for (1) shower valve.

**** Bathroom # 2 ****

- Run waste, hot and cold water for (1) lavvy sink.

- Run waste, vent and cold water for (1) wall mount toilet

- Run waste and vent for (1) shower drain.

- Supply hot and cold water for (1) shower valve

**** Bathroom # 3 ****

- Run waste, hot and cold water for (1) lavvy sink.

- Run waste, vent and cold water for (1) wall mount toilet

- Run waste and vent for (1) shower drain.

- Supply hot and cold water for (1) shower valve

**** Laundry ****

- Run waste, hot and cold water for (1) washer machine

- Run waste, hot and cold water for (1) laundry sink

- Supply gas for (1) dryer.

**** Waste Stacks ****

- Install (1) 2” waste stack for kitchen.

- Install (1) 3” waste stack for power room

- Install (1) 3” and (1) 2” waste stack for primary bath

**** Hose Bib ****

- Supply cold water for (2) hose bib.

Pricing is subject to change after 30 days of the submittal of this bid.

PAYMENT SCHEDULE-- SEE NOTES ABOVE

3,515.00

30,825.00

Bill To:

Murphy McKenna Construction P.O. Box 70515

Pt. Richmond, CA 94807

2012 Gilrix Street Petaluma, CA 94954 Terms See pay schedule below

Contract Date: 7/8/2022

Contract #: 875

Job Site Address

5242 Vista Grande Dr. Santa Rosa, CA 95403

Arnon Residence

-- UNDER FLOOR FIRST FLOOR

**** Kitchen *****

- Run waste, hot and cold water for (1) island sink.

- Run (1) foot vent.

- Supply cold water for (1) ice maker box.

- Supply hot water for (1) dishwasher.

- Supply gas for (1) cook top.

**** Powder Room ****

- Run waste, hot and cold water for (1) lavvy sink.

- Run waste, vent and cold water for (1) wall mounted toilet.

**** Primary Bathroom ****

- Run waste, hot and cold water for (2) lavvy sink.

- Run waste, vent and cold water for (1) wall mounted toilet.

- Run waste and vent for (1) shower drain.

- Supply hot and cold water for (1) shower valve.

**** Hose Bibs ****

- Supply cold water for (3) hose bib.

**** Mechanical ****

- Run (1) return line from mechanical room to farthest fixture.

-- ROUGH IN LOWER LEVEL

**** Bathroom # 1 ****

- Run waste, vent, hot and cold water for (1) lavvy sink.

- Install (2) gate valves for wall mount faucet.

- Install (1) wall mount faucet with final water connections.

- Run waste, vent and cold water for (1) wall mounted toilet.

- Install (1) toilet carrier with final waste and water connection.

- Run vent for (1) shower drain.

- Install (1) shower drain with final waste connection.

- Supply hot and cold water for (1) shower valve.

- Install (1) shower valve with (1) handheld outlet and (1) shower head outlet.

***** Bathroom # 2 ****

- Run waste, vent, hot and cold water for (1) lavvy sink.

- Install (2) gate valves for wall mount faucet.

- Install (1) wall mount faucet with final water connections.

- Run waste, vent and cold water for (1) wall mounted toilet.

- Install (1) toilet carrier with final waste and water connection.

- Run vent for (1) shower drain.

- Install (1) shower drain with final waste connection.

- Supply hot and cold water for (1) shower valve.

- Install (1) shower valve with (1) handheld outlet and (1) shower head outlet.

Pricing is subject to change after 30 days of the submittal of this bid.

PAYMENT SCHEDULE-- SEE NOTES ABOVE

23,950.00

40,998.00

2012 Gilrix Street Petaluma, CA 94954

Bill To:

Murphy McKenna Construction P.O. Box 70515

Pt. Richmond, CA 94807

Job Site Address

5242 Vista Grande Dr. Santa Rosa, CA 95403

Arnon Residence

**** Bathroom # 3 ****

- Run waste, vent, hot and cold water for (1) lavvy sink.

- Install (2) gate valves for wall mount faucet.

- Install (1) wall mount faucet with final water connections.

- Run waste, vent and cold water for (1) wall mounted toilet.

- Install (1) toilet carrier with final waste and water connection.

- Run vent for (1) shower drain.

- Install (1) shower drain with final waste connection.

