INTRODUCTION

Baltic Creek Greenway is the newest proposed project in Great River’s Greenway’s network of open space across the St. Louis region. This Summary Report is an overview of the master planning results from a year long process to identify alignment opportunities and naming for a new greenway in St. Charles County, MO. The report is organized into the following sections:

• Discovery - Summary of background gathered with input from project partners, committees and the community.

• Analysis - Mapping, Slopes, Alternatives with pros & cons, public input summary and evaluation matrix.

• Recommendation - Preferred alignments, greenway typologies, phasing/cost summary and next steps.

• Appendices - Separate document with more detailed project related information.

Great Rivers Greenway would like to acknowledge and thank those who contributed their time and valuable input for this study. Participation from the Community Advisory Committee (CAC) members, Technical Advisory Committee (TAC) Agencies (MoDNR, MoDOT, East-West Gateway Council of Governments St. Charles County Highways, City of Cottleville, City of St. Peters, City of Weldon Spring, Greenway Network, Trailnet, St. Charles Community College, Ameren UE and Missouri American Water) was greatly appreciated. The goals of the project (below) were established through the contributions of the CAC, TAC and project partners.

COMMUNITY GOALS FOR THE GREENWAY

DISCOVERY

REGIONAL LOCATION

Great Rivers Greenway works within St. Charles County, St. Louis County and the City of St. Louis, Missouri, to develop a regional network of greenways serving approximately two million residents. Currently, there are four existing greenways located within St. Charles County: Boschert, Busch, Centennial and Dardenne Greenways. The study area (shown below) for Baltic Creek Greenway was identified as a high priority project through community engagement as part of the 2020 St. Charles County Greenway Master Plan.

STUDY AREA

DISCOVERY

STUDY AREA MAP

This map illustrates the limits of the study area for the Baltic Creek Greenway project. Three zones North, Middle and South were established for further investigation. The northern area boundary was MO-364/94, Highway N in Cottleville, Dardenne Greenway at St. Charles Community College and St. Peters Howell Road. The middle area boundary was identified as Towers Road, Pitman Hill Road, MO-364/94, and Kisker Road. The southern area boundary was identified as the Katy Trail State Park, Pitman Hill Road, Towers Road, and Caulks Hill Road. Alignment options within these three zones were developed to connect to primary destinations such as Veteran’s Tribute Park, commercial areas along Mid Rivers Mall Drive, neighborhoods, the Katy Trail State Park and schools.

KatyTrailStatePark

DISCOVERY PUBLIC ENGAGEMENT

SURVEY 1: NOV 2022 - JAN 2023

289 RESPONSES

Avoid cars and roads

Access natural areas (wooded areas, lakes, ponds)

Foster vibrancy, unique community character, and sense of place

Avoid steep slopes to accommodate wheelchairs, beginner cyclists, children, and older adults

WHAT ARE YOU MOST EXCITED ABOUT?

CONNECTIONS TO EXISTING TRAILS

DESIRED GREENWAY

CONNECTIONS

Downtown Cottleville

Veterans Tribute Park

Businesses on Mid Rivers Mall Drive

Kisker Road south of Central School Rd

Highway N/Central School Road near St. Peters Howell Rd

Pitman Hill Road south of MO-364/94

Mid Rivers Mall Drive btn. Cottleville Pkwy and MO-364/94

KATY TRAIL STATE PARK VETERANS TRIBUTE PARK
MID

ANALYSIS MAPPING

The following Land Use and Land Cover maps are just a few examples of the analysis that was completed by the planning team as part of the study. The top three land uses in the study included Residential, Parks/Open Space and Commercial which indicated that connections to these major land uses should be considered in the alignment options. The top three land cover conditions in the study area were identified as Grassland, Deciduous Woody Vegetation and Urban / Impervious Areas. The concentration of woodland land cover is mostly in the south area and adjacent to the Dardenne Creek in the north. The more developed urban/impervious areas are north of MO-364/94.

LAND USE MAP (2030)

Deciduous Woody Vegetation

LAND COVER MAP
Barren / Sparsely Vegetated

ANALYSIS MAPPING

The following analysis maps illustrate Flood and Ecological Significance areas. The analysis of this type of data helped to inform decisions regarding the pros and cons of the various alignment options that were developed. The Flood Map indicates that areas mostly around Dardenne Creek are subject to flood hazard and potential wetland areas which may limit greenway development or at least require mitigation. Highly significant ecological areas as identified by East-West Gateway Council of Governments are concentrated in the north near Dardenne Creek and in the south near the Katy Trail State Park. The majority of the study area is on the lower end of the ecological significance scale. A goal of greenway development is to connect users to and also protect/enhance ecologically significant areas.

FLOOD MAP

Dardenne

ANALYSIS SLOPES

SOUTH AREA SLOPE MAP

ROAD PROFILES

Katy Trail State Park

ANALYSIS SLOPES

RECOMMENDED SLOPE* (0-2%)

MAX RECOMMENDED SLOPE (2-5%)

5% slopes are the maximum allowed for an accessible trail.

