1 minute read

adaptor pan connecting to the SPR3 (image).............................................. 4

Installation __________________________________________________

Opening the block-type connector:

 Drive out the roll pin(s).  Push the block connector halves in the direction of the arrows.

The block connector is open.

Closing the block connector:

 Push the block connector halves together opposite the direction of the arrow.  Drive in the roll pin(s).

The block connector is closed.

Flat-type connector

The flat-type connector can be installed in horizontal and vertical position.

Please keep in mind that dimension b of the flat-type connectors is larger than dimension b of the respective round steel link chain according to DIN 22252. Therefore, make sure to check the passage dimension of vertically installed flat-type connectors, e.g. in the bottom race of the conveyor.

Also observe the position of the chain link in the flight. Flat-type connectors are not allowed to be installed vertically in conveyors with flat link chains according to DIN 22255.

This article is from: