For Rudolph & Sletten FINAL 1 pg

Page 1


Rudolph & Sletten

LPAS Qualifications

UC Davis Health Folsom Medical Care Clinic, Folsom, CA

LPAS Architecture + Interior Design

LPAS has a 47-year history of providing creative design solutions and integrated design services including architecture and interior design.

Our diverse portfolio of numerous markets and building projects keeps our firm knowledgeableexperience gained from each market informs all our building projects. Current areas of focus includes universities and colleges, multifamily housing, public and civic facilities, and commercial buildings.

We’re committed to a collaborative process that prioritizes transparency, accountability, and predictability. By fostering strong partnerships with clients, consultants, and vendors, we develop thoughtful, cost-effective solutions that maximize resources, deliver long-term value.

LPAS Headquarters

Architecture + Interior Design

Collaborative / Efficient / Creative

LPAS offers fully integrated in-house architecture and interior design services. The result offers an efficient design approach and creative project solutions.

Seamless Design Process

Our seamless design process incorporates in-house architects and interior designers working side-by-side to provide creative architectural solutions with quality and aesthetically pleasing finish packages that consider the budget, the desired design aesthetic, and durability.

Collaboration

Through collaboration, our architects and interior designers identify the unique opportunities and challenges of each project and provide interior design solutions that complement the architecture goals.

Connections

Projects are viewed holistically with thoughtful integration and flow between interior and exterior spaces.

Cost Effective

The streamlined approach of incorporating architecture and interior design during inception of the project is cost effective, compared to addressing interior design later in the process.

Integration

Architects and interior designers work in the same Revit model which further supports efficient coordination of real-time changes.

LPAS Higher Education Clients

“I was particularly impressed with the LPAS team’s ability to work with a variety of stakeholders. The user group was very diverse and it was imperative that the architectural team be able to actively listen and respond in a manner that could be easily understood.”
Ines Zildzic
Vice Chancellor, Facilities Planning and Construction

Contra Costa Community College District

California Community College Districts

• Butte-Glenn CCD

• Chabot-Las Positas CCD

• Contra Costa CCD

• Foothill-De Anza CCD

• Gavilan JCCD

• Lake Tahoe CCD

• Los Rios CCD

• Marin CCD

• Ohlone CCD

• Peralta CCD

• San Francisco CCD

• San Joaquin Delta CCD

• San José-Evergreen CCD

• San Mateo County CCD

• Sierra JCCD

• Solano CCD

• Sonoma County CCD

• State Center CDD

• West Valley-Mission CCD

• Yosemite CCD

• Yuba CCD

California

State Universities

(CSU)

• Cal Poly Humboldt

• Cal Poly Maritime Academy

• CSU Chico

• CSU East Bay

• CSU Monterey Bay

• CSU Sacramento Universities

• UC Berkeley

• UC Davis

• UC Davis Health

• UCSF

• University of the Pacific

Las Positas College

Academic Support, Faculty Office, and Learning Resource Center

ARCHITECTURE INTERIOR DESIGN

Situated in a central campus location, this new Student Support Services building was designed to be visible, welcoming, and secure. Extensive shared gathering spaces, conference rooms, meeting rooms and small study rooms are located throughout the building.

The new building features critical programs to support student success:

- Math Learning Center - Math Emporium

- Computer Studies - English Center

- Tutoring Center - Open computer labs

- Maker spaces - Dean’s suite

- 80 faculty offices - Support spaces

LOCATION Livermore, CA

CLIENT Chabot-Las Positas Community College District

DELIVERY

VALUE

Lease-Leaseback with FLINT Builders

$60,000,000

BUILD 90,000 sf

STATUS Completed 2023

LEED LEED Gold

West Valley-Mission Community College District

Public Safety & Community Services Building

Locatied on on West Valley College campus, the new Public Safety & Community Services building serves as the District-wide public safety center. The design embodies new and innovative policing approaches developed by the District and campus police, in collaboration with students, faculty, staff, and the local community.

The design prioritizes safety, transparency, collaboration, and community engagement, which are evident in the programming, architectural language, and building systems. Moreover, it maintains a responsive approach to the surrounding neighborhood and community.

LOCATION Saratoga, CA

CLIENT West Valley-Mission Community College District

VALUE

$16,400,000

BUILD 9,890 sf

STATUS Completed 2025

CSU Stanislaus

Acacia Hall

The new Acacia Hall replacement building is the first new construction building for the Stan State Stockton campus. Strategically located, the new student services building will meet master plan goals to develop Acacia Street as the central circulation and primary access to the campus.

