29 Shearer Drive - Project Proposal

Page 1


Project Development

8

PRE-CONSTRUCTION AGREEMENT

EFFECTIVE DATE:

PROJECT:

OWNER:

ARCHITECT:

CONTRACTOR:

MurphyMcKennaConstruction,Inc. 125ParkPlace,Suite200 Richmond,CA94801

ContractoragreestothetermsandconditionssetforthinthePre- ConstructionAgreementandshall providethefollowingconsultingservicessubjecttothestatedtheinvoicingandpaymenttermsforthose services.PleasereadthroughthisPre-ConstructionAgreement.Ifyouagree,pleasesignanddatethePreConstructionAgreement,andreturntoContractorattheaboveaddress.

SECTION 1. SCOPE OF SERVICES:

TheArchitectandotherconsultantswillpreparedrawings,specifications,andotherconstruction documentsfortheProject.ContractorwillmeetwithOw nerandDesignTeamtoreviewtheoveralldesign andintentfortheProject.Contractorshalloffersugg estions,asappropriate,withrespecttoprojected costsandallowances,constructionfeasibility,economic alalternatives,availabilityofmaterials,andtime requirementsforprocurementandconstruction.

SECTION 2. BILLING RATES:

Pre-Constructionconsultationwillbechargedasati meandmaterialscontractatcostplus15%markup and2%forinsuranceasfollows:

(a)HourlyRates

i)SeniorProjectManager$165.00/hour

ii)ProjectManager$145.00/hour

iii)SeniorEstimator$125.00/hour

iv)Foreman/Supervisor$125.00/hour

v)ProjectCoordinator$125.00/hour

vi)JourneymanCarpenter$115.00/hour

vii)Laborer$95.00/hour

(b)ReimbursableExpenses

i)Reproduction,postage,handlingofdocuments

ii)Fax,OvernightMail

iii)OtherexpensesapprovedbytheOwner

SECTION 3. PAYMENT TERMS:

ThisisatimeandmaterialsPre-ConstructionAgre ementnottoexceed$8,000excludinganysitework, destructiveorintrusivetestingorevaluation,orvalueengineeringthatoccursaftertheinitialproposal.This amountstoapproximatelyhoursbilledtoProjectManager,hoursbilledtoProject CoordinatorhoursbilledtoSeniorEstimator.Onebidwalkwithsubcontractortradesisincluded. Ifadditionalbidwalksarerequired,theywillbebilledonatime-and-materialsbasis.

Allitemsarebilledat-costandmarkedupbyMMC.TheOwnershallpaytheContractorforPreConstructionserviceseveryfour(4)weeksbasedonadetailed,itemizedinvoicewhichshallbeprovidedby theContractor.Paymentsareduewithinseven(7)calendardaysoftheinvoicedate.Unpaidbalancesof morethanseven(7)daysshallbearsimpleinterestfromthedatepaymentwasdueatarateoftwentyfourpercent(24%)annually(2%permonthAllreportsgeneratedduringsuchactivitieswillbetheproperty oftheOwner.

ShouldprojectbeawardedtoContractor,$8,000shallbecreditedbacktoOwner(s)onthefinalinvoice issuedbyContractoratthecompletionoftheproject.

SECTION 4. INSURANCE:

MMCshallmaintainandprovidecertificatesfor:

(a)CommercialGeneralLiabilityinanamountof$1,000,000withtheOwneroftheproperty listedasadditionalinsured.

(b)WorkersCompensationInsurance.

IftheOwnerdesiresassurancesagainstProjectfailures,oragainstloss,Owneragreestoobtain appropriateinsurancethroughtheirowninsurancebroker,whichinsuranceshallincludeawaiverof subrogationclauseastoContractor,itsagents ,employees,shareholders,officers,assignees,or successors-in-interest.

SECTION 5. MANDATORY BINDING ARBITRATION:

ANY DISPUTE, CLAIM, OR CONTROVERSY ARISING OUT OF AND/OR RELATING TO CONTRACTOR’S SERVICES, THE WORK, PAYMENTS OR BILLING, OR THIS PRE-CONSTRUCTION AGREEMENT AND/OR THE BREACH, TERMINATION, ENFORCEMENT, INTERPRETATION OR VALIDITY OF IT, WHICH ARE NOT WITHIN THE SMALL CLAIMS EXCEPTION, SHALL BE RESOLVED BY BINDING ARBITRATION IN ACCORDANCE WITH CALIFORNIA CODE OF CIVIL PROCEDURE § 1280 ET SEQ.

JUDGMENT ON ANY ARBITRATION AWARD MAY BE ENTERED IN ANY COURT HAVING JURISDICTION. THIS CLAUSE SHALL NOT PRECLUDE PARTIES FROM SEEKING PROVISIONAL REMEDIES IN AID OF ARBITRATION FROM A COURT OF APPROPRIATE JURISDICTION.

The arbitrator may, in the interest of justice, allocate all or part of the costs of the arbitration and the arbitrator to one party as part of an arbitration award.

Initials:__________ Date:________________ _

SECTION 6. EXCLUSION OF WARRANTIES AND GUARANTEES:

Contractorshallprovideitsbesteffortsandopinionsbasedontheinformationavailabletoit.Contractor offersNOWARRANTY,EXPRESSORIMPLIED,INCLUDINGANYIMPLIEDWARRANTYOF MERCHANTABILITYORFITNESSFORANYPURPOSE,andmakesNOGUARANTEE,andnoneareintendedby ContractorinconnectionwithContract or'sservices,materialsorwork,orbyitsproposalforconsultingor otherservices,orbythefurnishingoforalorwrittenreports,suggestionsorfindings.

SECTION 7. LIMITATION OF LIABILITY:

Ownerherebyagreestolimitanyclaims,damages,demandsorliabilityofanykind,orconsequential damagesunderthisPre-ConstructionAgreement,whichOwnermightclaimorassertContractor,its agents,employees,shareholders,officers,assigneesorsuccessors-in-interest,totheactualdollarvalue paidtoContractorunderthetermsofthisPre-ConstructionAgreement.

SECTION 8. ONE-YEAR LIMITATIONS PERIOD:

Beingsophisticatedpartiesofequalbargainingstrengthandsubjecttovoluntarynegotiationsregardingall termsandconditionsinthisPre-ConstructionAgreement,thepartiesagreethat,forthepurposesofthis Pre-ConstructionAgreementandanymaterialsorservicesprovidedunderit,noticeofdemandfor arbitrationshallbeservedinwritingonotherpartytothisPre-ConstructionAgreementattheaddress listedabove(oratsuchotheraddresstobedesignatedbytheparty)withinone(1)yearfromthedateof Contractor’sfinalinvoicetoOwnerund erthisPre-ConstructionAgreement.

SECTION 9. TERMINATION AT WILL:

EitherpartymayterminatethisPre-ConstructionAgreementforanyreasonwhatsoever,withoutcause andatanytime,byfurnishingtotheotherpartyseven(7)dayspriorwrittennotice.Owner’sonly obligationforterminatingthisPre-ConstructionAgreement,pursuanttothissection,shallbethepayment toContractorofallagreed-uponexpensesincurredhe reunderuptothedateoftermination.Ownershall makepaymentin-fulltoContractorwithinten(10)businessdaysofterminationofthisPre-Construction Agreement.Contractor’sonlyobligationforterminatingthisPre-ConstructionAgreement,pursuanttothis section,shallbetoprovideServicesuntilthedateoftermination.NeitherOwnernorContractorshall thereafterbeentitledtoanyothercompensation.

ContractoragreestoandacceptstermsofthisPre-ConstructionAgreement.

Date:_______________

________________________________ AnthonyMurphy

MurphyMcKennaConstruction,Inc.

125ParkPlaceSuite200 Richmond,CA94801

OwneragreestoandacceptstermsofthisPre-ConstructionAgreement.

