Portfolio_MH 25

Page 1


MOHAMMED IBRAHIM

Course:

Details: THE MUSE

TEMPLE OF THE RISING SUN

Course:

-Structural Design+ Computational Intelligence

-Delft Institute of Technology -Spring 2023

-J.D.OCallaghan@tudelft.nl

-Academic

Details:

-Structural glass design

-Structural analysis in karamba

-Structural member optimization

-Detailing: resolving material connections

-Panelization

-Clustering:machine learning

Glass floor design iteration: Aesthetics, structure, and standardized panels were considered

Structural analysis: Glass diaphragm wall and Roof truss component sizing

Safety analysis: in the case of structural glass breakage.

Glass Floor Panelization: clustering and offsetting the average

Approach 1

Clustering Steps:

EMPIRICAL ASSESMENT OF GLAZING SLS

Course:

-MS. Thesis - Facade and structural engineering

-Delft Institute of Technology

-Fall-Spring 2024

-A.LunaNavarro@tudelft.nl

Details:

-Academic -Research development: glass SLS

-Experiment design:pneumatic system

-Structural analysis

-Statistical analysis

-Confrence presentation

-Publication

-Industry partner: AGC

Statistical analysis of survey conducted during experiment and design implications.

Insulated
Glass unit
Aluminum extrusion
EPDM Gasket Polyurethane
Cover
Main Facade Frame

WAVE AND SHADE

Course:

-Introduction to Computational Design

-Delft Institute of Technology

-Fall 2022

-S.Asut@tudelft.nl

-Academic

Details:

-Design Formulation

-Parametric modeling in GH

-Geo spatial data extraction

-Radiation analysis

-Optimization in galapagos

The Flowchart-Visual programing implemented in grashopper.

Creating twisted curve: curve to point

Lofting, extruding, and mirroring

Panneling the surface: from curve to surface

Optimization(maximum opening with minimum radiation) - Ladybug & Galapagos

CLIMA SHADE

Course:

-Bucky Lab

-Delft Institute of Technology

-Fall 2022

-Academic

-m.bilow@tudelft.nl

Details:

-Research by design

-Fabrication drawing

-Assembly Sequencing Study

-1:1 prototyping

-Testing: air flow study

Clima-shade Proof of Concept.

Prototyping

Prototyping

INTERNAL BRACING

MOVABLE PANEL (ROTATION)

FIXED PANEL

ROTATION MECHANISM (SEE SECTION)

CYLINDRICAL STEEL TUBE

FIXED TO THE GROUND

EXPLODED AXONOMETRIC NOT TO SCALE

FIXED PANEL ASSEMBLY BOLTED ONTO STEEL BRACKET

MOVEABLE PANEL

ASSEMBLY FIXED ON CIRCULAR STEEL BASE

WHEEL MOUNTED ON STEEL BRACKET ATTACHED TO THE MOVABLE PANEL ASSEMBLY

4-BOLTED STEEL BRACKET ON MOVABLE PANEL ASSEMBLY

STEEL “U” PROFILE HOUSING WHEEL FOR MECHANIZED PANEL MOTION

CIRCULAR TUBE

FIXED PANEL LATERAL SUPPORT

BEARING MOUNTED ON U PROFILE UNDERNEATH

STEEL PROFILE MOUNTED ON CIRCULAR STEEL TUBE

BOTTOM HEAVY BASE CONCRETE

EXPLODED 1:1 PROTOTYPE NOT TO SCALE

ROTATING MECHANISM DETAIL NOT TO SCALE

Prototyping

POTTERY WORKSHOP

Course:

-Integrated Design Project

-Addis Ababa University

-Spring 2018

-Samuelafewerk@eiabc.et

Details:

-Academic -Design development

-Material study

-Complex families in revit

-Connection detailing

-Documentation in revit

BANK OF OROMIA

Project:

-2100 m2 office space

-Makers Lab(Design Studio)

-Addis Ababa

Details:

-Interior design develoment

-construction drawing preparation

-Shop drawing

-construction supervision

IGAD HQ

- Intergovernmental Authority for Development HQ

-Makers Lab(Design Studio)

-Djibouti

Details: Project:

-Preliminary-final design development

-BIM and documentaion

-Constrution drawing

-Visualization

-Facade design proposal

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Portfolio_MH 25 by Mohammed Ibrahim - Issuu