Reinforcing the critical role of this new building, the design approach is to create a strong building elevation that features a glass lobby that will be a welcoming element for the new campus promenade. Designed to attract students and faculty, the contemporary building features:

- Lecture hall - Disability Resource Services

- Classrooms - Information Technology

- Special events space - Library Services

- Admin/Faculty offices - Learning Commons

- Specialized dry labs - Breakout spaces

- Study lounge spaces - Support spaces

LOCATION Stockton, CA

CLIENT

DELIVERY

CSU Stanislaus

Collaborative Design-Build with Otto Construction

$38,110,000 BUILD 45,000 sf

UCSF Parnassus Campus

Millberry Union ADA and Restroom Renovations

This project began with a feasibility study to identify code compliance and accessibility deficiencies, as well as opportunities to enhance the overall flow and functionality of the Student Union building.

As the scope expanded into a full renovation, the program grew to include new single-occupancy and dedicated restrooms, a campus police service area, administrative offices, multi-functional spaces, and additional storage. To ensure continued access and uninterrupted operations throughout construction, the renovation was strategically planned in three phases.

Cosumnes River College College Center Expansion

The College Center creates a onestop experience for Student Services, Administration, Counseling, Group Counseling, Assessment Center, e-services, Career Center, and Transfer Center.

The two-story building is a seamless addition to the existing cafeteria, bookstore and Administration building, creating a new campus destination. Where the buildings meet, a tall gathering space has been created featuring bleacher seating, open lounge area, and a study balcony. Abundant natural light, large video screens, power and data makes this the social and cultural heart of the campus.

LOCATION Sacramento, CA

CLIENT Los Rios Community College District

VALUE

$22,000,000

BUILD 30,000 sf new construction 3,000 sf modernization

STATUS Completed 2020

Sierra College Student Union Modernization and Expansion

LPAS is currently designing the modernization and expansion of the existing 60-year-old Student Union Facility at the District’s Rocklin campus. We have completed programming efforts with the Executive Committee, Campus Architect, and the Campus Master Planner.

User-group meetings will be held in the coming months which are expected to include diverse groups such as:

- Cross-Cultural Center - Pride Center

- Women and Gender Resource Center

- Extended Opportunity Programs and Services (EOPS)

LOCATION

Rocklin, CA

University of the Pacific

ELMSN Classroom and Lab Renovation

This Design-Build project supports the establishment of the Entry Level Masters of Science in Nursing (ELMSN) Program for the University of the Pacific School of Health in Sacramento. The new program is supported with a new entrance, classrooms, gender neutral restrooms, debrief and conference rooms, along with the essential clinical skills and simulation labs. This curriculum requires highly technical AV integration, which facilitates campus-based and online curriculum delivery which is essential in today’s learning environments.

LOCATION Sacramento, CA

CLIENT University of the Pacific

DELIVERY Design-Build with RCP Construction VALUE

$1,500,000

BUILD 5,600 sf

STATUS Completed 2022

University of the Pacific Occupational Therapy Renovation

This Design-Build tenant improvement project at the Sacramento Campus renovates the first floor of the Muddox Building for a new Occupational Therapy Program. The space is designed to include flexible classrooms and laboratory space, a multi-purpose clinic room with therapy tables and equipment, faculty offices and open work areas, administrative space, student preparation and study areas for small seminars and storage space. Thoughtful consideration was given to creating spaces that balanced durable interior finishes and aesthetics.

LOCATION Sacramento, CA

CLIENT University of the Pacific VALUE $1,566,000 BUILD 12,560 sf

DELIVERY

STATUS

Design-Build with RCP Construction

Completed 2020

CSU Sacramento TOCA MEA 2023 - 2026

LPAS is currently providing architectural and interior design services on the $25.3M Design-Build TOCA MEA 3-year contract at Sac State. The scope of work includes infrastructure upgrades, restroom renovations, tenant improvements, and classroom and student support space renovations.

The largest current project is the $7M WELL Basketball Arena Conversion which transforms the student recreations sports courts to television-ready pavilion to host basketball games, volleyball, gymnastics, and other various events. Features include a jumbotron, new retractable bleachers, and a new entry.

Current and future projects include:

- WELL Basketball Arena Conversion

- Campus-wide Electrical Upgrades

- HVAC Equipment Upgrades, Project A

- Lactation Room and All-Gender Restroom Updates

- Sequoia Hall Renovations

- American River Courtyard Fire Alarm & Interior Paint/Repair

LOCATION Sacramento, CA

CLIENT CSU Sacramento DELIVERY Design-Build

$25,300,000

On-Going

CSU Maritime Academy TOCA MEA 2018 - 2022 | 2024 - 2027

ARCHITECTURE INTERIOR DESIGN

LPAS completed the $30M on-call 2018-2022 TOCA MEA contract utilizing Design-Build delivery. The scope included 12 renovation projects and various improvements which were completed over the span of 4 years.

