
1 minute read
Install the straight fitting (6) onto the existing fitting (F the base end the dipper cylinder .
from CNH Object Handling kit 580ST 580T Loader backhoe Installation Instructions Manual 48161061 - PDF DO
Connect the rigid boom tube (7) the straight fitting (4) in port “V2”
Connect the hydraulic hose (8) the straight fitting (3) in port “Pil”.
Secure the rigid boom tube (7) the boom cylinder with one spacer (22) and one clamp (9) shown.
Connect the rigid boom tube (20) the existing fitting (L) the base end the boom cylinder . 10. Connect the hydraulic hose (8) the rigid boom tube (20) .
RAIL16TLB0352AA 12

RAIL16TLB0353AA 13

RAIL16TLB0354AA 14

RAIL16TLB0355AA 15
1 Secure the rigid boom tube (20) the boom cylinder with one spacer (21) and one clamp (9) shown.
12. Remove the plug (1A) below the oil control valve (1B) the locking valve (1) .
13. Install the elbow (27) , the sealing washer (25) and the pressure switch onto the lock valve (1) . 14. T orque the pressure switch – N·m ( –)

RAIL16TLB0356AA 16

RAIL16TLB0357AA 17

RAIL17TLB0214AC 18