5 minute read

Two-stage swing-away lattice extension 3.4 Slinging points

Slinging points for the 12.5 m (41 ft) section alone

• Sling the 12.5 m (41 ft) section alone onto the two slinging points (4) and (5) so that it is in the centre of gravity.

• Guide the sling rope from outside around the struts onto the slinging points to prevent tipping to the side.

Slinging points for 22 m (72 ft) two-stage swing-away lattice extension, 9 m (30 ft) section folded at the side

• Sling the folded 22 m (72 ft) two-stage swing-away lattice extension only onto the two slinging points (3) and (5) so that it is in the centre of gravity.

• Guide the rope at point (5) from inside and at point (3) from outside around the strut of the 12.5 m (41 ft) section onto the slinging points to prevent tipping to the side.

Slinging points for 22 m (72 ft) two-stage swing-away lattice extension, 9 m (30 ft) section swung-out

• Sling the rigged 22 m (72 ft) two-stage swing-away lattice extension only onto the two slinging points (1) and (2) so that it is in the centre of gravity.

• Guide the sling rope from outside around the struts onto the slinging points to prevent tipping to the side.

Two-stage swing-away lattice extension

3.5 Checklists for rigging work

3.5 Checklists for rigging work

3.5.1 Overview of the required rigging work

There are different initial states for rigging the lattice extension, depending on whether

–the lattice extension is folded at the side of the main boom or –the lattice extension has been removed for on-road driving with a maximum axle load of 12 t; à GMK 5200/6220-L operating instructions, Part 1, Chapter Driving with the truck crane, Section Checking the truck crane before driving – Driving mode table.

The following table shows you which checklist describes the required rigging work for your initial state.

Initial stateCorresponding rigging work

Before crane operation lattice extension is on the side of the main boom

CHECKLISTS: lattice extension was removed completely

Rigging 13 m (43 ft) swingaway lattice extension; à p.3-16.

Rigging 22 m (72 ft) two-stage swing-away lattice extension; à p.3-24.

CHECKLIST: Installing two-stage swingaway lattice extension; à p.3-12.

After crane operation lattice extension should be folded at the side of the main boom

CHECKLISTS: lattice extension should be removed for on-road driving

Unrigging 13 m (43 ft) swingaway lattice extension; à p.3-20.

Unrigging 22 m (72 ft) twostage swing-away lattice extension; à p.3-28.

CHECKLIST: Removing two-stage swingaway lattice extension; à p.3-14.

Two-stage swing-away lattice extension

3.5 Checklists for rigging work

3.5.2 CHECK LIST: Installing two-stage swing-away lattice extension

HThis checklist is not equivalent to complete operating instructions. There are accompanying instructions which are indicated by cross-references. Observe the warning and safety information given there!

Requirements:

–The truck crane is supported or the main boom is placed on the boom support.

–An auxiliary crane must be ready.

1. Install and connect hose drum for hydraulic supply (if applicable); à Installing hose drum, p.3-39.

2. Check the transport condition of the two-stage swing-away lattice extension; à Transport condition with removed lattice extension, p.3-37.

3. Sling two-stage swing-away lattice extension on auxiliary crane; à Slinging points, p.3-9.

4. Lift two-stage swing-away lattice extension with auxiliary crane in front of the main boom and create a swinging connection between the 12.5m (41 ft) section and the main boom; à Connections on main boom head, p.3-48.

Two-stage swing-away lattice extension 3.5 Checklists for rigging work

5. Establish hydraulic connection between lattice extension and main boom; à Establishing/disconnecting the hydraulic connection , p.3-67.

6. Establish electrical connection between lattice extension and main boom; à 13 m (43 ft) swing-away lattice extension , p.3-65.

HIf the lattice extension needs to be rigged in front of the main boom, see Point 9.

7. If the lattice extension needs to be folded at the side of the main boom, move run-up rail into Unrigging position; à Run-up rail, p.3-63.

8. The other types of rigging work are described in the CHECK LIST: Unrigging 13 m (43 ft) swing-away lattice extension from Point 14, p.3-39.

