Cat Bucyrus Dresser 8950 Dragline Maintenance & Operation Manual BI006248 - PDF DOWNLOAD

Page 1

Technical Manual

© Bucyrus All Rights Reserved
R
BI006248
BUCYRUS

• Thank you very much for reading the preview of the manual.

• You can download the complete manual from: www.heydownloads.com by clicking the link below

• Please note: If there is no response to CLICKING the link, please download this PDF first and then click on it.

CLICK HERE TO DOWNLOAD THE COMPLETE MANUAL
CLICK HERE TO DOWNLOAD THE COMPLETE MANUAL

MANUAL 1088 8950 DRAGLINE MAINTENANCE AND OPERATION

P""ter1 in USA R77D BI006248

-WARNING -

DUE TO THE DANGERS INHERENT IN THE OPERATION OF ANY HIGH VOLTA4E ELECTRICAL EQUIPMENT, A SAFE GROUNDING SYSTEM ';'

SHOULD. INCLUDE GROUND CONDUCTORS IN THE CABLE, A NEUTRAL GROUNOING RESISTOR AND RELATED RELAYS AND SWITCHGEAR. A '", ," ',' GROUND CONTINUITY CHECK SYSTEM IS ALSO RECOMMENDED.

This. has bee!,! prepared for the standard production machine. Any deviation due to advanced engineering design, optional equipment or the particular requirements of thi5machine may not be covered.

AdditicmaJ'i.J:lformation that is required will be furnished as soon as such jnformatiqn is available.

8950
,,", t"
;'.j . i", .
BI006248

TABLE OF CONTENTS

General Information

Engineering Data

Lubrication

Operation

Electrical Maintenance

Air Systems and Components

Mechanical Adjustments INSERTS

Welding Instruction

Installation of Open-Enclosed Gear Set

Instructions of Shrink Fit

Centralized Lubrication Systems

Wire Rope

Handling and Installing Strand Boom Support

Boom Inspection of Draglines and Stripping Shovels

Recommended Lubricants

Section 1

Section 2

Section 3

Section 4

Section 5

Section 6

Section 7

CI-894

CI-784-R

CI-772

CI·837

CI-897

CI·879

CI-927

CI-929-A

BI006248

SECTION 1

GENERAL INFORMATION INDEX

Introduction Parts Book

Serial Number of Machine Right and Left Hand Parts

Ordering Parts. ..

Further Information

Charge for Service, Labor, Etc.

Standard Warranty

Safety Precautions

Page Page Page Page Page Page Page
Page
Page
BI006248
2
2
2

SECTION 1

GENERAL INFORMATION

INTRODUCTION - This manual is provided for the guidance of all persons who operate, lubricate, adjust or maintain this machine. The information was prepared with the purpose in mind of furnishing accurately and concisely all the data necessary to the operation and servicing of this machine.

All information, measurements, and specifications herein are in accord with the Marion Power Shovel Engineering Department and should be strictly adhered to in all work on this machine.

PARTS BOOK - THIS MANUAL IS NOT A PARTS BOOK AND SHOULD NOT BE USED IN ORDERING PARTS.

You have been furnished detailed Parts Books which list all parts by group numbers with items and part numbers for your specific machine.

Read carefully the instructions in the front of the Parts Book for ordering parts.

SERIAL NUMBER OF MACHINE - Be sure that the serial number of the machine is given in any letters, telegrams, orders or other communications. Records for each individual machine are filed by serial number and if this number is available the design and original equipment can be quickly and accurately checked.

RIGHT AND LEFT HAND PARTS - On the upper frame, right hand (R.H.) and left hand (L.H.) correspond to the operator's right and left hands when he is facing the bucket while at the operator's controls.

ORDERING PARTS - The Parts Book covering this machine gives complete information on how to order parts. Order carefully so that the right parts in the right quantities can be furnished. Wrong parts, ordered by mistake, which are returned to the company are subject to a rehandling charge.

FURTHER INFORMATION - If further information is required which is not found in the Manual or in the Parts Books, communicate with the Marion Power Shovel Company, Inc., at Marion, Ohio.

Page
Section 1 8950 BI006248
1

CHARGE FOR SERVICE, LABOR, ETC. - No charges for service or labor are accepted unless the work has been previously authorized by the company in writing.

STANDARD WARRANTY - Marion Power Shovel Company, Inc. guarantees the equipment manufactured by it to be free from defects in material and workmanship under normal use and service, its obligation under this warranty being limited to making good at its factory any part or parts thereof manufactured by it which shall, within six (6) months after delivery to Buyer, be returned to it, with transportation charges prepaid, and which its examination shall disclose to its satisfaction to have been thus defective, this warranty being expressly in lieu of all warranties, express or implied, and of all other obligations or liabilities on Marion Power Shovel Company's part.

Marion Power Shovel Company, Inc. shall not be held responsible or liable in any event for special or consequential damages, arising from any cause whatsoever, and Buyer agrees to indemnify and save Marion Power Shovel Company, Inc. harmless therefrom.

Marion Power Shovel Company, Inc. makes no guaranty or warranty, express or implied, as to adequancy, fitness, quality, or performance of any machinery, equipment, apparatus or accessories not manufactured at its own factory which are subject only to such guaranty as may be made by the respective manufacturers thereof.

The company reserves the right to improve or change the design of its products and specifications thereof and the company shall incur no liability thereby or any obligations to install such improvements on products previously sold.

SAFETY PRECAUTIONS - The usefulness of this machine depends entirely on the man at the controls. The operator is its brain. He must think safety and work safely.

Neatness and safety go hand in hand. Good housekeeping habits should be developed.

1. Keep the floor clean and free from oil and grease.

2. Keep the walkways clean, clear and free from obstructions.

3. Prevent the accumulation of grease and oil around bearings and gears. Grease and oil collect and hold grit and dirt which work into finely machined parts.

4. A clean machine is easier to operate-easier to inspect-easier to service.

5. Keep hands and clothing away from moving parts.

6. Replace guards, inspection plates, access covers, etc., promptly after reason for removal is accomplished.

Strip mining equipment is subject to tremendous stresses and shock loads. These stresses are thoroughly studied and considered in the design and building of Marion equipment.

8950 Page 2 Section 1 BI006248

This machine is built with an ample reserve of power and strength and is well fitted to meet the demands of its task.

However, the Marion engineers cannot foresee the conditions imposed by abuse, mismanagement and neglect. These factors are more damaging to any piece of equipment than years of continuous operation and normal wear.

Care, sound judgement and reason are an economic necessity in the operation of power equipment.

1. Carefully read this Manual and Parts Book.

2. Lubricate regularly. Establish a systematic procedure and stick to it.

3. When lubricating, check all bolts, nuts, locknuts and cotter pins.

4. Keep loose objects in tool box or in suitable enclosure or cabinet.

5. Always watch your clearance when swinging.

1. Service or lubricate parts that are moving.

2. Leave the load suspended in air.

DON'T APPLY SWING BRAKES WHILE MACHINE IS ROTATING, EXCEPT IN EMERGENCY.

DO
DON'T
Page 3 Section 1 8950 BI006248

SECTION 2 ENGINEERING DATA INDEX

Bronze Bushings

Flange Bushing

Straight Sleeve Bushings

Bushing Life

To Replace Bronze Bushing

Installation of Anti-Friction Bearings on Shafts

Installation of Oil and Grease Seals

Split Seals

Installation of Vee Type Grease Seals

Involute Spline Assembly Permanent Fit with Adhesive

Surface Preparation.

Application of Adhesive

Disassembly of Cured Splines

To Reassemble Cured Splines

To Remove Adhesive

Gear Case Seal (For all Oil Tight Gear Cases)

Running Clearance for Bronze Bushings

Wire Lock Cap Screws.

Page

Page 3

Page 3

Page 4

Page 5

Page 6

Page 6

Page 6

Page 6

Page 6

Page 7

Page 7

Page 8

Page 14

Page Page Page Page
BI006248

SECTION 2 ENGINEERING DATA

Marion machines have been designed and built to rigid specifications in accordance to acceptable standards of the industry.

For the proper maintenance of this machine, we furnish the following information. This information is confidential and in the interest of Marion Power Shovel Company.

NOTE: THE INFORMATION PROVIDED IN THIS SECTION SHOULD BE CONSIDERED GENERAL IN NATURE. IT INCLUDES ESTABLISHED PROCEDURES RECOMMENDED BY MARION ENGINEERS, WHICH MAY OR MAY NOT WHOLLY APPLY TO YOUR MACHINE. THOSE PROCEDURES APPLICABLE ARE BY REFERENCE.

BRONZE BUSHINGS - Bronze sleeve bushings are assembled in the bearing bosses with aIight press fit.

FLANGE BUSHING - Each bushing is secured through the flange with a minimum of four dowels, to restrict rotation of the sleeve. Dowel material is to be softer than the bushing material.

STRAIGHT SLEEVE BUSHINGS - Each bushing is secured with four spring type straight slotted pin dowels. equally spaced around the outside diameter of the bushings, between the sleeve and the boss.

BUSHING LIFE - When the running clearance exceeds three times the figure shown in the table, the bushing is worn out and should be replaced.

TO REPLACE BRONZE BUSHING - Disassemble shaft and machinery from bushing to be replaced. Remove bushing by slitting the bushing with air chisel or use air arc cutting torch. Be careful not to cut or score the bearing boss.

Clean the boss thoroughly and remove all burrs.

Break the corner of the bushing and lightly coat the outside of the bushing with white lead. If a press is not available the bushing can be installed by using a long threaded rod. steel plates and a hollow center hydraulic jack. Assemble the apparatus as shown in the two sketches on next page. and pull bushing into place.

