TMS500E NOTE: 6.
7.
The pin-on boom extension approximately 60 kg (132 lb).
SET-UP AND INSTALLATION PROCEDURES nose
weighs
5.
Using a adequate lifting device, position the pin-on boom extension nose in the base section and secure with the two pins and hitch pins.
Carefully pull the telescoping section from the base until the holes in the base and telescoping section lineup. Install the retainer pin and hitch pin.
6.
If not already reeved, reeve the hoist cable over the mast and boom extension nose sheave. Install all cable retainer pins.
Connect the anti-two block cable connector to the junction box.
Setting the Telescoping Extension Length Extending 1.
Position the boom to over the rear.
2.
Lower the boom to horizontal.
3.
Remove the loop of anti-two block cable from the spool on the side of the swingaway base section and let the cable hang free.
4.
Stowing 1.
Unreeve the swingaway nose.
2.
Position the boom to horizontal.
3.
Remove the hitch pin and retainer pin securing the telescoping section in the base.
4.
Push the telescoping section into the base and secure with the retainer pin and hitch pin.
5.
Loop the anti-two block cable over the spool on the side of the base section.
Remove the hitch pin and retainer pin securing the telescoping section in the base.
4
4-13