Disassembly of AML Main Unit
3. Removing CPU Board/Analog Board /Power Board
[NOTICE]
Do not touch each front and rear face of the boards by hand when removing the boards.
1. Remove the screws (a) and take off the front panel and display board as an assembly from the main unit case. Remove the screws (c) and take off the rear panel and connector board as an assembly from the main unit case.
3.1 Notes on ROM/EEPROM Replacement
[NOTICE]
EEPROM stores the adjustment values for each specification number. When replacing the CPU board, remove the EEPROM from the broken CPU board and reuse it.
When replacing ROM or EEPROM, make sure that the concavities of the IC and socket meet each other.
2. Remove the screws (f) and separate the CPU board. Then, remove the spacers (h) and take off the analog board and power board as an assembly from the main unit case. Remove the nuts (g) and separate the analog board.
IW301-0151J24
INFORMATION AND DATA (TS-75M-1)
INFORMATION AND DATA (TS-75M-1)
AML model: AML-LIID
AML code No.: 361-919-50100
1. Setting before adjustment
2. Detector adjustment
Precautions for adjustment
(*1) Adjust the center of dispersion to coincide with the adjustment value.
(*2) Adjust the boom angle and the moment in the boom lowering operation.
(*3) Adjust the swing angle in the clockwise swing operation.
(*4) Before adjusting the moment, set the number of part lines to the standard number (four parts of line) for fully-extended boom, and set the boom status in the AML setting to "Boom."
INFORMATION AND DATA (TS-75M-1)
Boom length: Fully extended Moment (*2)(*4) Span fine adjustment
Boom angle: 10±0.1° (indicated value)
Load: Without load
Hook block: Hoisted down close to the ground surface.
3. Setting after adjustment
- Setting of number of part lines: Not set
- Language variation: Not set
0.07 t (Hook block mass) ±0.01 t
INFORMATION AND DATA (GT-250C-1)
INFORMATION AND DATA (GT-250C-1)
AML model: AML-LIID
AML code No.: 361-923-60000
1. Setting before adjustment
Head-off
2. Detector adjustment
Precautions for adjustment
Capacity setting
Applicable Serial No. : From JA0034 △ 1
(*1) Adjust the center of dispersion to coincide with the adjustment value.
(*2) Adjust the boom angle and the moment in the boom lowering operation.
(*3) Adjust the swing angle in the clockwise swing operation.
(*4) Before adjusting the moment, set the number of part lines to the standard number (four parts of line) for fully-extended boom, and set the boom status to "Boom" and the number of part lines to "Four parts of line" in the AML setting.
(A hook block with 25 t capacity is to be used.)
INFORMATION AND DATA (GT-250C-1)
Boom length: Fully extended Load radius: 7 m (actual value) Load radius adjustment Rated lifting capacity: 6.50 t 7
Boom length: Fully extended Moment (A hook block with 25 t capacity is to be used.) (*2)(*4) Span fine adjustment
Boom angle: 25±0.1° (indicated value)
Load: Without load (0.25 t 1 0.27 t hook block only)
Hook block: Hoisted down close to the ground surface.
3. Setting after adjustment
- Setting of number of part lines: Not set
- Language variation: English
INFORMATION AND DATA (GT-350C-1)
INFORMATION AND DATA (GT-350C-1)
AML model: AML-LIID
AML code No.: 361-925-10000
1. Setting before adjustment
2. Detector adjustment
Precautions for adjustment adjustment position: Rear (right swing)
(*1) Adjust the center of dispersion to coincide with the adjustment value.
(*2) Adjust the boom angle and the moment in the boom lowering operation.
(*3) Adjust the swing angle in the clockwise swing operation.
(*4) Before adjusting the moment, set the number of part lines to the standard number (four parts of line) for fully-extended boom, and set the boom status to "Boom" and the number of part lines to "Four parts of line" in the AML setting.
Boom length: Fully retracted angle: 80±0.1° (indicated value)
Load: Without load (0.39 t hook block only)
Hook block: Overwound
Boom length: Fully extended radius: 8 m (actual value) block mass minus Wire rope mass) ±0.14
INFORMATION AND DATA (GT-350C-1)
Boom length: Fully extended Moment (A hook block with 35 t capacity is to be used.)
