SERVICE MANUAL
Operating elements
5002 - 6002 - 6502
Lifting the excavator Raise arm and dozer blade. Fasten rope, chains, etc., to the boom and to the dozer blade on the left and the right (3-point suspension). To prevent damage, ensure there is enough distance between the ropes/chains and the excavator. The fastening points are indicated with stickers. Ensure the ropes/chains etc., cannot come undone. Ensure the ropes/chains etc., are rated strong enough to support the weight of the excavator. Minimum force required per lift: 9 tonf (80 kN) L1 = about 9’ 0”. (2.75 m) P1 ... P2 ...
L2 (2X)= about 15’ 7” (4.75 m)
Fastening point boom Fastening points left and right side of dozer blade
P1
L1 L2
P2
Page F10
Id.No.: Edition:
918157 June 05