ADVANCED TECHNOLOGY PORTFOLIO







Level 10 Construction is a full-service general contractor. Our range of services includes preconstruction, Lean construction, self-perform concrete work, design-build and design-assist collaboration, in-house MEP services, and sustainable/LEED construction.
Level 10’s core mission is to build at the highest level, consistently providing excellent customer service while delivering quality projects safely, on time and within budget.


Our Company Stats
.58 AVERAGE ANNUAL REVENUE
$875M 0 LOST-TIME INCIDENTS MAN HOURS 10 M $ 1.5B AGGREGATE BONDING CAPACITY REPEAT CLIENTS 93%
Our Market Sectors

BUILDING 3S ENGINEERING CLEANROOM + LAB
SIZE 20,500 SF
• C100 Cleanroom
• Data Center
• C10k lab space
• Office Spaces
• New Infrastructure (HVAC)
• Design-Build










CONFIDENTIAL CLIENT
ADVANCED TECHNOLOGY TENANT IMPROVEMENT
SIZE 882,857 SF
• Three Inter-Connected Four-Story Office Buildings
• Electronics Laboratory
• Two stories of Podium Parking
• Cafeteria
• Event Center
• LEED Platinum










CONFIDENTIAL CLIENT
ADVANCED TECHNOLOGY TENANT IMPROVEMENTS
SIZE 975,000 SF (TOTAL OF APPROXIMATELY 12 DIFFERENT PROJECTS)
• R&D Laboratories
• Office Space
• RF Chambers
• Ancillary IT Space
• Break Areas





CONFIDENTIAL CLIENT
ADVANCED TECHNOLOGY TENANT IMPROVEMENTS
SIZE 560,000 SF (TOTAL OF APPROXIMATELY 14 DIFFERENT PROJECTS)
• Multi-Disciplinary Research & Development Campuses
• Design Research and Outreach
• Training Rooms and Conference Rooms
• R&D Labs (Dry)
• Private Offices
• Collaborative Areas/Multi-functional Spaces
• Prototype Maker Spaces
• Advanced Audio/Visual Systems










QUALCOMM
SAN.P DATA CENTER
SIZE 4,783 SF
• Two New Single Story Buildings
• Data Center
• Underground Electrical & Mechanical
• Backup Electrical UPS Equipment
• Exterior Mechanical Chiller & Water Storage Tanks




SILEVO SOLAR CALIFORNIA (NOW TESLA)
CALIFORNIA TECHNOLOGY CENTER
SIZE 150,000 SF
• R&D Center
• Manufacturing Facility
• Class 100,000 Clean Room
• Corporate Offices
• Seismic Upgrade for H Occupancies
• Supported Owner Tool Installation Activities
• Design-Build Renovation





WESTERN DIGITAL
SOUTH BAY INITIATIVE PHASE I
SIZE 230,000 SF
• New Administration Building & Engineering Building
• Dry Labs
• Customer Briefing Center
• Cafe
• Office Space
• LEED Silver










QUALCOMM
VARIOUS PROJECTS
SIZE 106,500 SF (TOTAL SIZE OF 13 PROJECTS)
• Building R West Chiller Plant Upgrade
• SAN.AF TBS Rack Room
• SAN.AK High Piled Storage Remediation TI
• SAN.AY Pentari Antenna Installation
• SAN.P Pod UPS
• SAN.Q Pentari Antenna Installation Project
• SAN.QRC 413 Rack Room
• SAN.R Substation
• SAN.W-1 North Labs TI (Phase II)
• SAN.W-162 (Phase I)
• SAN.W-163 Lab
• SAN.W-165 Storage Phase 1
• SAN.W-165 Storage Phase 2
• SAN.WA Compressed Air
• SAN.WA SVE
• SAN.WE TI
• W155 TI
• WT 1165 Rack Room Remodel



SIZE 31,706 SF
• R&D Dry Bench Electronics Labs
• Cleanrooms
• New Data Center Utilizing a Hot-Aisle Containment System (HACS)
• Chiller, Rooftop Air Handling Units, Pumps, Boilers, & UPS System
• Building Automation System (BAS)






MPK 20
SIZE 433,555 SF
• Dry Laboratories
• Open Offices and Amenities Spaces
• Conference Centers
• Café/Restaurant
• Nine-Acre Green Roof
• Parking Structure with 347 Spaces
• LEED Gold Certified
• Completed in 17 Months








CONFIDENTIAL CLIENT
SANTA ROSA CAMPUS SEISMIC UPGRADE
SIZE 160,000 SF
• Executive Team & Chip Manufacturing Building
• Seismic Upgrade
• Occupied Campus

• Occupied Building and Operational Lab
• Design/Build MEPF








AMAZON LAB126
TENANT IMPROVEMENTS
SIZE 1,200,000 SF (APPROXIMATELY 9 PROJECTS)
• Technology Laboratories
• Exterior Upgrades
• New Lobby Areas
• New Central Plant
• Office spaces
• Conference Rooms
• Kitchens/Cafés
• Collaborative Spaces & Training Rooms
• MEPF Systems






SIZE 524,000 SF
• Dry Laboratories
• Open Offices and Amenities Spaces
• Conference Centers
• Café/Restaurant
• Extensive Green Roof
• 2,000-Seat Auditorium/Event Hall
• Open Parking Garage