Date:______________

Sent byDateCost CodeDescription Company Contact Email

JJ5/31/20241325PhotoDocumentationMultiVistaRudyCruzr.cruz@multivista.com(408)386-7169

Quote Received Bid on the way No Response

Declined Confirmed Site Walk 6/6 1-4:00

JJ5/31/20241500TempFacilitiesPacificSanitationMelissaHuttonmhutton@pacificsanitation.com(707)838-2597Melissasentquote5/30

JJ5/31/20242100DemoHurricaneHauling&DemolitionPaulYuketeswarSonnabendoffice@hurricanehauling.com(415)456-3407Paulconfirmedsitewalk5/31

JJ5/31/2024LVIJoeWhytejoe@lviengineering.com(415)305-5034

JJ5/31/20242300EarthworkCFerFernandoBecerraDiazcferconstruction@gmail.com(707)310-3073

JJ5/31/20242600DrainageCFerFernandoBecerraDiazcferconstruction@gmail.com(707)310-3073

JJ5/31/20242900LandscapeSiteworksCodySchreycody@siteworkslandscape.com(510)912-6003

JJ5/31/2024OxbowChuckHaeuserchuck@oxbowplc.com(707)501-7038

JJ5/31/20243300ConcreteCFerFernandoBecerraDiazcferconstruction@gmail.com(707)310-3073

CodyconfirmedquotesentinJan.2024is stillgood5/31

PatrickandChuckconfirmedinvite5/31

OxsentbidinJan.2024.Theywillrevise withanychanges.

JJ5/31/20243300ConcreteLVIJoeWhytejoe@lviengineering.com(415)305-5034Joeconfrimedsitewalk-6/6

JJ5/31/20243300ConcreteConcretumRobertoGonzalezconcretum721@yahoo.com(415)729-6060Robertoconfrimedsitewalk-5/31

JJ5/31/20244400HardscapeCoyleMasonryMickyCoylemichael@coylemasonry.com(650)270-7147

JJ5/31/2024SiteworksCodySchreycody@siteworkslandscape.com(510)912-6003

JJ5/31/20246100RoughCarpentryCFerFernandoBecerraDiazcferconstruction@gmail.com(707)310-3073

PatrickKirby-Estimater patrick@oxbowplc.com

SteveGraham-HeadofSales sam@murphymckenna.com

RobertDunham-Estimator robert@coylemasonry.com

JJ5/31/20247100WaterproofingDivision7Joejoe@division7waterproofing.comquotecamein6/19 MacSmith Mac@division7waterproofing.com

JJ5/31/20247200InsulationSDIInsulationSteveDeLorenziinfo@sdi-insulation.com(650)685-5500Receivedquote6/12/24

JJ5/31/2024VortexInsulationLuisHiertainfo@vortexinsulation.com(510)963-5713

IkeSample-Estimator mmiller@sdi-insulation.com

MikeBolgerconfirmedinviteandwillsend quote-5/30 Pamconfirmedsitewalk-5/31 BidresenttoPamon6/10/24 PamelaVorsatz pamela@vortexinsulation.com

JJ5/31/20247300RoofBerkeleyRoofServicesMilesMorrisWalkermiles@berkeleyroofservices.com(510)812-6678QuoteReceived6/13

JJ5/31/2024

JJ5/31/20247610Sheetmetalwindowpans

JJ5/31/20247630GuttersSunshineGutersCarolDaviasunshinegutters@gmail.com(510)525-0880

JJ5/31/20248210Doors&WindowsGoldenStateWindowsFrankAndradefandrade@goldenstatewdd.com(415)462-0026

JJ5/31/20248220InteriorDoorsPacificSash&DesignPatrickMarshpatrick@pacificsashdesign.com(650)504-5789

JJ5/31/20248310GarageDoorOverheadGarageDoorAlanCullumberalan@overheaddoorsantarosa.com(707)542-4949

KevinLee Kevin@westcoroofing.com

TalkedtoStevenwithSunshineGutters.He willbeattheSiteWalk5/31

WillupdatequotefromJan.2024-5/31 Jamesconfirmedsitewalk-5/31

Stevenconfirmedinviteandwillbesending bid-5/30

Alenconfirmedinviteandwillsendquote5/30

JJ5/31/2024RWGarageDoorsKenTraxlerken.traxler@rwgaragedoors.com(707)310-5650 QuotescameinforpaintgradeandVG Cedar-5/30 JJ5/31/20248700Hardware

JJ5/31/20248800GlassAcaciaGlassThomasKenihantom@acaciaglassco.com(415)661-4591

JJ5/31/2024DottoGlassKeithDottodotto@dottoglass.com(415)479-1274

JamesEver jesver@goldenstatewdd.comNathanOrnellas nornellas@goldenstatewdd.com

Tomconfirmedinviteandwillsendquote5/30 CaraMcCartan cara@acaciaglassco.com

JJ5/31/20249200DrywallA&VDrywallJaimePerezayvdrywall@gmail.com(510)815-3288Jaimeconfirmedsitewalk-5/31

JJ5/31/2024MayockDrywall(415)456-9306

JJ5/31/20249250StuccoFreyDennisFreydfrey@dfreyassociates.com(415)382-9293QuoteReceived6/14

JJ5/31/2024LevelFiveDesignRyeHudakinfo@levelfivedesign.com(510)621-8800

CourtneyFrey courtney@dfreyassociates.com

Needsconformationifthereisplasteronthe intiriorwalls5/30,otherwisenotbidding.

JJ5/31/20249300TileConstructaGiuliaBaldoitsgiulia5858@gmail.com(510)415-4822Confirmedinvite5/31

JJ5/31/2024ViennaTommyRasonskytommy@vtstone.com(707)480-1831

JJ5/31/20249400StoneConstructaGiuliaBaldoitsgiulia5858@gmail.com(510)415-4822

JJ5/31/2024ViennaTommyRasonskytommy@vtsstone.com(707)480-1831

JJ5/31/20249600WoodFloorValleyoftheMoonFlooringJasonPalterinfo@vomflooring.com(707)938-7194Jasonconfirmedsitewalk-5/31 JJ5/31/20249710PlasterFreyDennisFreydfrey@dfreyassociates.com(415)382-9293 JJ5/31/2024LevelFiveDesignRyeHudakinfo@levelfivedesign.com(510)621-8800

JJ5/31/20249900PaintingMiguel'sPaintingMiguelGomezmiguelspaintingcompany@yahoo.com(707)888-7174confirmednotbidding6/12/24

JJ5/31/2024MarocPaintingJamalZahidjamal@marocpainting.com(510)233-5373

JJ5/31/2024HamillPaintingAndyHamillandyhamill@comcast.net(415)519-7210

10300FireplaceOkellsFireplaceCharlieSimpsoncharlie@okellsfireplace.com(415)626-1110 BlazeFireplaceRobFredericksrob@blazefireplaces.com(415)683-7439

JJ5/31/202411450Appliances

Andyconfirmedsitewalk-5/31 Bidreceived6/14

JJ5/31/202412300Cabinets/CaseworkIWSEthanThrasherethan@interiorwoodsystems.com(415)971-4284Outoftheofficeuntil6/3-5/30

JJ5/31/202414200ElevatorMcKinleyMarkMcKinleymark.mckinley@mckinleyelevator.com (888)945-2358 (949)261-9244

emailedfromwebsite IsaacrequestedPDFversionofplans.Sent 5/31IsaacGuerra-isaac.guerra@mckinleyelevator.com

ArtCruz ArtCruz@championscaffold.com

JJ5/31/202414800ScaffoldingChampionScaffoldingMikemike@championscaffold.com(510)593-1652

JJ5/31/2024NorcalScaffoldingIncDaveNelsondnelson@norcal-scaffolding.comBidreceived6/10/24

Neilconfirmedinvitesandwillsendquote5/30

RobertoGonzalezrgonzalez@championscaffold.com FredericoRamirez-framirezchampionscaffold.com

