Case CX330 Excavator Operator's Manual - PDF DOWNLOAD

Page 94

OPERATING INSTRUCTIONS ●

If earth or mud stays stuck inside the bucket, operate the bucket through it’s full range of travel several times so as to loosen the earth or the mud.

After work, remove any mud and clean the machine.

When using the upper structure swing, never change the direction of swing too suddenly.

When climbing up a slope, place the bucket about 250 mm (10 inches) above the ground. When traveling down a slope it is recommended to place the bucket on the ground to prevent the machine from sliding.

Avoid turning the machine on steep slopes.

Never swing the upper structure on slopes of 15° in the direction of travel or 10° at right angles to the direction of travel.

Before changing travel speed bring the machine to a complete halt.

Basic Operation TRIM THIS EDGE

1. Take up position in the operator’s seat and adjust it so that all the controls are readily accessible. See “Operator’s seat” in the “Controls/Instruments/ Accessories” Section. Then fasten your safety belt. 2. Make sure the cab door is firmly latched in open or closed position. 3. Sound the horn to alert those around you that you are starting the machine. 4. Start the engine, taking into consideration the prevailing weather conditions. See “Starting the engine”. 5. Check all instruments are operating correctly. 6. Lower the function cancellation lever (safety bar in outward position). 7. Unlock the upperstructure swing function. 8. Try out all the controls in a safe, open area. WARNING: Follow the operating instructions listed in this chapter. Any other practice which has not received the prior approval of the manufacturer is considered to be strictly forbidden.

88

TRIM THIS EDGE LEFT PAGE Bur 87538932NA


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.