HIgh-Profile Monthly: September 2012

Page 22

September, 2012

22

High-Profile: Educational Facilities News

Wakefield, MA - Recently, Beverly High School and the Abraham Lincoln Elementary School were honored at the State House with Outstanding Green School Awards. These were two of five schools in the commonwealth honored by the Green Schools Organization for transforming their learning environments. The Green School organization commended both of these schools for their green initiatives. This is the fourth year that the Green Schools organization has recognized outstanding schools and environmental leadership in schools and communities. Awards were given to schools, leaders, projects, environmental education, and efforts to improve waste management. Robin Organ, executive director and founder of Green Schools, highlighted each school’s sustainable green design elements. Originally built in 1965, Beverly High School was the picture of classic Californian style academic campus. Sprawling over five acres, the two-story school building had three academic wings, a field house and auditorium jutting off like spokes from a central corridor. At the time of its construction there was little consideration as to its energy efficiency, utilization of physical space, or of percentage of impervious surface. As the years passed, the school started to decay, the roof was deteriorating, and the school was no longer a building of which the community could be proud nor could it deliver top-quality education to its students. Under the threat of losing accreditation due solely to the deteriorating school

Schools Honored with Green Awards

Abraham Lincoln School proximately 160,000sf and media center, classroom spaces, and a recrenovations to the main reation area including a synthetic turf field core facilities, including and resilient track. The new facility conthe field house, cafeteria, tains high-efficiency systems and meets or auditorium, and music exceeds all Massachusetts CHPS requirespaces. Breaking ground ments. in January 2009, Beverly The Abraham Lincoln School has High School was complet- been designated a “Model School” by the ed on-time, under-budget, Commonwealth of MSBA’s Model School and targeted 41 points un- Program. This program was established Beverly High School Photovoltaic Roof der the Collaborative for to allow communities to reuse the design High Performance School of a successful, recently constructed elbuilding, Mayor William Scanlon took the ementary, middle, and high school. Model necessary steps to transform the Beverly Verification Program. Beverly High School is now a high schools contain optimal classroom space High School campus. He formed a “Green and are chosen by the MSBA for their efTeam,” comprised of Al Calcagno, proj- performance school. Abraham Lincoln Elementary ficiency, ease of maintenance, ability to ect manager, Heery International, Ricardo Anderson, assistant project manager, CTA/ School was completed in 2010. The city accommodate lower or higher enrollments Konover Construction, Arnel Catalan, asso- of New Bedford worked with Daedalus and the incorporation of sustainable green ciate principal, MVG Architects, and Paul Projects Inc., MVG Architects and its con- design elements. Districts in the state can Banks, principal, B2Q Associates; to ensure sultant team to design and develop a new now use the Abraham Lincoln Elementary that the new Beverly High School would re- facility that would provide the commu- School as a model for their new elementary flect today’s principles of energy efficiency, nity with a 21st century learning environ- school, modifying space and floor plans to ment. The new 93,833sf elementary school suit the goals and needs of their communisustainability, and smart growth. The school underwent a significant serves 600 students from kindergarten to ty. When communities use a model school transformation. Construction included a fifth grade. The building features an au- they can reduce both projects costs and new four-story academic addition of ap- ditorium, gymnasium, cafeteria, library/ completion time. Beverly High School

lOwER COStS!

PRINT A 24” x 36” COLOR DRAWING LIkE THIS FoR oNLY

let us your wide format printing

¢ 1.7

PER Sq FT*

Proudly Serving New England’s Design/Build Community Since 1980.

1980|2012

32 YEAR

ANNIVERSARY

Print | Copy Scan | Distribute your wide format drawings, blueprints and CAD files.

Common Features of these Three Amazing HP ePrinters • • • • • • •

Color touchscreen enables intuitive operation Web-connected, updates software automatically Rich, dark blacks, neutral grays, vibrant colors Fine, detailed lines & highly accurate drawings 160 GB hard disk Print files from USB drive, without a computer Print remotely from computer or mobile device

HP DesignJet t790 PS 24”

HP DesignJet T2300 eMFP PS 44”

• Print up to 2 A1/D-sized prints per minute • 8 GB virtual memory

• 2 Paper Rolls - Smart Switching • 1-Click Print, Scan and Copy • Scan sketches and hand-annotated drawings • Print up to 2 A1/D-sized prints per minute • Print up to 103 D-sized prints/hour • 32 GB virtual memory • 2 Paper Rolls - Smart Switching • 32 GB virtual memory

ASK FOR OUR CURREnt PROmOtiOnAl PRiCing!

BUY OR lEASE - CAll OR EmAil FOR

call 1.800.255.8012 sales@topazeng.com www.topazeng.com 35 Pond Park Road, Hingham, MA • 1.781.749.8687

www.high-profile.com

HP DesignJet t1300 PS 44”

gEnEROUS tRADE-in REBAtES UP tO $2,000*

FAntAStiC PRiCing

ON ALL NEW AND PROFESSIONALLY RECONDITIONED WIDE FORMAT SYSTEMS!

* Total ink and print head cost. Media cost is additional and can vary from 2.9 cents per square foot and higher depending on media type. Trade-In Rebate is based on an HP program and is subject to change without notice. Trade-In Rebate is dependent on model purchased and equipment traded-in. Call or email for complete specifications and product details. Lease pricing is for 60 month FMV lease. Taxes are excluded. Free Delivery and Installation apply to standard dock or ground-level delivery and standard installation. Topaz is not responsible for errors in content or pricing. Expires 8/31/12.


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.