Project_ Client_
Advertisement
Golden Vines, Dayton, City of Swan
GM Dayton Land
KCTT were engaged by GM Dayton Land to provide Civil Engineering Services, inclusive of Concept Design, Detailed Design, Tender Assessment and Administration, Contract Administration, and UWMP Design Services on a 350-lot development area in Dayton which has been developed in stages over a 7-year period. Services KCTT provided on this project include but are not limited to:
Preliminary Infrastructure Service Reporting and project feasibility estimate; Preparation of Urban Water Management Plan; Concept and Detailed Design of urban infrastructure inclusive of: wastewater disposal system, scheme water supply system, storm water disposal and management systems, earthworks, road and intersection design. Obtaining all mandatory approvals, liaison with all relevant authorities and coordination of all design drawings from various consultants; Organization, assessment and award of tender for construction inclusive of: preparation of tender drawings, specifications; organization of tender; assessment and award of tender; Contract Management including site inspections, organization of meetings, and administration of contract during construction, organizing final inspections.

Aerial image of the site - November 2014

Aerial image of the site - February 2015

Aerial image of the site - May 2020

Stage 1A Golden Vines before (top) and after (bottom) the construction.
Project_ Client_
Old Lord Street Design, City of Swan
City of Swan
KCTT were engaged by the City of Swan to redesign the existing Lord Street road reservation between a location south of Youle-Dean Road and Marshall Road Dayton.
The project is necessitated by the urban expansion of the Swan Growth Corridor as well as the requirements of the Ellenbrook Bus Rapid Transit project and the proposed realignment of “New Lord Street” into the former Perth to Darwin National Highway Corridor.
KCTT provided detailed design engineering services in the following fields:-

Geometric road design; Storm water drainage design; Signage and line marking;

Project_ Client_
Peregrine Estate-Pierre Waters, City of Armadale
Zivalia WA
KCTT are the civil design consultant for the development of 200 lots for Handle Property Group in Peregrine Estate, Piera Waters.
The development is located on the western side of Wright Road and exhibits specific issues with high groundwater (exhibiting at surface through much of the development).
KCTT provided a range of services including:- • Detailed geometric road design; • Stormwater drainage design; • Sewer and water design; • Coordination of electrical, telecommunications, gas and landscaping inputs • Intersection design and roundabout design.
KCTT have recently completed the administration of an open tender process with the project split into separable portions for early earthworks and the construction of 3 stages consecutively of the development.



Project_ Town of Port Hedland TPS Amendments Client_ Town of Port Hedland
KCTT were engaged by the Town of Port Hedland as a suitably qualified consultant to update the strategy and concurrently prepare a new local planning scheme to implement the revised strategy. The ultimate purpose of this Project is delivery of a revised Strategy and new Scheme covering the entire municipality of the Town of Port Hedland in accordance with relevant planning legislation, policy and practices. Structure of the process includes the phases as follows:
Phase 1: Project Inception, Detailed Review of Existing Strategy & Scheme Phase 2: Prepare Community and Stakeholder Engagement Plan & Deliver Engagement Activities Phase 3: Prepare Draft Local Planning Strategy & Scheme Phase 4: Council Briefing, Refer to Council Meeting, Refer to WAPC to Certify Advertising Phase 5: Public Advertising of Draft Strategy and Scheme Phase 6: Finalization of Strategy and Scheme Documentation Phase 7: Publish and Advertise Approved Strategy and Scheme.




Project_ Client_
Perth College - Lawley Crescent, Mount Lawley
Perth College

Lawley Crescent is a road with strong pedestrian activity and pronounced requirement for pedestrians to cross it often throughout day. The school recently estimated that there are approximately 3,500 pedestrian crossings per day during school periods on Lawley Crescent. A formal zebra crossing will significantly enhance the safe movement of students/pedestrians throughout the day and for this reason the implementation of a zebra crossing has been a key component of the streetscape works proposed by the School.


Project_ Client_
Development of Lot 22 East Road, Pearsall
Westbury Investments
KCTT were engaged by Westbury Investments Pty Ltd to provide Civil Engineering Services, inclusive of Concept Design, Detailed Design, Tender Assessment and Administration, Contract Administration, and UWMP Design Services. KCTT completed the full design and tendering process for the development and construction was completed in 2017. Services KCTT provided on this project include but are not limited to:
Preliminary Infrastructure Service Reporting and project feasibility estimate; Preparation of Urban Water Management Plan; Concept and Detailed Design of urban infrastructure inclusive of: wastewater disposal system, scheme water supply system, storm water disposal and management systems, earthworks, road and intersection design. Obtaining all mandatory approvals, liaison with all relevant authorities and coordination of all design drawings from various consultants; Organization, assessment and award of tender for construction inclusive of: preparation of tender drawings, specifications; organization of tender; assessment and award of tender; Contract Management including site inspections, organization of meetings, and administration of contract during construction, organizing final inspections.



