INS,PECTION
,''t MARION 25,000·
L'
HOUR DRAGLINE MAINTENANCE
( L\
MARION POWER SHOVEL DIVISION-DRESSER INDUSTRIES, INC. USA. Printed In USA
SCHEDULE
• Thank you very much for reading the preview of the manual.
• You can download the complete manual from: www.heydownloads.com by clicking the link below
• Please note: If there is no response to CLICKING the link, please download this PDF first and then click on it.
CLICK HERE TO DOWNLOAD THE COMPLETE MANUAL
CLICK HERE TO DOWNLOAD THE COMPLETE MANUAL
DAILY .- EVERY 24 HOURS @"
Keep clear and clean
Check oil ·levels and general condition of all cases, oil cir· culation system and filter con· dition ·as required.
.. D tJ Check operation with manual valve.
0 0 Pay out rope/inspect drums grooving and rope clamps.
0 D Check anti-freeze level,· lubricator oil levels, line filters (liquid/dirt).
Check supply in drums. Verify · control valve operation. Check warning/reset circuits. Veryify pump. cycle timing! shutoff.
Check backleg/boom apex. Pressure gauges - check tension of backleg safety cable.
Check all working lights.
D 0 Check sump oil level and drain tank moisture. Check tank pressure-shut off 130. psi; turn on 100 psi. D D 0 0 0 D D 0
Check bleed duct fan operation and filter fan operation for noise or vibration. D D Check oil level site gauge. D D Check site gauge for bearing · lubricant.
D Verify air conditioning operational.
:·,.
IDENTIFICATION
INSPECTION SCHEDULE MODEL SIN
POINTS
MA.CHINE
25,000 HOUR ''MAINTENANCE
VISUAL CHECK
DAILY - EVERY 24. HOURS . DESCRIPTION
Walkways
Ladders
1.
and
2. All Gear Cases
Motions
3. Brakes for all
6. ·Compressor(s) L) ·· 7. Auto Lube System 8. Structural Components 9. Lighting System 10. Filter Fans 11. Main Transformer(s) 12. Motor Generator Set(s) 13. Power Control Room STATUS YES. NO 0 D D D SHIFT 1 2 3 OPERATOR INSPECTOR
4. Wire Rope on Hoist and Drag Drum 5. Air System
ACTION I REMARKS
D
·.·.
- EVERY 24
DAILY
HOURI
MACHINE IDENTIFICATION 25,000 HOUR ·MAINTENANCE INSPECTION SCHEDULE .,.1--Mo_oe_L__s_JN_----1 VISUAL CHECK POINTS SHIFT 1 2 3 DAILY EVERY 24 HOURS DESCRIPTION 14. Bucket - Hoist Chain - Upper/Lower ( ·s. Bucket- Drag Chain- Upper/Lower \.__. 16. Bucket- Wire Rope Sockets/Connections 17. Bucket- Spreader Bar Upper and Lower · 18. Bucket- Trunnion.Connect Points 19. Bucket- Dump Rope Rigging 20. Bucket - Wire Rope .Dump Line 21. Bucket - Arch Structure 22. Bucket - Corner Castings ,3, Bucket - Lip Casting 24. Bucket- Teeth 2 5. Bucket Wear Plates 26. Bucket Heel Casting 27. Basket Structure 28. Lubrication - Bucket Rigging STATUS YES NO 0 D 0 D D D D D D 0 D 0 D o· 0 D D D D D D.D D D D D 0 D D D OPERATOR INSPECTOR ACTION./ REMARKS Check links for twist and cracks. Check links for twist and cracks. Check. condition of rope and connections. Check .for cracking.Check for cracking RH and LH. Check condition of chain. Check condition of anchor. Check for cracks. Check for cracks. Check for cracks. Identify missing and replace. Check material remaining. Check, wear. Check for cracks. Verify distribution.
>':-."·.-.;..< .: - '• .:- ··. ': -.,_
- \EVERY
DAILY
·HOURS
• Thank you very much for reading the preview of the manual.
• You can download the complete manual from: www.heydownloads.com by clicking the link below
• Please note: If there is no response to CLICKING the link, please download this PDF first and then click on it.
CLICK HERE TO DOWNLOAD THE COMPLETE MANUAL
CLICK HERE TO DOWNLOAD THE COMPLETE MANUAL