Gehl AL20DX Articulated Loader Operator’s Manual 908180 - PDF DOWNLOAD

Page 7

CHAPTER 3 CHECKLISTS Remove Dealer’s File Copy at Perforation

PRE-DELIVERY

I acknowledge that pre-delivery procedures were performed on this unit at outlined above.

The following Checklist is an important reminder of valuable information and inspections which MUST be made before delivering the loader to the customer. Check off each item after prescribed action is taken.

Dealership Name

Check that: has NOT been damaged in shipment. Check for such o Unit things as dents and loose or missing parts; correct or re-

Dealer Representative’s Name

place components as required.

Date Checklist Filled Out

is securely mounted and not cracked. Cable cono Battery nections are tight and the battery disconnect switch is in

Loader Model#

the “ON” position. and tilt cylinders, hoses and fittings are not damaged, o Lift leaking or loosely connected. hoses and fittings are not damaged, leaking or o Radiator loosely connected. o Filters are not damaged, leaking or loosely secured. are properly and securely attached and tires are o Wheels properly inflated. is properly lubricated and no grease fittings are o Loader missing or damaged. system reservoir and engine crankcase are o Hydraulic filled to their proper levels. adjustment are made to comply with settings given in o All the Adjustments chapter of this manual. guards, shields and decals are in place and securely ato All tached. and serial numbers, for this unit, are recorded in o Model space provided on this page and page 2.

Loader Serial#

Engine Serial#

DELIVERY Check that: The following Checklist is an important reminder of valuable information that MUST be passed on to the Customer at the time the unit is delivered. Check off each item as you explain it to the customer. Review with the customer the contents of this manual; especially: Index at the back, for quickly locating topics; o The The Safety, & Safety Equipment and Operation o chapters, forControls information regarding safe use of the ma-

o o

Start loader engine and test-run the unit while checking that proper operation is exhibited by all controls.

o

Check that:

o

o Drive chains are properly adjusted. control foot pedal and lift/tilt control operate o Directional properly and are not damaged or binding. control foot pedals are properly adjusted for o Directional a correct “neutral” position so that loader does NOT

chine; The Adjustments, Lubrication, Service and Troubleshooting chapters, for information regarding proper maintenance of the machine. Explain that regular lubrication and maintenance are required for continued safe operation and long life. Give this Operator’s Manual to the customer and instruct the customer to be sure to read and completely understand its contents BEFORE operating the unit. Explain that the customer MUST consult the Engine Manual (provided) for related specifications, operating adjustments and maintenance instructions. Completely fill out the Owner’s Registration, including customer’s signature and, return it to the company.

Customer’s Signature

creep.

Date Delivered

(Dealer’s File Copy)

Printed in U.S.A.

5

908180/AP0601


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Gehl AL20DX Articulated Loader Operator’s Manual 908180 - PDF DOWNLOAD by www.heydownloads.com - Issuu