(*2)(*4)
Span fine adjustment
3. Setting after adjustment
Boom angle: 25±0.1° (indicated value)
Load: Without load (0.39 t hook block only)
Hook block: Hoisted down close to the ground surface
0.39 t (Hook block mass) ±0.01 t
- Setting of number of part lines: Not set
- Language variation: English
Checking the Detectors (TS-75M-1)
Checking the Detectors (TS-75M-1)
1. Boom Length Detector
1. Retract the boom fully, set the boom angle to 0 ° , and set the PTO switch to "OFF."
2. Measure the resistance of the potentiometer.
Checking at the connector of the detector
Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows:
C-D: 833±167 Ω
B-D: 698±140 Ω
2. Boom Angle Detector
1. Retract the boom fully, set the boom angle to 0 ° , and set the PTO switch to "OFF."
2. Measure the resistance of the potentiometer.
Checking at the connector of the detector
Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows:
C-D: 833±167 Ω
A-D: 146±29 Ω
Checking at the CN1 connector of the AML
Pull out the connector of the swing angle detector. Then pull out the CN1 connector of the AML and measure resistance of the potentiometer. The specified resistance values are as follows:
2-1: 833±167 Ω
3-1: 698±140 Ω
Checking at the CN1 connector of the AML
Pull out the connector of the swing angle detector. Then pull out the CN1 connector of the AML and measure resistance of the potentiometer. The specified resistance values are as follows:
2-1: 833±167 Ω
4-1: 146±29 Ω
Checking the Detectors (TS-75M-1)
3. Pressure Sensor for Moment Detection
1. Set the PTO switch to "ON." (5-V DC will be applied between R and B of the pressure sensor connector.)
2. Measure the output voltage between W and B of the pressure sensor connector.
33
32
3. The output voltage between W and B is proportional to the pressure in the elevating cylinder. The specified value is as shown below.
Checking the Detectors (GT-250C-1)
Checking the Detectors (GT-250C-1)
1. Boom Length Detector
1. Retract the boom fully, set the boom angle to 0 ° , and set the PTO switch to "OFF."
2. Measure the resistance of the potentiometer.
Checking at the connector of the detector Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows:
Applicable serial No. Up to JA0217
Resistance value
C-D: 833±167 Ω
B-D: 477±95 Ω
Checking at the CN1 connector of the AML Pull out the connector of the swing angle detector. Then pull out the CN1 connector of the AML and measure resistance of the potentiometer. The specified resistance values are as follows:
Resistance value
2-1: 833±167 Ω
3-1: 477±95 Ω
Applicable serial No. From JA0218
Resistance value R-G: 833±167 Ω
W-G: 477±95 Ω
Checking the Detectors (GT-250C-1)
2. Boom Angle Detector
1. Retract the boom fully, set the boom angle to 0 ° , and set the PTO switch to "OFF."
2. Measure the resistance of the potentiometer. Checking at the connector of the detector Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows:
Applicable serial No. Up to JA0217
Resistance value
C-D: 833±167 Ω
A-D: 146±29 Ω
Checking at the CN1 connector of the AML
Pull out the connector of the swing angle detector. Then pull out the CN1 connector of the AML and measure resistance of the potentiometer. The specified resistance values are as follows:
Resistance value
2-1: 833±167 Ω
4-1: 146±29 Ω
B-G: 146±29
Checking the Detectors (GT-250C-1)
3. Swing Angle Detector
1. Swing the boom to front and set the PTO switch to "OFF."
2. Measure the resistance of the potentiometer. Checking at the connector of the detector Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows:
R-B: 500±75 Ω
W-B: 224.2±34 Ω
G-B: 473.9±71 Ω
4. Pressure Sensor for Moment Detection
1. Set the PTO switch to "ON." (5-V DC will be applied between R and B of the pressure sensor connector.)
2. Measure the output voltage between W and B of the pressure sensor connector.
3. The output voltage between W and B is proportional to the pressure in the elevating cylinder. The specified value is as shown below.
