MXT-055_Nautical Center Abrantes

Page 1

No055


predominantemente orientada a sudeste. A

posicionado numa parte da cidade onde se nota um crescimento recente da malha urbana, coexistem

The terrain for the construction of the Nautical Centre of Abrantes is located on a hillside predominantly oriented to the southeast. The landscape is vast and impressive, marked by the channel of the river and by the road and rail bridges that cross it. From there one can also see the silhouette of the castle dominating the skyline, the profile of buildings in the historical center and the hospital. Being positioned in a part of the city where one notices a recent growth of the urban fabric, there co-exist quite different scales of buildings from houses to warehouses or multi-family buildings and still survive large areas of olive groves. In the vicinity of the intervention there is an access road that plunges toward the water mirror created by the operation of the inflatable dam Aquapolis,

de jardim bem cuidado.

practice of sports linked to the nautical center and the bathing potentiated by the river beach. The near river front extends in a two levels promenade equipped with bars and restaurants, an area devoted to car parking and fringes of a well-kept garden. What is the design strategy that best responds to the challenge of creating a Nautical Centre in Abrantes? What are the issues that must be answered? How?

Como?

programa funcional levado a concurso, com o programa de outros equipamentos semelhantes no Lima ou os de Coimbra) aponta para um

the Strategic Plan of the city of Abrantes. This, added to the comparison of the competition functional program with the program of other similar equipment in the country (for example, the Nautical Club of Ponte de Lima or those in Coimbra) points to an equipment with international ambition. In fact, this equipment is a key part in the whole operation of the Aquapolis and will enhance the uses of the water plan created with the inflatable dam, whether in the components of leisure or in of sports competition and all uses which may arise as the high competition, stages, restaurants, hotels, etc.

hotelaria, etc.

uma resposta mais clara e contundente. Qualquer projecto para este equipamento tem de

This ambition is one of the issues in need of a clear and convincing answer. Any project for this equipment must accompany this ambition. And in the context of the Aquapolis interventions what can be the role of this equipment?

pode ser o papel deste equipamento? fundamentais que assumimos no desenvolvimento da nossa proposta:

Two vectors are therefore assumed in the strategic development of our proposal: ambition and sense of identity; insertion in the environment and completion of the Aquapolis north shore;

Aquapolis margem norte;

studio

1


2


studio

3


Partimos de uma forma simples, forte e facilmente

limite norte do Aquapolis, uma voltada ao grande

cobertura.

We started from a simple shape, strong and easily recognizable, an equilateral triangle. After all, we need only three facades to establish relationships with the environment. One in the alignment of the northern boundary of the Aquapolis, one facing to the great water plan and one turned to the railway bridge. Later we will return to these facades as well as the other one, the roof. The triangle quickly insinuated itself in our thoughts about the meaning of identity of this equipment. The division of the base triangle in

base em unidades menores, com uma escala

fazendo-a participar na nossa proposta.

Andrew' bridge also establishes links with this existing structure, thus making it participate it in our proposal.

com um desenho virtuoso, impecavelmente equilibrado numa grafia estudada de volumes, cheios e vazios.

Here, we are not interested in an exercise in composition, with a virtuoso design, impeccably balanced in a studied graph of volumes, of fulls and voids.

envolvido na identidade do equipamento.

We are interested in an envelope so ambitious and precise as the boats that will be stored in it. We are interested in an envelope intrinsically involved in the identity of the equipment.

marca da cidade de Abrantes.

the intervention, able to insinuate itself naturally in the collective subconscious and there install a new brand for the city of Abrantes. The definition of the outer shell of the proposal is actively involved in the character of the equipment. It can only be like this.

desafiam o presente com a sua leveza, rapidez e

In most Nautical Centers we know the boats are closer to the challenge of the future than the buildings. Slender with proportions in the limits of the possible, boats are actually challenging the present with its lightness, speed and accuracy. The buildings tend to be low-qualified, or when they are, they are usually impregnated with some nostalgia and attachment to traditional shipbuilding in wood.

tradicional, em madeira.

apontar para o futuro, para a leveza, rapidez e

What if the Nautical Centre of Abrantes could also point to the future, for lightness, speed and accuracy, along with the beautiful boats stored in its interior? Inevitably, the railway bridge was one of the most important references in the development of the project.

do projecto.