Following the success of the 2018-2022 TOCA MEA effort at Cal Maritime, LPAS was selected as the exclusive architect for the current $30M 2024-2027 TOCA MEA contract utilizing Design-Build.

Current projects include:

- Student Services Building Tutoring Center Remodel

- Western Hillside Retaining Wall Replacement

- Residence Hall Road Replacement

LOCATION

Vallejo, CA

CLIENT CSU Maritime Academy

DELIVERY Design-Build/CM at Risk

VALUE

$30,000,000

STATUS On-Going

Skyline College Building 19 Renovation for Permanent & Temporary Spaces

This swing space project relocated academic and operational programs from various other Skyline College buildings to facilitate the modernization of Building 2. The Building 19 project converts a former elementary school into a new Skyline College Building for temporary and permanent spaces including administration, student services, computer technology and standard classrooms, health facility, faculty offices, and a separate entrance and tenant improvement for the Global Learning Passport Service.

LOCATION

San Bruno, CA

CLIENT San Mateo County Community College District

VALUE $5,000,000

BUILD 21,000 sf

STATUS Completed 2023

Skyline College Building 1 Creative Arts & Theater Renovation

The renovation of Building 1 provided extensive improvements for the Creative Arts & Theater program. The scope includes HVAC upgrades/ replacement, electrical/plumbing/IT/AV infrastructure and equipment improvements, roofing and envelope addition, upgrades to existing toilet rooms to meet current ADA standards, elevator replacement, plus additional FF&E, finishes and technology for classrooms, studios, laboratories, and offices.

San Bruno, CA

40,000 sf

City College of San Francisco Diego Rivera Theater Criteria Document

Currently under construction, the Diego Rivera Theater will be a new 3-story building on the City College of San Francisco campus located on Frida Kahlo Way. The building will include facilities for music, dramatic arts, broadcasting/recording, offices and support spaces. An important aspect of this project is the display of Diego Rivera’s Pan American Unity Mural so that it can be viewed from within the building and from Frida Kahlo Way in a secured and environmentally controlled setting.

Extensive programming with faculty and other stakeholders was performed to established the required functionality, relationships and adjacencies of the instructional and support spaces.

LOCATION Berkeley, CA

CLIENT UC Berkeley

VALUE $2,000,000

BUILD 1,511 sf

STATUS Completed 2024

UC Berkeley Morrison Hall - Wu Performance Hall Renovation

The historic 100-seat Recital Hall 125—formerly known as the Elkus Room—in Morrison Hall had remained virtually untouched since its original construction more than 62 years ago. As performances by UC Berkeley’s Department of Music continued to grow in scale and ambition, the limitations of the existing stage became increasingly apparent, and the entire venue was due for a comprehensive update. Now reintroduced as the Wu Performance Hall, the space has been revitalized with new finishes, upgraded entry doors, modern seating, enhanced acoustics, advanced AV systems, and improved lighting.

LOCATION San Francisco, CA

CLIENT City College of San Francisco

VALUE $100,000,000

BUILD 77,000 sf

STATUS Criteria Document Completed 2020

CSU Stanislaus

ASH Residence Life Village IV Student Housing

This new Collaborative Design-Build project brings much needed student housing to the Turlock campus. The program includes 122 beds (primarily double-occupancy), student study and lounge spaces, support spaces, and a maintenance office and shop. Located at the edge of campus, the design challenge was to create a project that provides a welcoming entry to student housing, but also connects the new building with the adjacent, established student housing village.

The design solution features an L-shaped building configuration to reduce the corridor length. The building floor plans create a welcoming environment for the students through spontaneous opportunities and connectivity to social and study spaces on each floor. Residential Assistant units are centrally located on each floor to support their ability to manage.

LOCATION Turlock, CA

CLIENT

DELIVERY

VALUE

CSU Stanislaus

Collaborative Design-Build with Otto Construction

$18,200,000

BUILD 46,000 sf STATUS In Design

CSU Sacramento Faculty & Staff Housing

The primary goal of the project was to deliver faculty housing that would attract top talent. The design prioritized the creation of social gathering space, providing residents with opportunities to connect, collaborate, and engage in meaningful interactions. Located at the edge of the Sacramento State campus, the site is situated in an established residential neighborhood. The architecture, massing, scale, and materials were designed within the neighborhood context.

LOCATION

Sacramento, CA

CLIENT CSU Sacramento

DELIVERY

VALUE

BUILD

STATUS

Collaborative Design-Build with Otto Construction

$14,000,000

30 units, 3 stories, 30,000 sf

Completed 2024

Ryder on Olive Student Apartments

Located a short walk from the UC Davis campus, this student housing project features 100 units with a mix of 2, 3, 4 and 5 bedrooms. The living units range in size from 900 to 1,465 sf and each bedroom has its own private bathroom. Units share a communal kitchen and dining area for gathering and amenities include a 7,500 sf leasing space and clubhouse, fitness room, bicycle parking and outdoor site amenities. LPAS was the design architect for the entitlement documents. The construction documents were completed by Humphreys & Partners Architects.