- Supply hot and cold water for (1) shower valve.

- Install (1) shower valve with (1) handheld outlet and (1) shower head outlet.

**** Laundry ****

- Run waste, vent, hot and cold water for (1) laundry sink.

- Run waste, vent, hot and cold water for (1) washer machine box.

- Install (1) washer machine box with anti hammer device.

- Supply gas for (1) dryer.

**** Pool E uipment ****

-supply cold water for (1) pool filler.

-supply gas for (1) pool heater.

**** Waste Stacks ****

- Install (1) 2” cast iron waste stack for kitchen.

- Install (1) 3” cast iron waste stack for powder room.

- Install (1) 3” cast iron waste stack for primary bath.

**** Hose Bibs ****

- Supply cold water to (3) hose bib.

Pricing is subject to change after 30 days of the submittal of this bid.

PAYMENT SCHEDULE-- SEE NOTES ABOVE

Contract Date: 7/8/2022

Contract #: 875

Bill To:

Murphy McKenna Construction P.O. Box 70515

Pt. Richmond, CA 94807

2012 Gilrix Street Petaluma, CA 94954 Terms See pay schedule below

Job Site Address

5242 Vista Grande Dr. Santa Rosa, CA 95403

Arnon Residence

-- ROUGH IN FIRST FLOOR

**** Kitchen ****

- Run waste, vent, hot and cold water for (1) island sink.

- Run (1) foot vent with accessible clean-out.

- Supply cold water for (1) ice maker box.

- Install (1) ice maker box with anti hammer.

- Supply hot water for (1) dishwasher.

- Supply gas for (1) cook top.

**** Powder Room ****

- Run waste, vent, hot and cold water for (1) lavvy sink.

- Run waste, vent and cold water for (1) wall mounted toilet.

- Install (1) toilet carrier with final waste and water connection.

**** Primary Bathroom ****

- Run waste, vent, hot and cold water for (2) lavvy sink.

- Install (4) gate valve for (1) wall mount faucet.

- Install (2) wall mount faucet with final water connection.

- Run waste, vent and cold water for (1) wall mounted toilet.

- Install (1) toilet carrier with final waste and water connection.

- Run vent for (1) shower drain.

- Supply hot and cold water for (1) shower valve.

- Install (1) shower valve with (1) shower head outlet and (1) hand held outlet.

**** Mechanical Room ****

- Supply hot and cold water for (2) tankless water heater.

- Stub out (1) hot water return line.

- Supply gas for (2) tankless water heater and (1) boiler.

- Run (2) T P drain line and (2) condensate drain line to exterior.

- Run (2) PVC intake and (2) PVC exhaust lines to exterior.

- Run (2) PVC drain pan lines to exterior.

**** Hose Bibs ****

-Supply cold water to (2) hose bib.

Pricing is subject to change after 30 days of the submittal of this bid.

PAYMENT SCHEDULE-- SEE NOTES ABOVE

Contract Date: 7/8/2022

Contract #: 875

25,595.00

2012 Gilrix Street Petaluma, CA 94954

Bill To:

Murphy McKenna Construction P.O. Box 70515

Pt. Richmond, CA 94807

Contract Date: 7/8/2022

Contract #: 875

Job Site Address

5242 Vista Grande Dr. Santa Rosa, CA 95403

Arnon Residence

-- TRIM OUT LOWER LEVEL

**** Bathroom # 1 ****

- Install trim for (1) wall mount faucet.

- Provide final connection to the drain line for (1) lavvy sink.

- Install (1) wall mount toilet with final waste and water connections.

- Install trim for (1) shower valve, (1) handheld and (1) shower head.

**** Bathroom # 2 ****

- Install trim for (1) wall mount faucet.

- Provide final connection to the drain line for (1) lavvy sink.

- Install (1) wall mount toilet with final waste and water connections.

- Install trim for (1) shower valve, (1) handheld and (1) shower head.

**** Bathroom # 3 ****

- Install trim for (1) wall mount faucet.

- Provide final connection to the drain line for (1) lavvy sink.

- Install (1) wall mount toilet with final waste and water connections.

- Install trim for (1) shower valve, (1) handheld and (1) shower head.

**** Laundry ****

- Install (2) angle stop with escutcheons.