JJ5/31/202415100PlumbingDesiredPlumbingNeilThorpeneil@desiredplumbinginc.com(415)827-1212

JJ5/31/2024LuntMarymorDaveMargolindave@luntmarymor.com(510)384-9355

QuoteReceived6/16

JJ5/31/202415300FireSprinklersToddMorrisFireProtectionToddMorristodd@toddmorrisfireprotection.com(415)716-4496Toddoutoftheofficeuntil6/3-5/30

JJ5/31/2024McCoyFireProtection

JJ5/31/2024LuntMarymorDaveMargolindave@luntmarymor.com(510)384-9355

JJ5/31/202415400PlumbingFixtures

JJ5/31/202415550Radiant

JJ5/31/202415700HV/ACHenryMechanicalDillonNorthropDillon@henrymechanical.com(707)975-5128Dillonconfirmedsitewalk-5/31

JJ5/31/2024CalveyJohnnyDelunajohnny@calveyhvac.com(408)784-1363Johnnyconfirmedsitewalk-5/31

JJ5/31/202416100RoughElectricalMCMElectricalKeithkeith@mcmelectricsf.com(415)680-4640

JJ5/31/2024ChristmanElectricalContractingPhillipR.ChristmanIVprc4@comcast.net(707)332-2957

JJ5/31/202416500LightingFixtures

AidanCalvey aidan@calveyhvac.com

Keithconfirmedstitewalk-6/1 Quotereceived6/13

JJ5/31/202416800AVSoundVisionBrianStangbrian@svsf.com(415)209-4009Brianconfirmedinvite5/31

5242 Vista Grande Drive

Preliminary Budget February 10th 2023

4. Introduction

6. Preliminary Budget

16. Architectural Drawings/Take-Offs

100. MMC Concrete Quote

118. MultiVista Quote

123. Structural Steel Quote

128. Insulation Quote

135. Roofing Quote

139. Roofing Information

146. Gutter & Downspout Quote

147. Blomberg Window & Door Quote

155. Blomberg Installation Quote

156. Interior Door Quote

162. Mid Fold Garage Door Quote

165. Mid Fold Garage Door Information

168. Drywall Quote

170. Tile Quote

172. Motorized Shade Quote

190. Pool & Spa Quote

195. Plumbing Quote

202. Fire Sprinkler Quote

205. Radiant Heat Quote

207. HVAC Quote

210. Electrical Quote Includes New Service, Rough and trim, Allowance for fixtures, and Lighting Control System

INTRODUCTION

This Updated Preliminary Budget for 5242 Vista Grande Drive was derived from the updated drawing set “Arnon Residence—50% Construction Documents” (46 pages), from Axelrod Design, dated 6/9/2022. Other drawings from Axelrod Design include Mechanical, CD Progress (14 pages) dated 1/6/2023, and Structural (20 pages) dated 12/21/2020, from Strandberg Engineering.

MurphyMcKenna Construction (MMC) calculated the costs using written proposals from subcontractors as well as our own internal cost estimating. All items should be considered allowances. Each line item (materials, labor, supervision) has a 15% markup added, with a 2% insurance surcharge added to the bottom subtotal.

This project is expected to take 16 months to complete. Management consists of Project Managers, Project Coordinators, and a Project Supervisor that works entirely on site.

As indicated in the Preliminary Budget, management’s hours are calculated by week and tied to the duration of the job. Note that supervision hours are calculated at 40h/week. The value represented in the cost code 1700 (Supervision) is the remaining balance after we distribute the hours across specific line items based on our understanding of how much time will be needed to supervise particular trades. Each line item includes allowances for material, labor, and supervision.

Best Regards,

PRELIMINARY BUDGET

ADDRESS SHIP TO

Murphy McKenna

125 Park Place, Suite 200

Point Richmond, CA 94801

Vella Glass, Inc.

214 Firethorn Drive Rohnert Park, CA 94928 US (415) 259-4111 admin@vellaglass.com www.vellaglass.com

5242 Vista Grande Dr Santa Rosa, CA 95403

Item

Budget Number to install Blomberg products per Blomberg Window Systems Quote dated 1/31/2023

W-W1 Bathroom 12: Fixed 20" x 138"

A1-W2 Home Office 4: XLCasement/ Fixed 34" x 126"

A2-W3+ W4 Living Room 3: FF-C-FF-FF-FF-FF, Field

Mull to D3 310" x 126"

D-D3 Living Roo,: Pivot Door 56" x 126"

D-W5+W6 Living + Dining: XXXXXXXXX-Z-XXX SLD 812" x 126"

D-W7 Master Bedroom: XXX SLD 199" x 126"

A3-W8+ W9 Mbed+ Closet: POB-FF-FF-FF 257" x 24"

A4-W10+ W10B Baathroom 12 FF-PIT 77" x 24"

A5-W11-Bedroom 15: XL TNT-FF-FF-XL TNT 199" x 102"

A6-W12 Bedroom 17: XL TNT-FF-FF-XL-TNT 199" x 102"

A7-W13 Bedroom 19: XL TNT-FF-FF-XL-TNT 4199" x 102"

A8-W14 Bedroom 19: FF-FF 124" x 24"

A9-W16 Bathroom 20: PIT/FF 54" x 102"

Estimate Specific Notes:

1. Price to be finalized when shop drawing is available. 2. Please review the Term of Installation sheet

General Note:

1. Glass quote only valid for 60 days. Re-quote required if past 60 days even if contract is in place. Vella Glass will not be held responsible for glass cost increase.

2. If any layout/ illustration drawing is needed for glass, first copy will be free at charge. Each revision or additional drawing is subject to a fee charge at $125.

3.Glass Samples: Samples are typically provided in sizes of 12”x12”. While samples are good representations of what the finished goods will look like, it is important to note that samples may look somewhat different from final goods produced. When glass gets larger the light will alter the appearance simply due to

TOTAL

189,600.0089,600.00

$89,600.00

THANK YOU.

PREPARED BY

Tarmo Taht

Elex Solutions, Inc (323) 527-5111

tarmo@elexsolutions.com

660 Las Gallinas Ave, San Rafael, CA 94903, USA

PROPOSAL DETAILS

Arnon Residence

5242 Vista Grande Drive, Santa Rosa, CA 95403

Dear Dale,

PREPARED FOR Dale Mossberger

MurphyMcKenna Construction (415) 725-2431

dale@murphymckenna.com

125 Park Pl, Richmond, CA 94801, USA

Issue Date January 31, 2023 Expires March 17, 2023

Thank you for choosing us to bid on the electrical scope for Arnon Residence. The proposal is created from the latest requests and information provided. Please review and we'll discuss this at our next meeting. Should you desire any changes along the way, we are glad to accommodate them and update this document whenever necessary. Please see the files attached.

We're happy to be working with you on this project.

*Here’s what you can expect when you work with us:*

You will receive the industry's top-quality work

Your calls and messages will be attended to promptly

You will be treated with integrity and professionalism

A clearly defined scope of work and associated pricing, allowing you to see exactly what you are paying for.

Industry-leading workmanship, documentation, and attention to detail.

We are experts in our field and are happy to provide you every advice on everything electrical

Project Management

Project Management allows for coordination between the client, designer, technicians, homeowner, builder, architect, millwork provider, painters, audio/video contractors, and other subcontractors providing related work.

Project Management also allows time for Elex Solutions to review the scope with the client and customize it to the client’s needs.

