1 minute read

Control, operation

Next Article
Control, operation

Control, operation

Raise the machine carefully with the crane and load.

Only proceed according to the operating instructions when restarting the machine.

Loading a machine with adjusting equipment:

Fig. 3-96 Loading a machine with adjusting equipment

Only use cargo handling gear which is sufficiently dimensioned or which has been specially developed by LIEBHERR for this purpose.

Extend the hoisting cylinder, retract the boom adjusting cylinder, and position the shovel arm more or less vertically. Press switch S16 down. Parking brake is engaged. Indicator light in the switch illuminates.

Switch off the engine, push the safety lever up. Secure the superstructure to the chassis using the locking pin. Push the safety lever down.

Turn the ignition key to the contact position and relieve pressure lines by moving the joystick carefully several times.

Remove the ignition key and push the safety lever up. Close and lock all doors, covers and panels on the machine. Fold in the mirror.

Attach the cargo handling gear to the points provided for the purpose.

Danger!

Standing under the raised machine is not permitted!

Raise the machine carefully with the crane and load.

Only proceed according to the operating instructions when restarting the machine.

This article is from: