
3 minute read
TMS800E OPERATOR’S MANUALLUBRICATION
filled. Oil escaping from ve nt plug is an indication the hoist may be overfilled.
BOOM, BOOM EXTENSION, AND BOOM ACCESSORIES LUBRICATION
NOTE: To service the boom at boom lengths longer than 120 ft (to access grease fittings, grease the sections, or to change the holding valve), a minimum of 12,000 pounds of counterweight must be installed on the turntable and the outriggers must be fully extended. Boom must be positioned over the right-hand side of the machine. No rigging, no hook block, or overhaul ball may be installed on the nose of the boom.
Extend boom to desired length at a boom angle of 20 degrees. Lower boom until RCL limits the boom lower function. Override RCL per RCL Operator’s Manual and lower boom to desired angle.
34. Boom Pivot Shaft
Lube Type - EP-MPG
Lube Interval - 250 hours or 3 months, whichever interval occurs first
Lube Amount - Until grease extrudes
Application - 2 grease fittings, one on each side
35. Extend Cable Sheaves
Lube Type - EP-MPG
Lube Interval - 250 hours or 3 months, whichever interval occurs first
Lube Amount - Until grease extrudes
Application - 1 grease fitting; extend boom for entry through access holes in fly and outer mid sections.
36. Retract Cable Sheaves
Lube Type - EP-MPG
Lube Interval - 250 hours or 3 months, whichever interval occurs first
Lube Amount - Until grease extrudes
Application - 2 grease fittings; extend boom for entry through access holes in front of inner mid section at boom length of 39 m (128 feet)
37. Telescope Cylinder Wear Pads
Lube Type - EP-MPG
Lube Interval - Every boom teardown.
Lube Amount - Thoroughly coat all areas the wear pads move on.
Application - By brush; 5 places.
NOTE: Should boom chatter or rubbing noises in the boom occur, it will be necessary to lubricate the telescope cylinder wear pads. By adding an extension adapter to a grease gun the wear pads and wear areas can be reached through the lubrication access holes in the side of the boom and through the access hole in the boom nose between the sheaves.
38. Internal Side and Bottom Wear Pads (Inner Sections)
Lube Type - EP-MPG
Lube Interval - 250 hours or 3 months, whichever interval occurs first. Lubricate more frequently if environmental conditions and/or operating conditions necessitate.
Lube Amount - Thoroughly coat all areas the wear pads move on.
Application - By brush: 14 places; with boom in extended position through access holes in inner and outer mid section.
39. Boom Section Upper Wear Pads
Lube Type - EP-MPG
Lube Interval - 50 hours or 1 week, whichever interval occurs first. Lubricate more frequently if environmental conditions and/or operating conditions necessitate.
Lube Amount - Until grease extrudes
Application - 8 places; with boom in extended position through access holes.
40. Boom Section Upper and Lower Wear Pads
Lube Type - EP-MPG
Lube Interval - 50 hours or 1 week, whichever occurs first. Lubricate more frequently if environmental conditions and/or operating conditions necessitate.
Lube Amount - Thoroughly coat all areas the wear pad moves on.
Application - By brush; 12 places; with boom in extended position.
41. Upper Boom Nose Sheaves
Lube Type - EP-MPG
Lube Interval - 250 hours or 3 months, whichever occurs first
Lube Amount - Until grease extrudes
Application - 2 grease fittings per sheave
42. Lower Boom Nose Sheaves
Lube Type - EP-MPG
Lube Interval - 250 hours or 3 months, whichever occurs first
Lube Amount - Until grease extrudes
Application - 4 grease fittings per sheave
43. Boom Extension Sheaves
Lube Type - EP-MPG
Lube Interval - 250 hours or 3 months, whichever occurs first
Lube Amount - Until grease extrudes
Application - 2 grease fittings
44. Boom Extension Mast Sheave
Lube Type - EP-MPG
Lube Interval - 500 hours or 12 months, whichever occurs first
Lube Amount - Until grease extrudes
Application - 1 grease fitting
45. Auxiliary Boom Nose Sheave
Lube Type - EP-MPG
Lube Interval - 250 hours or 3 months, whichever interval occurs first
Lube Amount - Until grease extrudes
Application - 1 grease fitting
46. Hook Block Swivel Bearing
Lube Type - EP-MPG
Lube Interval - 250 hours or 3 months, whichever interval occurs first
Lube Amount - Until grease extrudes
Application - 1 grease fitting
47. Hook Block Sheaves
Lube Type - EP-MPG
Lube Interval - 250 hours or 3 months, whichever interval occurs first
Lube Amount - Until grease extrudes
Application - 1 grease fitting per sheave
(4 fittings total - 75 ton)
48. Overall Ball Swivel Top
Lube Type - EP-MPG
Lube Interval - 250 hours or 3 months, whichever interval occurs first
Lube Amount - Until grease extrudes
Application - 1 grease fitting
49. Cable Follower Arm
Lube Type - EP-OGL
Lube Interval - 250 hours or 3 months, whichever interval occurs first
Lube Amount - Spray evenly
Application - Spray on; 2 places
Wire Rope Lubrication
Wire rope is lubricated during manufacturing so that the strands, and individual wires in strands, may move as the rope moves and bends. A wire rope cannot be lubricated sufficiently during manufacture to last its entire life. Therefore, new lubricant must be added periodically throughout the life of a rope to replace factory lubricant which is used or lost.
NOTE: Wire rope may be purchased by contacting the Manitowoc Crane Care Parts Department.
For more detailed information concerning the lubrication and inspection of wire rope, refer to WIRE ROPE in Section 1INTRODUCTION in the Service Manual.