
1 minute read
INST ALLING PT O
Figure 4–3. PT O Clutch Pressure Plumbing Schematic
Connect PT O Clutch Feed, required.
Some PT are clutchapplied. Use transmission main pressure from the main pressure tap for applying the PT O clutch. Refer Figure 4–1 for the location the main pressure tap and Figure 4–3 for a typical plumbing schematic when this feature is needed. This connection can made later if the clutch apply line will interfere with transmission installation.
4–4. INST ALLING FILL TUBE AND SEAL
Location.
The fill tube may mounted either the right left side. The unused fill tube provision must have a plug fill the tube opening.