1 minute read

TMS800E OPERATOR’S MANUALSET-UP AND INSTALLATION

Table 4-2NOTE: The information in (Table 4-3) applies to malfunctions during operation with the 33/56 ft (10.1/17.1 m) lattice extension.

with wind speed up to 66 ft/s with wind speed over 66 ft/s

•Set down the load.•Set down the load.

•Slew the superstructure so that the main boom creates as little wind resistance as possible.

•Fully retract the main boom.

•Set down the lattice extension.

MalfunctionCauseRemedy

No function of the lifting limit switchLifting limit switch not connectedConnect the lifting limit switch.

Electrical connection between the boom head and lattice extension and between 33 ft (10.1 m) section and 23 ft (7 m) section is not established.

Lifting limit switch on the main boom head not overridden.

When operating with a 56 ft (17.1 m) lattice extension or boom extension, the short-circuit plug is not inserted on the head of the 33 ft (12.5 m) section.

Establishing electrical connection.

Override the lifting limit switch on the main boom head.

Insert short-circuit plug.

The main boom cannot be telescoped with the rigged lattice extension or boom extension.

The lattice extension can not be derricked.

The main boom is derricked to such an angle at which telescoping is not permissible

Derricking gear of the lattice extension is switched off.

Monthly Maintenance Work

Pins

Lubricate all attach, securing and retaining pins, in other words:

- the pins for the pin connection on the lattice extension,

- the retaining pins on the return pulleys,

Derrick the main boom to the required angle.

Switch on the derricking gear of the lattice extension.

- the retaining pins used for fastening the lattice extension sections for transport,

- the spring latch on the run-up rail.

NOTE: The maintenance interval applies to average operation. Also, lubricate the pins after highpressure cleaning and generally at an interval that will prevent them getting dry.

Published 09-14-2012, Control # 132-07

This article is from: