Final presentation josh tait

Page 1

THE HOWARD SMITH WHARVES URBAN DESIGN PRECINCT

THE

PROPOSED

DESIGN HOWARD

URBAN

PRECINCT SMITH

WITHIN WHARVES

AIMS AT INTEGRATING THE

WITH

LOCALLY

COMMUNITY SOURCED

ARCHITECTS AND DESIGNERS, IN ORDER TO CONSTRUCT AND DESIGN

FURTHER

RENOVATIONS INNOVATIONS

AND FOR

SURROUNDING LOCALE.

THE

DAB 510 JOSHUA TAIT

SURROUNDING


PREVIOUS DESIGN FROM NODE TO PRECINCT

PROJECT ONE RESULTED IN AN URBAN ART NODE - SUPPLYING THE PUBLIC WITH A SPACE IN WHICH THEY MAY CONSTRUCT EXISTING COMMUNITY CENTRES, PCYC’S, AND HOMELESS SHELTERS WITHIN A 2KM RADIUS OF THE SITE

THEIR OWN SPACE TO PRODUCE WORKS OF ART INCLUDING PHOTOGRAPHY, PAINTING AND DRAWING.

BY STUDYING THE LOCALE AND REVEALING THE SOCIAL PROBLEMS AND MULTIPLE DEMOGRAPHIC DIFFERENCES IN THE REGION IT WAS DECIDED THAT EXISTING

ART

SCHOOLS

AND

THE DESIGN RESPONSE OF

THE SITE

PREDOMINANTLY THROUGH THE USE OF ART AND DESIGN, IN A COLLABORATIVE WAY.

PROJECT TWO SAW THE FOCUS OF DEVELOPMENT ON NURTURING THE EXPERIENCE AND RELATIONSHIPS FORMED DURING THE DESIGN PROCESS OF THE REDEVELOPMENTS IN ORDER TO ERASE SOCIAL PROBLEMS. THIS WAS AMENDED WITHIN PROJECT THREE - ALTERNATING THE FOCUS OF THE PROPOSAL TO THE CREATION OF A PRECINCT IN WHICH DESIGN AND COMMUNITY INVOLVEMENT COULD BE EXISTING ART EXHIBITION CENTRES AND GALLERIES WITHIN A 2KM RADIUS OF THE SITE

MAXIMIZED, WHILST PROVIDING THE LOCAL COMMUNITY WITH A PLACE OF RELAXATION, INSPIRATION AND DESIGN.

DAB 510 JOSHUA TAIT

PROJECT TWO, WAS TO ATTEMPT TO COMBAT SUCH PROBLEMS,

COLLEGES WITHIN A 2KM RADIUS OF


DESIGN PROCESS FROM NODE TO PRECINCT

THE SITE WAS DETERMINED TO BE PREDOMINANTLY ACCESSED BY FOOT, ADDITIONALLY, THE SITE ITSELF ONCE ACCESSED, WAS ONLY NEGOTIABLE ON FOOT, THUS, IT WAS DECIDED THAT THE PROPOSED DEVELOPMENT WOULD BE OF A COMFORTABLE HUMAN SCALE AND ACCESS, WHILST INTEGRATING INTO THE SITE SEAMLESSLY.

43.6% 26.6% 8.2% 3.15%

WALK TO DESIRED LOCATION DRIVE TO DESIRED LOCATION BUS TO DESIRED LOCATION TRAIN TO DESIRED LOCATION

SOLEIL - BRISBANES TALLEST BUILDING IS 243 METERS IN HEIGHT

AVERAGE BUILDING HEIGHT IN CDB IS 125 METERS APPROXIMATELY

HEIGHT OF CURRENT SHEDS ON-SITE IS APPROXIMATELY 7 METERS

HEIGHT OF STORY BRIDGE APPROXIMATELY 74 METERS

MEAN HEIGHT OF BRISBANE RIVER BELOW HOWARD SMITH WHARVES IS 3.7 METERS

DAB 510 JOSHUA TAIT

APPROXIMATE HEIGHT OF CLIFFS IS 29 METERS


THE PROPOSED URBAN DESIGN PRECINCT WITHIN HOWARD SMITH WHARVES AIMS AT INTEGRATING THE SURROUNDING COMMUNITY WITH LOCALLY SOURCED ARCHITECTS AND DESIGNERS, IN ORDER TO CONSTRUCT AND DESIGN FURTHER RENOVATIONS AND INNOVATIONS FOR THE SURROUNDING LOCALE.

