HIgh-Profile Monthly: September 2012

Page 1

September, 2012 Annual:

1

Educational Facilities

Dore & Whittier Designs, Agostini Builds

John Rogers Middle School and Rockland High School

Feldman Support on Major Projects Wessling Selected for School Renovations PARE Completes School Engineering Services Atkinson Family Practice to Open New Offices Bowdoin Completes Little Wanderers Expansion Hotchkiss School BioMass Facility Nears Completion North Branch Completes Kingswood School Projects Suffolk Construction Breaks Ground at Boston Wharf Vanderweil and CBT Complete Corporate HQ Design Pro Con GC for MRI Suite Fit-Up Intermodal Transportation Center Completed Reggio School of the Arts - Newfield CM, Friar Assoc. Architects Alpine Environmental School Lead Paint Abatement by Ron Peik Top-of-the-List Energy Conservation Measure by Peter J. Davey

NECA Standard on Photovoltaic System Installation Now Available Affordable High Performance Laboratory: Myth or Reality? by Suzanne Robinson

Forging Identity by Stephanie Goldberg

Boston Preservation Alliance 2012 Preservation Achievement Awards ASHRAE Boston Chapter 100th Anniversary Celebration Gala

September 2012

plus Heathcare Facilities,

Facilities News, Multi-Residential, Awards, Green News, People, Calendar and more...

P.O. Box 7, Pembroke, MA 02359 Change Service Requested

Inside this Issue

www.high-profile.com


2

www.high-profile.com

September, 2012


September, 2012 ,

3

Serving Boston and Surrounding Communities for 35 years. H&H Builders is a full service construction firm providing: • Pre-Construction Planning • Construction Management • General Contracting • Design/Build Assisted Living Corporate/Commercial Medical/Health Care Retail/Restaurant Academic Financial/Banking • Renovation • Tenant Fit-up • New Construction • Pre-Engineered Buildings

495 Business Center, Tewksbury, MA

108 Myrtle Street, Quincy, MA

The Café at 30 Corporate Drive, Burlington, MA

149 Buttonwood St. Dorchester, MA 02125 PH: 617-282-1082 | Fax: 617-282-0874 | www.hhbuilders.com

24 HOUR RESPONSE SERVICE FOR EMERGENCY MAINTENANCE REPAIRS www.high-profile.com


September, 2012

4

Subscribe to High-Profile Monthly all year Cover Story: Rockland Middle & High School.... 28 Sections: Calendar................................. 46 Upfront:................................... 6 Features: Facilities................................. 10 Education................................ 13 Connecticut............................. 30 Green..................................... 34 Healthcare.............................. 36 Awards................................... 37 People.................................... 44

Kingswood Schools.................... 20 Reggio School of Arts................ 21 ASHRAE Turns 100.................. 24 Atkinson Family Practice............. 33 PCINE News............................ 35 Hotchkiss School...................... 38 Home for Little Wanderers.......... 41

www.high-profile.com E-mail news releases, advertising queries, articles, calendar listings and announcements, to: editor@high-profile.com

Publishers: Happy Michael Barnes and Kathy Barnes Advertising Manager: Mike Marvelli SteelDay Business Development: Anastasia Barnes Sept. 28 Account Executive: Annie McEvoy Lucy Consultants: RAB Associates High-Profile Monthly accepts no responsiArt Direction & Design: bility for typographical errors or omissions Sandra Guidetti of ads. We will reprint, without charge, that Proofing Editor: part in which the error occurs if it affects the value of the ad. Credit for errors made only Peggy Dostie for first insertion. The advertiser or agency P.O. Box 7, Pembroke, MA 02359 seeking the services of High-Profile Monthly Express Delivery: will indemnify and save harmless claims, 615 School St., Pembroke, MA 02359 lawsuits, damages or expenses, including Phone: (781) 294-4530 attorney’s fees and costs that may arise from Fax: (781) 293-5821 E-Mail: editor@high-profile.com publication of the advertiser’s ads. COMMERCIAL

INDUSTRIAL

• • • •

ADVERTISERS INDEX A.W. Hastings & Company, Inc.........46 A/Z Corporation.................................30 Abbot Building Restoration Co., Inc..13 Abbott-Boyle, Inc................................9 ABX...................................................43 Air Graphics.........................................5 Allied Testing Laboratories................33 Alpine Environmental, Inc.................17 American Plumbing & Heating Corporation...................2 American Window Film, Inc..............32 BL Companies....................................24 B.L. Makepeace.................................26 Blakeslee Prestress.............................45 Boston Plasterers’ Cement Masons......6 Bowdoin Construction.........................7 Brennan Interior Contractors, LLC....41 Coast & Harbor..................................10 Cogswell Sprinkler Co., Inc...............44 Copley Wolff Design Group, Inc.......14 Coreslab Structures............................15 Daedalus Projects, Inc........................28 EHK Adjorlolo & Associates, Inc......31 Elkus Manfredi Architects.................37 Existing Conditions Survey, Inc........34 Granite State Glass.............................20 Great In Counters...............................36 H & H Builders, Inc.............................3 Harry R. Feldman, Inc.........................7 Harsco Infrastructure Americas.........40 Hutter Construction............................16 Ideal Concrete Block Company, Inc..36 IRONWOOD Commercial Construction, Inc........6 J. & M. Brown Company, Inc............40 Kelly’s Property Services...................30

INSTITUTIONAL

LAB Architects..................................27 Marr....................................................11 Max Sontz Roofing Services, Inc.......41 Mechanical Insulation Industry Professionals.....................9 Modern Mechanical Systems.............38 Monkowitz Photography....................31 NE Moves Mortgage LLC.................32 NECA - National Electrical Contractors Assoc.........................23 North Branch......................................11 NorthStar Construction Services Corporation.....................44 O’Brien and Sons...............................16 Pare Corporation................................47 PCINE - Precast/Prestressed Concrete Institute Northeast.........35 Property Pro Restorations LLC..........42 Purcell Associates..............................21 Rand Worldwide, Inc.........................12 RDK Engineers..................................24 South County Beam and Pole............39 Structure Tone Inc..............................27 Suffolk Construction Company, Inc... 14 Thomas G. Gallagher, Inc..................24 Topaz Engineering Supply, Inc..........22 Trident Building and Properties Group....................18 UPNOVR, Inc......................................4 Valleycrest..........................................19 van Zelm Heywood & Shadford, Inc..38 Vanderweil Engineers........................25 Vanderweil Engineers..........................8 Wayne J. Griffin.................................29 Wentworth Institute of Technology....13 Wessling Architects..............................8

FACILITIES

MUNICIPAL

Lightweight, durable aluminum fabrication Maintenance Free Meets OHSA 1910.27 and ANSI 14.3 requirements Custom fabrication available

UPNOVR, Inc., fabricates high quality aluminum fixed access ladders for a variety of applications. We offer a broad range of high strength vertical ladders and ship’s ladders to meet just about any requirement. Our ladders are fabricated per order, which means we have the ability to offer custom fabrication options to meet your unique jobsite condition. Please visit our website to view our full line of access solutions and contact us today to discuss your access requirements! UPNOVR, Inc. 3 Crane Way Hooksett, NH 03106 (t) 603-625-8639 (f) 603-625-8650 www.upnovr.com constprod@upnovr.com

www.high-profile.com


September, 2012

5

ON-SITE PRINT Solutions from AIR Graphics . . . AUTHORIZED RESELLER for . . .

GENEROUS MANUFACTURERS TRADE IN ALLOWANCES AVAILABLE!

25 years as new england’s “go to” company for digital print Offices in Boston, Watertown, Quincy, Portland, ME 800.734.3373 www.airgraphics.com www.high-profile.com


September, 2012

6

Downtown Crossing Funded

CFMA Event

A Perspective of the College Education System

On Tuesday, September 18, for diversity, making a positive the Construction Financial Manimpact at regional, state, and agement Association (CFMA) will national levels. As Wentworth’s present “A Perspective of the Colfirst female president and the lege Education System & the Defirst female engineer to lead a velopment of Construction’s Future higher education institution of Workforce.” technology in the United States, Dr. Zorica Pantić, president her leadership is exemplified by of Wentworth Institute of Techher strategic thinking and vision nology, will comment on today’s for implementing key initiastudent and parent expectations, Dr. Zorica Pantić tives and programs that advance goals, and motivations. She will educational opportunities for provide a behind the scenes view students pursuing studies in enof the challenges in attracting qualified and gineering, technology, design, sciences, and motivated students to Wentworth’s 20 plus management. bachelor and masters programs and the fiDr. Pantić served on Governor Deval nancial challenges for Wentworth, students Patrick’s STEM Advisory Council and is and parents in a difficult economy and com- co-chair of the STEM Diversity Subcompetitive market place. mittee. For more than 30 years, Dr. Pantić has More information about this event been an academic entrepreneur, technology can be found at http://mass.cfma.org/events. advocate, agent for change, and a champion

Save the Date

October 17, 2012 6th Annual MBC Hall of Fame Gala More information at www.buildingcongress.org

IRONWOOD

COMMERCIAL CONSTRUCTION

Recently Completed Projects: COMMERCIAL CONSTRUCTION UBS Corporate Office, 1 PO Sq., Boston, MA Nissan, Parts & Service Renovations, Marlboro, MA Lab Space - undisclosed client, Stow, MA CNE Direct, Corporate Office Space, Peabody, MA Ground up retail site, Malden, MA

BUILD VALUE, BUILD WITH IRONWOOD T (617) 334-9778 info@IronWoodDesignBuild.com

www.IronWoodDesignBuild.com

www.high-profile.com

Boston - Mayor Menino million to infrastructure improveannounced that $13.2 million in ments. public and private funds are beKensington Investment ing invested in infrastructure in Company is contributing $1 milDowntown Crossing. The anlion to enhance Liberty Tree Park, nouncement came as part of the Boylston Street Way, and sidemayor’s Celebrate Downtown walks, lighting, and trees around Block Party, held on West Street The Kensington, which is currently to highlight the area’s new housunder construction on Washington ing, retail, restaurants, and pro- Mayor Menino an- Street. Millennium Partners is congramming. The projects include nounces that $13.2 tributing $8.5 million for its two important quality of life improve- million is being in- projects, Millennium Place, under ments such as street lighting up- vested in Downtown construction now, and the future Crossing. grades, sidewalk repairs, and new Millennium Towers. Those monbike racks. ies will include improvements to “Downtown Crossing is Boston’s Shoppers Park, the MBTA head house and crossroads. More than 250,000 people pass elevator, new water and sewer lines, new through the area daily, and more than 3.2 traffic controls, and new sidewalks, street million walk through on the Freedom Trail lights, and street landscaping. In addition annually. As businesses continue to build the nonprofit Downtown Boston Business and invest in the area, this $13.2 million in Improvement District will spend $450,000 infrastructure investment is crucial to show- on district plantings, tables and chairs, and casing the neighborhood as a center of vital- seasonal decorations by year’s end. ity, progress, and excitement.” said Mayor These public and private infrastrucMenino. ture improvements are keys to attracting In the city’s five year capital plan, new investors to the BID and creating a $2.6 million has been designated for road thriving neighborhood. In 2012, more than repaving, sidewalk repair, intersection im- 20 new retail and restaurant locations are provement, and LED street sign installation. expected to open. These businesses will be An additional $552,500 has been invested supported by the more than 3,000 new resiby other city departments for Big Belly dents expected by 2015 thanks to the more trash cans, bike racks, street light upgrades, than 1,200 new units of planned housing in and tree pruning. These improvements the area. strengthen the neighborhood and make it an Downtown Crossing remains a top easier place to walk, drive, and navigate. Boston destination. In addition to restauThere is close to $900 million of con- rants and shopping, the area features weekly struction under way and planned in Down- programming, including live music during town Crossing in the next three years, and the lunch hour and after work, an outdoor developers have committed close to $10 market, and exercise classes.

Boston & Cement Masons Local 534 serving: serving: MA, MA, NH, NH, ME ME & &VT, VT, Boston Plasterers’ Plasterers’& America’s Building and Construction International America’s OldestOldest Building and Construction TradesTrades International UnionUnion Since 1864 Our trained and skilled craftsmen are just a phone call away. Since 1864 We offer responsible, highly qualified competent personnel, Ourreliable, trained and skilled craftsmen are justand a phone call away. state certified apprenticeship andhighly training program. membership. We offer reliable, responsible, qualified andOSHAcertified competent personnel, state We are and committed quality and performance. certified apprenticeship trainingtoprogram. OSHA certified membership. We and performance. Sub Contractors are committed to qualityPlasterers:

Sub A1Contractors Concrete Cutting A1 Concrete Cutting Angelini Plastering Angelini Plastering Austin Ornamental Inc. Austin Ornamental Inc. Back Bay Concrete Back Bay Concrete BidgoodAlloc. Assoc. Bidgood Cape CapeCod CodPlastering Plastering Cavalieri CavalieriConst. Const. Century CenturyDrywall Drywall Components Spray Fireproofing Components Spray Fireproofing D & M Concrete D &Coast M Concrete East Fireproofing East Concrete Coast Fireproofing F.C.F. Floors GH. & Carr G Plaster & Son& EIFS H.Island Carr & Son& Plaster Lath Island & Plaster J.R.J.Lath Construction J.R.J. Construction John L. Ciman & Son John L. Ciman & Son J.L.Marshall Marshall J.L. M.L.McDonald McDonaldCo. Co. M.L. Mass Acoustics Inc. Mailoux Bros. Construction Mecca Const. Corp. New England Decks New NewEngland EnglandDecks Finish Systems Polcari Plasterworks, Inc. Ricmor Construction, Inc. Ricmor Construction, Inc. S & F Concrete S & F Concrete StaffordConstruction Construction Stafford

Veneer Plaster Plasterers: Venetian Polished Plaster Veneer Plaster Three coatPolished conventional Venetian PlasterPlaster Ornamental Plaster Three coat conventional Plaster Historical Restoration Ornamental Plaster & Preservation E.I.F.S. Historical Restoration & Preservation Portland E.I.F.S. Cement (Stucco) Fireproofing Portland Cement (Stucco) Fireproofing Cement Cement Masons: Masons: Flatwork Flatwork Sidewalks Sidewalks Pool Pool Decks Decks Decorative Decorative Concrete Concrete Overlays Overlays Stamped Concrete Stamped Concrete Concrete Concrete Repair Repair & & Restoration Restoration Epoxy, Seamless Epoxy, Seamless and and Composition Composition Flooring Flooring *and *and much much more* more*

More Information Please ForFor More Information Please CallCall Peter Stracuzzi, Jr. Industry Analyst Peter Stracuzzi, Jr. Industry Analyst Office: 617-825-5200 • Cell: 617-750-0896 Office: 617-825-5200 • Cell: 617-750-0896 Website: www.opcmialocal534.org Website: www.opcmialocal534.org


September, 2012

Affordable High Performance Laboratory: Myth or Reality?

by Suzanne Robinson What do you get when you combine an energy intensive laboratory building, aggressive sustainability targets, and existing conditions that include low floorto-ceiling heights? The beginning of a bad joke? Nope, the Conant Science Center at Bridgewater State University. Bridgewater State University’s Marshall Conant Science Center stands as Suzanne Robinson a cost-effective example of green building design, drawing upon a number of sustainable features and strategies which has led to a building with exceptional energy savings as well as coming in well below budget. The project has been designed for Silver certification under LEED 2009 for New Construction as an academic science and research building for undergraduate students. The building is part renovation, part new construction, with a new wing constructed adjacent to the original, renovated building. The entire building is approximately 212,000sf and includes a vegetated roof, solar thermal array, greenhouse, and rooftop observatory. Total site energy savings amount to 34%, with an estimated cost savings of 28.3%. That’s all well and good, but what’s the secret to this success? The answer is quite simple: a good team and early align-

ment between the owner, contractor, architectural and engineering teams. The project’s kick-off meeting set the stage for what the project team wanted to do and made sure everyone was onboard. Early in the project, concepts were explored that allowed the project team and owner to make informed decisions about sustainability. Simplified controls, reduced air change rates, staged exhaust, low pressure air drop system, reduced exhaust rate, and cascading air systems were all ideas that made it through to the end due to continuous exploration and discussions of sustainability features throughout the project. After investigating the benefits and limitations of an enthalpy wheel, it was decided to include this energy recovery device. Five 30,000cfm low-pressure drop enthalpy wheels were installed in the project building. An enthalpy wheel is a total energy recovery device designed to transfer outgoing heat and humidity (energy) to the incoming air. Because removing moisture can represent a substantial cost for conditioning air, an enthalpy wheel offers more savings compared to a more conventional air-to-air exchanger. One of the more difficult hurdles to overcome within the existing building was the low ceilings – running ductwork was almost impossible because the floor-to-floor height was so low, at approximately 9-10 feet. To overcome this and in lieu of a more standard HVAC system, displacement Continued on page 42

7

Construction Under Way for Brightview Pro Con Architect and CM

North Andover, MA - Construction is under way for Brightview North Andover, a new senior living community located at 1275 Turnpike Road in North Andover. The $19.8 million project is being developed by Shelter Development of Baltimore, Md., and will be operated by Brightview Senior Living. Pro Con Inc of Rendering of Brightview North Andover Manchester, NH, is the projThe four-story, 140,530sf apartment ect architect and construction manager for the North Andover communi- home community will offer a vibrant social ty, which will be the fifth Brightview com- environment where housekeeping, dining, transportation, and maintenance are promunity in Massachusetts. Brightview will have 133 units, in- vided by a caring staff. Plans call for the cluding 65 apartments for independent community to have elegant dining rooms, living, 41 apartments for assisted living, a private dining room, a café, wellness/fitand 27 apartments for Alzheimer’s and ness center, on-site movie theater, hobby dementia care. The apartments, which are room, billiard room, beauty/barber salon, all under one roof, will offer the residents a library/media room, a roof-top garden, and outdoor patios. variety of floor plans and care options.

Kimberly Steimle Honored

Boston - Kimberly Steimle, human resources and training deSuffolk Construction’s chief marpartments and is responsible for keting officer and chief people implementing Suffolk’s actionofficer, has been named one of able long-term plan for developWomen of FIRE (Finance, Insuring the organization’s greatest ance and Real Estate), in Banker asset, its people. & Tradesman’s second annual In addition to her role at award honoring the key female Suffolk, Steimle is highly inplayers in the local FIRE sector. volved in the local business and At Suffolk, Steimle is rephilanthropic communities and sponsible for the overall managehas been recognized several Kimberly Steimle ment of the company’s branding times for her leadership skills, platform, corporate marketing, community involvement, and business development, and community achievements over the years. outreach campaigns. She also oversees the

FELDMAN Professional Land Surveyors F

O C U S I N G

O

N

E

X C E L L E N C E

S

I N C E

1 9 4 6

OUR SERVICES:

OUR CLIENTS:

•• Boundary Boundary Surveys Surveys •• ALTA/ACSM ALTA/ACSM Land Land Title Title Surveys Surveys •• Topographic Topographic Site Site Surveys Surveys •• Photogrammetric Photogrammetric Mapping Mapping •• Land Land Court Court Surveys Surveys •• Construction Construction Layout Layout •• As-Built As-Built Surveys Surveys •• 3D 3DLaser laser Scanning Scanning

• • Developers Developers • • Engineering Engineering Firms Firms • • Architectural ArchitecturalFirms Firms • • Law Law Firms Firms • • General General Contractors Contractors • • Educational Educational Institutions Institutions • • Health Health Care Care Institutions Institutions • • Government Government

• Revit Modeling

Harry R. Feldman, Inc. • 112 Shawmut Avenue • Boston, MA 02118 • 617-357-9740 • www.harryrfeldman.com

www.high-profile.com


September, 2012

8

Message from Michael Barnes, Publisher, High-Profile Monthly

Notes of Interest

ABX

1

one integrated design—one beautiful result.