- Install (1) laundry sink faucet with final water connection.

- Provide final connection to the drain line for (1) laundry sink.

- Install trim for (1) washer machine box.

- Install gas valve for (1) dryer.

**** Pool E uipment ****

- Install (1) gas shutoff valve.

- Provide final gas connection for (1) pool heater.

- Install (1) water shutoff valve for (1) pool filler.

**** Hose Bibs ****

- Install (2) hose bib with anti-siphon 7,650.00

Pricing is subject to change after 30 days of the submittal of this bid.

PAYMENT SCHEDULE-- SEE NOTES ABOVE

2012 Gilrix Street Petaluma, CA 94954

Bill To:

Murphy McKenna Construction P.O. Box 70515

Pt. Richmond, CA 94807

Contract Date: 7/8/2022

Contract #: 875

Job Site Address

5242 Vista Grande Dr. Santa Rosa, CA 95403

Arnon Residence

-- TRIM OUT FIRST FLOOR

**** Kitchen ****

- Install (4) angle stop with escutcheons.

- Install (1) kitchen faucet with final waste and water connection.

- Install (1) disposal with final connection to waste line.

- Install (1) air switch with final connection to disposal.

- Install (1) air gap with final connection to disposal.

- Install (1) shutoff valve for (1) cook top.

- Install trim for (1) icemaker box.

**** Powder Room ****

- Install (2) angle stop with escutcheons.

- Install (1) lavvy faucet with final water connection.

- Provide final connection to the drain line for (1) lavvy sink.

- Install (1) wall mount toilet with final waste and water connections.

**** Primary Bathroom ****

- Install trim for (2) wall mount faucet.

- Provide final connection to the drain line for (2) lavvy sink.

- Install (1) wall mount toilet with final waste and water connections.

- Install trim for (1) shower valve, (1) handheld and (1) shower head.

**** Mechanical Room ****

- Install (1) RSC199IN tankless water heater. (Includes water heater)

- Install (1) RSC199IN tankless water heater.

- Install (2) tankless drain pan.

- Provide final intake and exhaust connection for (2) tankless heater.

- Provide final gas connection with shutoff and sediment tee for (2) tankless heater.

- Provide final hot and cold water connection with check valve and expansion tank for (2) tankless water heater.

- Provide final water connection for (1) return line with (1) check valve, (1) shutoff valve and (1) hose bib.

- Provide final drain line connection for (2) condensate, (2) drain pan and (2) T P drain lines.

- Install (1) gas shutoff valve for (1) boiler.

**** Hose Bibs ****

- Install (3) hose bib with anti-siphon

Pricing is subject to change after 30 days of the submittal of this bid.

PAYMENT SCHEDULE-- SEE NOTES ABOVE

17,350.00

Bill To:

Murphy McKenna Construction P.O. Box 70515

Pt. Richmond, CA 94807

2012 Gilrix Street Petaluma, CA 94954 Terms See pay schedule

Contract Date: 7/8/2022

Contract #: 875

Job Site Address

5242 Vista Grande Dr. Santa Rosa, CA 95403

Arnon Residence

-- SERVICES

*** Gas ****

- Si e all gas appliance BTU load.

- Run (1) gas main from meter to the building.

- Install (1) gas riser at building and (1) gas riser at meter.

- Install (1) seismic valve off gas meter.

- Tie in meter riser into the building supply.

**** Water ****

- Tap into existing water main supply.

- Extend existing water main to building.

- Install (1) water main riser with (2) shutoff valves, (1) PRV, (1) irrigation supply, (1) fire sprinkler supply and (1) hose bib.

**** Sewer ****

- Install (1) 2-way clean-out within 3 feet of building.

- Run (1) sewer main from building to sanitary clean-out before sidewalk.