Management

DATE: Complete

PROJECT NUMBER:

PROJECT NAME:

Permit/JobCard&StampedPermitPlanSet

BuisnessLicenseforTown/CityofProject ContractBudgetEnteredintoSage

ControlBudgetCreated

ProjectSchedule

PardonourDustLetterstoNeighbors

JobSiteSignage(CityorCountyrequirements)

DesignatedParking&StagingAreas(CityorCountyrequirements)

Powertothesite

WifiConnection(ifclientdoesnothaveonethenonewillhavetobeinstalled)

WifiRouterandCables

WebcamService(ifneeded)

Port-a-potty.Temporaryfacilitiesneedtobeorderedand/orarrangedwithowner, DebrisBox-Vendorsetup

TempFence,ifneeded

LockBox(onsitetools)

Officelocationonsite.Trailor,Table,chair,PlanStation(whateverthejobsitefits)

Powerstrips

ExtensionCords

WorkStationand/ortablesandchairs

Computer

Copier/Scanner

JobSiteEmergencyContactListandEmergencyLocationPoster

EmploymentOSHAPoster

TailgateSafetyBinderandTailgateMeetingForms(enoughtogetthePM/Site Water-eitherawaterservicewillbesetuporwaterwillbesuppliedonsitetoALL Magneticrollerforscrews,etc.

Watertank?

PlasticFileStorageBox

HardHats

EyeWashStation

EyeProtection

EarProtection

Masks

Resporators

HandSanitizer

FirstAidKit

ClipBoard

Gloves

Booties

Sign-inSheetwithclipboard

FireExinguisher(oneforevery3,000s.f.)

TrashCan&Bags

Broom

Spiderbox

Please Pardon Our Dust DATE

To:TheNeighborsof_____________________

Re:UpcomingProjectActivity

DearNeighbor,

Ourcompany,MurphyMcKennaConstruction,isalicensedgeneralcontractorservingtheBay Area.Wearestartingaremodelprojectforyourneighborat650BrewerDrive.Our commitmenttoexcellentserviceextendstoyouasneighbors,whomay,despiteourbest efforts,experiencesomeinconvenienceorconcernsduringconstruction.

Werarelyhaveissues,butintheeventthatyouneedtogetintouch,pleasecallmeonmycell at415-710-4144,oremailmeifitisnotur gentatanthony@murphymckenna.com.Youmay alsocontactusattheofficenumberlistedbelow.

Wewilldoourutmosttokeepyo urinconveniencetoaminimum.

Thankyouinadvanceforyourpatienceandunderstandingwhileweworktoimproveyour neighbor’shome.

Sincerely,

Control Budget: Project:

Job Number:

500PlanCopies1,000.001,000.000.000.001,000.00

1000Mobilization1,000.001,000.000.000.001,000.00 1100De-Mobilization1,000.001,000.000.000.001,000.00 1325PhotographicDocumentation1,000.001,000.000.000.001,000.00 1400Permits/Inspections-ByOwner1,000.001,000.000.000.001,000.00 1425SpecialInspections-ByOw ner1,000.001,000.000.000.001,000.00 1500TemporaryFacilities1,000.001,000.000.000.001,000.00 1700Supervision1,000.001,000.000.000.001,000.00 1710ProjectCoordination1,000.001,000.000.000.001,000.00 1720ProjectManagement1,000.001,000.000.000.001,000.00

2010JobSiteCoordination1,000.001,000.000.000.001,000.00

2025SiteProtection1,000.001,000.000.000.001,000.00 2050Cleanup1,000.001,000.000.000.001,000.00

2125DebrisRemovalandRecycling1,000.001,000.000.000.001,000.00

2400RemovalofStructuralSteel1,000.001,000.000.000.001,000.00

5100StructuralSteelFraming1,000.001,000.000.000.001,000.00

5700ArchitecturalMetal1,000.001,000.000.000.001,000.00

6100RoughCarpentry1,000.001,000.000.000.001,000.00

6200FinishCarpentryBase&interiorDoor1,000.001,000.000.000.001,000.00

7200ThermalInsulation1,000.001,000.000.000.001,000.00 8210ExteriorDoors1,000.001,000.000.000.001,000.00 8220InteriorWoodDoors1,000.001,000.000.000.001,000.00 8700DoorandWindowHardwareInstallO1,000.001,000.000.000.001,000.00 9200Drywall&Taping1,000.001,000.000.000.001,000.00 9300TileInstallationOnly1,000.001,000.000.000.001,000.00 9400StoneInstallationOnly1,000.001,000.000.000.001,000.00 9600WoodFloors-EngineeredWood1,000.001,000.000.000.001,000.00 9900Painting1,000.001,000.000.000.001,000.00 10300FireplacesandStoves1,000.001,000.000.000.001,000.00 10800Toilet,Bath,LaundryAcc.InstallOnly1,000.001,000.000.000.001,000.00 10810Mirrors1,000.001,000.000.000.001,000.00 10820ShowerEnclosuresBath1,000.001,000.000.000.001,000.00 10900Wardrobe&ClosetSpecialties1,000.001,000.000.000.001,000.00 11450AppliancesInstallationOnly1,000.001,000.000.000.001,000.00 12240ElectricDraperies&rollerShades1,000.001,000.000.000.001,000.00 12300Casework&Cabinets1,000.001,000.000.000.001,000.00

12360CountertopFabrication&Install1,000.001,000.000.000.001,000.00 15100Plumbing1,000.001,

15300FireSprinklerAllowancetoReroute1,000.001,000.000.000.001,000.00 15400PlumbingFixtures1,000.001,000.000.000.001,000.00 15700HVAC1,000.001,000.000.000.001,000.00 16100Electrical1,000.001,000.000.000.001,000.00 16500LightingFixtures1,000.001,000.000.000.001,000.00 16800AV1,000.001,000.000.000.001,000.00 17000Contingency1,000.001,000.000.000.001,000.00 45,000.000.0045,000.00 0.00

Control Budget: Project:

Job Number:

500PlanCopies1,000.001,000.000.000.001,000.00

1000Mobilization1,000.001,000.000.000.001,000.00 1100De-Mobilization1,000.001,000.000.000.001,000.00 1325PhotographicDocumentation1,000.001,000.000.000.001,000.00 1400Permits/Inspections-ByOwner1,000.001,000.000.000.001,000.00 1425SpecialInspections-ByOw ner1,000.001,000.000.000.001,000.00 1500TemporaryFacilities1,000.001,000.000.000.001,000.00 1700Supervision1,000.001,000.000.000.001,000.00 1710ProjectCoordination1,000.001,000.000.000.001,000.00 1720ProjectManagement1,000.001,000.000.000.001,000.00

2010JobSiteCoordination1,000.001,000.000.000.001,000.00

2025SiteProtection1,000.001,000.000.000.001,000.00 2050Cleanup1,000.001,000.000.000.001,000.00

2125DebrisRemovalandRecycling1,000.001,000.000.000.001,000.00

2400RemovalofStructuralSteel1,000.001,000.000.000.001,000.00

5100StructuralSteelFraming1,000.001,000.000.000.001,000.00

5700ArchitecturalMetal1,000.001,000.000.000.001,000.00

6100RoughCarpentry1,000.001,000.000.000.001,000.00

6200FinishCarpentryBase&interiorDoor1,000.001,000.000.000.001,000.00

7200ThermalInsulation1,000.001,000.000.000.001,000.00 8210ExteriorDoors1,000.001,000.000.000.001,000.00 8220InteriorWoodDoors1,000.001,000.000.000.001,000.00 8700DoorandWindowHardwareInstallO1,000.001,000.000.000.001,000.00 9200Drywall&Taping1,000.001,000.000.000.001,000.00 9300TileInstallationOnly1,000.001,000.000.000.001,000.00 9400StoneInstallationOnly1,000.001,000.000.000.001,000.00 9600WoodFloors-EngineeredWood1,000.001,000.000.000.001,000.00 9900Painting1,000.001,000.000.000.001,000.00 10300FireplacesandStoves1,000.001,000.000.000.001,000.00 10800Toilet,Bath,LaundryAcc.InstallOnly1,000.001,000.000.000.001,000.00 10810Mirrors1,000.001,000.000.000.001,000.00 10820ShowerEnclosuresBath1,000.001,000.000.000.001,000.00 10900Wardrobe&ClosetSpecialties1,000.001,000.000.000.001,000.00 11450AppliancesInstallationOnly1,000.001,000.000.000.001,000.00 12240ElectricDraperies&rollerShades1,000.001,000.000.000.001,000.00 12300Casework&Cabinets1,000.001,000.000.000.001,000.00