LOCATION Davis, CA

CLIENT HighBridge Properties

BUILD

STATUS

LEED

100 units

900 - 1,465 sf per unit

Completed 2021

LEED Silver

The Frederic Apartments

Sacramento, CA

Located on the iconic Capitol Mall in Sacramento, The Frederic is located on a prominent corner bordered by 6th and L Streets. The mixed-use project infuses downtown Sacramento with additional residents, retail shops and restaurants to complement the new DOCO (Downtown Commons) entertainment zone anchored around the arena. The site plan was designed with a pedestrian paseo that links pedestrian traffic from Capitol Mall to the new DOCO.

CLIENT Shorenstein Properties, LLC

VALUE

BUILD

$55,000,000

162 units, 8 stories, 2 level parking garage, 79 parking spaces

SITE 0.99 acres

DENSITY

164 units/acre

STATUS Completed 2022

The Emery Apartments Emeryville, CA

The Emery replaces the brownfield site of the former Sherwin-Williams paint factory with a vibrant, family-friendly market-rate mixeduse community. LPAS was the architect for the entire master planned community which consists of 4 individual mid-rise residential buildings and 500 units with integrated parking. Because LPAS was the only architect for the entire community, one of the City’s primary concerns was that the architecture of the buildings appear as if designed by multiple firms. LPAS achieved design diversity throughout the site through design, massing, building height, and materials, while maintaining a consistent and cost-effective detailing approach across all buildings.

CLIENT Quarterra Multifamily

VALUE

$125,000,000

BUILD 500 units, Live Work,1, 2, +3 bedroom units, 7-story parking structure, 78,000 sf of street-level retail and office space

SITE 8.6 acres

DENSITY 58 units/acre

STATUS Completed 2023

LPAS Headquarters Sacramento, CA

Our new office is thoughtfully designed to captivate and inspire from the very first step. In our quest for an atmosphere that fosters creativity, we deliberately chose a building that exudes lightness, airiness, and openness.

By preserving the historical elements, such as the 100-year-old gantry crane and existing art installations, we not only pay homage to its industrial and artistic past, but also embrace the concept of sustainability. Repurposing this building allows us to tap into its embodied energy, minimizing environmental impact and creating a visually impressive and engaging environment that entices and retains top talent.

Our commitment to innovation has led us to break away from traditional hierarchical seating arrangements, creating a workspace that fosters equality and inclusivity within our team. By removing barriers, we actively promote growth, mentorship, and professional development opportunities.

CLIENT LPAS Architecture + Design

BUILD

12,000 sf

STATUS Completed 2023

730 I Street

Sacramento, CA

Located in the heart of the arts and entertainment district, just steps from the Golden 1 Center, this project transformed two floors of a historic bank building into a dynamic and modern workspace. The renovation introduced a versatile mix of environments, including private but transparent offices, collaborative areas, and tiered bleacher seating designed to inspire connection and creativity.

CLIENT Confidential

BUILD 29,883 sf

STATUS Completed 2023

McClellan Jet Services FBO McClellan Park, CA

The renovation of the McClellan Jet Services Fixed Base Operator (FBO) terminal elevates both form and function, delivering a sophisticated interior experience that aligns with the high standards of its corporate and military clientele. LPAS interior designers infused the historic Building 251 with contemporary elegance while honoring its midcentury roots.

Key interior upgrades include a re-imagined lobby, hospitality station, conference and training rooms, and a private pilot lounge complete with snooze rooms and showers. Dedicated military spaces enhance operational efficiency and comfort. The renovation creates a welcoming, efficient environment that supports 24/7 operations while reflecting McClellan Jet Services’ commitment to exceptional service.

CLIENT McClellan Jet Services

BUILD 12,700 sf

STATUS Completed 2025

Foothills Office Reposition Project

Roseville, CA

Outdoor amenities promote wellness and community with shaded work areas, semiprivate pavilions, and a central lounge featuring a calming water feature. A social zone near the café offers seating, games, fire pits, barbecues, a multi-sport court, and a semi-covered event space for 200–300 guests. Walking paths, nearby parking, covered routes, and a coffee cart add everyday convenience. Inside, the bright, nature-infused lobby includes green walls, planters, and a water feature, supported by a modern security desk and digital directories. A nearby 14-person conference room provides an easy setting for quick meetings and presentations.

CLIENT Optimus

BUILD

300,000 sf

STATUS In progress

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
For Rudolph & Sletten FINAL 1 pg by LPAS Architecture + Design - Issuu