
1 minute read
SUSTAINABILITY
LOAD DISTRIBUTION AND POWER REQUIREMENT

Advertisement


• Total power required for the proposed domestic terminal at Gauchar is 453KW
Solar Panels Above Parking
• Between September to June, Gauchar receives a good amount of sunny days ie More than 8 hours/day
• The month with the most daily hours of sunshine is May with an average of 11 26 hours of sunshine
• The solar panels are placed on the roof of the parking structure



WHITE BASE IS PROVIDED AS IT HELPS IN ACHIEVING MAXIMUM REFLECTION OF SUNLIGHT
• TOTAL ENERGY CONSUMPTION OF SITE – 453KW
• ENERGY GENERATED THROUGH SOLAR PANELS – 271.15 KWp
ALLANA COLLEGE OF ARCHITECTURE
ANTHONY

• As Gauchar has an average rainfall of 459mm, a rainwater harvesting plant will help in storing water and providing it for landscape watering, toilet flushing etc.


Faucets And Fixtures

• To be provided within site


• The treated water will thus be used for plant watering .
• It reduces the consumption of water in toilets by atleast 50 %


Daylighting Strategies

• Being in a hilly region at a high altitude, the need for maximum natural light is a must as it will provide warmth to the passengers within
• SKYLIGHTS provided on the roof allow natural light to enter into the building.


• Use of smart faucets in washroom areas will help in reduction in the amount of water consumed and will avoid unnecessary wastage of water

• Curtain walls with large glass panels are provided on the peripheral wall which allow maximum amount of daylight to enter the building
• This provides warmth to the interiors of the building which is required as it is a cold region