12360CountertopFabrication&Install1,000.001,000.000.000.001,000.00 15100Plumbing1,000.001,

15300FireSprinklerAllowancetoReroute1,000.001,000.000.000.001,000.00 15400PlumbingFixtures1,000.001,000.000.000.001,000.00 15700HVAC1,000.001,000.000.000.001,000.00 16100Electrical1,000.001,000.000.000.001,000.00 16500LightingFixtures1,000.001,000.000.000.001,000.00 16800AV1,000.001,000.000.000.001,000.00 17000Contingency1,000.001,000.000.000.001,000.00 45,000.000.0045,000.00 0.00

Control Budget: Project:

Job Number:

500PlanCopies1,000.001,000.000.000.001,000.00

1000Mobilization1,000.001,000.000.000.001,000.00 1100De-Mobilization1,000.001,000.000.000.001,000.00 1325PhotographicDocumentation1,000.001,000.000.000.001,000.00 1400Permits/Inspections-ByOwner1,000.001,000.000.000.001,000.00 1425SpecialInspections-ByOw ner1,000.001,000.000.000.001,000.00 1500TemporaryFacilities1,000.001,000.000.000.001,000.00 1700Supervision1,000.001,000.000.000.001,000.00 1710ProjectCoordination1,000.001,000.000.000.001,000.00 1720ProjectManagement1,000.001,000.000.000.001,000.00

2010JobSiteCoordination1,000.001,000.000.000.001,000.00

2025SiteProtection1,000.001,000.000.000.001,000.00 2050Cleanup1,000.001,000.000.000.001,000.00

2125DebrisRemovalandRecycling1,000.001,000.000.000.001,000.00

2400RemovalofStructuralSteel1,000.001,000.000.000.001,000.00

5100StructuralSteelFraming1,000.001,000.000.000.001,000.00

5700ArchitecturalMetal1,000.001,000.000.000.001,000.00

6100RoughCarpentry1,000.001,000.000.000.001,000.00

6200FinishCarpentryBase&interiorDoor1,000.001,000.000.000.001,000.00

7200ThermalInsulation1,000.001,000.000.000.001,000.00 8210ExteriorDoors1,000.001,000.000.000.001,000.00 8220InteriorWoodDoors1,000.001,000.000.000.001,000.00 8700DoorandWindowHardwareInstallO1,000.001,000.000.000.001,000.00 9200Drywall&Taping1,000.001,000.000.000.001,000.00 9300TileInstallationOnly1,000.001,000.000.000.001,000.00 9400StoneInstallationOnly1,000.001,000.000.000.001,000.00 9600WoodFloors-EngineeredWood1,000.001,000.000.000.001,000.00 9900Painting1,000.001,000.000.000.001,000.00 10300FireplacesandStoves1,000.001,000.000.000.001,000.00 10800Toilet,Bath,LaundryAcc.InstallOnly1,000.001,000.000.000.001,000.00 10810Mirrors1,000.001,000.000.000.001,000.00 10820ShowerEnclosuresBath1,000.001,000.000.000.001,000.00 10900Wardrobe&ClosetSpecialties1,000.001,000.000.000.001,000.00 11450AppliancesInstallationOnly1,000.001,000.000.000.001,000.00 12240ElectricDraperies&rollerShades1,000.001,000.000.000.001,000.00 12300Casework&Cabinets1,000.001,000.000.000.001,000.00

12360CountertopFabrication&Install1,000.001,000.000.000.001,000.00 15100Plumbing1,000.001,

15300FireSprinklerAllowancetoReroute1,000.001,000.000.000.001,000.00 15400PlumbingFixtures1,000.001,000.000.000.001,000.00 15700HVAC1,000.001,000.000.000.001,000.00 16100Electrical1,000.001,000.000.000.001,000.00 16500LightingFixtures1,000.001,000.000.000.001,000.00 16800AV1,000.001,000.000.000.001,000.00 17000Contingency1,000.001,000.000.000.001,000.00 45,000.000.0045,000.00 0.00

UNCONDITIONAL WAIVER AND RELEASE ON PROGRESS

PAYMENT NOTICE TO CLAIMANT: THIS DOCUMENT WAIVES AND RELEASES LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL WAIVER AND RELEASE FORM.

Identifying Information

Name of Claimant:

Name of Customer:

Job Location:

Owner: Through Date:

Vendor #

MurphyMcKenna Construction Inc.

24129 Turkey Road Sonoma CA 10/24/2023

Job # 21006 1072

Kathy O'Connor & Matthew Larabee

Unconditional Waiver and Release

This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for labor and service provided, and equipment and material delivered, to the customer on this job through the Through Date of this document. Rights based upon labor or service provided, or equipment or material delivered, pursuant to a written change order that has been fully executed by the parties prior to the date that this document is signed by the claimant, are waived and released by this document, unless listed as an Exception below The claimant has received the following progress payment:

Maker of Check:

Amount of Check:

Check Payable to:

Exceptions

MurphyMcKenna Construction Inc.

$24,742.74

This document does not affect any of the following:

(1)Retentions

(2)Extras for which the claimant has not received payment.

(3)Contract rights, including (A) a right based on rescission, abandonment, or breach of contract, and (B)the right to recover compensation for work not compensated by the payment.

Signature:

Claimant’s Signature:

Claimant’s Name & Title:

Date of Signature:

Mairead Coyle 1/25/24

Please scan back to accountspayable@murphymckenna.com CK #8110 dtd 10/30/23

Coyle Masonry Inc
Coyle Masonry Inc

The contractor agrees to perform and the owner agrees to pay for the following changes to this contract. Requested Amount of Change

Installation of landscape outlets per sheet L8.0 50% CD set dated 5.28.24 from Boundless Landscape. Does not include lighting per sheet L8.0.

NOTES: InstallationoflandscapeoutletspersheetL8.050%CDsetdated5.28.24fromBoundless Landscape.DoesnotincludelightingpersheetL8.0.

PREPAREDBY BenMarquand

ElexSolutionsInc

ben@elexsolutions.com

660LasGallinasAve,SanRafael,CA94903,USA

CHANGEORDERDETAILS

5242VistaGrandeDr,SantaRosa,CA95403,USA

CO#3LandscapeOutlets

PREPAREDFOR RobertAshley MurphyMcKennaConstruction (415)710-4144 robert@murphymckenna.com

5242VistaGrandeDr,SantaRosa,CA95403,USA

$0.00 TOTAL $4,611.00 August1,2024 August31,2024

DESCRIPTION TOTAL

MurphyMcKenna Construction, Inc.

125 Park Place, Suite 200

Point Richmond, California 94801

P: 4157104144

RFI #84: POOL MECH ROOM LOUVER - MODEL SELECTION

Status

To From Connor Bonyeau (MurphyMcKenna Construction, Inc.)

125 Park Place, Suite 200 Point Richmond, California 94801

Date Initiated

Location

Due Date Aug 9, 2024

Project Stage Course of Construction

Cost Impact Schedule Impact TBD

Spec Section

Cost Code

Drawing Number Reference

Linked Drawings

Received From

Copies To

Connor Bonyeau (MurphyMcKenna Construction,  Inc.)

Robert Ashley (MurphyMcKenna Construction, Inc.),  Sofie Mravcova (MurphyMcKenna Construction,  Inc.), Anthony Murphy (MurphyMcKenna  Construction, Inc.)

Activity

Question

Question from Connor Bonyeau MurphyMcKenna Construction, Inc. on Friday, Aug 2, 2024 at 12:48 PM PDT

Here is a model that was provided to me for the pool mech room door while working with the Ruskin Louver Reps. Please let me know if this works for you aesthetically.

