Operators Manual
BI620143
QXR 920 10243
• Thank you very much for reading the preview of the manual.
• You can download the complete manual from: www.heydownloads.com by clicking the link below
• Please note: If there is no response to CLICKING the link, please download this PDF first and then click on it.
CLICK HERE TO DOWNLOAD THE COMPLETE MANUAL
CLICK HERE TO DOWNLOAD THE COMPLETE MANUAL
BI620143
Cubex
1218 Redonda St., Box 13, Grp 524, RR5
Winnipeg, Manitoba Canada, R2C 2Z2
Phone: (204) 694-5505
Main Fax: (204) 633-0665
www.cubex.net
Copyright
Ltd.
BI620143
© 2008 Printed in Canda
BI620143
I TABLE OF CONTENTS Section 1 Introduction..........................................................1 1.1 Drill Description................................................................................1 1.2 Manual Objectives.............................................................................1 1.3 Drill Orientation...............................................................................2 Section 2 Description of Equipment.........................................3 2.1 Major Components and Sub-assemblies....................................................3 2.2 Electrical Controls............................................................................26 2.3 Manual Hydraulic Controls..................................................................31 2.4 Display Screens................................................................................35 Section 3 Start-Up and Tramming...........................................55 3.1 Operating Procedures for Start-Up........................................................55 3.2 Start-Up........................................................................................59 3.3 Tramming......................................................................................60 3.4 Set Up..........................................................................................63 Section 4 Drilling...............................................................69 4.1 Drilling Procedures...........................................................................69 4.2 Delivery Systems..............................................................................83 4.3 Drilling..........................................................................................85 Section 5 Maintenance........................................................91 5.1 Daily Maintenance Procedures..............................................................91 5.2 Lubrication....................................................................................94 5.3 Safety Procedures............................................................................98 Section 6 Troubleshooting...................................................109 6.1 Troubleshooting the Tram Drive.........................................................109 6.2 Troubleshooting the Hydraulic System..................................................110 6.3 Troubleshooting the Water Injection Pump............................................112 6.4 Troubleshooting the Air Driven Oil Injection Pump...................................113 6.5 Troubleshooting the Air Driven Grease Injection......................................113 BI620143
6.6 Troubleshooting the Air Delivery System...............................................114 6.7 Troubleshooting the Hammer.............................................................116 6.8 Troubleshooting the Drill Bit..............................................................117 6.9 Troubleshooting Depth Laser.............................................................119 Cubex Terra DGS Operation Manual........................................121 Section 1 Introduction.......................................................125 1.1 Features......................................................................................125 Section 2 Software Removal and Installation.............................126 2.1 Removal / Installation Procedure:.......................................................126 2.2 Sensor Installation..........................................................................133 Section 3 Operation...........................................................143 3.1 ZERO-OFFSET Calibration Procedure....................................................150 3.2 Local and Absolute Heading Measurements............................................153 II BI620143
Section 1 Introduction
1.1 Drill Description
The Cubex Megamatic QXR series of drills are designed to deliver maximum drilling efficiency and flexibility using a Down-the-hole Hammer. The standard QXR is a QXR 920 with a 900 cfm/500 psi (25.7m3/min 34.5 bar) compressor, a mast with carousel capable of handling 20 ft. (6 m) drill pipe and a Caterpillar engine. The QXR series of drills also offers up to 1350 cfm/500 psi (38.6 m3/34.5 bar) air capacity.
The QXR is designed to drill up to 8” (203 mm) diameter holes to a depth of 140 feet (42.7 m) without adding drill pipe to the carousel.
1.2 Manual Objectives
This manual covers a description and the operation of the Cubex QXR drill and can be used as a training aid for Cubex’s Operator Training Course.
The Objective of this manual is to familiarize operators with the following:
• Major components and sub-assemblies of drill
• Layout of controls and what they operate
• Drilling
• Maintenance
• Operator Safety
• Troubleshooting
1
BI620143
1.3 Drill Orientation
The operator's right hand side is the drill's right hand side with the operator standing at the tram step facing forward (Fig 1.1).
