
1 minute read
Y-4 Electric Switch Adjustment
1. 4th/top boom full retraction detection limit switch
Adjust the switch position so that its contact is shifted (opened/closed) when the top boom section is extended/retracted beyond the position where it is 5-8 mm (0.2-0.31 in) longer than its fully retracted length.
2. 2nd/3rd boom section full retraction detection switch
1. Adjust so that the switch turns OFF at the position when the No. 1 telescoping cylinder is extended 3 mm (0.12in).
2. After adjusting, apply screw locking agent to the nut and tighten it.
3. Jib lock pin detection proximity switch
Adjust the switch position so that the dimension A becomes 4-5 mm (0.16-0.2 in) with the jib stowed.
(*1): Apply the screw locking agent (Three-Bond 1401 or the equivalent).
4. Over-front detection proximity switch
Fully retract the boom and swing it to the over-front. Then, adjust the switch position so that the dimension A becomes 2.5-3 mm (0.1-0.12 in) and the dimension B becomes 1.5-2.5mm (0.06-0.1in).
(*1): Apply the screw locking agent (Three-Bond 1401 or the equivalent).