If you scroll down on the pdf you will see "Typical Installation Details"

I believe we should use the "Metal Panel Wall" detail as it will be resting on top of the Metal Door. Unlike the drawing though, we would shift the louver to the very front/exterior face of the door. It is the drip edge/pan that I find very beneficial.

Attachments l26_POOL MECH ROOM LOVER.pdf

Awaiting an Official Response

MurphyMcKenna Construction, Inc.

125 Park Place, Suite 200

Point Richmond, California 94801

P: 4157104144

Submittal #2.0 -

Cooritalia Paint Color

Revision 0

Status Closed

Issue Date Oct 11, 2023

Responsible Contractor CoorItalia Inc

Received Date

Final Due Date Nov 15, 2023

Submittal Manager  Robert Ashley (MurphyMcKenna Construction, Inc.)

Date Created  Oct 11, 2023

Spec Section

Received From  Architect

Submit By

Lead Time

Cost Code

Location Type Document

Approvers Architect

Ball in Court

Distribution

Description Please review the attached submittal for window/door paint color. Please let us know if physical samples have not yet been provided and we will get them over to you.

Submittal Workflow

Name

General Information Attachments VISTA-GRANDE-SUBMITTAL-002.pdf

Architect Oct 11, 2023 Nov 15, 2023 Oct 16, 2023

Comment 9016 MT Approved.

Approved as Noted 23_1013 Cooritalia Color Samples.pdf (Current)

MATERIAL PROCUREMENT SCHEDULE

Sheet#TagLocationSpecs.ManufacturerQuantityPurchasedby PLUMBING FIXTURES

WC Concealed tank

Powderroom-WC8

Aurenawall-mountedtoilet Model:259809

Finish:BlackMatt259809AF00 Duravit1

Flush Actuator plate

Powderroom-WC8

GESSI316Flessa Model:54611

Finish:707BlackmetalBr.Pvd

Lavatory Faucet OP 1

Powderroom-WC8

GESSI316Flessa Wallmountedwashbasinmixer Model:54090

Finish:239Steelbrushed

Sink Drain Powderroom-WC8TBD

APWashlet+C2wall-hungtoilet

WC Concealed tank

MasterBath12

Model:CWT4263074CMFG

Finish:MatteSilver Toto1

GESSI316Flessa

Model:54611

Flush Actuator plate

MasterBath12

Lavatory Faucet OP 1

MasterBath12

Thermostatic module OP 1

Wall-mounted adjustable shower head OP 1

Wall-mounted bath mixer control OP 1

Shower Drain

MasterBath12

MasterBath12

Finish:239Steelbrushed

GESSI316Flessa

Wallmountedwashbasinmixer

Model:54090

Finish:239Steelbrushed GESSI1

GESSI316Flessa

Model:54514

Finish:239Steelbrushed

GESSI316Flessa

Model:54148

Finish:239Steelbrushed GESSI1

MasterBath12

GESSI316Flessa Model:54038

Finish:239Steelbrushed

MasterBath12 InfinityDrain

S-LAG3860

60"completekit

Finish:TBD

https://www.duravit.com/products/all_series/aurena.c omen.html?product=542579DesiredPlumbing

https://areapro.gessi.com/us/product/54611?finId=707 &navId=eyJhbWJpZW DesiredPlumbing

https://areapro.gessi.com/us/product/54090?finId=239 &navId=eyJhbWJpZW50TmFtZSI6IkJBVEhST09NIiwiY29s bGVjdGlvbk5hbWUiOiJHRVNTSTMxNiIsInNlcmllTmFtZSI 6IkZMRVNTQSJ9

https://www.totousa.com/ap-washlet-plus-c2-wallhungtoilet-128gpf-0.9gpf

https://areapro.gessi.com/us/product/54611?finId=239 &navId=eyJhbWJpZW50TmFtZSI6IkJBVEhST09NIiwiY29s bGVjdGlvbk5hbWUiOiJHRVNTSTMxNiIsInNlcmllTmFtZSI 6IkZMRVNTQSJ9

https://areapro.gessi.com/us/product/54090?finId=239 &navId=eyJhbWJpZW50TmFtZSI6IkJBVEhST09NIiwiY29s bGVjdGlvbk5hbWUiOiJHRVNTSTMxNiIsInNlcmllTmFtZSI 6IkZMRVNTQSJ9

https://areapro.gessi.com/us/product/54514?finId=239 &navId=eyJhbWJpZW50TmFtZSI6IkJBVEhST09NIiwiY29s bGVjdGlvbk5hbWUiOiJHRVNTSTMxNiIsInNlcmllTmFtZSI 6IkZMRVNTQSJ9

https://areapro.gessi.com/us/product/54148?finId=239 &navId=eyJhbWJpZW50TmFtZSI6IkJBVEhST09NIiwiY29s bGVjdGlvbk5hbWUiOiJHRVNTSTMxNiIsInNlcmllTmFtZSI 6IkZMRVNTQSJ9

https://areapro.gessi.com/us/product/54038?finId=239 &navId=eyJhbWJpZW50TmFtZSI6IkJBVEhST09NIiwiY29s bGVjdGlvbk5hbWUiOiJHRVNTSTMxNiIsInNlcmllTmFtZSI 6IkZMRVNTQSJ9

https://infinitydrain.com/product/s-lag-38/

DesiredPlumbing

DesiredPlumbing

DesiredPlumbing

DesiredPlumbing

DesiredPlumbing

DesiredPlumbing

DesiredPlumbing

WC Concealed tank

Bathrooms16,18,20

Flush Actuator plate

Bathrooms16,18,20

Lavatory Faucet OP 1

Bathrooms16,18,20

Thermostatic module OP 1

Wall-mounted adjustable shower head OP 1

Wall-mounted bath mixer control OP 1

Bathrooms16,18,20

Bathrooms16,18,20

Bathrooms16,18,20

APWashlet+C2wall-hungtoilet

Model:CWT4263074CMFG

Finish:MatteSilver Toto3

GESSI316Flessa

Model:54611

Finish:239Steelbrushed GESSI3

GESSI316Flessa

Wallmountedwashbasinmixer

Model:54090

Finish:239Steelbrushed GESSI3

GESSI316Flessa Model:54514

Finish:239Steelbrushed GESSI3

GESSI316Flessa Model:54148

Finish:239Steelbrushed GESSI3

GESSI316Flessa Model:54038

Finish:239Steelbrushed GESSI3

https://www.totousa.com/ap-washlet-plus-c2-wallhungtoilet-128gpf-0.9gpf

https://areapro.gessi.com/us/product/54611?finId=239 &navId=eyJhbWJpZW50TmFtZSI6IkJBVEhST09NIiwiY29s bGVjdGlvbk5hbWUiOiJHRVNTSTMxNiIsInNlcmllTmFtZSI 6IkZMRVNTQSJ9

https://areapro.gessi.com/us/product/54090?finId=239 &navId=eyJhbWJpZW50TmFtZSI6IkJBVEhST09NIiwiY29s bGVjdGlvbk5hbWUiOiJHRVNTSTMxNiIsInNlcmllTmFtZSI 6IkZMRVNTQSJ9

https://areapro.gessi.com/us/product/54514?finId=239 &navId=eyJhbWJpZW50TmFtZSI6IkJBVEhST09NIiwiY29s bGVjdGlvbk5hbWUiOiJHRVNTSTMxNiIsInNlcmllTmFtZSI 6IkZMRVNTQSJ9

https://areapro.gessi.com/us/product/54148?finId=239 &navId=eyJhbWJpZW50TmFtZSI6IkJBVEhST09NIiwiY29s bGVjdGlvbk5hbWUiOiJHRVNTSTMxNiIsInNlcmllTmFtZSI 6IkZMRVNTQSJ9

https://areapro.gessi.com/us/product/54038?finId=239 &navId=eyJhbWJpZW50TmFtZSI6IkJBVEhST09NIiwiY29s bGVjdGlvbk5hbWUiOiJHRVNTSTMxNiIsInNlcmllTmFtZSI 6IkZMRVNTQSJ9

DesiredPlumbing

DesiredPlumbing

DesiredPlumbing

DesiredPlumbing

DesiredPlumbing

DesiredPlumbing

MurphyMcKenna Construction, Inc.