Wessling Architects has it all covered

How can you execute a successful building project, avoiding all the usual hassles, and fullfilling your original vision of beautiful, effective architecture? The solution is to address the entire project as one integrated design.

under one roof.

This total approach enhances the design process and protects your interests not only due to efficiency, but also through comprehensive professional strong Proud designerservices, of TD Garden’s communication, and a deepernew reliance on partnering. eco — friendly roofing system.

PROFESSIONAL SERVICES

ARCHITECTURE

BUILDING RESTORATION

INTERIOR DESIGN

Presidents Place, 1250 Hancock Street, Suite 815, Quincy MA 02169 (617) 773-8150

www.wesslingarchitects.com

Mechanical Electrical Plumbing Fire Protection Commissioning Central Plants

Vanderweil Engineers: Servicing our client’s most important projects for over 60 years.

Energy & Carbon Management Building Performance Simulation Sustainable Design Technology Infrastructure Audiovisual Security

The Boston Society of Architects, (BSA) founder and longtime co-producer of Build Boston and Residential Design & Construction, recently introduced ArchitectureBoston Expo as the new conference and tradeshow for New England’s design and construction industry. Most of us recognize ABX as the new name for the very successful Build Boston show held annually. This year for the first time the show will be held at the Boston Convention & Exhibition Center | Hall C. I recommend the show for those interested in design and construction of facilities. You can register by October 31 for free admission to the exhibit hall and workshop discounts. If you’ve missed the deadline, e-mail editor@high-profile.com for a free pass to the exhibit hall. You’ll find more information at www.abexpo.com or 800-996-3863.

Photo courtesy BisNow

Karen O’Malley, Andrew Zelermyer and Michael Feldman.

share with our readers in our October issue. At the same event, Goulston & Storrs real estate partners Karen O’Malley and Andrew Zelermyer are with Karen’s husband Michael Feldman, CEO of Harry R. Feldman, Inc. In an article on page 12 of this issue, Michael is quoted as saying that his survey business is up 15% over last year.

ASHRAE 100th

MassCEC

The Massachusetts Clean Energy Center (MassCEC) recently announced that the Bay State’s clean energy economy grew by 11.2% from July 2011 to July 2012. According to the 2012 Massachusetts Clean Energy Industry Report released recently, the growing sector now employs 71,523 people at 4,995 clean energy firms across Massachusetts.

BisNow

Michael Sears (center) with Bella Strings

Nicole DeBenedictis, Megan Lewis, and Steven Kelly of Timberline Construction High-Profile’s Michael Marvelli recently attended the BisNow Boston Retail Summit where he took a photo of Nicole DeBenedictis and Megan Lewis with their president Steven Kelly of Timberline Construction. We will have an update of the talk Steven presented at the summit to

Bridgewater State University Conant Science Center, Bridgewater, MA Payette

EnviroVantage Opens New Office

University of Massachusetts Integrated Science Building, Amherst, MA © Warren Jagger Photography / Payette

274 Summer Street Boston

Los Angeles

| Boston, MA 02210 | Tel: 617.423.7423 | Fax: 617.423.7401 New York

A special shout out to the people that helped us with the centerspread article on the ASHRAE 100th Anniversary Gala: Bob Persechini of RDK Engineers, Stacie Suh of Stebbins-Duffy, Inc., who also volunteers as editor of NorthEastAire the online ASHRAE publication for members, and Michael Sears of RDK Engineers, who was taking photos the night of the event and then provided them to us in quick time for our press date. Mike gave up his camera for the photo here with Bella Strings.

Philadelphia

www.high-profile.com

Princeton

Syracuse

Washington, DC

vanderweil.com

Westbrook, ME – EnviroVantage, a New England based firm headquartered in Epping, N.H., has opened a second office in Westbrook, Maine. Owner and President Scott Knightly commented, “Maine is an essential component to Envirovantage’s continued growth throughout New England. Having worked From Lubec to Kittery over the past 30 years, it was time to make the commitment to the state and its people by opening a full office and warehouse in Maine.”

Participating in the ribbon cutting ceremony are l-r: Vincent Marcisso, Tabitha Swanson, Scott Knightly, Alicia Papandrea and Hope Perkins


September, 2012

9

High-Profile: Educational Facilities News

Ann Beha Designs New England Conservatory Buildings Boston - The New England Conservatory of Music plans to construct two new buildings on its Boston Campus, both designed by Ann Beha Architects with Gensler Boston as associate architect. The projects were recently approved by the Boston Redevelopment Authority and are planned to break ground in 2013. Founded in 1867, the New England Conservatory of Music is the oldest independent school of music in the United States. Located in Boston’s East Fenway district, the Conservatory occupies 2.5 acres and offers undergraduate and graduate degree programs, a continuing education program, and a preparatory program for students ages 3-18. The core of the campus is Jordan Hall, an internationally-known con-

Gensler Associate Architect

Design Team for NE Conservatory Bldg.

Architect - Ann Beha Architects Pre-Construction Advisor - Tishman Construction Corporation Structural Engineer - Lemessurier Consultants MEP/FP Engineer - Altieri Sebor Wieber Landscape Architect - Carol R. Johnson Associates Civil Engineer - Nitsch Engineering Acoustical Consultant - Kirkegaard Associates Theater Consultant - Fisher Dachs Associates Student Housing Consultant - Brailsford And Dunlavey Food Service Consultant - Ricca Newmark Design Code Consultant - R.W. Sullivan engineering Lighting Designer - Sladen Feinstein Integrated Lighting

New student life and performance center and academic center

ing commons, the Conservatory’s superb library and archival collections, practice and performance facilities, and an opera workshop. Phase 2 will provide additional student and faculty resources, offices, practice rooms, and a black box theater designed for ensembles and for the Conservatory’s opera program. This $130 million project will create a vibrant new setting for academic and community life and will invigorate the Conservatory’s urban presence and cultural impact. These distinctly contemporary buildings symbolize the forward looking mission of the institution and its preeminence as a world class conservatory. The buildings are transparent, showcasing the activities and performances within, and, with the Conservatory’s historic buildings, form an architectural ensemble spanning two centuries.

cert hall, which was restored by ABA. These buildings will be the Conservatory’s first new construction projects in over 60 years. The design proposes an extensive transformation of the urban campus, removing two existing structures and installing extensive new streetscape and landscaping. A dynamic new image for the Conservatory will be seen on Huntington Avenue and on the famous southern edge, St Botolph street. Phase 1 is a new student life The Black Box Theatre and opera workshop will open and performance center accomonto St. Botolph St. modating student residences, din-

PLACE YOUR MECHANICAL SYSTEMS

UNDER A MAGNIFYING GLASS TO SEE IF YOU CAN SAVE MONEY W H I L E P R O T E C T I N G T H E E N V I R O N M E N T.

We’ve been green for over 100 years!

GET A FREE 3E INSULATION ENERGY AUDIT! Let the Mechanical Insulation Industry Professionals dispatch trained insulation professionals, using thermal cameras, heat guns and computer software, to detect the insulation strengths and needs of your facility and its mechanical systems. Using the detailed data that we obtain on site,

http://www.abphoto.com

we will then assemble and provide you with a detailed assessment of your insulation.

WE MAKE IT EASY! JUST VISIT

MECHANICALINSULATORS.COM/FREE & SIGN UP FOR A FREE 3E AUDIT TODAY! S AV E E N E R G Y ! S AV E M O N E Y !

Abbott-Boyle, Inc . 1 Mott Street Arlington, MA 02474

Tel. 781-646-0460 Fax 781-648-0396 Cell 617-930-1298

Providing quality service since 1971

www.high-profile.com


September, 2012

10

High-Profile: Facilites Development News

Boston Wharf Tower Breaks Ground Cornerstone Expands FoodState Facility Teams up with Stibler

Suffolk Construction CM for 20 Stories at Fort Point

Londonderry, NH Cornerstone Construction Company of Manchester is partnering with FoodState Nutrients (formerly BioSan Laboratories), maker of the MegaFood line of premium dietary supplements, to expand its New Hampshire manufacturing and warehouse Photo by Jodie Andruskevich) facilities. Looking over plans are (l-r) from FoodState, Richard Working with Stibler LaFond, VP of Research & Development; Robert Craven, Associates of Manchester, CEO; Elsa Pomberio, CFO; and Roland Martin, Cornerstone was hired to president of Cornerstone provide an analysis of Food to 11 Delta Drive. Approximately 15,000sf State’s space requirements and assess of the Delta Drive building was already bewhether the company should build, buy, or ing used by FoodState as a distribution cenexpand its current locations. Cornerstone ter and warehouse. Renovation of the buildsubsequently was awarded a design-build ing’s remaining 25,000sf will accommodate contract to renovate and build out a facility the increased production capacity. Boston Wharf Tower Rendering by ADD Inc at 11 Delta Drive in Londonderry. Completion of the work is expected FoodState is relocating its current dry by early fall. Boston - Mayor Thomas M. Menino; the first new high-rise multifamily project manufacturing facility from a Derry location BRA Director Peter Meade; Portland, Ore- in the Fort Point Channel area and is slated gon developers Gerding Edlen; restaurateur for completion by November 2013. Barbara Lynch; and Senator Jack Hart celA sister project at 63 Melcher will ebrated a groundbreaking on Boston Wharf feature 38 units of housing, including 27 Tower in Fort Point. The $100 million proj- innovation units for entrepreneurs, five afect will feature 202 rental units, including 22 fordable live/work artist spaces, and six top Boston - Colliers Meredith & international interior design and archion-site affordable units. The project also in- floor market rate units. It is scheduled to Grew was the project manager and Suf- tectural firm. cludes an off-site component at 63 Melcher come online in fall 2012. folk Construction general contractor for In preparation for The Fairmont Street with 27 units of innovation housing. Both Boston Wharf Tower and 63 the first phase of the renovation at The Copley Plaza’s centennial celebration, Boston Wharf Tower at 319 A Street Melcher are designed to maximize space Fairmont Copley Plaza. The architect is the hotel announced a complete restoraRear, in the heart of the Innovation Dis- and minimize energy usage, and both projParker Torres, a Massachusetts-based tion project, totaling over $20 million. trict, will be Gerding Edlen’s first Boston ects are expected to achieve minimum development. This 20-story tower will be LEED Silver certification.

Fairmont Copley Plaza Cuts Ribbon Suffolk Construction GC

Coast and Harbor provides high quality Owner’s Construction Project Management services to private, not for profit, and public owners Preconstruction Services

Government

Office

92 State Street, Boston, MA 617.523.8330

www.high-profile.com

Multifamily |

Construction Management

Healthcare

www.coastandharbor.com

|

Commissioning

Energy Retrofit

LEED Projects

500 New Jersey Ave NW, Washington, DC 202.715.1255


September, 2012

11

High-Profile: Facilites Development News

New Bank Branch for Lowell Five

Elevation of the future Lowell Five Bank

North Andover, MA - The Lowell Five Bank and NES Group have contracted with Jewett Construction Company, Inc. of Raymond, NH to build a new 3,150sf branch facility in North Andover, Mass. Work for the upcoming project includes concrete foundations and slab, landscaping, masonry and structural steel,

wood siding and trim, architectural millwork, insulation systems, synthetic stone, both EPDM membrane and shingle roofing, doors, glass and aluminum storefront and windows, glass and aluminum curtainwall systems, and all interior finishes including acoustical ceiling systems, ceramic tile, carpet, resilient flooring and painting.

Quincy, MA - J. Calnan & Associates, Inc. was recently awarded the preconstruction and construction management project for Parametric Technology Corporation (PTC). The project consists of the complete renovation of 320,000sf spanning multiple floors and buildings to PTC’s Needham Campus. Simultaneous and overlapping construction zones will have the campus undertaking an incredibly detailed phased restacking program. Included in the overall project will be new software labs and general office space renovations, amounting in large amounts of new usable space. The net reclaimed

15,000sf of lab space will be converted to general office use and programmed according to various department proximities. Various departments have also been reconfigured in an effort to maximize space efficiency, and a projected campus headcount growth of approximately 15% has been tested and incorporated into the program. The team includes Boston Properties, landlord; Spagnolo Gisness & Associates, architecture, A/E/C Solutions, project management; and AHA Engineering. The project is scheduled for completion in the fall of 2013.

J. Calnan to Renovate PTC Campus

Our mission: To provide a level of value, quality and service that is unrivaled in the construction industry.

Al’s Auto Ctr Renovated

Exeter, NH - Al’s Automotive Service Center has contracted with Jewett Automotive Design & Construction of Raymond for an extensive renovation of its Exeter facility. A groundbreaking was held on July 26. The project includes the demolition of interior offices and service bays to accommodate a new, upgraded floor plan consisting of new office space, service bays, wash bay, and storage areas, as well as additional tenant space. Work includes selective demolition, concrete foundations and slabs, new CMU masonry walls, Exterior Insulated Finishing System (EIFS), new EPDM roof, overhead doors, aluminum storefront glass,

Design by JSA, Inc.

and acoustic ceiling systems, as well as plumbing, HVAC, electrical work, and all finishes.

Ground Broken for U.S. Embassy

Boston - US Ambassador Barry B. White, along with other honored guests and foreign dignitaries, recently celebrated the groundbreaking of the EYPdesigned US Embassy in Oslo, Norway. Situated on a 10-acre site, the multi-building complex will include a chancery, an underground support annex, three entry pavilions, and Marine security guard quarters. The new Embassy will incorporate numerous sustainable features, Rendering of US Embassy in Oslo, Norway including a restored stream that will to meet nearly 100% of its heating load. become a key landscape feature and con- The new site is also located within 300 metribute to storm water management. Other ters of public transportation and includes sustainable features include a green roof on more than 45 bicycle parking spaces. The one building, use of natural daylight for en- facility is targeting LEED Silver certificaergy savings, and a ground-source heat ex- tion. change system that will allow the Embassy

MARR Restoration R e n o v a t i o n

Recently Completed Northeast Rehabilitation Hospital, Portsmouth, NH

Al’s Automotive Service Center groundbreaking

engineering I design erection I dismantling

Hydro Mobile: Masonry I Window Work Facade Removal and Replacement

North Branch Construction, Inc. (603) 224-3233 . FAX (603) 225-7165

www.northbranch.net

AERIAL LIFTS FROM 10’ TO 170’ SECTIONAL FRAME I SHORING SYSTEMS SCAFFOLD ROLLING TOWERS I TUBE & CLAMP SUSPENDED SCAFFOLD I DEBRIS CHUTES SCAFFOLD ENCLOSURES PEDESTRIAN PROTECTION HYDRO MOBILE MAST CLIMBERS

lullofboston.com

marrscaffolding.com www.high-profile.com


September, 2012

12

High-Profile: Facilites Development News

Feldman Support on Major Projects

Boston - Business is up 15% over last year for Harry R. Feldman, Inc. according to Michael Feldman, president and CEO. Its crew members find themselves on sites like Boston Wharf Tower, Liberty Mutual, Kensington, and Hayward Place. “Construction managers have been calling on us,” states Feldman. “We took over the layout services for The Innovation Center near Fan Pier and for the Consolidated Rental Car facility at Logan Airport.” Harry R. Feldman, Inc. provides ALTA/ACSM Land Title surveys and all other survey services to help clients achieve their projects’ goals including 3D laser scanning and Revit modeling. Recent projects include Dudley Square redevelopment of the Ferdinand Building, the redevelopment of the Herald Building, and the Historic Preservation of the Malcolm X House in Roxbury. “As you look at the Boston and Cambridge skylines, it is a great sight to see all of the cranes. And on many of these sites you will find a field crew from Harry R.Feldman, Inc.,” says Paul Foley, PLS a project manager at Feldman. “It is great to these projects come to fruition after all of the years that we have provided our services to support the design and permitting efforts.”

Hayward Place

Natick, MA - Callahan Construction and Avalon Bay Communities have hired Metro Walls, Inc. of Manchester, NH to be part of the team for the Avalon Bay Apartments in Natick, Mass. Metro Walls is performing all light gauge framing, sheathing, rough carpentry, and drywall. The Avalon apartments consist of 407 units split between two The Avalon apartments under construction high rise buildings. Units will range from studio apartments to two bedfill framing. This project has a demanding rooms. schedule, and Metro Walls has been working The building is designed with block at a very fast pace, completing at least a floor and plank structures and light gauge in- a week of interior and exterior framing.

Voke Lofts Groundbreaking

WinnDevelopment, Dellbrook, The Architectural Team

Kensington Tower

Liberty Mutual

What does BIM mean to you? BIM can be many things—green, integrated, a process, a technology. But all you care about is your BIM, your team and your clients. All we care about is making BIM work for you. • Revit, Navisworks and Facilities Management experts • Implementation, training, technical support—in person or online • IMAGINiT Clarity, Scan to BIM and IMAGINiT Utilities for Revit To get started or ask a question, call our Boston office at 506-663-1400 or visit us online at imaginit.com.

www.high-profile.com

Metro Walls Hired for Apt. Project

Worcester, Mass - WinnDevelopment, of Boston, announced the ceremonial groundbreaking and funding of Voke Lofts, a 116,306sf foot mixed-income residential building in Worcester. WinnDevelopment joined government officials in celebrating the opening of the sole housing component of the city of Worcester’s Gateway Park Master Plan. The Gateway Park Master Plan represents an innovative partnership between Worcester Polytechnic Institute and the Worcester Building Development Corp. to redevelop the 55-acre brownfield district next to downtown Worcester. The plan has resulted in $80 million worth of public and private investment funding to date. The Voke Lofts project will consist

of the preservation and adaptive reuse of the existing building at 34 Grove Street, formerly known as the Worcester Vocational Technical School. Once complete, the building will be comprised of 84 units of mixed-income multifamily housing, half of which will be operated as low-income rental units that will be restricted to households with incomes between 30% and 60% of the area’s median income. The Lofts will also feature amenities such as an onsite management office, a community room with a kitchen, a computer learning center, and fitness center and bike storage. Dellbrook Construction was named the project’s general contractor, and the architect of record is The Architectural Team, Inc.


September, 2012

13

High-Profile Focus: Educational Facilities News

New Haven, CT - The Gateway Community College in New Haven held a ribbon-cutting celebration in August. The Dimeo Construction Co. team was part of the collaborative effort in helping deliver the new campus designed by Perkins+Will. This is the largest CM-at-Risk construction project the state has ever undertaken and its first public building designed to be LEED Gold certified. The Dimeo team was also on hand for a topping-off at the new Visual & Performing Arts Center, designed by Holzman Moss Bottino Architecture / Amenta Emma, at Western Connecticut State University in Danbury. The new 134,000sf center for WCSU will house two primary teaching/

Dimeo Milestones on Recent Projects

Rendering of the Gateway Community College

performance spaces, a 350-seat concert hall, and a 350-seat proscenium theater, as well as multiple technical production and rehearsal spaces required to support these venues. The town of Grafton, Mass. held a ribbon-cutting ceremony on August 27 for the new Grafton High School designed by Symmes Maini & McKee Associates (SMMA). This new 186,000sf high school

Western Connecticut State University

Ruane Center for the Humanities

Rendering of Duxbury Middle and High School

Jonathan E. Reed School

Vernon Group Architects. The new school will be part of the 65+ acre St. George Street campus and be built behind the existing Duxbury middle school. It will replace the current Duxbury middle and high schools. The existing middle school will be demolished, and the area will be redeveloped with reorganized parking, improved vehicular path of circulation, as well as active and passive recreational outdoor space. The existing high school site will be redeveloped for the replacement of athletic fields displaced on the middle school site and will include parking, vehicular and pedestrian circulation, as well as a field house with restrooms, team areas, and concession area. The project is scheduled for completion in

will house 900 students, with a capacity to expand the population to 1,100. The project is located on the existing 46 acre high school site so great care and planning needed to take place to segregate the work site from the occupied campus. The Dimeo Team is currently under way with construction on the new 322,000sf, $104.7 million, colocated Duxbury Middle and High School, designed by Mount

Get to the top floor of the built environment.

the fall of 2014. The Dimeo Team also recently completed the new 76,000sf Jonathan E. Reed School in Waterbury, Conn., designed by Svigals + Partners, and began construction on the 63,000sf, Providence College - Ruane Center for the Humanities project in Providence, RI, designed by The S/L/A/M Collaborative.

