ID Description Original Duration Start Finish
C.T.E
Improvements 465 05/23/24 09/02/25 Project Summaries 463 05/23/24 08/28/25 PS-100 Project Construction Duration (5 Day Work Week) 331 05/23/24 08/28/25 PS-110 Project Construction Duration (Calendar Days) 463 05/23/24 08/28/25 Project Milestones 0 05/23/24 08/29/25 PM-120 Notice to Proceed 0 05/23/24 PM-130 Contract Execution 0 05/30/24 PM-140 Begin Design Services 0 06/03/24 PM-150 50% DD Documents 0 07/08/24 PM-160 100% D.D Documents 0 08/05/24 PM-170 Land Use Approval 0 06/17/24 PM-180 Grading / Underground / Demolition Permitting 0 06/17/24 PM-190 Long Lead Procurement (PEMB, Kitchen Equipment RTU's, Lights, Transformer) 0 08/05/24 PM-200 Establish GMP 0 08/19/24 PM-210 Building Permit Documents 0 08/26/24 PM-220 Permitting 0 08/05/24 PM-230 Final Construction Documents 0 08/26/24 PM-240 Substantial Completion 0 08/01/25 PM-250 Final Completion 0 08/29/25 SPSD Schedule 323 06/06/24 09/02/25 PM-260 Summer Break 2024 64 06/06/24 09/03/24 PM-270 Back to School 2024/2025 196 09/04/24 06/04/25 PM-280 Summer Break 2025 63 06/05/25 09/01/25 PM-290 Back to School 2025/2026 0 09/02/25 Administration / Preconstruction 326 06/03/24 09/01/25 Design & Permit 61 06/03/24 08/26/24 DP-300 Land use & Erosion Control Design 11 06/03/24 06/17/24 DP-310 Design Phase 46 06/03/24 08/05/24 DP-320 Building Permit 16 08/05/24 08/26/24 Bids & Contracts 50 06/03/24 08/23/24 BC-330 Early Contract with PEMB Contractor to start the design process 15 06/03/24 06/21/24 BC-340 Bids & Sub Contracts Contracts 35 07/08/24 08/23/24 Submittals 55 06/24/24 09/13/24 S-350 (PEMB) Building Submittal (DEFERRED) 40 06/24/24 08/16/24 S-360 MEPF Submittal s 15 08/26/24 09/13/24 Procurement 85 08/19/24 12/13/24 P-370 (PEMB) Building, Roof & Panels 35 08/19/24 10/04/24 P-380 MEPF Procurement 65 09/16/24 12/13/24 Civil / Below Grade 316 06/17/24 09/01/25 CBG-390 Civil Mobilization 5 06/17/24 06/21/24 CBG-400 Build Access 5 06/24/24 06/28/24 CBG-410 Demolish Lean to Shed 5 07/01/24 07/05/24 20242025 May JunJul Aug Sep OctNovDecJanFebMar Apr May JunJul Aug Sep OctNovDec Project Start Project Finish Data Date Today Baseline Finish Project Construction Duration (5 Day Work Project Construction Duration (Calendar Notice to Proceed Contract Execution Begin Design Services 50% DD Documents 100% D.D Documents Land Use Approval Grading / Underground / Demolition Permitting Long Lead Procurement (PEMB, Kitchen Equipment RTU's, Lights, Transformer) Establish GMP Building Permit Documents Permitting Final Construction Documents Substantial Completion Final Completion Summer Break 2024 Back to School 2024/2025 Summer Break 2025 Back to School 2025/2026 Land use & Erosion Control Design Design Phase Building Permit Early Contract with PEMB Contractor to start the design process Bids & Sub Contracts Contracts (PEMB) Building Submittal (DEFERRED) MEPF Submittal s (PEMB) Building, Roof & Panels MEPF Procurement Civil Mobilization Build Access Demolish Lean to Shed Start Date:04/30/24 Finish Date:09/01/25 Data Date:04/30/24 Run Date:05/03/24 St.Paul RFP Schedule 5.3.2024 .1 AS.ppx St.Paul SD C.T.E Facility & Improvements. RFP Schedule 5/03/2024 Page 1A