9. If the lattice extension needs to be rigged in front of the main boom, attach guide ropes to the head of the 12.5 m (41 ft) section. The other types of rigging work for the 13 m (43 ft) swing-away lattice extension are described in the CHECK LIST: Rigging 13 m (43 ft) swingaway lattice extension from Point 15, p.3-39.

The other types of rigging work for the 22 m (72 ft) two-stage swingaway lattice extension are described in the CHECK LIST: Rigging 22 m (72 ft) twostage swing-away lattice extension from Point 12, p.3-39.

Two-stage swing-away lattice extension

3.5 Checklists for rigging work

3.5.3 CHECK LIST: Removing two-stage swing-away lattice extension

HThis checklist is not equivalent to complete operating instructions. There are accompanying instructions which are indicated by cross-references. Observe the warning and safety information given there!

Requirements:

–The truck crane is supported or the main boom is placed on the boom support.

–An auxiliary crane must be ready.

1. Carry out all of the rigging work for a rigged 13 m (43 ft) swing-away lattice extension listed in the CHECK LIST: Unrigging 13 m (43 ft) swingaway lattice extension up to and including Point 12; à p.3-21.

2. Carry out all of the rigging work for a rigged 22 m (72 ft) two-stage swing-away lattice extension listed in the CHECK LIST: Removing 22 m (72 ft) two-stage swing-away lattice extension up to and including point 18, à p.3-39.

3. Disconnect hydraulic connection between lattice extension and main boom; à Establishing/disconnecting the hydraulic connection, p.3-67.

4. Disconnect electrical connection between lattice extension and main boom; à 13 m (43 ft) swing-away lattice extension, p.3-65.

Two-stage swing-away lattice extension 3.5 Checklists for rigging work

5. Sling two-stage swing-away lattice extension on auxiliary crane; à Slinging points, p.3-9.

6. Loosen swinging connection between 12.5 m (41 ft) section and basic section and set down two-stage swing-away lattice extension onto separate vehicle with auxiliary crane; à Connections on main boom head, p.3-48. à Transportation on a separate vehicle , p.3-76.

7. Remove hose drum for hydraulic supply (if applicable); à Installing hose drum, p.3-39.

Two-stage swing-away lattice extension

3.5 Checklists for rigging work

3.5.4 CHECK LIST: Rigging 13 m (43 ft) swing-away lattice extension

HThis checklist is not equivalent to complete operating instructions. There are accompanying instructions which are indicated by cross-references. Observe the warning and safety information given there!

1. Prepare the truck crane for rigging the swing-away lattice extension; à Preparing the truck crane for rigging, p.3-33.

2. Install/connect hose drum for the hydraulic supply of the lattice extension (if applicable); à Installing hose drum, p.3-39.

3. Check that the lattice extension was unrigged properly and is in transport condition; à Transport condition with lattice extension folded at the side, p.3-37.

4.Move run-up rail into rigging position; à Run-up rail, p.3-63.

HWhen only the 12.5 m (41 ft) section is folded at the side of the main boom: see Point 8.

5. Establish connection between 9 m (30 ft) section and main boom in front area; à Connection between 9 m (30 ft) section and main boom, p.3-45.

6. Remove the connection between the 9 m (30 ft) and 12.5 m (41 ft) sections; à Connections in the front area , p.3-44.

Two-stage swing-away lattice extension 3.5 Checklists for rigging work

7. Remove the connection on the pivot point between the 12.5 m (41 ft) and 9m (30 ft) sections; à Connections on lattice extension, p.3-50.

8. If only the 12.5 m (41 ft) section is folded at the side of the main boom, remove connection between 12.5 m (41 ft) section and run-up rail; àConnections in the middle area, p. 3-46.

9. Establish hydraulic connection between lattice extension and main boom; à Establishing/disconnecting the hydraulic connection , p.3-67.

10. Establish electrical connection between lattice extension and main boom; à 13 m (43 ft) swing-away lattice extension , p.3-65.

11. Swing 12.5 m (41 ft) section onto the main boom head; à Swinging the lattice extension onto the main boom head , p.3-64.

12. Establish the swinging connection between the 12.5 m (41 ft) section and the main boom head; à Connections on main boom head, p.3-48.