76 Years And Going Strong Brick & Stone Restoration Repointing & Recaulking Concrete Repair & Protection

MASTER OF SCIENCE IN FACILITY MANAGEMENT Now enrolling for Fall 2012 New Hope Baptist Church Boston, MA

Abbot has set the standard for commercial, institutional, and condominium masonry restoration throughout Eastern Massachusetts since 1936. What this means to our customers is cost-effective single source solutions, quality workmanship, and consistent service on each and every project from small to large. Now transitioning to a fourth generation, our family-oriented management team can provide the knowledge, insight, and expertise our customers demand and deserve.

How Can You Afford Not to Choose Abbot? Wentworth’s new Master of Science in Facility Management (MSFM) was designed with Boston's leading Facility Management firms to prepare you for a leadership role running a hospital, university, stadium, or other key facility.

617-445-0274

EARN A SENIOR LEADERSHIP ROLE. START TODAY. • Multi-disciplinary, format designed in

collaboration with industry experts to meet IFMA accreditation standards

estimating@abbotbuilding.com

• Part-time 20-month program, built for

working adults

Call or email to learn more. 617-830-1170 | cpce@wit.edu 550 Huntington Avenue | Boston, MA 02115 | wit.edu/continuinged

274 Summer Street Boston, MA

www.abbotbuilding.com 28 Allerton Street, Boston, MA 02119 • HIC#166212

www.high-profile.com


September, 2012

14

High-Profile: Educational Facilities News

D.E.W. Completes UVM Redstone Lofts Eckman Building CC Student Center Williston, VT – D.E.W. Construction Corp. announced the completion of the Redstone Lofts project at the University of Vermont. Redstone Lofts, owned by UVM’s Catamount Housing, LLC., is the university’s largest on-campus student housing complex, with two UVM’s largest on-campus student housing complex. buildings and 403 beds, within 144 manage the buildings and rental agreements. units. The housing is a mix of studio, D.E.W. broke ground for the one-, two-, three-, and four-bedroom apart167,000sf buildings in April, 2011. Bill ments. The two buildings are joined by a Wolpert of Youkel was the architect. The common room called the Lantern. UVM’s project was completed in July 2012, ahead juniors, seniors, and graduate students are of schedule. eligible to live in the apartments. D.E.W. has registered for and anticiRedstone Development of Burlington pates LEED Silver certification. developed the project and will continue to

Wessling Selected for School Renos

Coddington School elevation MEP & FP systems throughout the building. The newly renovated 40,000sf space will feature city of Quincy school department administrative offices, city school information technology (IT), and city printing department. In addition, the renovated building will include a new meeting space for the public.

COLL ABOR ATE.

Quincy, MA – The design for the renovations of the Coddington School is under way. Wessling Architects of Quincy was selected to provide historic preservation, building envelope restoration, and interior design for this turn-of-the-century historic building. The Coddington School is one of Quincy’s finest institutional buildings, designed by Charles Brigham, one of Boston’s great architects. The Coddington School is individually listed in the State National Registers of historic places. The work includes masonry restoration, a new slate roof and copper detailing, new energy-efficient windows and doors, new interior finishes, and complete new

Lavallee Brensinger Architects

Rendering by Lavallee Brensinger Architects

Proposed Manchester Community College sudent center Manchester, NH - Eckman Construction of Bedford has been selected to serve as construction manager for a student center at Manchester Community College. Construction has begun on the 28,000sf renovation and addition project at the Front Street campus, Eckman’s third project at the school. The new space will include a large multi-purpose room with a full-size basketball court, a new kitchen with dining room, a function room, a student lounge area, fitness rooms, locker rooms; and offices for student organizations. An outdoor

courtyard will be created between the student center wing and the health education wing that Eckman built in 2007, and the two spaces will be joined by a second-story bridge. Construction is scheduled for completion in May 2013, with the building remaining occupied throughout the project. The first task, which has already been completed, was the relocation of the kitchen to a temporary location during construction. The student center was designed by Lavallee Brensinger Architects of Manchester.

The Sustainable Design Institute at the Boston Architectural College (BAC) announced that registration is open for its second session of the Fall Sustainable Design 2012 courses. October 22 - December 15 courses include: building envelope, daylighting and state-of-the-art electric lighting, energy modeling in building design, environmental systems, global perspectives on sustainable

ity principles, green residential remodeling and renovation, greening existing buildings, greening the city, high performance design and the LEED rating system, materials, resources and indoor environmental quality, sustainable design as a way of thinking and sustainable neighborhoods. Learn more and register at www.thebac.edu/green or call +1-617-585-0101.

BAC Courses design, green practice: energy and air qual-

w

We create working environments that encourage our teams and partners to work together as one. At Suffolk, we understand that working collaboratively is the reason why we succeed…and how we build smart.

RESPITE I THINK THAT THE ENVIRONMENT IS ONE VERY STRONG WAY TO COUNTERBALANCE THE CHAOTIC NATURE OF OUR LIVES. – Minoru Yamasaki

www.suffolkconstruction.com

www.high-profile.com

160 Boylston Street 3rd floor Boston, MA 02116 www.copley-wolff.com · 617.654.9000


September, 2012

15

High-Profile: Educational Facilities News

PARE Completes School Engineering Services Ai3 Architects

Lincoln, R.I. - Pare Corporation (PARE), a planning and engineering firm headquartered in Lincoln, completed engineering services for two new Massachusetts high schools that opened their doors to students this September. Designed and constructed under the Massachusetts School Building Authority’s Model School Program, the new $78.5 million, 255,000sf Natick High School and the new $83 million, 268,000sf Plymouth North High School are based on a similar design, yet uniquely customized for their communities and adapted to their respective sites.

Front view of Plymouth North High School

Natick High School entrance

Working collaboratively with a design team led by Ai3 Architects, PARE provided site/civil, geotechnical, environmental, traffic, permitting, and LEED documentation services for both projects. Each school required significant site feasibility analysis to fit the new buildings, parking, and athletic facilities on sites next to the schools they were replacing. In both

cases, additional parking and athletic fields are still to be constructed on the sites following the demolition of the old schools. A PARE-designed synthetic turf football/ multipurpose/track & field facility has already been constructed at each school in time for the fall football season. The 1,500-student Natick High School and the 1,225-student Plymouth

North High School will seek LEED certification based on their numerous energy-reducing and environmentally friendly features including green roofs, provisions for solar panels, rain-collection systems to collect and reuse storm runoff, and HVAC and lighting systems that sense room use and adjust automatically. Both schools were completed on schedule and under budget. At Plymouth North High School, the A/E team also designed an adjacent 18,000sf Senior Center for the Plymouth Council on Aging. The facility is scheduled to open by the end of the year. Established in 1970, Pare Corporation provides comprehensive planning, engineering, permitting, and construction-phase services throughout the Northeastern and Mid-Atlantic United States. The firm specializes in civil, geotechnical, structural, transportation, environmental, marine, dam, and municipal engineering. PARE also operates a fullservice branch office in Foxboro, Mass.

Photos of Roger L. PutnamConcrete Vocational High being School,installed Springfield, Massachusetts Architectural Precast Panels at Kent Hospital currently Medical under Officeconstruction Building.

WWW.CORESLAB.COM

PHONE 860-283-8281

Check us out on

YouTube!

Your single source provider for all your design needs. Coreslab Structures has advanced their manufacturing process of providing high quality manufactured Architectural and Structural Precast Concrete products to include Thin-brick faced precast, HighPerformance Insulated Walls, Ultra-High Strength Precast Concrete, Insulated Metal Stud Wall, “Liquidwall”™, as well as traditional structural precast products for all types of building sectors.

www.high-profile.com


September, 2012

16

High-Profile: Educational Facilities News

Alpine Environmental School Lead Paint Abatement

Milton Academy

by Ron Peik Imagine for a moment your oldest daughter is excitedly preparing for her first year at an independent preparatory school starting just after Labor Day. Your dreams for her future are coming to fruition. She will be able to be anyone she wants, do anything she wants. Then you get a letter from the school advising that due to a contractor not finishing the renovation of a dormitory on time, school opening will be delayed until mid-September. And, the cost of the year at the boarding school remains the same. Imagine for a moment that you are an administrator at the same school, you have met the family and know that the incoming student has two siblings who had shared their sister’s excitement and now her dismay. Part of your task is to find and bring to your school the candidates who not only will fill out your needed enrollment, but actually pay the many thousands annually that

Mt. Hermon School are needed to maintain the level of excellence you provide. Alpine Environmental has been performing needed services at institutions across New England for over 20 years and has consistently met every deadline and exceeded customer expectations on every project. This summer we worked on an emergency project preparing for the housing of the Match Charter Public School at one of the Bethel AME Church buildings. Many windows and woodwork in the Jamaica Plain structure on Wachusett St. were covered with layers of lead paint requiring abatement. We met the stringent deadlines with long shifts as well as weekend shifts. Just prior to submitting this article to High-Profile, Alpine Environmental was selected to perform lead paint abatement at four other institutions, all with the same issues and time constraints that we face at every school. Along with General Contrac-

Directed Research

Higher Ed/AEC Industry Collaboration

by Terry Paul Calhoun Once “hired” by a client, students in directed research initiate contacts, arrange meetings, prepare agendas, conduct online and in-person research, and prepare a draft report with an executive summary, detailed citations for reference, and an appendix for support and further information. Much of the research is industry based, conducted through interviews and site visits with project team members and other practitioners. In-person research is initiated by each student and builds confidence as well as long-term relationships through working with senior professionals. This practice-based approach prepares students to conduct independent research on real estate-related topics such as market studies, project finance and management, development team structure, legal and corporate issues, life cycle costing, sustainable design, public policy, and asset management. We also expect them to understand and integrate key topics they learned elsewhere curriculum. When our graduates leave the program they enter the job market armed with a real project to reference in interviews and a practitioner to use as a job reference. Terry Paul Calhoun is director of media relations & publications at SCUP.

Leslie Ellis School

tor C.E. Floyd, we worked at the Fairfield Country Day School in southern Connecticut and removed the many lead paint layers, repaired muntins, rails and stiles – restoring over 50 windows. Then with less than a month before the start of school, we answered the call to perform the lead removal services at three independent schools: The Leslie Ellis School in Arlington, Mass. and the Northfield – Mount Hermon School in Franklin County in Western Mass. Both of these institutions discovered lead paint problems that had to be removed prior to the start of the fall semester. Again we worked extended shifts and weekend shifts, not an uncommon requirement for such projects. Lastly, Milton Academy acquired a building near campus to house a faculty member and needed to be brought to healthy standards. Ron Peik is president, Alpine Environmental.

MAKING IT

• D/Bu • Cu M • Cu Sv • Dv

dIffIculT To GeT KIds bAcK IN The cAr sINce 1929.

Highbridge Hill Elementary School New Ipswich, NH Barker Architects, Inc.

Call Today to Explore Concepts, Budgets & Feasibility:

Call Lars Traffie: (603) 878-2300 everyThING else, we proMIse To MAKe eAsy. from planning and design to construction and compliance, o’Brien & sons simplifies every step of your playground project. We offer far more than just equipment. We offer generations of experience and a unique family approach to business. talk to us. once you see what we can do, you won’t want to leave either.

ElEmEnts for a GrEat outdoors.™

800.835.0056 obrienandsons .com

www.high-profile.com

.HuCu. P.O. Bx 257 | 810 Tuk R | N I, NH 03071


September, 2012

17

Lead Paint Abatement ◆ PCBs ◆ Mold Remediation

Complete Lead Paint and Restoration Services PCB’s ◆ PCBs Mold◆ Mold Leadquality Paint environmental Abatement Providing contracting for Remediation commercial

and Before

residential clients for Afterover 20 years. Providing quality environmental contracting for commercial and residential clients for over 20 years. Check our website As seen on... for details. Check our websi As seen on... for details. Phone: (978) 250-2740 - Fax: (978) 250-0565 21 Progress Ave, Suite #1, Chelmsford, MA 01824 Phone: (978) 250-2740 - Fax: (978) 250-0565 www.alpineenvironmentalinc.com 21 Progress Ave, Suite #1, Chelmsford, MA 01824 www.alpineenvironmentalinc.com ad Paint Abatement ◆ PCBs ◆ Mold Remediation

ding quality environmental contracting for commercial Four appearances on... and residential clients for over 20 years.

n on...

Check our website Check our website for details

for details.

www.alpineenvironmentalinc.com hone: (978) 250-2740 - Fax: (978) 250-0565 1 ProgressPhone: Ave, Suite #1, Chelmsford, (877) 527-4040 MA • 01824 Fax: (978) 250-0565 www.alpineenvironmentalinc.com 21 Progress Ave., Suite #1, Chelmsford, MA 01824 www.high-profile.com


September, 2012

18

High-Profile: Educational Facilities News

CTA Finishes Four, Starts Four

Waltham, MA - As the start of a new academic year approached, CTA Construction Co. Inc. last month handed over the keys to several new schools while at the same time starting as many new projects as it finished. Three school projects were on time and on budget for the start of the school year, with a fourth on schedule for completion later this fall. Meanwhile, CTA’s project teams were ramping up on four new projects, two set to break ground this fall. Tewksbury Memorial High School – The $52-million school covers 219,000sf. It features an impressive two-story, glass entryway and a full performing arts center with lighting, sound, and rigging systems. The project architect is Symmes Maini & McKee Associates. The second phase includes demolition of the existing, adjacent 175,000sf school for playing fields and parking. The building was occupied last month, and total project completion is slated for fall of next year. Weston High School Science Wing – A new science wing at Weston High School, built to meet LEED Silver standards, opened for classes last month. The $9.4 million project added 23,000sf of science labs that meet environmental standards and have state-of-the-art safety features. Overall, the project added seven new classrooms and expanded two existing rooms. In addition, a new fire suppression system now protects the entire existing school. Project architect is Dore & Whittier Architect, Inc. Parker Elementary School – The new $22 million school in Billerica is 89,000sf

science rooms, classrooms, media center, administrative offices, and a music suite. Renovations to the 118,000sf existing building included a new kitchen, bathrooms, accessibility code requirements, roofing, fire protection, plumbing, HVAC, and electrical systems. The addition and the majority of the renovation were turned over for SepSteel goes up at the Douglas School tember. Minor renovation work will continue through the end of 2012. The project architect is KBA Architects, Inc. Douglas – A new 83,100sf elementary school and the renovation of an 88,245sf middle school are under way in this $36.2 million project that kicked off last spring. The project also includes construction of a new roadway and athletic fields. CTA’s winning bid saved taxpayers $2.6 million off the proposed budget. The project architect is DiNisco Design Partnership, Ltd. Maynard High School - work progress Vinson-Owen Elementary School with a red-brick exterior and opened for the – The new 78,000sf school in Winchester start of the 2012-2013 school year. The proj- broke ground in the spring. The $20.7 milect architect is Symmes Maini & McKee lion, three-story, brick-clad school is being Associates. The second phase of the project built on the site of its predecessor, which includes the abatement and demolition of was demolished last year. Designed by the existing school to make way for park- Tappe Associates of Boston, the school will ing, and detention systems as well as a new feature a classroom wing, art, music and playing field. computer rooms, a media center, gymnaMarshall Simonds Middle School sium, cafeteria, offices, and multiple play– The $21.5 million project includes con- grounds. struction of a 37,000sf addition to include

ABA Designs Cornell U Reno

Courtesy of Ann Beha Architects

Phase 1 includes a new entry and lobby.

Ithaca, NY - Cornell Law School’s three collegiate gothic buildings include its landmark library and moot court, law clinics, and instructional, faculty, and staff spaces. Ann Beha Architects (ABA) identified a series of compelling opportunities to support and advance the law school’s academic agenda. Central to the plan is the sustainable repurposing of existing buildings; and the preservation of the law school’s historic resources and unique landscape. ABA has designed a three-phase approach for the renovation and expansion of the law school, preserving greenspace and strengthening campus pathways with carefully considered architectural and landscape initiatives. Phase 1, currently under construction, includes a new entry and lobby on College Avenue and a new below-grade Academic Center accommodating three tiered classrooms, gathering and break out spaces. Future phases include the reconfiguration of the law library to accommodate instructional, gathering and student life spaces. Phase 1 is designed to achieve LEED Gold and will meet the University’s criteria for sustainable annual energy use.

A Project Management Company MA (978) 687-7717

TRUST

NH (603) 898-6110

www.tridentgrp.com

LEADERSHIP

EXPERIENCE

COMMITMENT

Words used in defining our character in engagements with our Clients. Increasing demands, aggressive schedules, and constrained budgets – our Clients require nothing less than our superior project management, top quality personnel, experienced actions, and clear communications to allow for solid decision making on their projects.

Knowledgeable clients are choosing to engage Trident’s PROJECT ADVANTAGE GROUP. We stand ready to provide you with our best in class professional services as your Owner’s Project Manager.

Achieving Success Through Proven Expertise

www.high-profile.com


September, 2012

19

High-Profile: Educational Facilities News

DPM’s Current Academic Assignments

Newton, MA - In Western Massachusetts, diversified project management ( DPM) is managing the design and construction of a new, 400 bed residence hall at Westfield State University ( WSU). This $40 million project is the collaboration between the university and the Massachusetts State College Building Authority. The 135,000sf complex includes two major five-story buildings linked by sky corridors. The university was unyielding in its stance to create a building that contained a prominent iconic feature, and the element that was developed is a two-story dramatic tunnel which also creates the main entrance to the building off of the campus green. The dorm project, when completed, will give Westfield State the highest on-campus residency among the state system. The new hall is specifically designed to accommodate students that require physical and behavioral assistance. DPM coordinated the assembly of the design team and construction manager, managed the design process, and is currently overseeing construction. The project team included RF Walsh, GC; ADD, Inc, architect; MEP Engineers, BVH Integrated Services, Inc.; structural engineer, Odeh Engineering, Inc.; civil and geotech engineers, Tighe & Bond and commissioning consultant, WSP – Flack & Kurtz. The project is within budget and on time for fall 2013. Diversified is also managing the design and concentrated renovations to WSU’s Ely Hall. This $15 million program, funded collaboratively by the uni-

WSU University Hall versity and the Massachusetts State Col- space and 25% offices and noninstructional lege Building Authority, includes complete space. DPM was involved with specificaHVAC and electrical system replacement, tion of specialized medical equipment, connew roofs, windows, and doors, sections of ducting an inventory of existing FF&E, and new building façade, and interior renova- assisting with developing scenarios for new tions for a variety of departments. The ma- furniture. In addition, DPM reviewed and jority of the Phase I work is complete with verified the specified FF&E; assisted in its Phase II scheduled to wrap up in January procurement; and coordinated the delivery, of 2013. installation, and reuse and / or disposition Diversified’s Hartford office is cur- of nonusable furniture. DPM also planned, rently managing the FF&E coordination coordinated, is currently managing and and move management services for Gate- overseeing the relocation of the contents, way Community College’s new, state- programs, etc. from the existing campuses of-the-art campus on Church Street in to the new downtown campus. downtown New Haven. The $198 milThe project team included construclion, LEED Gold facility is 360,000gsf and tion manager and GC, Dimeo Construction consists of 75% instructional and student Company, New Haven, & Providence, RI;

architect, Perkins + Will, New York, and construction administrator - Gilbane Building Company, Glastonbury, Conn. Also in Connecticut, DPM has been hired by Connecticut College to provide OPM services for the renovation and expansion of New London Hall – the college’s oldest academic building. Built in 1915, New London Hall houses the life sciences departments including biology, botany, environmental science, and computer science. This project involves the renovation of the 25,500sf New London Hall and attached 3,200sf greenhouse, as well as the construction of a 13,60sf addition to the building. Upon completion, the building will feature 21 offices, five classrooms, seven teaching labs, and six research labs. Best practices of sustainability are being implemented with a goal of obtaining LEED Silver certification through the USGBC. Construction is now under way and is expected to be completed by the fall of 2012. DPM is providing staff augmentation for the existing facilities management department and is responsible for the management of the construction schedule and budget for the project. The project team includes GC, KBE Building Corporation of Providence; architect, Payette of Boston; movers, William B. Meyer; and engineers, Vanderweil Engineers of Boston. DPM has recently completed assignments at Rochester Memorial School, Hanover High School, Norwalk Community College, and KIPP Academy in Lynn.

Commercial • Institutional • Fine Residential • Irrigation • Stonewalls • Walkways • Terraces

Fine Residential

Princeton University Chemistry Building

Athletic Fields

The Work Force of Nature Current Landscaping Projects Include:

• Harvard Law School – Skanska • MIT Koch Center – William Berry • MGH – Building for the Third Century – Turner Construction • Temple Beth Elohim - Richard White Sons • Princeton University Chemistry – Turner Construction • Brown Creative Arts Center – Shawmut Design and Construction • Isabella Stuart Gardner Museum – Shawmut Design and Construction • Appleton Mill – CWC Builders • Russia Wharf – John Moriarty and Associates • Cambridge Rindge and Latin – Consigli Construction • Harbor Park Pavilion – Turner Construction • Dana Farber – Walsh Brothers • Dorchester Ave Improvements – McCourt Construction • Johnson and Wales University – Johnson and Wales • Linden Square Improvements – Federal Realty • Boston College Weston Jesuit Housing – Lee Kennedy Company • Logan Conrac Enabling – Suffolk Construction • IRS Modernization – Columbia Construction

ValleyCrest

Landscape Development

Telephone: 617-254-1700 • Fax: 617-254-0234 • 17 Electric Avenue, Boston, MA 02135 • www.valleycrest.com www.high-profile.com


September, 2012

20

High-Profile Feature: Kingswood Schools

W

North Branch Completes Kingswood School Projects

olfeboro, NH - North Branch Construction of Concord has completed the phased $43 million additions and renovations to the Kingswood Regional High School, Middle School, and Technical Center. Despite the challenges of working on an occupied school campus, North Branch completed this project for the Governor Wentworth Regional School District four months ahead of schedule. The architect for this project was CMK Architects of Manchester. This project has been called the “most complicated public school project in the history of the state” by the Governor Wentworth Regional School District Superintendent John Robertson. North Branch was already on site for Phase 1 building a new multi-purpose building, new synthetic and natural turf athletic fields as well as a geothermal ground heat exchanger (GHE) piping system to serve the entire campus. The $18.2 million multi-purpose building includes a 900 seat auditorium with classrooms and locker rooms. Phase 1 construction was completed in November 2010 and won the Award of Merit in Construction for the Institutional Over $10 Million category at the 2011 ABC NH/VT Excellence in Construction Awards.

CMK Architects

2010 and included major underground site utility reconstruction bringing the geothermal system (wells drilled in Phase 1) to all three schools. Over 300 construction workers were on-site daily when students left for the summer of 2011 school vacation. The high school and middle school schedules were fast-tracked in order to be ready for the 2011 fall semester. This two year project included 90,000sf of additions and nearly 270,000sf of renovations to the middle school, high school and technical center. All three schools were re-roofed and renovated. The high school underwent a total gut renovation, including asbestos abatement. The middle and highschools’ exterior façades were replaced, upgrading the thermal envelopes.

Aerial photo of Kingswood Regional Schools This project was built to meet the energy efficiency and environmental standards of the Northeast Collaborative for High Performance Schools (NECHPS State Funding for School Construction). Chip Krause of CMK commented that the preliminary results for total energy used by this facility is 40% less than other high performance schools. The techniques utilized for this energy savings are applicable to any building type. Phase 2 of construction began in June

Project Team for Kingswood Schools

Owner: Kingswood Regional Schools Construction Manager: North Branch Construction Architect: CMK Architects Civil Engineer: White Mountain Survey Co. Structural Engineer: Foley Buhl Roberts & Assoc. Mechanical Engineer: Yeaton Associates Inc. Electrical Engineer: Engineered Building Systems Acoustical Engineer: Acentech Inc.

Subcontractor for Kingswood Schools Glass and Glazing

Focus:

Educational Facilities Developments

Agostini Builds Norwood HS

241 Narragansett Park Drive, East Providence, RI 02916 Phone (401) 431-1200 Fax: (401) 431-0049

Compass Project Management CM, Ai3 Architect

w w w. b a c o n c o n s t r u c t i o n . c o m

Congratulations to North Branch Construction!

(above) gymnasium (below) auditorium

Norwood, MA - Agostini Construction Company of East Providence, R.I. along with Compass Project Management, Inc. of Medfield, Mass., the owner’s project manager, teamed up with the Massachusetts School Building Authority (MSBA) and Architectural Involution (Ai3) of Wayland to successfully manage, design, and build the new Norwood High School. The new high school was the first model built under the MSBA’s Model School Program...see story on page 32. (above) athletic field (top and below) Entrance to athletic center and performing arts center.

Norwood High School main entrance

Inside this Issue

September 2011

Windover Construction Completes Three School and College Projects BOND CM for UMass Fitchburg State Project Erland Tops Off New School Center with Robert Olsen + Assoc. LLD Designs, KBE Builds URI’s Hillside Residence Hall Profile: CTA Cements Place as Leading School Builder Cutler Associates’ Design Build Anna Maria College Holds Open House Oldcastle Precast Awarded Liberty Terrace Dormitory Featuring: BC Project Achieves LEED Platinum Tewksbury High School Tops Off UMass Lowell Begins Steel Erection

Library P.O. Box 7, Pembroke, MA 02359 Change Service Requested

Suffolk Construction Builds The Victor Luxury Apartments Pro Con Breaks Ground For Aviv Center for Living, KDA Architect Contracting Specialists Awarded Ground Breaking for Bristol Hotel Construction Starts on New Storrs Center Increasing Natural Gas Demand in NE by Douglas Pope MIT Sloan: Archieving Acoustical, Audiovisual, and Technological Success Colleges Carving out New Space on Existing Campuses by Julie Nugent

plus Connecticut Facilities, Heathcare, Green News, Awards, Multi Residential, Business News, People, Calendar and more...

Save Time - Save Money Advertise TF monthly Save 25% to 30% every month and receive a full package of benefits with the monthly TF (‘Til Finished) program. This is our most popular adveritising schedule because it’s simple, it saves money and it is effective.

What is the TF program?

The TF program has your ad appear each month both in print and online. The rate is automatically discounted each month to fit your budget for the year. Your advertisement is online and in full color., automatically hyperlinked to your firm’s website.

News is free but with the TF program-

Your news and articles receive preferred placement Your headlines appear on the High-Profile cover under “InsideThis Issue” Your articles are posted to the High-Profile Monthly blog Your headlines are e-blasted in FastFacts Friday

Aluminum Windows • Entrances Storefronts • Curtain Walls • Slopes & Skylights Aluminum Composite Panels 4 Aviation Drive, Gilford, New Hampshire. 03249-6600 Telephone (603) 528 - 4748 www.granitestateglass.com

www.high-profile.com

Call us: 781-294-4530 or e-mail: publisher@high-profile.com Why keep a low profile?


September, 2012

21

High-Profile Feature: Reggio Magnet School

Reggio School of the Arts Under Way

Newfield Construction CM - Designed by Friar Assoc.

A

von, CT - Construction recently started for the 67,000sf Reggio Magnet School of the Arts in Avon. Designed by Friar Associates Inc. of Farmington, this 450-student, pre-kindergarten through grade five school follows the Reggio Emilia educational philosophy. The main piazza forms the building’s central design theme. This gathering space acts much like the outdoor, old-world piazzas in Italy. Bringing the outdoor piazza inside allows both small and large gatherings to meet for presentations and other group functions. While also serving as a gallery to display projects and art, the piazza at Reggio Magnet School of the Arts provides circulation space between the classrooms, gymnasium, and cafeteria. True to the Reggio Emilia tradition, the classroom arrangement creates shared studio spaces – one per every three classrooms. Throughout the school, student projects and art retain importance with display cases, tack boards, and interior viewing windows throughout the building. The two-story structure complies with Connecticut High Performance Building standards. The design team incorporated energy-efficient systems and finish

Rendering of Reggio Magnet School of the Arts

materials with a high recycled content into the building, which assisted in attaining the required 28 points. Construction materials include a structural steel frame with a brick and stone exterior and PVC roof membrane. The brick detailing is reminiscent of old-world brick corbelling and features a low-relief brick sculpture on the front façade. As the construction manager, Newfield Construction of Hartford is leading the construction effort. This project is scheduled for completion for the 2013/2014 school year at a construction cost of $20 million. When the school is complete students and staff will enjoy a modern educational facility – one that utilizes building systems, technology, and architectural elements that facilitate learning and enhance the educational environment. Tom DiMauro, Newfield’s project executive, stated, “We are so proud to be under way, helping CREC to attain their vision of providing specialty magnet education to Connecticut’s children. We also look forward to working with the local subcontractor and M/WBE community to deliver this project.”

The piazza provides circulation space between the classrooms, gymnasium, and cafeteria.

Subcontractor for Reggio Magnet School Civil Engineer

Project Team for Reggio School

Owner: Capitol Region Education Council Architect: Friar Associates Inc. MEP: Friar Associates II LLC. Structural: Szewczak Associates Civil: Purcell Associates Construction Manager: Newfield Construction

Subscribe Now! complete this form and fax it to Subscriptions, 781-293-5821 Name_______________________________________ Company ____________________________________ Address_____________________________________ ___________________________________________ City,State & zip_______________________________

$58 $58 individual subscription for one year

www.purcellassocates.com

Engineering Quality Into Life

Civil & Site Structural Transportation Land Surveying

Connecticut 90 National Drive Glastonbury, CT 06033 860.633.8341 Massachusetts 50 Redfield Street Boston, MA 02122 617.288.0900

$116 corporate subscription (three individuals) for one year $125 To order your subscription using Visa, Master Card, Discover or American Express call 781-294-4530, 8 am - 5 pm.

www.high-profile.com


September, 2012

22

High-Profile: Educational Facilities News

Wakefield, MA - Recently, Beverly High School and the Abraham Lincoln Elementary School were honored at the State House with Outstanding Green School Awards. These were two of five schools in the commonwealth honored by the Green Schools Organization for transforming their learning environments. The Green School organization commended both of these schools for their green initiatives. This is the fourth year that the Green Schools organization has recognized outstanding schools and environmental leadership in schools and communities. Awards were given to schools, leaders, projects, environmental education, and efforts to improve waste management. Robin Organ, executive director and founder of Green Schools, highlighted each school’s sustainable green design elements. Originally built in 1965, Beverly High School was the picture of classic Californian style academic campus. Sprawling over five acres, the two-story school building had three academic wings, a field house and auditorium jutting off like spokes from a central corridor. At the time of its construction there was little consideration as to its energy efficiency, utilization of physical space, or of percentage of impervious surface. As the years passed, the school started to decay, the roof was deteriorating, and the school was no longer a building of which the community could be proud nor could it deliver top-quality education to its students. Under the threat of losing accreditation due solely to the deteriorating school

Schools Honored with Green Awards

Abraham Lincoln School proximately 160,000sf and media center, classroom spaces, and a recrenovations to the main reation area including a synthetic turf field core facilities, including and resilient track. The new facility conthe field house, cafeteria, tains high-efficiency systems and meets or auditorium, and music exceeds all Massachusetts CHPS requirespaces. Breaking ground ments. in January 2009, Beverly The Abraham Lincoln School has High School was complet- been designated a “Model School” by the ed on-time, under-budget, Commonwealth of MSBA’s Model School and targeted 41 points un- Program. This program was established Beverly High School Photovoltaic Roof der the Collaborative for to allow communities to reuse the design High Performance School of a successful, recently constructed elbuilding, Mayor William Scanlon took the ementary, middle, and high school. Model necessary steps to transform the Beverly Verification Program. Beverly High School is now a high schools contain optimal classroom space High School campus. He formed a “Green and are chosen by the MSBA for their efTeam,” comprised of Al Calcagno, proj- performance school. Abraham Lincoln Elementary ficiency, ease of maintenance, ability to ect manager, Heery International, Ricardo Anderson, assistant project manager, CTA/ School was completed in 2010. The city accommodate lower or higher enrollments Konover Construction, Arnel Catalan, asso- of New Bedford worked with Daedalus and the incorporation of sustainable green ciate principal, MVG Architects, and Paul Projects Inc., MVG Architects and its con- design elements. Districts in the state can Banks, principal, B2Q Associates; to ensure sultant team to design and develop a new now use the Abraham Lincoln Elementary that the new Beverly High School would re- facility that would provide the commu- School as a model for their new elementary flect today’s principles of energy efficiency, nity with a 21st century learning environ- school, modifying space and floor plans to ment. The new 93,833sf elementary school suit the goals and needs of their communisustainability, and smart growth. The school underwent a significant serves 600 students from kindergarten to ty. When communities use a model school transformation. Construction included a fifth grade. The building features an au- they can reduce both projects costs and new four-story academic addition of ap- ditorium, gymnasium, cafeteria, library/ completion time. Beverly High School

lOwER COStS!

PRINT A 24” x 36” COLOR DRAWING LIkE THIS FoR oNLY

let us your wide format printing

¢ 1.7

PER Sq FT*

Proudly Serving New England’s Design/Build Community Since 1980.

1980|2012

32 YEAR

ANNIVERSARY

Print | Copy Scan | Distribute your wide format drawings, blueprints and CAD files.

Common Features of these Three Amazing HP ePrinters • • • • • • •

Color touchscreen enables intuitive operation Web-connected, updates software automatically Rich, dark blacks, neutral grays, vibrant colors Fine, detailed lines & highly accurate drawings 160 GB hard disk Print files from USB drive, without a computer Print remotely from computer or mobile device

HP DesignJet t790 PS 24”

HP DesignJet T2300 eMFP PS 44”

• Print up to 2 A1/D-sized prints per minute • 8 GB virtual memory

• 2 Paper Rolls - Smart Switching • 1-Click Print, Scan and Copy • Scan sketches and hand-annotated drawings • Print up to 2 A1/D-sized prints per minute • Print up to 103 D-sized prints/hour • 32 GB virtual memory • 2 Paper Rolls - Smart Switching • 32 GB virtual memory

ASK FOR OUR CURREnt PROmOtiOnAl PRiCing!

BUY OR lEASE - CAll OR EmAil FOR

call 1.800.255.8012 sales@topazeng.com www.topazeng.com 35 Pond Park Road, Hingham, MA • 1.781.749.8687

www.high-profile.com

HP DesignJet t1300 PS 44”

gEnEROUS tRADE-in REBAtES UP tO $2,000*

FAntAStiC PRiCing

ON ALL NEW AND PROFESSIONALLY RECONDITIONED WIDE FORMAT SYSTEMS!

* Total ink and print head cost. Media cost is additional and can vary from 2.9 cents per square foot and higher depending on media type. Trade-In Rebate is based on an HP program and is subject to change without notice. Trade-In Rebate is dependent on model purchased and equipment traded-in. Call or email for complete specifications and product details. Lease pricing is for 60 month FMV lease. Taxes are excluded. Free Delivery and Installation apply to standard dock or ground-level delivery and standard installation. Topaz is not responsible for errors in content or pricing. Expires 8/31/12.


September, 2012

23

A MESSAGE TO THE MASSACHUSETTS CONSTRUCTION INDUSTRY

MA Court Rules: Solar PV Installations are Electrical PHYSICAL INSTALLATION of PV Systems Must Be Done by LICENSED ELECTRICIANS

A

July 2012 ruling by Suffolk Superior Court affirmed the long-held position of the Massachusetts State Board of Examiners of Electricians: licensed electricians and properly supervised apprentices must install solar photovoltaic (PV) systems with the assistance of other non-electrical building professionals as necessary. In August 2010, a contingent of solar companies without electrical licenses took legal action against the Board (John Carroll et al. v. Massachusetts Board of State Examiners of Electricians et al.), alleging the Board’s position kept them from advertising for and taking on solar PV projects out of fear of prosecution. The group sought a declaratory judgment that they, as so-called general contractors, are beyond the Board’s jurisdiction with respect to advertising and performing non-electrical solar PV installation tasks. WHAT THE RULING MEANS TO YOU The Court’s decision affirmed the following in regard to solar PV installations: • PHYSICAL INSTALLATION of solar PV systems MUST be done by LICENSED ELECTRICIANS. • INSTALLATION includes, but is not limited to: Linking individual modules, hardware, mounting brackets, grounding, installation of wires, conduits, apparatus, devices, fixtures, other appliances, etc., as mandated by M.G.L. Chapter 141. • General Contractors MAY advertise solar PV systems ONLY if subcontracting installation to LICENSED ELECTRICIANS. • General Contractors MAY perform NON-ELECTRICAL tasks within a project, including energy audits; applying for tax credits; consulting with consumers about renewable energy options; analysis of roof conditions, strength, wind effect and load; physical piercing, waterproofing and reinforcement of the roof; and purchase of PV panels and transport from warehouse to the jobsite. However, a LICENSED ELECTRICIAN is required for INSTALLATION. The National Electrical Contractors Association, the Massachusetts Electrical Contractors Association, the International Brotherhood of Electrical Workers, the Municipal Electrical Inspectors Association of Massachusetts and Rhode Island, and the International Association of Electrical Inspectors Paul Revere Chapter are fully committed to the safe installation of solar PV systems by licensed electricians, in collaboration with other construction professionals if needed. This message is brought to you by: National Electrical Contractors Association

Massachusetts Electrical Contractors Association

International Brotherhood of Electrical Workers

International Association of Electrical Inspectors Paul Revere Chapter

Municipal Electrical Inspectors Association of Massachusetts and Rhode Island

www.high-profile.com


September, 2012

24

High-Profile Feature: ASHRAE - American Society of Heating, Refrigerating and A

ASHRAE Boston Turns 100

B

oston, MA - The Boston Chapter of ASHRAE recently hosted the Region 1 Chapter Regional Conference at the Marriott Copley Place in downtown Boston. ASHRAE’s Region 1 is comprised of 15 chapters that are located throughout the six New England states plus New York and New Jersey. More than 150 active ASHRAE members and their families attended the conference. The three-day Chapter Regional Conference began on Thursday at noon and offered attendees seminars on building design and technical training, along with time built in to exPhotos courtesy M. Sears, RDK Engineers plore the city of Boston, complete with a Duck Tour and a guided trip to the Sheet Metal and Air Conditioning Contractors National Association (SMACNA) Boston site. As the conference came to a close on Saturday the 25th, there was a 100th Anniversary Celebration Gala. Approximately 600 people from local engineering firms, contractors, manufacturers, facility owners and Abigail Day, Ron Hayduk, Bob Preshini, Stephanie LaFontaine, Katy other professional societies joined in Shultz, RDK Engineers; Jennifer DeAmicis, M+W Group the celebration at this action-packed event. Dance music and entertainment from the Las Vegas rock string Preparation and planning for the gala took over a year, with ASHRAE quartet Bella Electric Strings wowed the crowd! Society President Tom Watson and many other Society dignitaries in attendance. Gala planners worked together on everything from menu choices to auditioning acts for live music to making sure they compiled photos that showcased everything that the Boston ASHRAE Chapter had accomplished in the past 100 years. RDK Principal Bob Persechini, who planned the event along with d former ASHRAE President Bill Garvey and Darcy Carbone of StebbinsDuffy, Inc., had this to say about gala: “Turning 100 years old is a major achievement for the Boston Chapter of ASHRAE. We are tremendously C ASHRAE Boston immediate grateful for the personal friendships and professional connections that all c Colonel Domenick Bill Reid, Urell, past president Patrick Duffy, of us have made as ASHRAE members and we enjoyed every moment we A. Garzone, Army entertainment BR+A with Tom Watson, Ed Fruth, Daikin McQuay; spent at the conference and gala.” Corps of Engineers sponsor ASHRAE Society Jim Dale, Daikin AC

HVAC

Plumbing Fire Protection

Davis Street Arts & Academics School, New Haven, CT

Design Assist

T G Gallagher Congratulates Boston ASHRAE Prefabrication

on its

100th Anniversary

Mechanical Prime

Design Build

www.high-profile.com

Mary M. Hooker Environmental Sciences Magnet School, Hartford, CT | LEED PLATINUM

CREATIVITY ▪ QUALITY ▪ EXPERTISE Connecticut · New York · New Jersey · Ohio Pennsylvania · Maryland

www.blcompanies.com | 800.301.3077 An Employee-Owned Company


September, 2012

25

Air-Conditioning Engineers Boston Chapter’s 100th Anniversary Celebration Gala

Boston 100th Anniversary Gala Committee (l-r) Bob Persechini, RDK Engineers; Teri Shannon, DAC Sales; Stacie Suh, Stebbins-Duffy Inc.; Stephanie Lafontaine, RDK Engineers; Jim Magarian, TMP Consulting Engineers Inc.; Steven Rosen, EYP; Mike Sconsoni, TMP Consulting Engineers Inc., Bryan Hermanny; BR+A, Jim Liston, Suffolk Construction; Dan Cooke, Engineered Solutions Inc.; Pat Duffy, BR+A; Dan Diorio, Boston College, Bill Garvey; Darcy Carbone, Stebbins-Duffy Inc..

Emery George, John Duffy, and Darcy Carbone; Stebbins-Duffy Inc.

During the event ASHRAE Boston chapter past presidents and outstanding members were recognized. Certificates of appreciation were presented to sponsors.

With Bella Strings (l-r starting 2nd to left), Terri Shannon, DAC Sales; Stacie Suh, editor NorthEastAire, StebbinsDuffy Inc.; and Stephanie Lafontaine, RDK Engineers.

With Bella Strings are Steven Tafone (MC), Suffolk Construction; Jim Magarian, TMP Consulting Engineers; and Bob Persechni, RDK Engineers.

100th Gala Platinum Sponsors (l-r) Bob Persechini, RDK Engineers; Darcy Carbone, Stebbins-Duffy Inc.; Steve Nicholas, Air Industries Inc.; Andrew Santella, APA - LLC; Rick McGinley, DAC Sales; John Duffy and Emery George, Stebbins-Duffy Inc.; Tom Trumbull, Trumbull Campbell Assoc.; Brian Hermany, BR+A

Engineering in the Boston Area for Over 60 Years

© Peter Vanderwarker Photography/Elkus Manfredi

© Jeff Goldberg/Esto/Ennead Architects

Congratulations ASHRAE Boston Chapter on its 100th Anniversary!

vanderweil.com BOSTON

Technology Services Central Plants Energy & Carbon Management Aquatic Life Support Systems Transmission & Distribution

HVAC/Electrical Engineering Plumbing / Process Engineering Fire Protection / Life Safety Commissioning Sustainability / Modeling

Participant of the

LOS ANGELES

NEW YORK

PHILADELPHIA

PRINCETON

SYRACUSE

WASHINGTON, DC

www.high-profile.com


September, 2012

26

High-Profile: Facilities Development News

BOND Completes Health Center

Quincy, MA BOND, a construction management firm joined local officials and residents to celebrate the completion of the new South Cove Community Health Center on Holmes Street in Quincy with a Participating in the ribbon cutting were l-r State Senator ribbon cutting and dedi- John Keenan, Mayor Thomas Koch, Board Member Dr. Stecation ceremony. phen Tang, State Rep. Tackey Chan, and South Cove BOND provided Executive Director Eugene Welch construction management gyn, behavioral health, optometry, and soservices on the $11 million, 21,000sf community health center. cial services The new building features eight peThe center has an existing patient base of diatric rooms, four behavioral health con12,000 that continues to grow at a rapid sultation rooms, expanded OB/GYN, denrate. tal operatories and an optometry suite. The This facility will allow for improved fourth floor has conference and meeting service to the city’s rising demand for room space, a learning center and a roof top multi-cultural medical services with exZen garden incorporating feng-shui design. panded services in pediatrics, dental, ob/

New Apts at Rosemont Square Pro Con GC

Randolph, MA - Construction is on schedule for three new apartment buildings located in the Rosemont Square community of Randolph. The new development will complement the existing 384 garden-style apartment units that are also undergoing renovations. Pro Con Inc of Manchester, NH is the general contractor for 120 new apartment homes. The community is being developed by The Praedium Group, a New York Citybased national real estate investment firm and its partner, Beacon Commu-

New apartment building at Rosemont Square

Brookstone Completes Project

Nashua, NH - Brookstone Builders, Inc. of Manchester recently announced that they have completed a renovation project at St. Joseph Hospital in Nashua. The project involved the upgrading of interior finishes at the hospital’s off-site Medical Arts West physicians’ office on Kinsley Street. All of the three-story building’s common areas,

including hallways, stairways, elevatorlobbies and bathrooms, were refinished with new ceilings, flooring, wallpaper and paint. In order to avoid any interruption of or interference with patient visits, the work was completed during evening and weekend hours, enabling the physicians to maintain a full schedule during the project.

Under construction nities of Boston. Davis Square Architects of Somerville is the project architect, and Stantec Consulting of Boston is the landscape architect. “We are installing the interior finishes, including cabinets and flooring, in the first building and expect the model unit

to be open in early August,” stated the project manager for Pro Con Inc. “We are on target for a September completion for the first building.” Each of the 840sf, one-bedroom apartments will feature a fully furnished kitchen with Energy Star appliances, washer and dryer, and individual balconies with sliding glass doors. Six of the units will be accessible apartments, and some units will have open kitchen floor plans. The new apartments will be located in three four-story garden-style buildings with elevators. Construction on the 120,000sf residential project began in December 2011. The first building will be ready for occupancy in September 2012; the other two buildings will be completed by the end of October 2012.

NEW Océ PlotWave 350 All-In-One Large Format Monochrome Copy • Print • System

50% Productivity increase 6 “D” prints per minute!

Oce Mobile WebTools enables printing and scanning workflows from mobile devices via Wi-Fi when on the same network Print from cloud services, e-mail or locally stored files on smartphone Retrieve scanned files from the controller inbox and share them via cloud or email

B.L. MAKEPEACE www.makepeace.com • (800) 835-0194 • sales@makepeace.com Give us a call or email for current promotional pricing!

www.high-profile.com

HP Designjet T2300 eMFP and ePrint & Share COPY • PRINT • SCAN

Canon MFP Series 22” touchscreen monitor Dedicated PC 40” color scanner COPY • PRINT • SCAN

Dual-roll 2 D-size prints per minute 2 D-size prints per minute


September, 2012

27

High-Profile: Facilities Development News

Awards to Green Communities

Amherst, MA - Energy and Environmental Affairs Secretary Rick Sullivan and Department of Energy Resources Commissioner Mark Sylvia recently presented more than $1.15 million in grants to fund clean energy projects in the towns of Amherst, Conway, Gill, Huntington, Northfield, Pelham, and Sunderland. In addition to the grants listed below, the towns will receive a certificate from the commonwealth and four road signs identifying them as an official Green Community. Receiving grants were: Amherst: $302,000; Conway: $139,650; Gill: $139,900; Huntington: $140,650; Northfield: $143,750; Pelham: $138,100, and Sunderland: $146,450 The grants are part of a package of nearly $2.75 million in funding to be given to the state’s 17 newest Green Communities. In addition to the seven communities receiving grants Monday, awards were made to Ashland, Auburn, Berlin, Great Barrington, Lakeville, Leominster, Richmond, Tisbury, Townsend, and West Tisbury.

By Stephanie Goldberg When we began our firm over a year ago, we spent time thinking about how we want to represent ourselves. The development of a clear identity was important for both expressing our uniqueness and solidifying the concept of our company. Likewise, the process of designing for a client is an opportunity to assist in clarifying their own sense of who they are and shape how they are perceived. We have found that many Stephanie Goldberg of our clients are looking to us to find this collaboration. As architects, we enjoy the challenge, and two very different projects show how such exploration can drive a design process. While working for a university client, we were commissioned to renovate a floor of a historic building, designed by a prominent architect. The client asked for an approach that would express the character of the building itself and which could be repeated as more floors were renovated. While focusing on the program for the occupants’ space and community needs was important, our design looked to capture the spirit of the original architecture and to reinforce the role of the building in the campus experience.

Tagline: Trade Gothic Lt Std

Forging Identity

Researching the architect’s design career, we found elements from his complete body of work, as well as from within the building itself which could be reinterpreted to create an identity that links the history of the building to an exciting new future chapter. Part of the enjoyment of the design process stemmed from learning with the client, as researching the architect’s work led to a fuller understanding of the importance of the building within a broader context. On a different scale, we recently began work for a newly emerging commercial client, who was looking for a design which strongly reinforced their vision. Their clarity of identity allowed us to assist in strengthening their brand through architecture. As the first impression of a place, the lobby and connected public spaces needed to embody the idea of the company in a dynamic fashion, allowing the balance of the space to be designed for more functional internal needs. Working with this highly collaborative client, we pursued several avenues, all of which expressed different aspects of their brand. This exploration allowed the team to decide what was most important about the company and was an excellent platform for the investigation of ideas, making for an enjoyable and interactive design process. Though on a tight schedule, spending time on the expression of the most prominent spaces was critical in subsequent design decisions, as their de-

velopment informed the rest of the project. It is interesting to us to find the connection between the iterative process with our clients and our own recent process of focusing our firm’s identity. Before even taking on clients, we sat down and went through not only options for our firm’s name, but how that would be expressed in print and on the web. Working with a graphic designer, we looked closely at how the focus of our work related to the visual expression of the company. Multiple options and concepts were created as we pursued ways of identifying who we intended to be. Paring those ideas down into one single expression was a way to solidify how we wanted to work as architects and how we would approach collaborations with future clients. We took away important lessons from that process, reinforcing the connection that architecture can make between self-expression and space. Through our recent work we have found that by looking with our clients at how they want to shape their spaces, we engage them in thinking about what is important within their company or campus. By working through different ideas and paring the design to a clear idea, we find architecture can shape not only space, but how we understand ourselves and where we are and want to be. Stephanie Goldberg, AIA, LEED AP is a principal at Life.Science.Architecture, Inc.

Life. Science. Architecture. LAB is a new firm that combines the knowledge and skill of a large firm with the energy of a startup. We have 20 years of lab design experience behind us, and use technology and strategic partnerships to bring an agile, focused and responsive approach your projects. Learn about our approach at labarchitectgroup.com

www.high-profile.com


September, 2012

28

High-Profile Cover Story: Rockland Middle and High Schools Dore & Whittier Designs, Agostini Construction Builds

R

John Rogers Middle School and Rockland High School

ockland, MA - Agostini Construction Company of East Providence, RI was selected as construction manager at risk by the Rockland School Building Committee in April 2010 to manage the $66 million construction of the new John Rogers Middle School and renovation of the Rockland High School. Agostini joined owner’s project manager Daedalus Projects, Inc. of Boston and Dore & Whittier Architects, Inc. of Newburyport, Mass. and South Burlington, Vt. to successfully direct the project through fi-

nal design, bidding, and construction. This project was designed for LEED Silver certification. Despite difficult economic times, Rockland residents voted overwhelmingly to support the replacement of their existing 84-year-old middle school and an upgrade of the town’s high school. A new 110,000sf middle school was attached to the front of the existing 162,000sf high school with a design that allows sharing of some core spaces while establishing necessary separation Construction of the middle school

New middle school and courtyard

Donald M Walter, AIA, NCARB principal Dore & Whitier Architects, Inc.

In progress

Steve Agostini president Agostini Construction and Robert Gilchrist, project manager at ribbon cutting event for the middle school started in January 2011 and was completed and opened to students as scheduled in September 2012. Renovation of the occupied high school also started in January 2011 with a phased renovation schedule. Phase 1 classrooms were occupied by students on schedule in September 2011 and the final phase of renovations will be completed in December 2012. The middle school is a three-story building with brick masonry and metal panel façade that presents expansive curtain walls and banks of windows to flood the classrooms and common areas with natural light. Programmatically, the school features state-of-the-art classrooms, modern science lab facilities, multiple computer labs, cafeteria, and gymnasium. Compelling and distinctive elements of the new school include a library/media center that will be shared with the high school, a multi-purpose Continued on next page

Project Manager

Helping to make the Rockland Public Schools dream a reality is an achievement we are proud of every day! Owner’s Project Management Services

Daedalus Projects, Inc. / 112 South Street / Boston, MA 02111 / 617-451-2717 / www.daedalusprojects.com www.high-profile.com


September, 2012

29

High-Profile Cover Story: Rockland Middle and High Schools Continued from previous page 140-seat lecture hall with the latest in audio/ visual technology, an enclosed courtyard with recycled glass walkway, and expansive common areas including an open courtyard and outdoor stage. The existing high school, constructed in 1958, expanded in 1969, and essentially in original condition, will be completely gutted and renovated. Windows, curtain walls, roofing, and metal panels will be new, and the existing brick masonry will undergo extensive patching and repair. Inside, the flooring, ground-face masonry walls, doors and hardware, ceilings, and porcelain ceramic wall tiles will be new as will the electrical, lighting, plumbing, fire protection, and HVAC systems. A renovated auditorium features a new orchestra pit, an attached chorus room, a new band room with storage and practice areas; the renovated gymnasium and locker room facilities include new fitness, trainer, and weight room spaces, and the kitchen and cafeteria are updated. New technol-

New shared auditorium ogy labs and home economics spaces have been included in the program, and extensive renovations have led to modern science lab facilities and upgraded computer labs, art room spaces, radio station, and cable TV studio. Removal and replacement of an existing rooftop photovoltaic system is included in the project. Following completion of the new John Rogers Middle School, the existing building will be abated of asbestos and hazardous materials and then demolished to

Project Team for the Rockland Schools

Architect - Dore and Whittier, Inc. Project Manager - Daedalus Projects, Inc. General Contractor - Agostini Construction Structural Engineer - Engineers Design Group, Inc. MEP / FP Engineer - Garcia, Galuska, DeSousa, Inc. HVAC Engineer - Garcia, Galuska, DeSousa, Inc. Civil / Site Engineer - Nitsch Engineering, Inc. Landscape Architect - Places Site Contractors Surveyor - Eastern Surveyors

New middle school corridor

make space for new parking areas. Exist- their staff facilitated effective teamwork. A ing limestone accent pieces from the exist- high level of cooperation and collaboration ing middle school main entrance were sal- was mandated and established on day one vaged and incorporated into the new middle and was exhibited daily as multiple owner school construction. requests and changes were expeditiously Sitework improvements include new managed and executed while impacts to the granite curbing, extensive concrete side- project were minimized. walks with integrated concrete pavers, and new paving, landscaping, signage, site lighting, bike racks, site benches and game tables, brick veneer planters, chain link fencing, and retaining walls. Tennis courts and basketball courts have been added to the school’s outdoor facilities. The success of this project has been exemplified by the consistent, on-schedule completion of the multiple phases of work and careful cost control that kept the project under budget through all stages of its development. An excellent working relationship between Agostini, the Walkway from middle school. Note the panel on the Rockland School Building Comwall preserved from the former middle school, “nulmittee, Daedalus Projects, Dore & Whittier Architects, the owner and la dies sine progress,” (not a day without progress).

Subcontractor for Rockland High School

Electrical

Lead by Example We believe in leading by example. At Griffin Electric, we’ve been doing that for over 34 years. We strive to be among the best in the electrical contracting industry by listening to the needs of our customers, offering cost-effective solutions, and delivering superior results. You can rely on us to take the lead on your next project. Corporate Headquarters: 116 Hopping Brook Road Holliston, MA 01746 (508) 429-8830 North Shore Community College Allied Health Building Danvers, MA

www.waynejgriffinelectric.com

Regional Offices: Charlotte, NC Raleigh, NC Duluth, GA Pelham, AL MA Lic A8999

www.high-profile.com


September, 2012

30

High-Profile: Connecticut Facilities Development News

Winchester Joins BL Board

Meriden, CT - BL Companies announced that Steve Winchester has joined its board of directors. Winchester started his career with McDonnell Douglas and then joined Black & Veatch, a global engineering firm, where he served in various capacities for 16 years, ending as the regional manager of the Pacific Northwest Region’s Water and Wastewater Business. He then moved to the engineering firm Psomas. In 2010, he formed his own firm, the Winchester Consulting Group LLC, to assist companies serving the water industry, including engineering, technology, and venture capital firms.

Winchester

Donations Protect Watershed

Torrington, CT - C.H. Nickerson & Company, a Torrington-based construction firm specializing in water and wastewater treatment construction, was recognized this week for its $2,500 donation to the Housatonic Valley Association (HVA), an organization that works to protect nearly 2,000 square miles of land and water throughout the Housatonic River Valley. Four other Connecticut and New (l-r): Robert Houlihan, president - Housatonic Valley Assoc.; Jason Nickerson, England-based construction companies director of development – C.H. Nickerson also donated $2,500 each, bringing the and Charles V. Firlotte, president and CEO total donation to $12,500. The donation Aquarion Water Co. triggered a $12,500 matching grant from Aquarion Water Company, making a grand ognized at a ceremony at Aquarion Water total $25,000. Company’s headquarters in Bridgeport. In addition to Nickerson, the other The Housatonic River flows 150 participating firms were: Burns Construcmiles from Hinsdale and Washington, tion of Stratford, H.D. Supply Waterworks Mass., to the Long Island Sound. The waof Bridgeport and New Britain, J.J. Brentershed includes hundreds of rivers and nan Construction of Shelton, and Tighe & streams throughout Connecticut, MassaBond Engineers of Westfield, Mass. chusetts, and New York. The five participating firms were recNEBFM Trade Show 2012, Booth #622

Here’s a top-quality, oNe-stop solutioN for all your roofiNg, paiNtiNg aNd carpeNtry Needs! Facilities and maintenance managers rely on Kelly’s ProPerty services to ensure their buildings are always weather-tight and looking their very best. call Kelly’s for: Shingle, membrane and slate roofing Windows, doors, siding, trim and flashing

All exterior envelope maintenance and repairs your inquiry or rfp is an opportunity for us to demonstrate our friendly attitude, solid craftsmanship and expedited installation skills.

Looking for durable, attractive floor & wall coverings, wood-work & coordinated interior finishes? Call KeLLy’S!

they’ve made Kelly’s a favorite for quality and value since 1989. ʼ

Property Services LLC

TM

Kelly’s property services 508-958-2196 | www.Kellyspropertyservices.com Kelly’s property services is fully licensed, insured and bonded in New england.

www.high-profile.com

Dan Kinard Promoted

Glastonbury, CT - Dan T. perience participating in, diKinard, P.E. has been promoted recting, and managing geoto associate principal at GZA technical investigations and GeoEnvironmental’s Glastonrelated engineering studies bury office. for a wide variety of facilities Kinard joined the comacross the US, Middle East, pany in October of 2009. Preand Caribbean. His areas of viously he was a senior projspecialization are geotechniect manager with Ocean and cal and foundation engineerCoastal Consultants, with prior ing for buildings, bridges, Kinard employment as vice president highway infrastructure, power of Haley & Aldrich. plants, wind farms, dams and He has more than 30 years of ex- levees, slope stability and stabilization.

Viking Scholarship Winner

Bridgeport, CT Erin Liberis of Stamford was selected as the first recipient of the new Viking Construction Education Scholarship. Viking president Anthony Gaglio, Sr., joined Anthony Gaglio Jr., Viking project manager, and Jennifer Di Renzo, member of Vi(l-r): Anthony Gaglio, Sr., Anthony Gaglio Jr. Erin Liberis, king’s Scholarship team, and Jennifer Di Renzo. to present the $4,000 Viking created the annual scholarscholarship award to Liberis, who is pursuship program as part of its efforts to suping a degree in civil engineering at Clarkport the next generation of construction son University in New York. professionals.


September, 2012

31

High-Profile: Connecticut Facilities Development News High-Profile: Connecticut Calendar AIA Connecticut

The AIA Connecticut Annual Conference - Two Days (Oct. 3 & Oct. 25) October 3, 2012 - New Haven Lawn Club, 193 Whitney Avenue, New Haven Program: Walking tours of new and old significant New Haven architecture; Hard Hat Tour of the new Yale University School of Management designed by Sir Norman Foster. October 25 - Educational Programs; Opportunities to network with event underwriters and sponsors. For more information please go to aiact.org.

CSA

September 19 8 - 9:30 a.m. The Connecticut Subcontractors Association invites you to attend a Finance/State Bonding and Grants Seminar. Hartford Square North Building in Hartford Kim Hawkins, the director of the Business Resource Center, will provide information to successfully maneuver through the often complicated process of obtaining a bond, estimating a construction project, getting financing, or applying for a grant. If you are a subcontractor in Connecticut this seminar should not be missed For information: www.brcct.com

CBC

September 24 Shuttle Meadow Country Club in Kensington The Connecticut Building Congress is holding its 17th Annual Robert J. LeFloch Memorial Golf Outing. The annual golf outing is the CBC’s main fund raising event. Proceeds will go to the CBC scholarship fund This year’s outing will again be an 18-hole shot-

gun start scramble with various contests, lunch, door prizes, and a buffet dinner with awards and raffle prizes. Registration is available online at www. cbc-ct.org.

Boroson Falconer Completes School Giordano CM

New Haven, CT – The New Havenbased architectural and engineering firm of Boroson Falconer, LLC announces the completion of its most recent project, Hill Central School. Located on Dewitt Street in the city’s Hill neighborhood, the public PreK8 school opened on schedule on August 29 with a projected enrollThe two-story main entrance corridor with skylights allows ment of 540 students. sunlight to the interior. The 77,500sf new construction proj“It is tremendously gratifying to create a ect, which replaces the former Hill Cen- new school that’s state of the art, energy tral Music Academy on the same site, was efficient, aesthetically pleasing and conapproximately $2.5 million under budget. structed significantly under budget. We The school’s heating and cooling will be always look forward to being present at the generated by a new central utility plant, first day of school to welcome the students that also provides supplementary power and staff to their new educational home.” via a fuel cell. The central utility plant also Hill Central is the fourth school deserves another school nearby. signed by Boroson Falconer as part of Designed to LEED Silver standards, New Haven’s $1.5 billion Citywide School the facility has been submitted for Energy Construction Program, initiated by Mayor Star Challenge certification, sponsored an- John DeStefano Jr. and Superintendent of nually by the US EPA. A unique quality is Schools Dr. Reginald R. Mayo, and overthe two-story main entrance corridor with seen by the New Haven School Construcskylights to allow sunlight to the interior. tion Program manager, Gilbane Building All of the school’s occupied spaces permit Company. Giordano Construction of Branviews to natural daylight. ford was construction manager. Principal architect Ken Boroson said,

Armed Forces Reserve Ctr Awarded KBE, DeRita and Kleinfelder Team Up

www.frankmonkiewiczphotography. com 617.868.9000 Award winning Armed Forces Reserve Center Farmington, CT - KBE Building Corporation has won a 2012 Connecticut Green Building Award of Merit from The US Green Building Council, Connecticut Chapter (CTGBC) for its Armed Forces Reserve Center in Middletown. The $54 million, 203,000sf center encompasses a training center, a vehicle maintenance facility, and a field equipment storage facility for the Connecticut National Guard and Army Reserve. In a joint venture with DeRita Construction, KBE building Corporation was the designBuilder, with Kleinfelder as the architect of record. The fast-tracked construction phase was completed in just 16 months,

even with permit delays and the removal of nearly 500,000 cubic yards of soil and rock from the site. The new Reserve Center features numerous “green” building measures, including a green roof, photovoltaic arrays, and high-efficiency heating and cooling systems. The Armed Forces Reserve Center project also won Best in Show from Connecticut’s Associated Builders and Contractors, Inc., as well as the 2012 Engineering Excellence Grand Award from the American Council of Engineering Companies and a First Place Award at the 2012 Connecticut Building Congress (CBC) 16th Annual Project Team Awards Banquet.

Receive FastFacts Friday Anastasia’s weekly networking e-blast. Get connected with the latest New England facility news headlines and events. Send your e-mail address to previews@high-profile.com for

www.high-profile.com


September, 2012

32

High-Profile: Facilities Development News

Top-Of-The-List Energy Conservation Measure

by Peter J. Davey The need to shift from dependency on fossil fuels to renewable energy resources has never been more apparent than it is now. This shift, no doubt, will take time, but conserving energy by reducing your building’s energy load is an immediate step in the right direction. Before replacing major systems in your building, finding ways to reduce the overall energy consumption could improve your botPeter Davey tom line in more ways than one. Installing a quality insulating low-e window film before investing in a new cooling system can make it possible to buy a smaller, less expensive system. Along with lowering your utilities expense, the reduced load is likely to extend the life of your existing system. For building owners and managers looking to increase their building’s energy efficiency and interested in going green, many 3M window films meet LEED energy and atmosphere prerequisites and qualify for LEED credits. Qualifying categories for credits include “Indoor Environmental Quality,” “Daylight and Views” and “Optimize Energy Performance.” In addition, the National Fenestration Rating Council (NFRC) has certified a range of the 3M™

Window Films. NFRC certification provides affirmation that 3M’s films meet rigid energy performance factors for windows. Featuring wavelength-selective metals which block more of the solar spectrum than conventional metals, many low-e window films manufactured by 3M can reduce air conditioning costs by blocking up to 73% of the sun’s heat. They also reduce heat loss by up to 30%. Patented construction enables their metal coating to reflect more interior room heat back into the room. Personal comfort is improved and reduction in drafts and fluctuations in temperature can generate considerable savings on fuel expense. As a 3M authorized window film dealer and member of their Prestige Dealer Network, American Window Film, Inc. can provide a comprehensive energy analysis that includes return-on-investment projections for large commercial customers. Many 3M window film installations pay for themselves within three years, conservatively. With energy costs high, return-on-investment arrives more rapidly. Post installation, a large 3M window film project consisting of 11,000 windows completed in April 2009, was tracked for its KWH savings. It saves 155,000 KWH per month, and payback period for the project was less than eight months. If your building is already equipped with low-e windows, 3M window films can enhance their performance. A low-e window can block up to 90% of UV radiation. After an installation of 3M window film, the same

window will block more than 99% of the UV radiation that contributes to a building’s heat gain and loss. In addition, by holding

ing air-conditioning costs while preserving the cosmetic integrity of a building’s windows. An innovative series of window films, the PresA low-e window can block up to 90% tige Series of films reject of UV radiation. After an installation of infrared without using metals. Metals can corrode over 3M window film, the same window will time in moist conditions and can block more than 99% of the UV radiation interfere with cell phone signals that contributes to a building’s heat gain and WiFi transmissions. 3M’s and loss. Prestige Series window films unconditionally guarantee against broken shards of glass in place, particular corrosion. They offer high optical clarity, 3M window films will improve the safety low reflectivity and incomparable perforof low-e windows that do not typically mance. They reflect and absorb 99.9% of protect against flying glass unless they are the UV light that fades fine furnishings, and tempered. Low-e windows do not ordinarily they do this by aligning more than 200 layreduce glare since most have a visible light ers of polymers in a total thickness that is transmission greater than 70%. 3M window less than one-half the thickness of one 3M films can reduce glare up to 80%. Post-It Note. Established in 1975, American WinUpon application of insulating, low-e dow Film, Inc. carries a line of 3M window window film, specifically designed to confilms that significantly reduce heat loss, serve energy, your bottom line will begin heat gain, and energy consumption while to improve immediately by reducing costly lowering utilities bills. An ISO9002 certi- heat gain and loss through your windows fied facility and $25 billion diversified tech- throughout the year, lowering your utilities nology company, 3M is recognized for its expense, and increasing the life expectancy outstanding accomplishments in reducing of your HVAC equipment. Additionally, greenhouse gas emissions through energy many films qualify for LEED credits and a efficiency. quick, clean, cost-effective installation can Additionally, 3M has responded to provide a rapid return-on-investment…a demand for a high clarity, non-metallic win- “top-of-the-list” energy conservation meadow film. 3M’s spectrally selective Prestige sure. Series window films reject up to 97% of the Peter J. Davey is president of Amerisun’s infrared heat (900-1,000 nm) – reduc- can Window Film, Inc.

cReative soLutions FoR ReaL estate Financing needs

Recently Closed Transactions

CREATIVE SOLUTIONS FOR CREATIVE CREATIVE SOLUTIONS SOLUTIONS FOR FOR $4,854,000 Purchase Loan REAL ESTATE FINANCING NEEDS REAL REAL ESTATE ESTATE FINANCING FINANCING NEEDS NEEDS CVS

COMMERCIAL COMMERCIAL COMMERCIAL DIVISION DIVISION Haverhill, MA DIVISION

LocaL & RegionaL expeRtise:

peRmanent LoansL:Loans ppeRmanent eRmanent oans ::

$4,000,000 Since 1994 the Commercial • Retail•Centers Retail RetailCenters Centers Division has been involved in Buildings • Industrial Industrial Buildings Buildings Refinance and• Industrial Working Capital Loan • Apartment Buildings arranging financing for Real LocaL & RegionaL expeRtise: • Apartment Apartment Buildings Buildings LocaL LocaL & R& egionaL RegionaL expeRtise expeRtise : :Pine Manor College - Agency & Conventional --Agency Agency && Conventional Conventional Estate related transactions. Since the1994 Commercial Division Since the Commercial Division Since1994 1994 the Commercial Division • Office• Buildings Office OfficeBuildings Buildings

has involved in arranging has been involved in arranging hasbeen been involved in arranging financing forfor RealReal Estate financing for Real Estate financing Estate related transactions. related transactions. related transactions.

Property types include: condominium construction, specialized properties. specialized specialized properties. properties. single family subdivision, office, retail, assisted living, hotel & RReLationships aRe ta het Bhe asis ReLationships Re t he Basis eLationships aRe Basis specialized properties. oo Fo usiness : : : F uR oouR FBo BuRusiness Business

americanwindowfilm.com

Relationships Are the Basis Of Our Business: Whether it is relationships with our capital sources or with our clients, we are constantly striving to improve our dealings.

www.high-profile.com

/ Condominiums / Condominiums • Subdivisions • Subdivisions Subdivisions / Condominiums Spec Houses Single Spec Houses • Single• Family SingleFamily Family Spec Houses

$800,000 Whether it isit relationships withwith ourwith Purchase &Loan Permanent Loans Loans Whether Whether is relationships it is relationships ourour • Construction • Construction Construction &&Permanent Permanent Loans capital sources or with our clients, capitalcapital sources sources or with or with ourour clients, clients, Medical Condominiums tax ettxempt BondsBB/onds tonds ax /ct weweareare constantly striving to to to ax ax exempt xempt /redits ax tax credits credits weconstantly are constantly striving striving improve ourour dealings. improve improve dealings. our dealings. Brookline, MA sBa sBa LsBa oansLoans oans WindW &ind soLar nergy W ind & sseoLar oLar eenergy nergy

Sid Spiegel Sid Spiegel Sid SidSpiegel Spiegel

Vice President - Commercial Division Vice President - Commercial Division Vice VicePresident President - Commercial - Commercial Division Division Phone: 781-684-5712 Phone:Phone: 781-684-5712 Phone: 781-684-5712 781-684-5712 Sid.Spiegel@NEMoves.com Sid.Spiegel@NEMoves.com Sid.Spiegel@NEMoves.com Sid.Spiegel@NEMoves.com rd Floor 52 Ave., 33rd 52Second Second Avenue, Floor, Waltham, MA 02451 52 52 Second Second Avenue, Avenue, 3rd 3rd Floor, Floor, Waltham, Waltham, MAMA 02451 02451 Waltham, MA 02451 Tel:NY 781-878-4540 NE NY NE Tel: Tel:781-878-4540 781-878-4540 NY Proof REal EstatE JouRNal Proof Proof REal REal EstatE EstatE JouRNal JouRNal

New Proof Proof Approved Changes New New Proof Proof Proof ProofApproved Approved Changes Changes

p 2”

3M™ Window Film Features & Benefits at

• Office• Buildings Office OfficeBuildings Buildings $1,800,000 • Retail•Centers Retail RetailCenters Centers cc anan Fc inance anyany Fan inance Finance any • Industrial Buildings • Industrial Industrial Buildings BuildingsLoan pp RopeRty stRuctuRe : :Refinance and Rehab RopeRty pRopeRty stRuctuRe stRuctuRe : • Apartment Buildings Property types include: • Apartment Apartment Buildings Buildings Property Property types types include: include: Lodging House condominium construction, singlesingle - Agency & Conventional condominium condominium construction, construction, single --Agency Agency && Conventional Conventional family subdivision, office, retail, family family subdivision, subdivision, office, office, retail, retail, MA LandBoston, cquisition /d eveLopment / construction LoansL: oansL:oans: La Land and acquisition cquisition /d /d eveLopment eveLopment / construction / construction assisted living, hotel &hotel assisted assisted living, living, hotel &&

p 2”

Access Video on

constRuction LoansL:Loans cconstRuction onstRuction oans ::

p 2”

can Finance any pRopeRty stRuctuRe:

Loans --Bridge BridgeLoans Loans Chestnut- Bridge Hill, MA


September, 2012

33

High-Profile Feature: Atkinson Family Practice

A

Atkinson Family Practice to Open New Offices

mherst, MA - Dr. Kate Atkinson, MD, a widely recognized Amherst family physician practice, began looking for a new office four years ago, and she found it was not easy to find buildings or land that were zoned for medical offices in Amherst. Atkinson persevered and finally broke ground for the new facility in April of this year, where she will be able to expand on the practice’s values of patient service, integrated practice, and disease prevention. Atkinson Family Practice, designed by Kuhn Riddle Architects of Amherst and being constructed by Wright Builders, Inc. of Northampton, is making headway toward a late-2012 move-in, approximately

family-centered care. Psychologists Susan Molano and Chaia Wolf will partner with the medical team to provide whole-person care to patients of all ages from newborn to elderly in this family practice. Kuhn Riddle Architects, onboard from the very beginning, designed this new 13,513sf building using sustainable components and building practices such as double wall construction, triple glazed windows, and VRV system heat pumps with energy recovery ventilators. Architects Ann Marshall and John Kuhn, along with their team, put together a unique and visionary facility, now more than mid-way into construction. Wright Builders joined the team to

Participating in the groundbreaking were (l-r): Linda Gaudreau; Juan Dominguez; Chet Mitchell, foreman; and Jon Harris, PM - all from WBI; Dr. Kate Atkinson; John Kuhn of Kuhn Riddle Architects; Mark Ledwell, WBI co-owner, Ann Marshall, KRA; Ann Ledwell, WBI; and Jonathan Wright, WBI Co-Owner.

Atkinson Family Practice, more than mid-way into construction.

Subcontractor for Atkinson Family Practice Testing & Inspection Soils, Concrete and Steel Construction

provide estimating, value engineering, construction, and construction management. Dr. Atkinson felt that “the pairing of Kuhn-Riddle and Wright Builders was a natural choice, given their impressive history of collaboration on the design and construction of sustainable homes and offices throughout the valley.” Rendering of Atkinson Family Practice The building also features a 34.662 kW DC solar photovoltaic sysfour months ahead of contract schedule. tem, designed to meet a substantial portion High on the facility’s requirements of the building’s power needs. The whole list is a sustainable, solar-powered environ- facility is designed to harmonize with the ment filled with natural light and healthy LEED Platinum certified headquarters of air for patients and staff. New England Environmental Services next The new facility will have ample door. room for medical-behavioral integrated

Project team for the Atkinson Family Practice Architect - Kuhn Riddle Architects General Contractor - Wright Builders, Inc. Structural Engineer - Monadock Engineering MEP Engineer - Lindgren & Sharples Fire Protection Engineer - Warehouse Mechanical HVAC Engineer - M.J. Moran, Inc. Civil / Site Engineer - Doucet & Associates Landscape Architect - Amherst Landscape Surveyor - Harold L. Eaton & Associates, Inc.

Allied Testing Laboratories Inc. Serving the Western Mass Construction Industry for over 40 years!

Full service laboratory staffed by engineering and technical personnel qualified to perform testing & inspections to various state and commercial building codes, military specifications, or client requirements.

A full service laboratory staffed by engineering and Specialized Testingqualified and Inspection technical personnel to performof Soils,&Concrete, Steel testing inspectionsMasonry to various&state and Member: Building Trades Association, Mass Dept.specifications, of Public Safety commercial building codes, military American Concrete Inst. or client requirements. Accredited By: CCRL & Corp of Engineers 115 ST. George Rd. Springfield, MA 01104 (413) 736-1846 Specialized Testing and Inspection of www.alliedtestinglaboratories.com

Soils • Concrete • Masonry • Steel Member: Building Trades Association, Mass Dept. of Public Safety American Concrete Inst. Accredited by: CCRL & Corps of Engineers

115 ST. George Rd., Springfield, MA 01104 (413) 736-1846 www.alliedtestinglaboratories.com

www.high-profile.com


September, 2012

34

High-Profile: Green Facilities Development News

Callahan Completes Green Arena

Aerial view of the Falmouth Ice Arena

Falmouth, MA - Callahan, Inc. of Bridgewater recently completed work on the new Falmouth Ice Arena. The state-ofthe-art, energy-efficient arena opened earlier this summer. Callahan provided construction management and general contracting services for the new facility. The $6 million project was funded entirely by private donors and supporters of the Falmouth Youth Hockey League. The rink was at its previous location for 40 years. The new location features a 50,000sf pre-engineered metal building and sits on seven acres. “We are always eager to work on projects that integrate the latest energysaving technologies and cost-efficient products,” said Joe Roche, project manager at Callahan. The arena features one full NHL rink and a half sheet studio rink. The building is powered by the sun, through an 890 kW solar panel field on the roof and carport canopies in the parking areas. Other energy

Commercial

Retail

efficiency technologies include: optimized heating, ventilation, and air-conditioning systems, heat recovery technologies and ondemand water heaters. The advanced water heat recovery system powers the under-slab heating, snow melting and heating for ice resurfacing. “The new cutting-edge arena is the only one of its kind in the region, using only half the power of similar arenas,” said Joel Irving, general manager of the arena. In addition to the solar and energy efficient elements, the arena features a number of added amenities. These include a 2,000sf fitness center, full service snack bar and concession kitchen, administrative offices, nine locker rooms, lobby with a fireplace and seating area viewing the ice, and a pro shop with skate rentals. The custom made bleachers were built above the team changing rooms, providing an excellent view of the ice. The arena holds close to 850 spectators.

Educational

Historic

Hospitality

NECA PV Installation Standards

Bethesda, MD – NECA 412-2012, Standard for Installing and Maintaining Photovoltaic Systems (ANSI) is now available from the National Electrical Contractors Association (NECA). This highly anticipated standard describes the application procedures for installing photovoltaic (PV) power systems and components. NECA 412 complements the National Electrical Code (NEC) rules with essential information about quality and performance aspects of the photovoltaic equipment that transforms solar energy into electric power. This installation standard covers performing site assessments, designing PV systems, and determining the correct PV equipment to install to ensure desired results, quality, and acceptable returns on investment customers expect. This NECA installation standard on photovoltaic systems is critically important, according to Michael Johnston, NECA’s executive director of standards and safety. He said, “We are excited about the renewable options solar power can provide customers of all sizes. However, photovoltaic installation is a type of electrical installation that should be always performed by qualified installers and qualified contractors, as required in the NEC. Customers should never forget that they’re essentially installing a power-generating station on their building. To protect the property and the occupants, they should always have a qualified electrical contractor oversee the installation.”

Healthcare

Municipal

Manufacturing

This new NEIS will assist professionals and contractors alike in understanding appropriate positioning of PV arrays, calculating the amount of PV needed for a given facility, and essential information related to necessary interconnections for interactive systems. NECA 412 is a must for organizations involved with providing solar photovoltaic power system installation and maintenance services. NECA 412 applies to the installation of low-voltage AC and DC photovoltaic power systems, rated 1,000V and less, for grid-connected and stand-alone operation for residential, commercial, and industrial applications. NECA 412 does not apply to solar heating systems or photovoltaic power systems rated more than 1,000V. For ordering information, call NECA at 301 215-4504 or visit http://www. necanet.org/store/products/index.cfm/ NECA%20412-12.

Industrial

Mixed-Use

Residential

Existing Conditions As-built Drawings 2-D/3-D 3-D Models & BIM 3D Laser Scanning Scan to BIM

Existing Conditions Surveys, Inc.

BOMA & Square Foot Calculations

Architectural Existing Conditions Documentation Boston/New England (Main Office) phone: 617.247.9161

www.existingconditions.com www.existingBIM.com

Providing Architects, Engineers, Building Owners and Real Estate Professionals with the most accurate as-built documentation and Building Information Models. We deliver drawings or models using your in-house office standard so you can begin working immediately upon delivery.

Boston

New Jersey

www.high-profile.com

Albany

New York

Philadelphia

Washington D.C.

Raleigh

Durham

Chicago

Palm Beach


September, 2012

35

High-Profile: PCINE News

Intermodal Transportation Center Completed Norwich CT - Groundbreaking for Phase 1 the Norwich Intermodal Transportation Center in Norwich began in July 2010, and the facility was completed on time and on budget in the spring of 2012. The precast concrete facility brings together several modes of transportation including cars, buses, taxis, and limousines. Strategically built on Hollyhock Island near Route 82, it will allow phase two to include future access to rail and ferry service. Designed by Domenech Hicks and Krockmalnic (DHK) of Boston and New York, the façade of the parking structure features a inlaid combination brick with

Designed by DHK

Norwich Transportation Center stone look. DHK chose an thin brick façade that uses thin slices of real brick placed on a form; concrete is then poured over them securing them, and producing a large finished panel. The result is almost impossible to tell from a traditional masonry structure. The benefit of thin brick precast concrete wall panels goes beyond aesthetic appeal to include expedient erection, low maintenance, and reduced

Photo credit: Blakeslee Prestress, Inc.

construction cost. The graceful stone arches over the windows are actually precast concrete that is cast in forms along with the thin brick inlay, producing one large panel that includes the window and is ready to erect. Precast concrete perimeter columns were designed to look like stone and used to eliminate corner joints and expedite construction. The resulting design has a look

of permanence that will endure into the future. The ability to cast forms into practically any shape provides architects with unprecedented design freedom. According to Bruce Hultgren, RA, AIA, “Precast concrete was used to maximize span lengths needed for the design, and its use shortened the construction schedule.” DHK worked closely with Blakeslee Prestress, CT, who produced all 393 precast concrete pieces for the project and erected them on the island and over an active street. The $21.8 million project has been in the works since 1995 and has finally come to fruition with a well conceived design that not only promises a new era in transportation for the area but will compliment future maritime traffic and travel into the harbor. This finished first phase is three levels, a total of 61,940sf, with 162 parking spaces; taxi and bus bays. Phase 2 is next, but certainly not another 16 years away, according to Mayor Peter Nystrom.

Project Team Intermodal Transportation Center: Architect: Domenech Hicks Krockmalnic General Contractor: Downes Construction Co. LLC. Precaster & Erector: Blakeslee Prestress, Inc. Engineer: Desman Associates

A Chapter of the Precast/Prestressed Concrete Institute NORTHEAST

A Chapter of the The use of precast Precast/Prestressed Concreteconcrete Institute in parking structures

allows architects and designers to go beyond simple design expectations.

In the Spring of 2012, phase one of the Norwich Intermodal Transporation Center in Norwich, CT, was completed on time and within budget. The precast concrete facility brings together several modes of transportation including cars, buses, taxies and limousines (rail and ferry service in phase two). Designed by Domenech Hicks and Krockmainic, (DHK) of Boston and New York, the exterior façade of the parking structure features an inlaid thin brick with a stone look combination. DHK chose this combination because of its aesthetic appeal, expedient erection, and low-maintenance benefits. According to Bruce Hultgren, RA, AIA “precast concrete was used to maximize span lengths needed for the design and its use shortened the construction schedule.” The 393 precast concrete products including; double tees and girder floor members, wall columns, wall panels were manufactured and erected by Blakeslee Prestress, Inc. of Branford, CT. See for yourself how precasters can help your bottom line by: • Suggesting value-engineering ideas • Assisting your design team in the completion of drawings • Developing firm pricing and schedules early in the design process • Providing an accelerated construction schedule and occupancy timeline

Photo: ©Blakeslee Prestress, Inc.

• Providing design solutions that satisfy structural and aesthetic requirements

Read the complete story on the Norwich Intermodal Transportation Center visit www.pcine.org /projects /parking. For more information on the benefits of precast concrete or to find a precaster in your area call 888-700-5670, or visit www.pcine.org.

On time and within budget with Precast! 12424_PCINE_Norwich_Intermodal_PS-Blakeslee_ad.indd 1

www.high-profile.com 8/29/12 2:34 PM


September, 2012

36

High-Profile Focus: Healthcare Facilities Development News

Pro Con GC for MRI Suite Fit-Up JSA Architect

Portsmouth, NH - Pro Con Inc of Manchester is building the fit-up of a medical office suite in the West Building at 155 Borthwick Avenue to accommodate a fixed magnetic resonance imaging (MRI) unit for Portsmouth Regional Hospital. JSA of Portsmouth is architect for the project. Pro Con Inc will reinforce the floor of the MRI room by pouring a new slab with steel columns and footings. The interior of the room will be encased with a copper shield, and a quench vent will be installed up through the core of the building. Plans call for the MRI to be craned into place through an exterior wall, requiring the exterior skin of the building to be removed prior to installation and then be rebuilt.

JSA Completes Hospital Labs

Portsmouth, NH - JSA Inc. recently completed renovation and expansion projects on two new hospital labs. Portsmouth Regional Hospital’s project involved the renovation and expansion of the original undersized microbiology, chemistry, Portsmouth Regional Hospital and hematology laboratoThe six month project is expected to ries and blood bank locatbe completed in late fall. ed in the hospital’s core. This is one of several medical ofIn order to maintain all fice fit-ups Pro Con has managed at 155 lab services unimpeded, Borthwick Ave. including a 7,000sf office fit-up for Beacon Internal Medicine and a 16,000sf fit-up for Portsmouth Regional Hospital’s Physical Therapy and Pediatric Rehabilitation Center.

Interior view of Portsmouth Regional Hospital lab

Boston Medical Clinic Completed Jones Lang LaSalle CM

Boston - Jones Lang LaSalle’s Construction team completed an interior renovation for Boston Medical Center in its Preston Family Buildings Center for endocrinology, diabetes, nutrition, and weight management on 732 Harrison Avenue, Boston. The $2.5 million project provides the community with a contemporary care facility. Jones Lang LaSalle is the construction manager/general contractor.

Patient treatment and common areas in the new 10,000sf hospital clinic on the second floor have been significantly upgraded. Features include: upgraded HVAC and electrical systems, new finishes, comfortable check-in and waiting areas, and other system upgrades and improvements on the existing floor. The construction work was multi-phased so as not to interrupt clinic operations.

PAV E R S B Y I D E A L

St. Raphael Parish, Medford, MA

The Solution to Stormwater Runoff is Right Under Your Feet Aqua-Bric® and Eco-Stone® Permeable Pavement Ideal permeable pavers offer built-in technology - the pavement and base act as a stormwater treatment system that reduces or eliminates runoff to reduce pollutants and improve water quality. ■ ■ ■ ■

High-strength 9000 psi pavement ■ Easy to clean and maintain Freeze-thaw and snow-plow safe ■ Qualifies for LEED® credits ADA compliant - firm, stable, slip-resistant Cost competitive to conventional pavements Ideal Concrete Block Company, Inc. www.IdealConcreteBlock.com Serving New England Since 1923

CALL 1-800-24-IDEAL FOR A PERMEABLE LUNCH & LEARN

www.high-profile.com

Frisbie Memorial Hospital’s renovated lab

construction was broken into four carefully planned phases. At Frisbie Memorial hospital the lab was redesigned and renovated, creating more efficient workflows within the existing square footage. Because the lab remained fully functional during construction, the renovation was conducted in three phases to eliminate any disruptions to critically needed lab services.


September, 2012

37

High-Profile: Awards

Boston Preservation Alliance 2012 Preservation Achievement Awards

Boston - The Boston Preservation Alliance recently announced its 2012 Preservation Achievement Awards: New Construction in Harmony with Boston’s Built Environment • Dudley B-2 Neighborhood Police Station; owner/developer: City of Boston Public Facilities Department; architect: Leers Weinzapfel Associates. • Liberty Wharf; owner/developer: Cresset Development, LLC; land owner: Massachusetts Port Authority; architect: Elkus Manfredi Architects. • Paul S. Russell, MD Museum of Medical History and Innovation at Massachusetts General Hospital; owner/de-

Photo by Kelly Thomas

Granary Burying Ground 1801 Paul Revere Bell at Old South Meeting House

Liberty Wharf

developer: City of Boston Parks and Recreation Department; landscape architect: Walker-Kluesing Design Group. Neighborhood Restoration Effort • Peabody Square Reconstruction; owner/developer: City of Boston Public Works Department; prime project consultant: Nitsch Engineering. Restoration of a Park, Landscape, or Natural Area • Statler Park; owner of plaza: City of Boston Parks and Recreation Department; owner of roads: City of Boston Public Works Department; architect: Halvorson Design Partnership. Rehabilitation/Restoration of a Religious Property • St. Cecilia’s Parish; owner/developer: Boston Roman Catholic Archdiocese; architect: Donham & Sweeney Architects

Isabella Stewart Gardner Museum

Aerial view of Statler Park Lighting Design in Harmony with Boston’s Built Environment veloper: Paul S. Russell, MD Museum of • Everett Square Theatre Sign; ownMedical History and Innovation at Massachusetts General Hospital; architect: Leers er/developer: Pat Tierney, Tierney Realty Group; architect: Bergmeyer Associates. Weinzapfel Associates. Integration of Preservation and New Rehabilitation/Restoration Construction Preserving Boston’s Architectural or • Faneuil Hall Visitor Center; owner: Cultural Heritage • Eustis Street Fire House; owner/ City of Boston; developer: National Park developer: Historic Boston, Incorporated; Service; architect: EYP. • Isabella Stewart Gardner Museum; Architect: Bergmeyer Associates, Inc. • 1801 Paul Revere Bell at Old South owner/developer: Isabella Stewart Gardner Meeting House; owner/developer: Old Museum; architect: Renzo Piano Building South Meeting House; architect: McGinley Workshop. Rehabilitation/Restoration of an Kalsow & Associates. Iconic Boston Landmark • Granary Burying Ground; owner/

www.high-profile.com


September, 2012

38

High-ProfileFeature: Hotchkiss School

L

The Hotchkiss School BioMass Facilty Nears Completion Designed by van Zelm Engineers and Centerbrook Architects, O&G CM

akeville, CT - O&G Industries, Inc. was contracted by the Hotchkiss School and is nearing completion of its new 16,500sf biomass heating facility. The new central heating facility will utilize wood chips in lieu of fossil fuel to support the school’s steam and hot water demands of the entire campus. Greenhouse gas emissions will be reduced by one third to one half, compared to the oil-fired boiler plant it replaces. Designed by van Zelm Engineers and Centerbrook Architects, the plant consists of two Messersmith biomass boiler units and a 17,500cf storage bin capable of

Southwest corner of the central heating facility

The vegetative roof right after installation in June

MEP Systems Engineer/Designer

www.high-profile.com

supplying a week’s worth of fuel. An oil fired boiler serves as further backup. With its low profile and curved, sloping green roof, the new building blends with its surrounding landscape. David Madigan, PE, LEED AP, and principal at van Zelm, states that the two biomass boiler units, operating at 82% efficiency, can generate 14 million BTUs per hour in the form of 60 psi steam. The units will burn waste wood acquired from sustainably harvested, (FSC) Federal Stewardship Council certified local forests, replacing some 150,000 gallons of fuel oil per year and saving approximately 95% of the campus heating requirements. The school will burn 5,400 tons of wood

chips will be burned by the School annually. Waste ash from the combustion is collected for use as a fertilizer, and an electrostatic precipitator will remove over 95% of particulate matter from emissions. The 48-foot chimney will disperse emissions into prevailing winds, reducing ground-level impact to almost zero. The project includes extensive buried steam/condensate and hot water piping to convert the new plant to the existing campus steam distribution system as well as the hot water heating plant for the Mars Athletic Center. Biomass heating is expected to reduce Hotchkiss’ carbon footprint by more Continued on next page

Mechanical Contractor


September, 2012

39

High-ProfileFeature: Hotchkiss School Continued from previous page than 6 million pounds of carbon dioxide per year. One of only three LEED certified power plants in the country, the new central heating facility attests to the Hotchkiss School’s commitment to becoming a carbon-neutral campus by 2020. The building will also serve this independent boarding school of nearly 600 students in grades 9 thru 12, as an educational mission, exposing its technologies and wood structure. Tours along the mezzanine balcony allow students and community groups to overlook the boiler room and examine wall-mounted charts and maps and interactive computer consoles that track performance data. Outside the plant, a nature path affords up-close views of the serpentine shaped green roof and a stroll

through the new rain gardens, bio-swales, and nearby wetlands. Jefferson B. Riley, Centerbrook partner in charge of the project, explained that they wanted a building that would, at once, establish itself as an iconic, seminal, biomass building and, more or less, disappear into the landscape in sympathy with nature. The building’s vegetated roof combines with the bio-swale/rain garden system to absorb rainwater and filter run-off, and is just one of its many sustainable features. Others include a renewable, laminated wood structural system; water-conserving plumbing features; use of local materials with a high recycled content; highly efficient mechanical systems, lighting systems, and exterior skin; and an abundance of daylight. Messersmith wood chip boiler No. 1 and steam piping

Maintenance and chip receiving overhead doors Upper plant mezzanine viewing area

Timber Roof System Contractor

Chip storage bays

Project Team for The Hotchkiss School

Owner: The Hotchkiss School Architect for Core and Shell: Centerbrook Architects MEP Systems Eng./Designer: van Zelm Engineers General Contractor: O&G Industries Civil Engineer: Milone & MacBroom Structural Engineer: DeStefano & Chamberlain, Inc. Mechanical Contractor: Modern Mechanical Systems, Inc. Timber Roof System Contractor: South County Post and Beam www.high-profile.com


September, 2012

40

High-Profile: Facilities Development News

Walpole Public Library

Vanderweil Completes Design

LLB Architects

Walpole, MA The Walpole Public Library is a rare new building sited adjacent to the town hall and historic Blackburn Hall and just steps away from downtown. LLB Architects had been working with the Walpole community since 2007 when it was asked to re-envision and improve upon a previous library design, acceptPhoto by Bruce T. Martin Photography ed for a construction The Walpole Public Library grant from the Mass. On the interior, service desks for cirBoard of Library Commissioners. After a long, 22 process and culation, reference, and the children’s area funding approval by a slim margin, the are centrally located for the highest viscommunity of Walpole can be proud of its ibility and security. One of the areas in the library that has grown in popularity is the new library. The design of the new 32,000sf quiet study rooms, designed with floor to building uses traditional architectural tex- ceiling glass, which allows for a sense of tures, colors, and fundamentals to respond privacy and territory, but a sense of secuto the New England context. The library rity as well. The building is expected to receive program is organized around four masses encased in fiber cement panels that anchor LEED Silver certification and makes use of the building’s entries. In between them, both passive sustainable strategies as well generous circulation paths, a sculptural as active strategies. Walpole’s new library, with a project staircase, and skylights create a feeling of openness and lightness. The difference in budget of $11.2 million, has been made treatment and fenestration on each side of possible by various contributions including the library appropriately responds to its site a generous grant from the MBLC, chariorientation and the environmental effects table donations from the community, and optimism from the taxpayers of Walpole. on them.

Electrical Construction s Fire Alarm s Special Projects s Tel-Data/Security Systems

Excellence in Electrical Construction… For More Than 90 Years

Museum of Fine Arts Boston, Massachusetts

1 92

1 ce Sin

Member of

Connecting Greater Boston to a Bright Future 267 Amory Street, Jamaica Plain, MA

www.high-profile.com

Tel: 617.522.6800

info@jmbco.com

www.jmbco.com

Interior view of completed Bright Horizons corporate headquarters Watertown, MA - Vanderweil, a Boston based full-service engineering firm, recently completed the design of Bright Horizons Family Solutions’ corporate headquarters located in Watertown. Bright Horizons is an employer-sponsored childcare, early education, and work/life solutions. Comprising space in three separate buildings at the historic Watertown Arsenal on the Charles River, the company’s corporate headquarters renovation project redistributes space within departments to provide a more efficient work environment. Vanderweil collaborated with Boston-based CBT Architects on the renovations to this 70,000sf corporate headquarters. Renovated spaces include new open and private offices, a new reception area, a “Town Square” conference center with

movable walls for flexibility and efficiency, multiple cafés, renovated core restrooms and relocated support spaces including mail sorting, copy/print, and circulation spaces. Both design and construction were phased to enable continuity of operations for Bright Horizons. As part of Vanderweil’s design, the existing MEP infrastructure was utilized to the fullest extent possible to reduce first costs and also minimize new materials required in support of sustainable practices. In addition to full MEP services, Vanderweil provided technology infrastructure services, including the consolidation of the tel/data spaces into a main network room. In addition, utility rebates for high-efficiency lighting and lighting controls were pursued for this office space.


September, 2012

41

High-Profile Feature: Home for Little Wanderers

Bowdoin Completes Little Wanderers Expansion Northstar PM - Roundel 47 Architects

W

alpole, MA - Bowdoin Construction has recently completed a major expansion project at The Home for Little Wanderers’ Longview Farm Campus in Walpole. Prior to construction, Bowdoin worked in conjunction with the home’s staff; Northstar Project & Real Estate Services, project managers; Roundel 47, architects; and Beals and Thomas, Inc., civil engineers, to provide extensive preconstruction services, including progress budgets, scheduling, phasing, and safety planning. New construction entailed four singlestory residence buildings, totaling 14,530sf, as well as a three-story 31,000sf addition to the Longview Educational Center.

The Home for Little Wanderers - Longview Farm Campus Now that the main expansion is complete, Bowdoin has begun a second phase of work to renovate the existing 16,000sf school building. In total, the project encompasses 62,000sf of new and renovated space featuring housing for 44 residents, a cafeteria, multiple classrooms, middle and upper school libraries, music rooms, and administrative offices, as well as upgrades to the existing gym and locker rooms and vocational classrooms. The project also involved a new entry drive, staff and visitor parking, improved septic system, improved storm water drainage/recharge system, new water service, and new landscaping. The project also involved a new entry drive.

Subcontractor for Home for Little Wanderers Roofing Commercial Industrial

“We Keep You Covered” Subcontractor for Home for Little Wanderers Acoustical Contractor

BRENNAN INTERIOR CONTRACTORS, INC. Excellence in Acoustical Ceilings

FAMILY OWNED AND OPERATED SINCE 1984

Quality Workmanship Supreme Customer Value Acoustical / Specialty Ceiling Installations Wall Panels / Fiber-Reinforced Plastic Installations Proud to be a part of the Bowdoin construction Team on the Home for Little Wanderers Project 127 Camelot Drive, Suite 2 Plymouth, MA 02360 (508) 830-3830 estimating@brennancontractors.com Visit us online @ www.brennancontractors.com

82 Sanderson Ave., Suite 104, Lynn, MA 01902

www.sontzroofing.com • 781-593-9300 www.high-profile.com


September, 2012

42

High-Profile: Facilities Development News

Affordable High Performance Lab.

Marshall Conant Science Center at Bridgewater State University

Continued from page 7

ventilation was utilized throughout the existing portion of the project building which ties into the operable windows. This particular system is very quiet and uses 100% outside air, resulting in a healthier environment for occupants as air is not re-circulated through the building. Not only did this system provide a healthier ventilation alternative but it does not require a return air system, which resulted in considerable cost savings. Chilled beams were utilized in the new wing of the project. In the entry, there was no space to run duct work, so a radiant floor was used with a chilled water system. The project building also uses solar thermal heating for hot water used within lab spaces. A large cistern was buried near the project site, which provides a space for reclaimed water to be kept for flushing.

This, combined with low-flow fixtures and a system designed to capture condensate and rainwater, helped reduce water use. Three main ingredients provided a successful project from an MEP point of view. First, a good working relationship with the architect, Payette. Second, a great contractor that was involved early on, Barr & Barr. And finally, and most importantly, an owner that was readily accessible by the engineering team, willing to entertain newto-them design concepts and set a realistic budget and objectives. As a result, the MEP portion of the project came in 20% under budget and Bridgewater has a wonderful new Science Center that fits their needs and is a showcase of sustainability. Suzanne Robinson, PE LEED AP BD+C heads up the sustainability department at Vanderweil Engineers.

Speedway Building Completed

Loudon, NH - Construction of a new utility service building for NH Motor Speedway in Loudon was recently completed by Jewett Construction Company, Inc. of Raymond. Completed on a tight schedule to accommodate the client’s full summer racing program, this project involved the construction and interior fit-up of a new, 9600sf multi-use metal building to house ambulances for track use, a vehicle wash bay for track vehicles, seasonal quarters for the owner and Speedway staff, and a Legends parts showroom and retail store.

New utility service building at NH Motor Speedway

Columbia Completes Restaurant

Boston - Columbia Construction Company recently celebrated the completion of Back Deck restaurant, a new “backyard cookout” spot in the Downtown Crossing neighborhood of Boston. As the newest addition to Boston’s Downtown Crossing area, Back Deck offers a laid-back, backyard grilling experience to its patrons. Boston’s new “backyard cookout” spot. Upon visiting, one will experience the warm throughout the dining room, as well as an ambiance of the space, which brings the open kitchen that invites guests to watch outdoors inside with such details as ex- the fun. terior carriage lighting and glazed brick

Painting / Plaster / Drywall / Renovation

EIFS EIFS

Stucco Stucco

Professional ProfessionalExterior Exteriorand andInterior Interior Construction ConstructionServices Services

Preventative PreventativeMaintenance—Fully Maintenance—FullyInsured Insured

1-800.722.6112 1-800.722.6112PropertyPro PropertyProRestoration Restoration www.propertyprorestoration.com www.propertyprorestoration.com

www.high-profile.com


September, 2012

43

2012 November 14–16, 2012 Boston Convention & Exhibition Center | Exhibit Hall C Conference registration is open! Register by October 31 for FREE ADMISSION to the Exhibit Hall and workshops discounts.

New name, new venue, same great experience. With more than 150 accredited workshops to choose from, the ABX conference program is built for architects, builders/contractors, facility managers, engineers, landscape architects and the like. Session tracks feature the region's brightest stars on topics ranging from Energy to Accessibility, Code to Residential Homebuilding and more. Get your credits for the year in one place, at one time.

Produced by the Boston Society of Architects

abexpo.com www.high-profile.com


September, 2012

44

High-Profile: People

Bergin Joins Triumph Modular

Littleton, MA - Triumph all construction disciplines at the Modular Corporation announced project site, maintaining the projthat Alfred P. Bergin, Jr. (AJ) ect schedule, and managing the has joined the company as site workforce. He will also implesuperintendent. He brings with ment and maintain the company’s him more than 20 years of expesafety policy. rience managing all aspects of For over 10 years, Bergin field construction projects across ran his own construction comseveral markets, geographies, pany, specializing in large scale building types, and materials. hotel renovations primarily in Bergin His expertise spans routine the New York area. Previously, capital improvement projects to he was with Hirsch Construction $350 million ground-up new construction. Corp. of Danvers, and Shawmut Design At Triumph Modular, Bergin will be and Construction. providing coordination and execution of Photo by Triumph Modular

New Leadership at Tecton

Hartford, CT - Tecton Architects announced its new leadership team with Ted Cutler, AIA, LEED AP as CEO and Jeff Wyszynski, AIA as COO. The appointments follow a successful second-generation transition of the 30-year-old firm from founding Principals Dave Foster and Peter Hentschel. Cutler joined the firm as an intern in 1994, became a principal in 2008, and was slated for COO at the onset of the transition. He sees Tecton’s success hinged on its ability to provide “good counsel, great results” regardless of project type or scope. Wyszynski joined Tecton in 2004 with solid academic design experience.

Cutler Wyszynski Like Cutler, he became a principal in 2008 and heir apparent to the role of COO. Wyszynski notes Tecton’s continued investment in both technology and its people as fundamental to the firm’s vitality.

Hamilton Joins BL Companies

Meriden, CT - BL Companies cility projects for electric and announced that Tom Hamilton has natural gas and is well versed joined the firm in its Meriden office in all the requirements and as senior project manager. interrelation of engineering, He has over 30 years of exenvironmental services, perperience in the energy industry that mitting, and regulatory comencompasses multiple engineering, pliance, and construction. construction management, and opHamilton will assist erational disciplines. He has comBL Companies’ clients in the prehensive expertise in high-level Northeast and Mid-Atlantic reHamilton program and project management gions. He also will be involved on complex engineering and conin the development and implestruction management projects for trans- mentation of BL’s growth strategy for the mission and distribution pipeline and fa- shale plays and overall energy market.

D’Angelo Joins Nadeau

Attleboro, MA - Nadeau Corporation announced that David D’Angelo has taken the position of project manager/ estimator. His responsibilities will include supporting projects from the estimating stage all the way through to ribbon cutting. D’Angelo is joining Nadeau after a long tenure across all industries including hospital, high rise, tenant fit-out, concrete foundations, telecommunications, wastewater, and sitework.

D’Angelo

D’Antona Principal at TCI

Marion, MA - TCI announced its newest principal, Jason D’Antona. Having spent the past 12 years as in-house senior electrical engineer for Partners HealthCare, D’Antona understands how clinical, research, and in-patient facilities are designed, operated, and maintained over the life of the systems. As a result, he will offer critical insight into TCI’s projects and facilities.

D’Antona

We Install, Service and Inspect “Peace of Mind” • INDUSTRIAL • INSTITUTIONAL • RESIDENTIAL • COMMERCIAL

We Are the “Green” Roofers! 1-888-5NU-ROOF

Fire Protection Specialists 24 Hour Emergency Service 1-800-422-4971

Proud to be a part of the Columbia Construction team on the Waltham Watch Factory project. (508) 753-0015 • 22 Canterbury Street • Worcester, MA 01610

www.cogswellsprinkler.com www.high-profile.com

Eagle Hill School in Hardwick, MA

All Your Roofing and Solar Needs 24 Hour Service 200 Mount Laurel Circle Shirley, MA 01464 Phone 978-425-0001 Fax 978-425-0002 www.nstarroofing.com


September, 2012

45

High-Profile: People

Hammond Joins Wentworth’s CPCE Metric Welcomes New Staff Members

Boston - Wentworth Instiin construction management and facility management. He will tute of Technology’s College of contribute to curriculum design, Professional and Continuing Edudevelopment, and assessment; cation (CPCE) announced that inadvise adult learners enrolled dustry professional Phil Hammond in CPCE’s graduate programs; joined its team as the new director and recruit and select industry of CPCE graduate programs. practitioners as adjunct faculty He brings 35 years of experimembers. ence, serving in private, public, and Hammond will also imnonprofit roles within the architecplement integrated marketing tural, engineering, and construcHammond plans and conduct on-going martion industries. Hammond will ket research of industry trends in play a key role in leading Wentworth’s newest master’s degree programs support of these graduate programs.

Precast Specialties Welcomes Duffel Boston - Precast Specialties Corp. announced that Brandon Duffel has accepted the position of senior project manager. His responsibilities will include managing and supporting projects for the company’s rapidly growing architectural group. Duffel brings many years of experience and a proven track record as a project engineer and project manager to Precast Specialties Corp. Most recently, he was the engineering manager for Coreslab Structures in CONN. He has extensive knowledge and expertise with both architectural and structural precast.

Duffel

Fort Point Hires Taras

Boston - Fort Point Project Management announced that Jordan Taras has joined the firm as project manager. In this role Taras will lead renovation and relocation projects for companies in the high tech, life sciences, and healthcare sectors. Her proven successes with clients like Sanofi Genzyme and Harvard School of Pub-

lic Health guarantee seamless transitions for employees moving to a new work space. Prior to joining Fort Point Project Management, Taras managed real estate projects at ViryaNet where she facilitated customer communications while managing all project budgets and resource allocations.

Boston - Metric Construction Corporation recently welcomed several new employees to the firm. Anthony Sanchez serves as Metric’s new senior project manager, bringing more than 30 years of experience in general construction to the team, including 20 years in project management. Formerly of Pacific Mills Industrial Complex, he is currently overseeing the construction of a retail center in Allston as well as two new apartment buildings in Boston. Ryan Mador recently joined Metric as an assistant project manager. Previously with National Millwork Co., Mador’s current position allows him to serve as a liaison between senior project managers and site superintendents. Currently, he is responsible for academic, luxury residential, and historic rehabilitation projects under Metric’s purview. Charles Burzlaff has more than 20 years in project management and construction supervision experience. With a variety of projects under his belt, including residential, assisted living, and institutional buildings, Burzlaff specializes in complex, large-scale construction. Previously at J&J Contractors, he is currently supervising the construction of an apartment building in Boston. Based in Maine, Michael Doherty of Cloverleaf Management is supervising construction of The Bay House, a mixed-use residential/retail complex on Portland’s historic waterfront. As a veteran of the construction industry, Doherty draws on 35 years of experience ranging from luxury homes to commercial and financial institutions. Kevin McGrath, formerly of TLT Construction joins Metric as a project su-

Sanchez

Mador

Burzlaff Doherty perintendent bringing over 25 years of experience in supervising and coordinating construction projects. He has worked on a variety of projects, including assisted living, residential, and institutional facilities. Currently he is superMcGrath vising the construction of the Allston retail center and will later oversee the rehabilitation of the 170-unit historic Charleston Chew mill outside of Boston.

BLAKESLEE BLAKESLEE Since 1958 we've been building

Precast, Prestressed Concrete Structures! Since 1958 we've been building Precast, Prestressed Concrete Structures!

CONGRATULATIONS TO DIMEO CONSTRUCTION CONGRATULATIONS TOofDIMEO CONSTRUCTION Glad to be part the Project Team Glad to be part of the Project Team

Blakeslee Prestress, Inc. Corporate Office: Blakeslee Prestress, Inc.

Route 139 ■ P.O. Box 510 ■ Branford, CT 06405 ■ P hone : 203.481.5306 Route 139 ■

Corporate Office: P.O. Box 510 ■ Branford, CT 06405 ■ P hone : 203.481.5306 Massachusetts Sales Office:

5 Mount Royal Avenue ■ Marlborough, MA 01752 ■ P hone : 508.486.9100

Massachusetts Sales Office:

CERTIFIED P L A N T

CERTIFIED P L A N T

www.blakesleeprestress.com ■ E-mail: rvitelli@blakesleeprestress.com MA 01752 ■ P hone : 508.486.9100 5 Mount Royal Avenue ■ Marlborough, www.blakesleeprestress.com ■ E-mail: rvitelli@blakesleeprestress.com

00000_Blakeslee_"Congrats"_Gateway_Com_College_ad.indd 1

00000_Blakeslee_"Congrats"_Gateway_Com_College_ad.indd 1

CERTIFIED ERECTOR

CERTIFIED ERECTOR

8/30/12 2:59 PM

www.high-profile.com 8/30/12 2:59 PM


September, 2012

46

SFNE

October 18 The Steel Fabricators of New England New Technologies Dinner Meeting. Doubletree Hotel, 5400 Computer Drive, Westborough, Mass. 5 - 6 p.m. registration, networking reception, sponsor visits. 6 - 8 p.m. dinner, new technologies panel discussion. The SFNE Education Committee has designed this dinner meeting program to provide members and colleagues with information about the latest technical innovations and systems that can be used in the steel fabrication business. Have the chance to learn about new technologies in the steel fabrication industry! To register and for more information log onto ssfne.org.

Boston Preservation Alliance

October 3, 5:30 p.m. Paramount Center, 559 Washington Street, Boston 2012 Achievement Awards The Boston Preservation Alliance presents awards to property owners and developers of exceptional preservation-related projects in order to celebrate their positive impact on Boston’s built environment. For more information: Christine Piontek, Membership and Programs Manager cpiontek@bostonpreservation.org or 617367-2458.

High-Profile: Calendar SEEA IIDA

September 20, 1 - 5 p.m. Sheraton Portsmouth Harborside Hotel, 250 Market Street, Portsmouth, N.H. The Steel Erectors Association of America (SEAA) is presenting an informative, educational seminar followed by a reception from 5 - 6:30 p.m. Sessions will include information on Rigger Safety and Signal Person Training requirements presented by respected SEAA member. There will be a session on indemnification language in construction contracts. October 4, SEAA’s 13th Annual Education Fundraiser Golf Tournament. Lonnie Poole Golf Course at North Carolina State University in Raleigh, N.C. Shotgun start begins at 1 p.m. after a group lunch. Players are invited to a celebratory dinner after the tournament. For more information go to SEAA.net.

NEWiRE

September 19 Mandarin Oriental Hotel, Boston - 12 p.m New England Women in Real Estate will host a global commercial real estate update luncheon program with Raymond Torto, Ph.D., CRE providing an update of the global commercial real estate market and discussing how Massachusetts fits into an international perspective. Free to NEWiRE members and $95 for non-members. For more information, visit http://www. newire.org/eventdetail.aspx?id=8597, email laura@newire.org, or call 617247-2346.

EMC

Space With A Soul October 30, Seaport World Trade Ctr. October 3, 281 Summer Street, Boston 200 Seaport Blvd, Boston The International Inte8 a.m. - 5 p.m. Free rior Design Association Forum 2012: Transform: will present its Annual Art IT+Business+Yourself Uncorked - a great way Get ready for EMC Forum 2012: This to kick off the fall season one-day conference aims to transform by viewing the amazing artwork of your tal- the way you see the future of IT, busi­ ented archi­tectural and design community as ness – and yourself. well as networking with your peers. Discover the knowledge, skills, and A portion of the proceeds from this event support that will transform you to meet will be donated to Extras for Creative Learn- the challenges ahead. ing (EXCL), an organization that provides For more information: visit EMC.com. low- or no-cost supplies for teachers, parents, artists, and other cre­ative professionals by keeping tons of materials out of landfills. For more information please go to iidane.org. Thursday, Sept 20 IFMA Health Care Institute will hold its healthcare seminar, Resolving Design Steel Day Facility and Financial Conflicts in HealthSeptember 28, 11 a.m. care. 605 Pittman Road, Curtis Joseph B. Martin Conference Center at Bay, MD Harvard Medical School Tour Of Cianbro’s Baltimore The Pechet Room, 77 Ave. Louis Pasteur, Fabrication Facility. Cianbro Boston is a major bridge, fracture critical, building 7:45 - 8:30 a.m.: Registration and Refreshstandard, AISC certified fabrication shop. ments Lunch is provided. 8:30 a.m. - noon: Program Long pants and closed toe shoes required In this half-day seminar hear from the top, for facility tours. Hard hat and safety glass- participate in dialogue that’s relevant. es will be provided. • Project Delivery Models Under MassaArchitects, engineer, contractors, students – chusetts Healthcare Reform all welcome! • Money Flow Impacts on You Under For more information: Alex Huddleston, Healthcare Reform ahuddles@cianbro.com, phone: 443-400- • Lessons Learned from ADA Settlements: 10 Steps to Reduce Exposure. 8246 Or visit: www.SteelDay.org/SteelDayReg- Register online @ www.squarefootage.net or call 503-274-7162. istration.

IFMA

AISC

COMMERCIAL SOLUTIONS FROM THE MARVIN FAMILY OF PRODUCTS From precise replication of historic profiles to high performance applications, Marvin Windows and Doors’ solution-driven approach has made us an industry leader in non-residential settings. Let the Marvin Family of Products' broad network of design and technical experts help you craft the perfect window solution for your next project. The Dining Hall at Deerfield Academy required major renovations after a fire. Proposing a unique solution of Marvin Double Hung Magnum windows as insert windows and matching all site lines, we were able to meet the historic needs of the building. View a video on the renovation project of the Dining Hall at Deerfield Academy.

www.awhmedia.com/deerfield Deerfield Academy Dining Hall Deerfield, MA Architect: Thomas Douglas Thomas Douglas Architects, Inc. of Northampton, MA

www.high-profile.com


September, 2012

47

Even the students were smiling as they headed back to school at these beautiful new buildings—engineered by PARE!

Pare Corporation provided site and stormwater design, traffic engineering, field design, utility connections, geotechnical services, environmental site assessments, permitting, and—in some cases—structural design for these facilities.

ENGINEERS LINCOLN, RI 401-334-4100

SCIENTISTS PARECORP.COM

PLANNERS FOXBORO, MA 508-543-1755

www.high-profile.com


VERMONT

48

September, 2012

1795 Willston Road Suite 200 South Burlingston, VT 05403 P 802.863.1428 F 802.863.8955 MASSACHUSETTS

New Business Contact: 260 Merrimac Street lpdore@doreandwhittier.com General info@doreandwhittier.com Dore & E-mail Whittier is a New England based architecture and www.doreandwhittier.com project management firm. The firm established in 1992 has a current staff of more than 40 professionals collaborating across two regional offices.

Building 7, 2nd Floor Newburyport, MA 01950

General E-mail: info@doreandwhittier.com P: 978.499.2999 F: 978.499.2944

VERMONT 1795 Williston Road Suite 200 South Burlington, VT 05403

R

ockland, MA - Agostini Construction Company of East Providence, RI was selected as construction manager at risk by the Rockland School Building Committee in April 2010 to manage the $66 million construction of the new John Rogers Middle School and renovation of the Rockland High School. Agostini joined owner’s project manager Daedalus Projects, Inc. of Boston and Dore & Whittier Architects, Inc. of Newburyport, Mass., and South Burlington, Vt., to successfully direct the project through..see page 28.

The firm’s philosophy and operP: 802.863.1428 ations are based on three simF: 802.863.6955 ple yet critical elements. Design. Performance and Leadership. By combining these critical eleMASSACHUSETTS ments and the staff’s consider260 Merrimac Streeet able expertise, Dore & Whittier Building 7, 2nd Floor is uniquely qualified to help cliNewburyport, 01950 241 Narragansett Park Drive, East Providence, RI MA 02916 ents achieve their visioin as the Phone (401)from 431-1200 Fax: (401) 431-0049 firm guides projects initial P: 978.499.2999 concept to completion. F: 978.499.2944

w w w. b a c o n c o n s t r u c t i o n . c o m

Lecture hall

www.high-profile.com Walkway

Several hundred Rockland residents gathered recently for the ribbon cutting of the new middle school. In the background is the original high school, built in 1928, that became the middle school when Rockland built the new high school in 1958.


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.