125 Park Place, Suite 200

Point Richmond, California 94801

P: 4157104144

Daily Log: Friday 8/2/2024

Daily Log Completed

The Daily Log was completed by Connor Bonyeau on Fri, Aug 2, 2024 at 02:55 PM PDT

WEATHER REPORT

DAILY SNAPSHOT

OBSERVED WEATHER CONDITIONS

1 02:50:00 PM No

1

Comments: Waterproofing lower stair area grade beams

Created By: Connor Bonyeau 2

Comments: Continued working on stem wall forms for south east corner to rear door. As well as gridlines 2.1 & 3 between gridlines c.8 and A

Created By: Connor Bonyeau

1722635669258.253174_tempImage.jpeg

1722635674500.064941_tempImage.jpeg

1722635680054.768066_tempImage.jpeg

1722635668860.722168_tempImage.jpeg

1722635669773.612061_tempImage.jpeg

1722635684778.553955_tempImage.jpeg

1722635676654.868164_tempImage.jpeg

1722635678919.081055_tempImage.jpeg

This week was a great week. We are almost complete with the preprufe waterproofing in the slab area and other required foundation areas.

We are working at completing another concrete pour of the foundation footings between the 21st and 23rd of this month, so that we can continue with the rest of the stem walls.

We have completed our review of the steel package and have sent it out to Axelrod and Strandberg for their final blessing before going to our steel contractor for the final round of shop drawings.

I believe the doors and windows review has also been completed on our end as well as Axelrod. We are now just waiting for the final drawing package from Cooritalia. These are both pivotal moments in the building process as there are so many factors related to successfully coordinating steel, windows and doors, concrete stem walls, shade pockets, pool details, you name it.

We have spent most of this week working on waterproofing the foundation areas and forming stem walls. Mark Dietrich from the waterproofing consultants was out to see the progress. And we had several inspections this week that went well.

Next week, we will have plumbers back on site to install more pre foundation plumbing for patio drains and gas lines to pool equipment room.

On Monday we have the pool contractor out on site to start installing the pipes in the stem wall that will travel between the pool and the pool mechanical room.

The MMC crew will be working on more foundation related items, such as steel connections, wood wall connection hardware, and foundation vent openings. We will also be installing more subdrainage.

The office is working at finalizing all fixture, equipment, and finish schedules with Axelrod. Landscape estimates are under way still, but we should hopefully receive the numbers in the next week or two.

OAC MEETING 54

Date: 8/6/24

Time: 10:00am

Venue: Zoom

Invitees:

Owner

Architect Designer MMC

Topics:

1. Exterior building lights – code requirements
2. Pivot door hardware specifications 3. PG&E contract signature & payment 4. Vulcan vents
Auto water shut off – homeowners insurance requirement

OAC MEETING MINUTES 54

Date: 8/6/24

Time: 10:00 – 11:00am

Venue: Zoom

Aendees: Owner Architect

MMC

Topics:

1. Exterior building lights – code requirements.

• AA and MMC to confirm what the code requirements are for exterior building lights and whether landscape lighting is acceptable for illuminating the pool mechanical room entrance and lower exit door landing. AA would like to add ceiling light for the lower exit door landing.

2. Pivot door pull/handle specifications and keyed cylinder elevation

• RK sent the specs 8/5. MMC shared the specs with CoorItalia on 8/6. AA to research aftermarket manually operated keypad lock.

3. PG&E contract signature & payment

• PG&E re-sent the contract and Yoram confirmed that he received it and is taking care of it.

4. Vulcan vents

• Bathroom fans from the lower floor bathrooms to be vented on the east side of the house (add 1 more Vulcan vent) not by the pool mechanical room.

5. Auto water shut off – possible homeowners insurance requirement.

• MMC to email Yoram pros and cons for getting an auto water shut off and ask him to check with a homeowner’s insurance broker whether they will require it.

Project Photos

Turkey Road, Sonoma, CA

Recently completed 5,000 sq-ft modern, single-family, 3-bedroom home with pool on 4 acres of vineyards with full development of utlilities, wells, drainage and a ADU/ Barn.

Architect: Zimmerman & Associates

Interior Design: Studio Becky Carter

Lighting Design: Techlinea

Structural: ZFA Structural Engineers

Vista Grande Drive, Sonoma, CA.

5,000 sq-ft, ground-up construction of a modern, single-family, 4-bedroom home with an infinity edge pool built on a 40-degree slope.

Architect: Axelrod Architects

Structural: Strandberg Engineering

Vista Grande Drive, Sonoma, CA.

5,000 sq-ft, ground-up construction of a modern, single-family, 4-bedroom home with an infinity edge pool built on a 40-degree slope.

Architect: Axelrod Architects

Structural: Strandberg Engineering

Vista Grande Drive, Sonoma, CA.

5,000 sq-ft, ground-up construction of a modern, single-family, 4-bedroom home with an infinity edge pool built on a 40-degree slope.

Architect: Axelrod Architects

Structural: Strandberg Engineering

West Dry Creek, Healdsburg, CA.

400 sq.ft cantilevered modern addition to an existing single-family home. Primary elements include exposed structural steel, Swiss windows, spiral stair, ipe decking, and hot tub.

Architect: Couture Architecture

West Dry Creek, Healdsburg, CA.

400 sq.ft cantilevered modern addition to an existing single-family home. Primary elements include exposed structural steel, Swiss windows, spiral stair, ipe decking, and hot tub.

Architect: Couture Architecture

CA

An 8-year, multi-phase development project on 3.5 acress in Woodside, CA inspired by the Château de La Colle Noir, formely owned by Christian Dior.

Completed scope: interior remodel of a 7,000 sq-ft single-family estate.

Remaining scope/in-progress: ADU accessory building and landscape.

Architect: BAR Architects & Interiors

Interior Design: BAR Architects & Interiors

Landscape Architect: STRATA Landscape Architecture

Structural: Strandberg Engineering

Olive Hill Lane, Woodside,

View Park Court, Mill Valley, CA.

Interior remodel of a single-family residence & foundation work. Included extensive finish carpentry, new kitchen, new bath, cantilevered stairs, decks, Venetian Plaster and flushed finished throughout.

Architect: Wright Architecture

Architect References

“Anthony and the team at MurphyMcKenna have been a pleasure to work with and are able to provide early phase estimating services in addition to general contracting.”

BAR Architects

Earl Wilson, BAR Architects - ewilson@bararch.com

“Sometimes there is an innate and successful fluidity that develops and guides a project towards success. An ability to think outside the box and ‘on the fly’ problem solving are strong MurphyMcKenna traits. Not only are they experts at finding ways to execute a design, but they are extremely proficient at staying on schedule. It is also through a clear and concise management of the project that made our experience memorable.”

Terry&Terry Architecture

“We thoroughly enjoyed the collegial teamwork with MurphyMcKenna on the job. Our client received clear reporting on project costs and schedule, while we as architects got superior care on both infrastructure and installation details. Their projects are characterized by craftsmanship and built to last.”

2M Architecture

“I’ve known and worked with Anthony Murphy for over twenty years. We’ve done exceptional projects together. What makes them special is the relationship between art, technology, and craft, between architect and builder. MurphyMcKenna are “Master Builders” they bring expertise and professionalism to the work that we share, elevating the process and product”.

