Installation procedure, general Joystick
HCU secondary station
EVC system tachometer
Helm steering unit
Controls Neutral switches
Auxiliary dimmer unit (ADU)
Instruments
NMEA
Key switch EVC system display Y-split
Relay, external accessories
Y-split steering
Y-split
Y-split Y-split Key switch
Extension cable
Y-connector
Fuel level sender
PCU port
Relay
HCU stb Tachometer/ instruments, stb engine
PCU stb
Standard bus cable
Sync. cable, to stb engine HCU, secondary station
EVC control panel
HCU port
Extension cable
Auto pilot
Diagnostic connection
Rudder sensor, not used
Steering unit (SUS)
Y-connector Steering unit (SUS)
Steering signals cable
Fresh water level sender
Fresh water level sender
Gear shift cables
Propulsion unit
SUS power supply cables Propulsion unit
NOTE! The nodes are always located close to the components they control. A power train node, the Power train Control Unit (PCU), is located in the engine room. A helm node, the Helm station Control Unit (HCU), is located close to the helm station. Cables and connectors must never be located where they are exposed to water. Locate the electrical equipment far from heat sources. Choose cable lengths to minimize the number of connectors and never locate a connection in a non accessible area.
NOTE! You are not allowed to build network in a way that branches will be formed. Bus cables with branches longer than 0.5 m (1.6 ft) cannot exist in an EVC system. Also please refer to the Building a network. Requirements chapter for more information. IMPORTANT! Always make sure that the locking mechanism between the male and female connectors closes with a click. This guarantees a water-tight correct closure. IMPORTANT! Only use grease on gear shift solenoid and power supply connections. Other connections should not be greased.
25