DESIGN PROCESS INTENT

THE PROPOSED DEVELOPMENT WILL FORM A PRECINCT WITHIN WHICH LOCALE RESIDENTS MAY UTILISE FOR THE AESTHETICALLY PLEASING, AND CONVENIENTLY LOCATED SERVICES AND AMENITIES. BY ATTRACTING MEMBERS OF THE ADJACENT COMMUNITIES, AND WELCOMING THEM INTO THE RELAXED ENVIRONMENT OF THE DEVELOPMENT, THE AIM OF THE PROJECT IS TO GAIN LOCAL KNOWLEDGE AND LOCAL HANDS ON EXPERIENCE, ADVICE, AND DESIGN CONSIDERATIONS, THAT MAY BE IMPLEMENTED INTO FUTURE DEVELOPMENTS AND RENOVATIONS IN THE SURROUNDING AREAS AND BEYOND. THE BUILDING PROVIDES ALL AMENITIES AND SERVICES FOR ONE TO TWENTY MEMBERS OF THE PUBLIC, CREATING THE OPPORTUNITY FOR THOSE WHO KNOW THE LOCALE TO PROPOSE AND CONTRIBUTE TO FUTURE COMMUNITY REDEVELOPMENTS WITHIN THE CITY OF BRISBANE. FURTHERMORE, THERE ARE ASPIRATIONS THAT ALLOWING MEMBERS OF DIFFERENT DEMOGRAPHICS TO COLLABORATE MAY REDUCE SOCIAL PROBLEMS SUCH AS THE AGE GAP, VANDALISM AND THE LIKE. NEVERTHELESS, THE OUTCOME WILL RESULT IN A PROPOSAL FOR THE SURROUNDING LOCALE OR BEYOND, THAT IS TRULY CATERED TOWARDS AND MEETS THE NEEDS AND WANTS OF THE COMMUNITY IN QUESTION.

PROPOSED LOCATION ON SITE OF THE HOWARD SMITH WHARVES URBAN DESIGN

TIO LEC

REF

TRIU A O HT T

LIG SKY

TO

F P

O LO

R P R

N IO

T EC

W ELO B M

J O

PRECINCT

ALE M E F ND A OR T E L A V A ELE S-M

OM

RO EST

R

E PAC S G

IN

ND GA

FT A R D

WIN A R D

E PAC S G

IN

EF BRI

W

ND GA

TIN

N PRI

OP

SH ORK S

GE A R TO

DAB 510 JOSHUA TAIT

ACE P S N


INTEGRATION

DESIGN PROCESS PARAMETERS

ONCE THE INITIAL DESIGN WAS COMPLETED, LANDSCAPING

UPON

REALIZING

THAT

THE

RAMPS

WHERE

AN

FOR SPACE TO BE MAXIMISED, AN INITIAL MODEL WAS

WAS COMPLETED IN AN ATTEMPT TO FURTHER INTEGRATE

INCONVENIENCE, IT WAS ALSO DISCOVERED THAT A GROUND

CONSTRUCTED OF A SIMPLE, GROUND BASED, LINEAR

THE SITE AND STRUCTURE.

BASED BUILDING WOULD APPEAR CLOSED OFF, AND ALMOST AS THOUGH IT WAS A BARRIER BETWEEN THE MOVEMENT OF

DESIGN.

THE PEDESTRIAN.

IN THE PRELIMINARY STAGES, THE IDEA WAS TO INTEGRATE

THE ADDITION OF RAMPS AIMED TO ACHIEVE THIS -

THE USERS WITH THE DEVELOPMENT, BY FORCING THEIR

HOWEVER, DUE TO THE HEIGHT OF THE LANDSCAPED LEVELS,

MOVEMENT THROUGH THE SPACE DUE TO STRATEGIC SIZING

IT WAS FOUND THAT A PORTION OF THE RAMPS WERE OF AN

FOR THIS REASON THE OPPORTUNITY WAS TAKEN TO RAISE

OF THE PROPOSAL

INCONVENIENT SIZE.

THE GROUND FLOOR, TO A DOUBLE CEILING LEVEL, AND CONSTRUCTING A PRECINCT FOR THE COMMUNITY.

DAB 510 JOSHUA TAIT

DUE TO THE LIMITED FOOTPRINT OFPROPOSAL AND THE NEED


DESIGN PROCESS PARAMETERS

INTEGRATION

THIS FORM MAXIMIZED THE SUCCESSFUL CIRCULATION OF PEDESTRIANS AND USERS AROUND THE SITE - ALLOWING USERS TO NEGOTIATE FREELY AROUND, OR THROUGH THE SITE UNHINDERED.

INTENDED USER OF THE PROPOSAL MAY NEGOTIATE THE SITE

DAB 510 JOSHUA TAIT

AS AN EXAMPLE, A ROUTE IS DISPLAYED, CLEARLY SHOWING THE EASE AT WHICH A PASSERBY PROGRESSING FROM THE CITY, OR


INTEGRATION

DESIGN PROCESS PARAMETERS

UNDERSTOOD WITHIN THE IDEA OF INTEGRATION, IS THE NEED FOR THE DEVELOPMENT TO AESTHETICALLY SUIT THE SITE. FOR THIS REASON THE FOLLOWING MATERIALS ARE PROPOSED. GREEN TINTED GLASS WAS UTILISED WHERE THE AESTHETIC WOOD, AS A NATURAL ELEMENT, AIMED TO REPLICATE THE SURROUNDING FLORA OF THE SITE.

TIES MADE BY THE GREEN ROOF WERE DESRIBLE BUT UNACHIEVABLE, SUCH AS THE ELEVATOR SHAFT, AND STAIR BALUSTRADES

GREEN ROOFS, TYING THE DEVELOPMENT FROM THE GROUND, BACK INTO THE CLIFF.

ROLE, COULD EASILY HAVE BEEN RENDERED, INSTEAD, IT WAS LEFT BARE, AS AN IMITATION OF THE SURROUNDING BUILT ENVIRONMENT.

DAB 510 JOSHUA TAIT

THE CONCRETE SLAB, WHILST PERFORMING A FUNCTIONAL


INTEGRATION

DESIGN PROCESS PARAMETERS

AS PREVIOUSLY MENTIONED, THE LOCATION

AND

SCALE

OF

THE

DEVLOPMENT WAS OF THE UTMOST IMPORTANCE. IN ORDER TO DIVULGE THE

CORRECT

SIZING

OF

THE

PROPOSAL, THE INTERIOR SPACES NEED BE PLANNED.

AS THE BUILDING WAS TO BE BUILT TO

A

HUMAN

UNNECCESSARY

SCALE,

SPACES

NO

WHERE

EC EFL

R

CE A P NS

TIO

ADDED, RETAINING ONLY THE SOUL OF

COMMUNITY

INVOLVEMENT,

PROVIDING

THEM

WITH

AND THE

TRIU A O HT T

LIG Y K S

FACILITIES AND RESULTANT SERVICES

R O

NEEDED.

P O T

O L F

R P

N IO

T C E

W ELO B M

NURTURING

J O

DAB 510 JOSHUA TAIT

CONCERN

LE A S-M

M

O O R T

RES

R

G

IN W A DR

D D N A

B

G

PR

IN INT


INTEGRATION

DESIGN PROCESS PARAMETERS EC EFL

R

ACE P S N

TIO

IU ATR O HT T

LIG SKY

R P R

O LO

F P

TO

N IO

T EC

W ELO B M

J O

ALE M FE D N TOR LE A A V A ELE S-M

M

OO R T S

RE

E PAC S G

TIN

ND GA

F DRA

WIN A R D

IN

EF BRI

OP

SH ORK

W

ND A G

GE A R STO

N

NTI

PRI

E PAC S G

ING

T

ING

F

D

CE SPA

UM

I ATR

AND

P

GE A R STO

E PAC S N

TIO

O KSH

R

WO

CE A P S

ION

BIT XHI

EP REC

AND

E

E CAF

E PAC S N

O

CTI

FUN

IES ILIT

FAC N HE

ITC K D

AN

F

T S IR

O L F

R O

PR

N IO

J O

T EC

ELE R O VAT

S

IC AREA L B PU KING R WO SEC ARY D ON ANCE R ENT

DAB 510 JOSHUA TAIT

ALE M FE D N OR T A V ELE


N IO

DESIGNCEPTPROCESS PARAMETERS IO E PAC S N

T EC

E

UM

I ATR

R AND

ON

I NCT

U

ION

BIT XHI

E

C

ND

A AFE

F D N A

HEN C T KI

CE SPA

IES T I L I

FAC

T S R

FI

R O

O L F

PR

ELE R O VAT

SEC ARY D ON ANCE R ENT

IRS F O IR T

STA

E

NC TRA

N U

F D

O LO

R P R

J O

T EC

N IO

DAB 510 JOSHUA TAIT

R

O R G

J O

S IC AREA L B PU KING R WO

OO L F T

EN Y R MA G PRI TIN A E IC S L B PU

INTEGRATION


INTEGRATION

DESIGN PROCESS PARAMETERS

PERSONAL REFLECTION SPACE

WORKSHOP AND DRAFTING SPACE

CAFE AND KITCHEN DAB 510 JOSHUA TAIT

PUBLIC PRECINCT

EXHIBITION AND FUNCTION SPACE


COLLABORATION

DESIGN PROCESS COLLABORATION

VIDEO DAB 510 JOSHUA TAIT


COLLABORATION

DESIGN PROCESS COLLABORATION

ENTRANCE POINT OF THE PRECINCT

WITHIN THE PRECINCT ARE LARGE

SITUATED UNDER THE MAIN STRUC-

COMMUNITY TABLES - OVERSIZED TO ALLOW

ANY

ACTIVITY

TO

TURE ITSELF. PUBLIC SEATING AND

BE

LANDSCAPING CAN BE SEEN.

COMPLETED, INCLUDING MODELLING, DRAWING, PAINTING, ETC.

CHOOSE

TO

CONTRIBUTE

FUTURE PROPOSAL, AN

TO

A

INFORMAL

LECTURE THEATRE WILL PROVIDE THEM WITH ALL THEY NEED TO KNOW,

IN

A

RELAXED

COMFORTABLE SETTING.

AND

DAB 510 JOSHUA TAIT

IF A MEMBER OF THE PUBLIC DOES


PRODUCTION

PRODUCTION SECTION N

TIO P E C

E DR

N

A IUM

ATR

CE A P S

N

IO NCT

CE A P S

U

N

IO IBIT

F D N A

EXH

ND A FE

IES T I L I

FAC N HE

KITC

T S R

CA

I F

R O

O L F

R P

T C E

J O

IC A L B PU KING R WO

SEC ARY D ON ANCE R ENT

IRS F O IR T

R O

STA

E

NC A R T

D

O L F

R P

J O

T C E

N IO

DAB 510 JOSHUA TAIT

R

OO L F T

EN Y R MA I R ING P T A SE C I L PUB

N IO


PRODUCTION

PRODUCTION PLANS R

LOO F T S

R P R

IR

OF IR T

ELE R O VAT

STA

CE

AN NTR

E RY A M ING PRI T A E IC S L B PU

F D

N U

O R G

EAS

O LO

J O

J O

T EC

N IO

DAB 510 JOSHUA TAIT

H P RA

G

T EC

PRIVATE REFLECTION

R P IC

TOP FLOOR

N IO


PRODUCTION

PRODUCTION PLANS

R P IC

T EC

J O

W.C. W.C.

G O

H T R

O

H P RA

N IO

BRIEFING

WORKSHOP COMPUTER AND DRAFTING

PRINT AND STORAGE

EXHIBITION AND FUNCTION

FIRST FLOOR

DAB 510 JOSHUA TAIT

CAFE AND KITCHEN


PRODUCTION

PRODUCTION PLANS

PUBLIC PRECINCT

DAB 510 JOSHUA TAIT

GROUND FLOOR



Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.