St. Paul SD
Facility &
ID Description Original Duration Start Finish CBG-420 Clear & Grub Site 5 07/08/24 07/12/24 CBG-430 Place Construction Pad 10 07/15/24 07/26/24 CBG-440 Build Contractor Parking Area 10 07/29/24 08/09/24 CBG-450 Underground Utilities 15 08/12/24 08/30/24 Structure 50 09/02/24 11/08/24 STU-460 Form and Pour Slab On Grade 15 09/02/24 09/20/24 STU-470 Cure Concrete 10 09/23/24 10/04/24 STU-480 Erect Structural Steel 15 10/07/24 10/25/24 STU-490 Exterior Framing & Sheathing 10 10/28/24 11/08/24 Exterior 55 11/11/24 01/24/25 E-500 Weather Barrier & Flashings 15 11/11/24 11/29/24 E-510 Storefront & Window Assemblies 10 12/02/24 12/13/24 E-520 Roofing and RTU's 20 12/16/24 01/10/25 E-530 Veneer, Brick, Metal Panels, Exterior Insulation 40 12/02/24 01/24/25 Interior 76 01/13/25 04/28/25 I-540 Framing 20 01/13/25 02/07/25 I-550 MEP Rough-In's 30 01/20/25 02/28/25 I-560 Hang & Tape Gypsum Wallboard 16 03/03/25 03/24/25 I-570 Paint 10 03/25/25 04/07/25 I-580 Flooring Assemblies 5 04/08/25 04/14/25 I-590 Casework 10 04/15/25 04/28/25 Sitework 45 04/03/25 06/04/25 SIT-600 Site Concrete 15 04/03/25 04/23/25 SIT-610 Irrigation 10 04/24/25 05/07/25 SIT-620 Landscaping 10 05/08/25 05/21/25 SIT-630 Site Furnishings 5 05/22/25 05/28/25 SIT-640 AC Paving 5 05/29/25 06/04/25 Kitchen 23 06/05/25 07/07/25 K-650 Walk-In-Cooler 10 06/05/25 06/18/25 K-660 Lighting 5 06/19/25 06/25/25 K-670 Flooring 5 06/26/25 07/02/25 K-680 Equipment 3 07/03/25 07/07/25 Security Upgrades 20 06/05/25 07/02/25 SU-690 Cameras and Auto Door Locks 10 06/05/25 06/18/25 SU-700 Junior/High School Cameras and Auto Doors Locks 10 06/19/25 07/02/25 Existing C.T.E. Facility 40 06/05/25 07/30/25 E-CTE-710 Scope to be Determined 40 06/05/25 07/30/25 Close Out 23 07/31/25 09/01/25 CO-720 Final Permits 10 07/31/25 08/13/25 CO-730 Punch List 10 07/31/25 08/13/25 CO-740 Owner Move in 21 07/31/25 08/28/25 CO-750 Substantial Completion 1 08/01/25 08/01/25 CO-760 Final Completion 2 08/29/25 09/01/25 20242025 May JunJul Aug Sep OctNovDecJanFebMar Apr May JunJul Aug Sep OctNovDec Project Start Project Finish Data Date Today Baseline Finish Clear & Grub Site Place Construction Pad Build Contractor Parking Area Underground Utilities Form and Pour Slab On Grade Cure Concrete Erect Structural Steel Exterior Framing & Sheathing Weather Barrier & Flashings Storefront & Window Assemblies Roofing and RTU's Veneer, Brick, Metal Panels, Exterior Insulation Framing MEP Rough-In's Hang & Tape Gypsum Wallboard Paint Flooring Assemblies Casework Site Concrete Irrigation Landscaping Site Furnishings AC Paving Walk-In-Cooler Lighting Flooring Equipment Cameras and Auto Door Locks Junior/High School Cameras and Auto Doors Locks Scope to be Determined Final Permits Punch List Owner Move in Substantial Completion Final Completion Start Date:04/30/24 Finish Date:09/01/25 Data Date:04/30/24 Run Date:05/03/24 St.Paul RFP Schedule 5.3.2024 .1 AS.ppx
SD C.T.E Facility & Improvements. RFP Schedule 5/03/2024 Page 2A
St.Paul

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.