project_ WALGA_Murat Road and Mortiss Street Enhancement Project client_ Shire of Exmouth
KCTT were engaged to design and manage the delivery of approximately 4.5km of Murat Road and 1.5km of realignment of Mortiss Street to cater for heavy vehicles and a separated residential access.
KCTT prepared Civil Engineering Design for Murat Road and Mortiss Street along with the following intersections: • Murat Road / Preston Street • Murat Road / Mortiss Street • Murat Road / Gnulli Court • Murat Road / Kestrel Place • Murat Road / Corella Court • Murat Road / Reid Street.
One of KCTT’s key achievements in this project was managing the full delivery of the project within budget and enabling a small contract sum to be set aside for additional drainage enhancements in Murat Road which are presently being tendered for delivery in 2020.


Project_ Rockingham Road, Munster Client_ Progress Developments
KCTT were engaged by Progress Developments to provide Civil Engineering Services, inclusive of Concept Design, Detailed Design, Tender Assessment and Administration, Contract Administration, and UWMP Design Services on a 28-lot development area in Munster which will be completed in December 2019.
Services KCTT provided on this project include but are not limited to:
• Preliminary Infrastructure Service Reporting and project feasibility estimate; • Preparation of Urban Water Management Plan; • Concept and Detailed Design of urban infrastructure inclusive of: wastewater disposal system, scheme water supply system, storm water disposal and management systems, earthworks, road and intersection design. • Obtaining all mandatory approvals, liaison with all relevant authorities and coordination of all design drawings from various consultants; • Organization, assessment and award of tender for construction inclusive of: preparation of tender drawings, specifications; organization of tender; assessment and award of tender; • Contract Management including site inspections, organization of meetings, and administration of contract during construction, organizing final inspections.

KCTT have achieved a balanced budget on this project by iterating the design as construction issues are found inclusive of: -
Modifications to the proposed intersection with Rockingham Road to negate requirements to relocate a major Telstra optic fibre asset. Modifications to lot levels to negate the requirements for a noise wall on the eastern boundary.


Project_ Client_
Lucky Bay Campgrounds
Department of Parks and Wildlife
KCTT were engaged by the Department of Parks and Wildlife to complete civil engineering design for Lucky Bay Campgrounds in Cape Le Grand National Park, approximately 60 kilometres east of Esperance. The design brief encompasses: over 100 parking bays, camp sites and caravan bays, over 2.5 kilometres of roadways and over 1 kilometre of footpaths inclusive of stairs.
This iconic location represented a particular engineering challenge due to varying site levels, specific nature of the project itself and work within highly restricted areas (national park). Usage of locally produced construction materials was set as a priority.
The design commenced in late January 2015. Construction began in July 2015 and was completed before the start of tourist season.


Project_ Lot 26 Coast Road, City of Swan Client_ Home Group WA
KCTT assisted Home Group WA with completion of their first land development project. Lot 26 Coast Road has been subdivided and developed into 31 residential lots. KCTT have completed design and managed construction of this development. The work on overall concept design commenced in May 2014 with construction completed in May 2015, in accordance with the project programs.
Services KCTT provided on this project include but are not limited to:
• Preliminary Infrastructure Service Reporting and project feasibility estimate; • Preparation of Urban Water Management Plan for the proposed development; • Concept and Detailed Design of urban infrastructure inclusive of: wastewater disposal system, scheme water supply system, stormwater disposal and management systems, earthworks, retaining walls, road and intersection design. • Obtaining all mandatory approvals, liaison with all relevant authorities and coordination of all design drawings from various consultants; • Organisation, assessment and award of tender for construction inclusive of: preparation of tender drawings, specifications; organisation of tender; assessment and award of tender; • Contract Management including site inspections, organisation of meetings, and administration of contract during construction, organising final inspections.