MEDIUM DIFFICULTY (5-8%)

Slopes above 5% along an accessible path are considered ramps that require hand railings and frequent landings. Slopes above 8% are only allowed if constructed with an existing right-of-way.

8.3% slopes are the maximum for accessible ramps.

HIGH DIFFICULTY (8-12%)

10% slopes are acceptable for short distances along trails.

VERY HIGH DIFFICULTY (>12%)

Slopes above 12% are very difficult for most users and should be avoided if possible.

NORTH AREA ALTERNATIVES

Scott A. Lewis Park College Meadows Park

Legacy Park

Lions Club Park Grand Slam Ballpark C&H Ballpark

Community Park

Middle & Elementary School

LEGEND

Existing Greenway / Trail Off-Road Alignment Road Adjacent Alignment

Existing Path (Adjacent)

Existing Path (Off-Road) Alignment Option X1

PROS

• Connects to:

• Old Town Cottleville

• Schools

• Residential Neighborhoods Dardenne Greenway Uses existing multi-use path CONS

• Limited Right-of-Way width

• Conflicting infrastructure

• Existing trail not to GRG standards Bicyclist/pedestrian conflict with golf carts

PROS

• Connects to:

• Commercial District Dardenne Greenway Community College CONS

• High traffic area

• Limited signals and crosswalks

• Obstacles in Right-of-Way

PROS

• Off-Road

• Underpass possible at MRM Dr.

• Natural setting CONS

• Easement acquisition Prone to flooding

• Federal permits required

PROS

• Connects to:

• Residential Neighborhoods Schools

• Current high-pedestrian use CONS

• High traffic area Limited Right-of-Way width

• Obstacles in Right-of-Way

PROS

• Off-Road Natural setting

• Connects to: Parks

Residential Neighborhoods CONS

• Easement acquisition Cost (bridges)

ANALYSIS

MIDDLE AREA ALTERNATIVES

Veterans Tribute Park

St. Charles City-County Library

LEGEND

Existing Greenway / Trail Off-Road Alignment Road Adjacent Alignment

Existing Path (Adjacent)

Existing Path (Off-Road) Alignment Option X1

PROS

• Existing multi-use path

• Connects to Mid Rivers Mall Dr Traffic separation at highway CONS

Adjacent to road

• Several at-grade intersection crossings

• Existing trail not to GRG standards

PROS

• Separated from traffic CONS

• Cost (Grade Separated crossing)

PROS Off-Road

• Existing multi-use path

• Park setting CONS

Existing trail not to GRG standards

• Potential conflicts with current park users

PROS

• Direct access to park via crosswalk Can use MO-364/94 underpass

• Connects to Residential Neighborhoods

• Kisker Rd has excess capacity

• Old ROW possible for alternative alignment from Towers Rd to Kisker Rd CONS

• Adjacent to road Traffic (4 lane - high speed)

• Distance from MRM Dr

• Narrow ROW at MO-364/94 underpass

Veterans Tribute Park

SOUTH AREA ALTERNATIVES

St. Charles City-County Library

PROS

• Direct route to Veterans Tribute Park

Existing trailhead at Katy Trail State Park

Provides access to go west on Katy Trail (more popular route)

• Potential partnership with future development sites to bypass steepest section of Pitman Hill Rd

CONS

Very steep slopes

• Limited Right-of-Way width

LEGEND

Existing Greenway / Trail

Off-Road Alignment

Road Adjacent Alignment

Existing Path (Adjacent)

Existing Path (Off-Road)

Alignment Option X1

Towers Rd

Creek

PROS

Towers Rd is relatively level Generous ROW width on Towers Rd

Connects to Residential Neighborhoods

CONS

• Further from Veterans Tribute Park

• Steep slopes on Caulks Hill Rd

• Numerous driveway and road curb cuts on Towers Rd

• Inconvenient for users to go west on Katy Trail (more popular route)

SURVEY AND MEETING RESULTS ANALYSIS

S U R V E Y 2: MAY 20 2 3 - J UN 202 3

A second survey was conducted in the spring of 2023 to narrow down options for each section of the alignment. The survey asked respondents to rate how each section performed against the project goals.

252 RESPONSES

WHICH ALIGNMENT OPTION RANKED BEST AT MATCHING THE COMMUNITY GOALS?

Connect to parks and natural areas

Inspire people to get outside

Connect to unique local destinations

Avoid high traffic roads

Prioritize safety

Accommodate people of all ages and abilities

WHICH ROUTE IS PREFERRED BY THE PUBLIC?

N4 M1 NORTH AREA MIDDLE AREA

S1 / S2 SOUTH AREA TOP 3 GREENWAY NAMES

RIDGELINE

BALTIC RIDGE

BALTIC CREEK

ANALYSIS

EVALUATION MATRIX

The Baltic Creek Greenway evaluation categories and factors were created to be utilized in an evaluation matrix by which specific alignments could be compared and prioritized. The categories were grouped into three categories – User Experience, Feasibility and Public Preference. Within each of those three categories various factors were evaluated. For example, factors in the “User Experience” category included Connections, Topography, Neighborhood Access, etc. Each alignment was evaluated and given a numeric score of 1, 2, or 3 for each factor. The higher the score the better the alignment performs for that factor.