- Provide finial connection to existing sanitary clean-out. (Sanitary clean-out to street lateral to be done by other) 14,398.00

Pricing is subject to change after 30 days of the submittal of this

PAYMENT SCHEDULE-- SEE NOTES ABOVE

164,281.00

Accepted by,

C16 License No 972675

392 WEST LARCH ROAD, SUITE 19, TRACY, CA, 95304 (209) 831-9560_jhernandez@jmhfirepro.com

1/31/2023

PROPOSAL

TO: Murphy McKenna Construction, Inc

Attention: Dale Mossberger

PH: (510) 778-9964 x115

FX:

Email: dale@murphymckenna.com

RE:

Arnon Residence (Overhead Sprinklers)

5242 Vista Grande Drive, Santa Rosa, CA 95403

We are pleased to provide you this proposal with a lump sum quotation in the amount of sixteen thousand, eight hundred, fifty dollars ($16,850.00), for design, permit, installation, materials, and equipmentnecessaryofaNewOverheadAutomaticFireSprinklerSystem,perNFPA13D,edition 2019. EXCLUDING UNDERGROUND, METER CONNECTIONS AND PUMPS.

SCOPE OF WORK:

Our Scope will star 2’-0” above finish floor at our check valve, providing design, installation, materials, and equipment necessary for a new Automatic Fire Sprinkler System at the above referenced location, Main house and Garage. Totaling ±4,093 SQ.FT. JMH is proposing to use ALL CONCEALED HEADS, except the areas with high temperature required, such as Garage and Laundry room, and using Upright/Pilot heads in the attic where required in accordance with NFPA #13D, edition 2016 and the Local Authority Having Jurisdiction. With the exception to include any/all water tanks, underground, pumps and connection from meter to Riser.

EXCLUSIONS:

1. Electrical wiring of any kind and/or supervisory systems. (By others)

2. Any requirements more stringent than NFPA 13D.

3. Painting or furring of pipe or equipment.

4. Bonding of any kind.

5. Structural or seismic calculations and/or cost of structural Engineer review.

6. All underground piping work, including the METER feeds.

7. Monitoring of the system, (Alarms).

8. Insurance requirements in excess of $1,000,000 for liability, automobile and/or Workman’s Compensation.

9. Any Fire watch, security fees.

10. Any and all liquidated damage cost.

11. Fire calking.

12. Any unforeseen condition.

13. Any structural work or responsibilities, such as, cutting walls, frame and or calcs.

14. Water Meter connections and or water line from the meter to riser.

PH: 209-831-9560 C16 License No 972675 jhernandez@jmhfirepro.com

C16 License No 972675

392 WEST LARCH ROAD, SUITE 19, TRACY, CA, 95304 (209) 831-9560_jhernandez@jmhfirepro.com

15. Booster Pumps, Water Tanks and or Underground connections.

INCLUDE:

1. Approved working Drawings per NFPA 13D and the Local Authority Having Jurisdiction.

2. Permit and Inspections.

3. Concealed sprinklers, Inspections, i.e… Rough inspection and Final inspection.

4. Recessed heads in laundry room.

5. Upright heads in attic spaces as needed.

6. Industry standard pipe (CPVC), fittings (CPVC), hangers, sprinklers, etc. to be utilized at JMH’s discretion.

7. Our start point (Resi-Riser) at 2’-0” AFF.

ASSUMPTIONS/QUALIFICATIONS:

1. Water flow data (Fire Flow) will be provided for calculations by the owner.

2. No piping may be concealed until after inspection by the Fire Department.

3. The building structure is capable of supporting the weight of the water-filled pipe per NFPA #13.

4. It is the Owner’s responsibility to maintain adequate heat to prevent freezing of pipe and valves in wet pipe sprinkler systems.

5. All work will be performed during times discussed between the GC and JMH, upon agreement of this Proposal/ Bid.

6. The work area will be accessible at all times.

7. All Areas will be accessible.

Exclusions Assumptions/Qualifications of this proposal shall supersede any conflicting contract language.

NOTES:

a) Owner represents that this agreement is a cash transaction wherein no financing is completed and contractor acts in reliance on said representation.

b) Due to the volatility of the current materials market, this proposal will only remain valid for thirty (30) days, after which it will be subject to our review, due to the unpredictable material market. If you have any questions, please feel free to contact us. If this proposal is acceptable, please sign in the space allocated below, and return to us via e-mail at jhernandez@jmhfirepro.com or jmhoffice@jmhfirepro.com

c) Upon agreement of this proposal, we require that you send us CAD Files, and start up deposit to cover all startup fees, i.e.. Engineering fees, permits and labor, after aproval of plans we required second payment, during the durection of the project we required progress payment per schedule below, leaving 10% be collected at pass of Final inspection.