Project_ Lot B38 Lakes Road, North Dandalup Client_ Niroda Holdings
KCTT have completed detailed design and contract administration for all stages of the subdivision of 102 rural residential lots in Lot B38 Lakes Road in North Dandalup. Services KCTT provided on this project include but were not limited to:
Preliminary Infrastructure Service Reporting and project feasibility estimate; Preparation of Urban Water Management Plan. Concept Design of urban infrastructure inclusive of: scheme water supply system, stormwater disposal and management systems, road and intersection design. Detailed Design of all abovementioned urban infrastructure; Obtaining all mandatory approvals, liaison with all relevant authorities and coordination of all design drawings from various consultants; Organization, assessment and award of tender for construction inclusive of: preparation of tender drawings, specifications and other relevant documentation; organization of tender; assessment and award of tender; Contract Management including site inspections, organization of meetings, administration of contract during construction, organizing final inspections Expert witness consultancy services with relation to concrete protective structures and excavation likelihoods over major infrastructure assets

Project_ Lot 19 Coast Road, Dayton Client_ Summer Breeze Developments Pty Ltd
KCTT was engaged in Civil Engineering Concept Design, Detailed Design, Tender Assessment and Contract Administration Services on the Subdivision Concept Plan with 37 lots.
Services KCTT provided on this project include but were not limited to:
Preliminary Infrastructure Service Reporting and project feasibility estimate; Preparation of Urban Water Management Plan. Concept Design of urban infrastructure inclusive of scheme water supply system, stormwater disposal and management systems, road and intersection design. Detailed Design of all abovementioned urban infrastructure; Obtaining all mandatory approvals, liaison with all relevant authorities and coordination of all design drawings from various consultants; Organization, assessment and award of tender for construction inclusive of preparation of tender drawings, specifications and other relevant documentation; organization of tender; assessment and award of tender; Contract Management including site inspections, organization of meetings, administration of contract during construction, organizing final inspections

project_ Car Parking Area - Dan Murphy’s, Bicton,
City of Melville
client_ APP / Woolworths KCTT have completed concept and detailed design for 129 parking bays for Dan Murphy’s facility in Bicton. The construction is currently underway.
project_ Binningup Road Desaliantion Plant Access
Road
client_ TPG / Water Corporation KCTT have completed the concept and detailed design for a proposed access road and intersection with Binningup Road.
project_ 65 Eric Street, Como, City of South Perth client_ Niroda Holdings KCTT have completed design, managed tendering process and are currently administering contract for construction of 6 strata lots.
project_ Shothole Canyon Road, Exmouth client_ Shire of Exmouth KCTT have prepared, advertised and assessed tender as well as administered contract on behalf of Shire of Exmouth for reconstruction of Shothole Canyon Road within Shothole Canyon National Park.
project_ Lot 12 Market Street, Exmouth client_ Exmouth Civil KCTT have completed the design of urban infrastructure and contract administration for the subdivision of 11 residential lots in Exmouth. project_ Lot 3 Barytes Road, Wyndham client_ Ridges Iron Ore Project KCTT have completed the design and obtained all relevant approvals for construction of 1.2 kilometre of water main pipeline.
project_ Port Access Road, Bunbury client_ State Solicitor’s Office KCTT provided expert engineering opinion in legal dispute over Lot 5 Boyanup to Picton Road developmen.
project_ Lot 250 Flynn Drive, Neerabup client_ McLeods Barristers and Lawyers KCTT provided expert engineering opinion on a potential subdivision cost for four proposed development options. The report was utilised by City of Wanneroo.
project_ Townsite of Cue, Preliminary Master Plan client_ TPG / Shire of Cue KCTT have provided a preliminary infrastructure servicing report as an input into preliminary master plan. The purpose of the report was to review the existing infrastructure, nominate any perceived risks and make preliminary assessments regarding upgrade requirements
project_ Patersons Stadium - Preliminary Master
Plan
client_ TPG / Shire of Cue KCTT have provided an infrastructure servicing report as an input into preliminary master plan. The purpose of the report was to review the existing infrastructure and make preliminary assessments regarding upgrade requirements project_ Strategic Infrastructure Review client_ Shire of Mundaring/ Conway Highbury KCTT have completed a strategic review of available infrastructure (sewer, power, water) for the Shire of Mundaring. The key outcome of the report was a macro scale review of current and future growth patterns for Shire of Mundaring and to discuss the infrastructure requirements for intended expansion in broad terms with relevant authorities.
project_ Maddington Kenwick Strategic Employment
Area (MKSEA) - Precinct 1
client_ MKSEA Landowners / Dynamic Planning and Developments. KCTT have prepared a strategic overview of the existing infrastructure, nomination of perceived risks and discussion on potential upgrades required if the area is to be rezoned as industrial area.
project_ Signalised Intersection Concept Design client_ APP / Charter Hall KCTT are currently working on a concept design for the signalisation of an intersection of Oneida Road and Warnbro Sound Avenue.
of Gosnells
client_ Norwesgt Land KCTT have completed the full design and tendering process for the proposed development of Lot 1516 Leslie Street in Southern River. The proposed development comprises of 32 lots and Public Open Space area. The construction is due to commence shortly.