Checking at the CN1 connector of the AML Pull out the connector of the boom length and angle detector. Then pull out the CN1 connector of the AML and measure resistance of the potentiometer. The specified resistance values are as follows:
2-1: 500±75 Ω
5-1: 224.2±34 Ω
9-1: 473.9±71 Ω
Checking the Detectors (GT-350C-1)
Checking the Detectors (GT-350C-1)
1. Boom Length Detector
1. Retract the boom fully, set the boom angle to 0 ° , and set the PTO switch to "OFF."
2. Measure the resistance of the potentiometer.
Checking at the connector of the detector
Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows:
R-G: 833±167 Ω
W-G: 412±83Ω
2. Boom Angle Detector
1. Retract the boom fully, set the boom angle to 0 ° , and set the PTO switch to "OFF."
2. Measure the resistance of the potentiometer.
Checking at the connector of the detector
Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows:
R-G: 833±167 Ω
B-G: 146±29 Ω
Checking at the CN1 connector of the AML
Pull out the connector of the swing angle detector. Then pull out the CN1 connector of the AML and measure resistance of the potentiometer. The specified resistance values are as follows:
2-1: 833±167 Ω
3-1: 412±83Ω
Checking at the CN1 connector of the AML
Pull out the connector of the swing angle detector. Then pull out the CN1 connector of the AML and measure resistance of the potentiometer. The specified resistance values are as follows:
2-1: 833±167 Ω
4-1: 146±29 Ω
Checking the Detectors (GT-350C-1)
3. Swing Angle Detector
1. Swing the boom to front and set the PTO switch to "OFF."
2. Measure the resistance of the potentiometer. Checking at the connector of the detector Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows:
R-B: 500±75 Ω
W-B: 224.2±34 Ω
G-B: 473.9±71 Ω
4. Pressure Sensor for Moment Detection
1. Set the PTO switch to "ON." (5-V DC will be applied between R and B of the pressure sensor connector.)
2. Measure the output voltage between W and B of the pressure sensor connector.
3. The output voltage between W and B is proportional to the pressure in the elevating cylinder. The specified value is as shown below.
Checking at the CN1 connector of the AML Pull out the connector of the boom length and angle detector. Then pull out the CN1 connector of the AML and measure resistance of the potentiometer. The specified resistance values are as follows:
2-1: 500±75 Ω
5-1: 224.2±34 Ω
9-1: 473.9±71 Ω
MAIN fuse (3A)
AML main fuse for whole unit.
RLY1, 2 fuse (3A)
Common, with relay output 1 and 2.
RLY3, 4 fuse (3A)
Common, with relay output 3 and 4.
RLY5, 6 fuse (3A)
Common, with relay output 5 and 6.
RLY7, 8 fuse (3A)
Common, with relay output 7 and 8.
SIF1 fuse (2A)
For SIF1SRC power supply output terminal.
SIF2 fuse (2A)
For SIF2SRC power supply output terminal.
Replacing Clock Battery
Replacing Clock Battery
[NOTICE]
When the built-in clock battery is worn out, the adjustment values, error codes, and driving history cannot be backed up (saving data at power OFF). Also, when the error code or driving history is recorded in the AML, an accurate date and time cannot be recorded.
The built-in clock battery life is usually about 10 years.
If the built-in clock batteries are worn out, replace them according to the following procedure.
1. In the Case of CPU Board Employing BR1225 Battery
1. Remove the CPU board from the AML main unit.
2. Remove the battery from the battery holder on CPU board by pressing the battery diagonally.
Two built-in clock batteries are on CPU board of the AML main unit.
Ensure to replace both 2 pieces at once.
3. Set new batteries on the CPU board by pressing them diagonally. (Refer to the figure below.) The battery positive side must face upward.
Lithium battery (PANASONIC BR1225)
4. Install the CPU board in the AML main unit.
5. Reconnect the connector to the board.
2. In the Case of CPU Board Employing CR2032 Battery
[NOTICE]
One built-in clock battery is on CPU board of the AML main unit.
[NOTICE]
When removing the battery, remove while holding the battery upper (positive) side because the battery may pop up.