Grove GMK4075 Truck Crane Maintenance Manual SN 2084680 - PDF DOWNLOAD

Page 17

Additional maintenance work Validity

These additional pages apply to all truck cranes with main booms that are equipped with Twinlock systems.

Additional maintenance work

These truck cranes require additional maintenance work on the main boom locking system.

G

Risk of accidents if maintenance work is not carried out! Have the additional maintenance work on the main boom locking system performed by your authorized GROVE dealer or CraneCARE regularly. This prevents the inadvertent unlocking of a telescoping section in Emergency operation/Emergency program mode, which could cause serious accidents and damage to the truck crane. These additional pages describe this additional maintenance procedure only and are part of the maintenance manual supplied.

5.2

Maintenance plan

5.2.6

M 12 maintenance plan: Every 12 months / after 1000 oper. hrs.

M 12 Maintenance work on the SUPERSTRUCTURE: Every 12 months / after 1000 oper. hrs.

Oil / lubricant Amount (l)/ number

Designation p. 6 – 1

à

Main boom 4

23.02.2005

– Have the main boom locking system checked by your authorized GROVE dealer or CraneCARE.

Additional pages GMK Truck cranes

2 084 966 en

1


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Grove GMK4075 Truck Crane Maintenance Manual SN 2084680 - PDF DOWNLOAD by www.heydownloads.com - Issuu