CLAAS RAKE UP P420 LEXION RAKE UP P420 MEDION MEGA Set-Up Instructions Manual_EN_US_RU - PDF DOWNLO

Page 15

SECTION 2 – SET UP

D. HYDRAULIC CONNECTIONS 1)

Connect motor hoses to steel tubes and run to the pickup motor using the clamps and brackets provided in the crate.

2)

Install orifice and 90o elbow into hold down master cylinder. See Operator’s manual “Hydraulic System” section.

E. SHOCK INSTALLATION Attach shock to channel upright and frame as shown.

See your parts manual for detailed diagrams and your operator’s manual for suspension adjustment procedure.

9


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.