2
BI620143
Fig 1.1 Orientation
Section 2 Description of Equipment
2.1 Major Components and Sub-assemblies
2.1.1 Mast and Undercarriage
Refer to Fig 2.1.1, Fig 2.1.2, Fig 2.1.3, and Fig 2.1.4
1. Undercarriage and Chassis
The tracks use Caterpillar components with 19-5/8” (500mm) wide, triple grouser shoes.
Brakes are spring applied/hydraulic released. Gradability is 36° and ground clearance 16” (406mm).
2. Boom
The 9ft. Boom allows great flexibility in mast positioning.
3. Boom Lift
This cylinder raises and lowers the Boom from 10° below horizontal to 45° above.
4. Boom Swing Cylinder
The swing cylinder moves the boom from 30° to the left and 35° to the right.
5. Mast Assembly
The mast overall length is 32’7” (9931mm) with 24’ (7315mm) of head travel. An option of 19’ (5791mm) of head travel is available.
A chain feed system that uses a powerful hydraulic cylinder provides hoisting and pull down power. Hoisting force is 10,600lbs (47kN) and pull down force is 10,600lbs (47kN).
A hydraulic centralizer with a maximum size of 8 3/8” (219mm) along with a hydraulically actuated slip plate (size varies on drill pipe used).
6. Mast Dump Cylinder
This cylinder moves the mast from a horizontal position to 45° past the vertical axis (135° total from horizontal).
7. Mast Swing Cylinder
The mast swing cylinder has two positions. One allows the mast to be moved ± 30° from vertical in the perpendicular axis from the drill.
The cylinder can be repositioned to allow the mast to be moved 15° above horizontal.
3
BI620143
4
Fig 2.1.1 Right Side
BI620143
Fig 2.1.2 Boom Cylinders
8. Feed Extension Cylinder
Extends the mast into contact with the rock. It has 60” (1500mm) of travel.
9. Manual Controls (Mast)
See section 2.3.2 for layout.
10. Top Drive
Hydraulically driven by two high torque motors, the Top Drive has a torque capacity of 4225 ft-lbs (5730 Nm) @3000psi (207bar) standard or an option of 6280 ft-lbs (8517Nm).
The speed is infinitely variable between 0 to 80 rpm.
Incorporated into the Top Drive is the splined piston breakout system, which eliminates the need for wrenches to breakout drill pipe.
11. Divertor Assembly
Debris and water from hole are diverted from passing to the centralize assembly along the drill pipe.
12. Cable Chain
Air and hydraulic hoses are protected on the mast by the cable chain.
13. Triple Jaw Breakout System
A combination of three jaws used to breakout drill tool joints.
5
Fig 2.1.3
BI620143
Fig 2.1.4
6
BI620143
Fig 2.1.5 Engine Filter Mounting Plate
2.1.2 Right Side
Refer to Fig 2.1.5, Fig 2.1.6 (next page)
1. Engine Filter Mounting Plate
All of the engine filters have been located on the fuel tank in one spot for ease of maintenance.
2. Engine Oil Filter
3. Fuel Filters
4. Water Separators
5. Carousel Assembly
The carousel holds up to six rods. These rods can be up to 20’ (6 m) long and 3 1/2” (89 mm) to 5” (127 mm) diameter.
6. Diesel Engine
Cummins water-cooled diesel engine. Refer to your Parts Manual for engine model.
7. Primary Batteries
Four Caterpillar heavy-duty batteries supplying 24 volts.
8. Oil Injection
The oil injection reservoir has a 22 gal (83 L) capacity.
9. Grease Injection (Standard)
Grease injection for DTH hammers. The reservoir has an 8.4 gal (32L) capacity.
10. Winch (Optional)
Winch for handling the drill pipe. The winch has a single line pull capacity of 1500 lbs (682 kg) and uses 3/8” (10 mm) cable.
11. Fuel Tank
370 gal (1400 L) (standard); 280 gal (1059 L) capacity (optional).
12. Fill Cap Fuel tank fill cap.
7
BI620143
• Thank you very much for reading the preview of the manual.
• You can download the complete manual from: www.heydownloads.com by clicking the link below
• Please note: If there is no response to CLICKING the link, please download this PDF first and then click on it.
CLICK HERE TO DOWNLOAD THE COMPLETE MANUAL
CLICK HERE TO DOWNLOAD THE COMPLETE MANUAL