4


studio

5


6


studio

7


8


studio

9


10


studio

11


12


De forma subtil, sugeriu a textura das fachadas e

Acabada de construir em 1889, com engenharia francesa, da escola de Eiffel, tem um tabuleiro com

vibrante.

After all, it is the nearest construction to the Nautical Center. It contributes to, together with the building, to define a new square in the access to water. Subtly it suggested the texture of the Nautical Center building facades and roof. Built in 1889, with french engineering from the Eiffel school, it has a hollow beam with a current design at the time, standing out the exhaustive repetition of the same building element, the cross of St. Andrew. This exhaustive repetition, decision informed by structural calculation models most advanced at the time of the construction, resulted in a rich and vibrant texture. This exhaustive repetition of a structural element is

proposta.

um elemento menor, simultaneamente parede,

Nothing seems more appropriate than the repetition of a minor element, simultaneously wall roof, and structure, to define both the character of the building and its construction, strategy in everything similar to that present in the bridge.

em tudo similar aquela presente na ponte. Definimos um elemento menor, triangular, a

estes elementos acumular: estrutura,

We define one smaller element, triangular, the same shape as the building itself, repeat it and define walls, continued it on the roof. We questioned ourselves how many functions can these elements accumulate: structure, waterproofing, drainage, are certainly only a few of the possibilities.

apenas algumas das possibilidades.

elementos estruturais com grandes comprimentos, grande capacidade de carga e extremamente leves, a

extremamente vantajoso. De facto ao aumentar a resulta praticamente numa planta livre, sem

One hypothesis we studied quickly gained advantage over all others, the construction of elements in composite materials of fibers reinforced resins. This technique proved to be quite adequate because it allows the execution of structural elements with great lengths, high load capacity and extremely light, at very competitive costs thanks to the enormous repetition of identical parts. Another advantage is the large possible length of the parts and reduced weight allowing to reduce the support structures, in steel, required throughout the building, increasing the distance between supports without additional costs, which in the case of the warehouse area proves to be extremely advantageous . In fact increasing the distance between supports in the warehouse space results in virtually free floor plan, unconstrained for the occupancy by the various types of boats that will shelter there.

studio

13


14


studio

15


16


studio

17


18


ROOF SECTION AT WIDEST POINT SCALE 1:100

REFERENCE GEOMETRY TRIANGLE

ROOF ELEMENTS SECTION AND OVERLAP

ROOF ELEMENTS GEOMETRY SCALE 1:10

REFERENCE GEOMETRY TRIANGLE

WALL ELEMENTS GEOMETRY SCALE 1:10

studio

19


20


studio

21


ROOF ELEMENTS CONSTRUCTION SCALE 1:2

WALL ELEMENTS CONSTRUCTION SCALE 1:2

22


studio

23


24


studio

25


26



No055

concurso limitado. limited competition.

1 classificado. 1st place. credits. location

Portugal, Abrantes, AquaPolis Norte promotor. promoter.

arquitectura. architecture.

Telmo Cruz / Maximina Almeida colaboradores. collaborators.

arquitectura paisagista. landscape architecture.

estruturas. structural engineer.

Miguel Villar, betar electrical installations.

hydraulic installations.

Marta Azevedo, betar gas installations.

Miguel de Sousa comunication installations.

security.

HVAC installations.

thermal analysis.

accoustics.

Palma Ruivo, Certiprojecto plastic materials consultant.

Jorge Morais, Decatlo projecto. project.

2008 valor de obra. construction costs.

1.800.000,00 maquete. model.

MAQUETEAM imagens 3D. 3D pictures.

ONstudio


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.