1 Section 2

8950 BI006248
Page

ILlI----- Threaded Bolt

Steel Plate

METHOD NO.1

Steel Plate

Break Corner

Threaded Bolt

White

METHOD NO.2

8950
1/ .1:.<:.4_- White Lead Steel Plate
Page 2 Section 2 BI006248

INSTALLATION OF ANTI-FRICTION BEARINGS ON SHAFTS - Anti-friction bearings, which require an interference fit, must be assembled by shrinking the inner race onto the shaft. To do this it is necessary to establish a difference in temperature between the shaft and the inner race. It is easier to heat the bearing assembly than reduce the temperature of the shaft. The complete bearing assembly, including the inner race (cone), the roller cage and the outer race (cup) should be heated in an oil bath. Do not apply direct heat to the bearing.

Use any clean light oil with a flash point that exceeds 3000 F. Transformer oil or quench oil is suitable. Use a clean container with plenty of clean oil. Filter the oil if it is reused. The container should be twice the size of the bearing diameter and width. Place block (non-metal) or rack in the container to support the bearing and keep the bearing off the bottom of the container. Do not allow metal to metal contact with the heat surface.

Place the bearing in the oil at the same time heat is applied to the oil. Stir. Heat the oil to 200 0 F- 94 0 C. Use a bulb thermometer to check temperature. Allow the bearing to remain in the oil at 200 0 F for at least 15 minutes. Extend the time for large bearings or until the bearing is heated through. Do not exceed 250 0 F - 122°C.

Install the bearing on the shaft that has been de-burred and cleaned.

Locate the bearing on the shaft with a single thrust if possible. Do not drive.

INSTALLATION OF OIL AND GREASE SEALS (J.M. Clipper) - The proper installation and performance of oil and grease seals is very important to the successful operation of the machine.

Solid moulded, soft type seals are used wherever the design of the assembly will permit. Each seal is moulded with a slight interference fit on the O.D. to make an oil tight fit between the seal and the bore. It also holds the seal in place and prevents the seal from turning in the bore.

Split seals are furnished as a replacement seal where major disassembly of the machine would be required to install solid seals.

WARNING: Do not cut a solid seal to make a split seal. Split seals are especially made with an interference at the butt and must be installed with compression at the joint. Split seals should be considered as an expedient until a solid seal can be installed at a major overhaul.

Seals should be stored in a cool, clean, dry area away from extreme heat, ozone or direct sunlight. Do not open the shipping container until the seal is to be used. Keep the seal clean.

Page 3 Section 2

8950

BI006248

The following procedures should be used to install solid oil or grease seals:

1. Carefully inspect the seal for cuts, breaks or nicks. Rub the fingerti p over the O.D. and the lip to detect any roughness or pits that may result in a leak path. Do not install a damaged seal. Be sure the proper size seal is used.

2. Inspect the shaft for scratches, burrs or any roughness that may cut or score the lip of the seal. Inspection should include the area over which the seal must be installed, especially keyway and splines. Use a thimble or protective tape over the keyway and splines.

3. Inspect the bore for burrs or any roughness that may cut or scrape the O.D. of the seal when the seal is pressed into place. The bore and the shaft should have a 1/16" chamfer. If not, carefully break the corner of the seal.

4. Determine the proper position of the lip. Should the seal be used to retain fluid or grease in a bearing or case? Or should the seal exclude contaminates from the bearing or case? Position the seal with the lip turned toward the inside to retain grease or oil in the housing or toward the outside to keep out contaminates such as dust or dirt.

5. Lubricate the seal with light grease or oil on all surfaces of the seal, particularly the O.D. and the lip. Lubricate the shaft and the interior of the bore with a light coat of grease or oil.

6. Very carefully install the seal on the shaft. Be sure the lip is in the proper position and be sure the garter spring is in the slot. Move the seal from the end of the shaft to the bore with a spiral rotating motion.

7. Align the seal in the bore and tap lightly with a hammer and wood block. Alternate from side to side and around until the seal is firmly seated in the bore. No retainer plate is required.

Two seals may be installed in a bore, back-to-back, to retain grease or oil and at the same time exclude contaminates from the bearing. In this case fill the space between the seals with MPG grease.

SPLIT SEALS - Split seals are installed in much the same manner.

1. First remove the garter spring and separate at the hook and eye.

2. Open the seal to install on the shaft as shown in sketch.

8950 Right Way Page 4 Section 2 Wrong Way BI006248

• Thank you very much for reading the preview of the manual.

• You can download the complete manual from: www.heydownloads.com by clicking the link below

• Please note: If there is no response to CLICKING the link, please download this PDF first and then click on it.

CLICK HERE TO DOWNLOAD THE COMPLETE MANUAL
CLICK HERE TO DOWNLOAD THE COMPLETE MANUAL

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.