
1 minute read
Job sequence in assembling the engine
BMW Dl 2 Marine engine — Install; the bearing cover and measure the crankshaft end clearance. Specified end clearance with crankcase cold: 0,1 — 0,3 mm; with crankcase warm: 0,3 0,5 mm.
Fit the large counterweight on the flywheel side. Tighten the socket-head screws of the counterweights with a tightening torque of 65 Nm.
JOB SEQUENCE IN ASSEMBLING THE ENGINE
— Install thecrankshaft — Fit the b~aring cover — Measure the crankshaft end clearance — Install the fuel control system — lnsta!l the connecting rod — Install the counterweights — Install the piston — Fit the crankshaft gear — Install the rocker levers — Install the camshaft assembly — Fit the timing cover — Fit the hand-crank guide — Install the cylinder — Measure the piston projection — Fit the valves — Install the decompression lever — Fit the rocker arms — Fit the cylinder head — Set the valve clearance — Set the decompression device — Install the injector — Fit the temperature pickup — Fit the thermostat — Install the exhaust manifold — Install the water pump — Install the injection pump — Install the fuel pump — ~ith electric engine stop as accessory) Install the electric engine stop — Install the air filter — Install the stator — Fit the flywheel housing ring — Install the flywheel with rotor — Install the clutch — Install the gearbox — Install the retaining plate with engine electricals — Install the starter — Set the injection pump