PH: 209-831-9560 C16 License No 972675 jhernandez@jmhfirepro.com

392 WEST LARCH ROAD, SUITE 19, TRACY, CA, 95304 (209) 831-9560_jhernandez@jmhfirepro.com

d) Schedule of payments as follow:

1. Payment due, upon agreement and signing proposal - $2,000.00

2. Payment due, upon on approval and receive of Permit & Mobilization/Material Procurement (To order material and before scheduling rough-in onsite) - $5,500.00

3. Progress payment due at completion of installation and Rough Inspection. - $7,665.00

4. Upon completion of installation and of Final Fire Inspection = $1,685.00 (Minimum of 10% Retention)

TOTAL BID AMOUNT SHOULD EQUAL SUM OF LINES 1-4 ABOVE = $16,850.00

Thank you for the opportunity to present this estimate. If you have any questions, please do not hesitate to call.

Billing Information: (This must be provided prior to JMH Fire Protection starting work)

AuthorizedSignature Date

AuthorizedSignature Date

PH: 209-831-9560 C16 License No 972675 jhernandez@jmhfirepro.com

JMH FIRE PROTECTION, INC. Client
Juan Hernandez

2012 Gilrix Street Petaluma, CA 94954

Bill To:

Murphy McKenna Construction P.O. Box 70515

Pt. Richmond, CA 94807

Contract Date: 2/3/2023

Contract #: 954 RH

Job Site Address

5242 Vista Grande Dr. Santa Rosa, CA 95403

BOILER- Radiant Heat

- Install (1)NAVIN FB200H 199k Boiler.

- Run intake and exhaust for (1) boiler.

- Run (2) 3/4" T&P drain lines to the exterior.

- Run 3/4" PVC condensate drain with neutralizer.

- Install (1) primary manifold with service ports.

- Install (1) 1/2" auto fill valve

- Install (1) 1/2" check valve with drain line to the exterior.

- Install (1) 1" decalcifying air separator.

- Install and strap (1) 4.4 gallon extrol hydro expansion tank.

- Install (1) Grundfos 1/25 HP CI system pump w/ union connections and service valves.

- Install (4) isolation valves w/ hose connection for servicing and airing out system.

- Install (1) 3/4" bypass valve.

- Install (2) supply and return temp gauges.

- Insulate all exposed radiant mechanical piping.

-- Tubing and manifolds:

- Run 1/2” uponor MR PEX barrier coil tubing for supply and return loops in slab, to the manifolds.

- Run 1” uponor MR PEX barrier coil tubing for the supply and return from the manifolds to the mechanical room.

- Install (1) Uponor 4 outlet manifold with flow meters.

- Install (1) Uponor 6 outlet manifold with flow meters.

- Install (1) Uponor 7 outlet manifold with flow meters.

- Install zone actuators on all manifold loop legs.

- Insulate exposed supply and return lines from manifold to mechanical.

-- Zoning:

- Install (1) Taco 6 zone controller.

- Run thermostat wire for (6) zones.

- Install (6) TEKMAR 7-day programmable thermostat.

*** NOTE: Radiant piping to be attached to the rebar underslab.

Pricing is subject to change after 30 days of the submittal of this bid.

PAYMENT SCHEDULE-- SEE NOTES ABOVE

41,625.00

2012 Gilrix Street Petaluma, CA 94954

Bill To:

Murphy McKenna Construction P.O. Box 70515

Pt. Richmond, CA 94807

Job Site Address

5242 Vista Grande Dr. Santa Rosa, CA 95403

BOILER- Radiant Heat

Contract Date: 2/3/2023

Contract #: 954 RH

NOTES:

This uote does NOT include permits, fixtures, roofing, electrical, install or removal of sheet rock and or carpentry. Unless otherwise specified in writing.

REBATES/ GRANTS/ INCENTIVES: All rebates, grants or incentives submitted and processed through Desired Plumbing, Inc. are subject to program approval which include but are not limited to: BayRen, Tech Clean California and Sonoma Clean Power. e hold no control over the approval process and are not liable for any declined application. The amount of the rebates will be given by the above listed companies who have control and access to the grant money and or discounts. Desired Plumbing, Inc. simply serves as a facilitator on the behalf of the client on our contract. In the event the rebate, grant or incentive is denied, the client will be held liable for the payment in full agreed upon both parties. The contract will list an amount that we are re uesting from the companies above and does not guarantee that amount. Once the rebate, grant or incentive has been approved and Desired Plumbing, Inc. has been notified of the approved amount, we would forward the finalized invoice to the client with the approved amounts listed.

CHANGE ORDERS- All change orders must be accepted and signed off by the general contractor and homeowner to be honored.

All SPECIAL- ORDER fixtures purchased through Desired Plumbing, Inc. must be paid in full with the acceptance of this bid so that we may place the order with the supply house. Any special fixture orders will be final. For any other order, a restocking fee of 13.5 may apply.

Before signing contract, please initial the services and fixtures you would like Desired Plumbing, Inc. to perform and purchase.

Should you agree to this proposal, please sign and date so that we may schedule your project in a timely manner. If you wish to cancel this contract, you have (3) business days after signing this contract to send an e-mail or postal letter, informing Desired Plumbing, Inc. you wish to cancel your contract. E-mail: Neil@desiredplumbinginc.com or Erika@desiredplumbinginc.com

Address: 2012 Gilrix St. Petaluma, CA 94954

Payment Schedule:

1st payment of 10 or 1000, whichever is less. is due upon start of project.

2nd payment of 35 is due upon delivery of materials.

3rd payment of 30 is due upon completion of rough in.

4th payment of 25 will be due upon completion of this contract.

Pricing is subject to change after 30 days of the submittal of this bid.

PAYMENT SCHEDULE-- SEE NOTES ABOVE

BILL TO

Murphy McKenna- Main Account 125 Park Place #200 Richmond, CA 94801 USA

JOB ADDRESS

Murphy McKenna- 5242 Vista Grande 5242 Vista Grande Drive Santa Rosa, CA 95403 USA

TASK DESCRIPTION

ESTIMATE PROJECT

Job: 23056326

Technician: Johnny Deluna

-INSTALL 2X MITSUBISHI 60KBTU MULTI ZONE HEATPUMP

MOD# MXZ-SM60

-INSTALL 2X MITSUBISHI 36KBTU MULTI ZONE HEATPUMP

MOD# MXZ-SM36

-INSTALL MITSUBISHI 48KBTU CONCEALED DUCTED INDOOR UNIT

MOD# PEFY-P48

-INSTALL MITSUBISHI 18KBTU CONCEALED DUCTED INDOOR UNIT

MOD# PEFY-P18

-INSTALL 3X MITSUBISHI 8KBTU CONCEALED DUCTED INDOOR UNIT

MOD# PEFY-P08

-INSTALL MITSUBISHI 6KBTU CONCEALED DUCTED INDOOR UNIT

MOD# PEFY-P06

-INSTALL ERV IN CRAWLSPACE MOD# FV-20VEC1

-INSTALL BATHFANS AND KITCHEN HOOD VENTILATION (BATHFANS & KITCHEN HOOD PROVIDED BY OTHERS)

-INSTALL SUPPLIES AND RETURN USING R6 WIREFLEX (INCLUDED BOOTS AND STANDARD GRILLS)

-INSTALL 12X NEST MODULES (NEST THERMOSTATS PROVIDED BY OTHERS)

-INSTALL COPPER LINESETS

-RUN DRAINAGE AND COMMUNICATION LINES

-INSTALL DISCONNECTS AND WHIPS

-INSTALL PORTABLE PADS AND SECURE

*ELECTRICAL, PLUMBING, CAPENTRY AND ROOFING DONE BY OTHERS

Feb 09, 2023

*PERMITS BY OTHERS

*HERS TEST BY OTHERS

-12 YEAR MANNUFACTURE WARRANTY INCLUDED -3YR LABOR WARRANTY INCLUDED

CONTRACT PRICE: $118,500 00

APPROXIMATE START DATE:2/9/2023

APPROXIMATE COMPLETE DATE:2/9/2023

00

ANY CHANGES IN THE SCOPE OF WORK OR EXTRA WORK MUST BE CONFIRMED IN WRITING BY BOTH THE CONTRACTOR AND HOMEOWNER IN ADVANCE OF THE WORK COMMENCING EXTRA WORK OR A CHANGE ORDER IS NOT ENFORCEABLE AGAINST YOU UNLESS THE CHANGE ORDER ALSO IDENTIFIES ALL OF THE FOLLOWING IN WRITING PRIOR TO THE COMMENCEMENT OF ANY WORK COVERED BY THE NEW CHANGE ORDER: THE SCOPE OF WORK ENCOMPASSED BY THE ORDER; (II) THE AMOUNT TO BE ADDED OR SUBTRACTED FROM THE CONTRACT; AND (III) THE EFFECT THE ORDER WILL MAKE IN THE PROGRESS PAYMENTS OR THE COMPLETION DATE HOWEVER, FAILURE TO COMPLY WITH THE REQUIREMENTS OF THIS PARAGRAPH DOES NOT PRECLUDE THE RECOVERY OF COMPENSATION FOR WORK PERFORMED BASED UPON LEGAL OR EQUITABLE REMEDIES DESIGNED TO PREVENT UNJUST ENRICHMENT.

YOU, THE HOMEOWNER (BUYER) OR TENANT HAVE THE RIGHT TO REQUIRE THE CONTRACTOR TO FURNISH YOU WITH A PERFORMANCE AND PAYMENT BOND, HOWEVER THE CONTRACTOR CAN REQUIRE YOU TO PAY FOR THAT BOND.

INFORMATION ABOUT THE CONTRACTORS STATE LICENSE BOARD (CSLB)

CSLB is the state consumer protection agency that licenses and regulates construction contractors. Contact CSLB for information about the licensed contractor you are considering, including information about disclosable complaints, disciplinary actions and civil judgments that are reported to CSLB Use only licensed contractors If you file a complaint against a licensed contractor within the legal deadline (usually four years), CSLB has authority to investigate the complaint. If you use an unlicensed contractor, CSLB may not be able to help you resolve your complaint. Your only remedy may be in civil court, and you may be liable for damages arising out of any injuries to the unlicensed contractor or the unlicensed contractor’s employees

For more information: VISIT CSLB’s website at www cslb ca gov CALL CSLB at 1-800-321-CSLB (2752) WRITE CSLB at P.O. Box 26000, Sacramento, CA 95826

You are entitled to a completely filled in copy of this agreement, signed by both you and the contractor, before any work may be started. CUSTOMER AUTHORIZATION

This invoice is agreed and acknowledged. Payment is due upon receipt. A service fee will be charged for any returned checks, and a financing charge of 1% per month shall be applied for overdue amounts.

Sign here Date

PREPAREDBY

TarmoTaht

ElexSolutions,Inc (323)527-5111

tarmo@elexsolutionscom 660LasGallinasAve,SanRafael,CA94903,USA

PROPOSALDETAILS

ArnonResidence 5242VistaGrandeDrive,SantaRosa,CA95403

DearDale,

PREPAREDFOR DaleMossberger

MurphyMcKennaConstruction (415)725-2431

dale@murphymckennacom 125ParkPl,Richmond,CA94801,USA

ExpiresMarch17,2023

ThankyouforchoosingustobidontheelectricalscopeforArnonResidence Theproposaliscreatedfromthelatestrequestsand informationprovided Pleasereviewandwe'lldiscussthisatournextmeeting Shouldyoudesireanychangesalongtheway,weare gladtoaccommodatethemandupdatethisdocumentwhenevernecessary Pleaseseethefilesattached.

We'rehappytobeworkingwithyouonthisproject.

*Here’swhatyoucanexpectwhenyouworkwithus:*

Youwillreceivetheindustry'stop-qualitywork

Yourcallsandmessageswillbeattendedtopromptly

Youwillbetreatedwithintegrityandprofessionalism

Aclearlydefinedscopeofworkandassociatedpricing,allowingyoutoseeexactlywhatyouarepayingfor Industry-leadingworkmanship,documentation,andattentiontodetail.

Weareexpertsinourfieldandarehappytoprovideyoueveryadviceoneverythingelectrical

ProjectManagement

ProjectManagementallowsforcoordinationbetweentheclient,designer,technicians,homeowner,builder,architect,millwork provider,painters,audio/videocontractors,andothersubcontractorsprovidingrelatedwork.

ProjectManagementalsoallowstimeforElexSolutionstoreviewthescopewiththeclientandcustomizeittotheclient’sneeds