LEVY art + architecture

Ross Levy, LEVY art + architecture - ross@levyaa.com

“We have successfully completed several very high end and complex projects with MurphyMcKenna Construction. As consultants with 30 years’ experience in the custom residential market, we always look forward to collaborating with MurphyMcKenna; they are highly organized, professional and produce premium results. Anthony Murphy and the entire team are exceptional builders. I recommend MurphyMcKenna Construction every chance I get”.

Techlinea Inc.

“MurphyMcKenna are excellent collaborators bringing their expertise and attention to detail from construction estimates to finish craftsmanship. True teamwork!”

BAR Architects

Tim Hepworth, BAR Architects - THepworth@bararch.com

Jee-Hee Haar, BAR Architects - jhaar@bararch.com

“We appreciate how thorough, and detail oriented the MurphyMcKenna team is. Our collaboration was exceptional and made the client experience seamless and our job as designers that much easier!”

McCaffrey Design Group

Alice Cummings, McCaffrey Design Group - alice@mccaffreydesigngroup.com

“Couture Architecture is dedicated to designing and building uniquely tailored homes to meet the needs of clients with exceptional taste. Our contractor of choice to do so is MurphyMcKenna. They bring an exceptional level of skill and dedication to every project. Recently Couture Architecture brought the MurphyMcKenna team in for a project requiring their proficiency with handling a complex and precise design, their technical know-how with innovative problem-solving plus their project management abilities. All brilliantly executed. MurphyMcKenna consistently brings their attention to detail combined with a commitment to quality to execute complex designs to the highest standards.

MurphyMcKenna’s proactive approach to project management and their seamless coordination with subcontractors, suppliers, designers and the client, make them a valuable partner for clients & designers in any construction endeavor”. Couture Architecture

Scott Couture, Couture Architecture - design@couturearchitecture.net

“MurphyMcKenna has been very helpful on a current project where significant solid rock excavation under an existing home is occurring. They have been responsive, found the perfect subcontractor for the work, and we are looking forward to embarking on this project. The project also includes surgically cutting a new 49’ elevator shaft through the existing three-story home to the garage below. With such a complicated project, we feel we are in good hands with MMC”.

MacCracken Architects

Steve MacCracken, MacCracken Robinson Architecture - stevem@macarchs.com

“I’ve worked with MurphyMcKenna on a project that required great attention to detail, as the products used were high end and needed to be installed in a very precise manner in order to show off their beauty. The project was also running on an extremely compressed schedule, and it finished on time without a sweat. Anthony’s team is courteous, patient and professional; they do a great job of monitoring and supervising their subcontractors, and they’re very communicative.”

Studio Ku

“I would give MurphyMcKenna a 5-star recommendation to anyone looking for a General Contractor with a direct honest approach to remodeling or building their home in the Bay Area. Both Sean and Anthony are straight to the point and what you see is what you get.

As a Modular Designer, I have worked with Anthony on numerous projects in the Bay Area. I would have no hesitation in referring MurphyMcKenna for your construction needs.” NYŪ Designs

Paul Nyulassie, NYU Designs - paul@modernprefabhouse.com

Alexa d’Argencé, Ken Fulk, Inc. - alexa@kenfulk.com

Michael Rex, Michael Rex Architects - rex@michaelrexarchitects.com

Scott Couture, Couture Architecture - design@couturearchitecture.com

Jerome Buttrick, Buttrick Projects - jerome@buttrickprojects.com

Linda Herman Consulting - linda@lindahermanconsulting.com

Heidi Richardson, Richardson Pribuss Architects - heidi@rp-architects.com

Client References

“I’m a repeat customer of this company’s services, having relied on them to construct both a 3-story, 4000 square foot duplex condo project in San Francisco and then later a large custom single-family home (more than 5000 square feet). Both projects were extremely complex, and we were impressed by Anthony (one of the principals) and his insights, expertise, and contributions to overcome numerous logistical challenges that came up trying to effectuate (and often remediate!) the architects’ plans. In constructing the San Francisco duplex, his tasteful accents and improvements to the original design were masterful and helped us command top dollar when we sold the units later. The realtors raved over his tasteful execution using different structural elements of wood, stone, and steel. Based on his earlier phenomenal work, we hired him again to build our dream home in Berkeley, which is really a work of art thanks to his efforts. It was an extensive project, requiring a demolition, significant excavation and retaining wall work, tons of concrete, dozens of steel beams/reinforcements, and substantial amounts of high-end carpentry work. His team handled dozens of design changes seamlessly and efficiently. We could not be more pleased.

From what I’ve seen of Anthony over the past 10 years he is extremely conscientious and will do everything he can to bring your design vision into perfect form. If we build another home his company will definitely be our first choice again”.

“We had a defined vision of what we wanted our home to be and Anthony and his team’s input was instrumental in making our dream a reality. This was an internal remodel that required extensive structural modifications such as addition of extra large view windows, cantilevered staircase, removal of walls, repositioning structural elements, building shear walls and reinforcement of the foundation. Basically MurphyMcKenna rebuilt the house from the inside. The reno also required fine carpentry and workmanship to carry out our interior design ideas like the slat ceiling, which turned out to be far more difficult and involved than anybody foresaw. The tolerances for the carpentry were very fine but their master carpenters succeeded beautifully, and in the end visitors comment on the ceiling as much as our view, which is stunning.

All this was carried out during the Pandemic when supply chain logistics and staffing were a constant source of potential chaos but MMC’s staff kept the project moving ahead. Communication was excellent and their commitment to maintaining the work flow kept us from despairing. Well not too much, LOL. The confidence boost and reduced stress from working with such professional builders was a huge plus. A side benefit was the MurphyMcKenna’s workers were popular with our neighbors despite the interruptions and inconvenience. We look forward to working with Anthony & Sean and the rest of the MMC team for the second – and hopefully final – phase of the renovation”.

—Doug W and Susan C, Clients

“After we designed our dream home on the Bay, we were faced with the daunting challenge of finding a contractor who had the technical expertise to complete our structural and foundation complexities (long, open spans to optimize the water view, an additional story requiring complete reinforcement of the existing foundation, and difficult easement requirements) and also the craftsmanship to provide highend finishes and stunning detail work throughout.

Our experience hiring MurphyMcKenna for our project has been nothing short of exceptional. Not only is the work impressive, but Anthony and his team have provided clear and timely communication on every aspect, and also seamlessly supported every small design change with ease. Most impressively, the project remained on schedule and on budget throughout, and our neighbors (inconvenienced, to say the least) have had nothing but accolades for the MurphyMcKenna crew and their work”.

Todd W, Client

“Thank you for the tremendous work you and your team did for us. We are thoroughly enjoying our new kitchen and bathrooms, especially now that it’s finally totally complete. Yes, Home Depot finally managed to deliver and install the range, so now our kitchen is fully functional. Everything turned out so well. I know we had some quirky wants like the powder room. Your team dealt with our wishes with total professionalism. They rose above the many challenges, including the confusing design issues and the delivery delays for so many items used in the project.

A special mention goes to Anthony Parrish. He was amazing to work with. He has the most “can-do” approach and identified countless potential problems in time to make changes and adjustments. He has a great attention to detail and even noticed issues with the original construction and finish out of our home. We were also able to address these mistakes, so all the work blended with the untouched areas of our home. Anthony is also incredibly friendly and a great communicator.

We would gladly provide a reference to anyone who wishes to speak with people who have used your company. And anyone who asks for building works, we will definitely provide them with your contact details. Thank you so much for helping create our spaces just the way we want them.”

—R. Kreeger, Client

Daniel DiCicco, Woodside - daniel.dicicco@me.com

Stephanie Harman, Woodside - stephaniecharman@yahoo.com

Jennifer Haas, Piedmont - jennchaas@gmail.com

Doug Wilkinson, Mill Valley - dgwilkinson@comcast.net

Rick Ronald, Mill Valley - rick.ronald@skylinepacific.com

Doug Piper, San Francisco - doug@piperspace.com

McKenna Murphy