The score for each factor in a category (e.g. “Public Preference”) is totaled and averaged. In addition, if a particular alignment exhibited merits that were consistent with the Project Vision and Goals then that alignment received a 3-point, or 6-point bonus added to the total score. The matrix below is a summary of the scores in each of the three categories. The name and location of each alignment evaluated is listed on the left side of the matrix. The evaluation categories are listed along the top row of the matrix.

OVERALL ALIGNMENT

The recommended alignments shown below are a culmination of the planning effort in the study area. The process considered data collected, analysis completed, pros and cons developed, evaluations completed, and the significant input received from the public. The map shows the recommended alignments and highlights the experience type and the trail condition of the overall alignment. On the following pages, more detailed alignment maps highlighting aspects of the North, Middle and South alignments are included.

St. Charles Community College miles of greenway*

slope (Pitman Hill)

LEGEND

NORTH AREA

RECOMMENDATION

NORTH AREA

DARDENNE CREEK
DARDENNE GREENWAY
DYE CLUB DR

RECOMMENDATION MIDDLE AREA

LEGEND

Recommended Alignments

Alternative Alignment

Major Access Point

Access Point

Kisker Rd lane diet with new greenway multi-purpose trail

Utility relocates

Crossing at Bal Harbor Ct

Crossing at Briargate Dr

Potential retaining wall impacts

St Charles City-County Library

Midblock HAWK crossing of Kisker Rd

Veterans Tribute Park

Rebuild existing park trail to GRG standards

Upgrade (widen) bridge

Bridge crossing (use-in-place)

Upgrade trail to GRG standards

Replace sidewalk with multipurpose trail

Crossing at S St. Peters Pkwy / Intersection improvements

Use existing pavement

Crossing at N St Peters Pkwy / Intersection improvements

Pedestrian bridge

Potential road crossing (future)

New off-road greenway pavement

Commercial district

Rebuild retaining wall

Crossing at Roseberry Topping Ct

Crossing at Towers Rd

Kisker
Baltic Creek

RECOMMENDATION MIDDLE AREA

CROSSWALK

RECOMMENDATION SOUTH AREA

LEGEND

Recommended Alignments

Alternative Alignment

Major Access Point

Minor Access Point

Destination

Improvement / Impacted Area

Potential trailhead

Culvert crossing

Replace sidewalk with multipurpose trail

Crossing at Wincliff Dr

Crossing at Georgian Oaks Dr

Rebuild retaining wall

Steep slopes (9-12%)

Crossing at Big Bluff Ct

Homes close to ROW (consider impacts)

Crossing at Seven Hills Ln

Utility pole relocations

Crossing at Napa Ln

Crossing at Loyd Ln

Multiple driveway crossings

Crossing at Hidden Spring Dr

Crossing at John Meyer Dr

Crossing at Jacobs Crossing Dr

Crossing at Jacobs Station Rd

St. Philippine Cemetery & Mausoleum

Crossing at Windam Pl Dr

Midblock crossing of Tower Rd

Crossing at Saratoga Heights

Crossing at Clover Valley Ln

Alternate route in right-of-way

Intersection improvements at Kisker Rd

Existing Katy Trail State Park trailhead

Crossing at Deer Valley Ln

Crossing at Pitman Trails Ln

Crossing at Windcastle Dr

Crossing at Muirfield Dr

RECOMMENDATION SOUTH AREA [CAULKS HILL]

CAULKS
STEEP SLOPE AT CAULKS HILL

RECOMMENDATION SOUTH AREA [PITMAN HILL]

MUIRFIELD DR AT PITMAN HILL
KATY TRAIL STATE PARK RIGHT-OF-WAY
PITMAN HILL AT KATY TRAIL
STEEP SLOPE ON PITMAN HILL
PITMAN HILL NEAR CROSSHAVEN DR
KATY TRAIL STATE PARK
STEEP SLOPE

RECOMMENDATION GREENWAY TYPOLOGIES

The following illustrations demonstrate how different pedestrian safety features could be implemented along the Baltic Creek Greenway. There are three categories of road treatment represented. The pedestrian underpass, which separates a pedestrian route from a roadway by grade and will allow for the continuous flow of cyclist traffic along the greenway. The High Intensity Activated Crosswalk (HAWK), a crosswalk effective even on streets with multiple lanes and high speeds that allows pedestrians to activate lights signaling their intent to cross the road. Finally, the staggered midblock crosswalk, which encourages pedestrians to check oncoming traffic from the safety of a median at the midpoint of the crosswalk.

RECOMMENDATION GREENWAY TYPOLOGIES

STAGGERED MIDBLOCK CROSSWALK - TOWERS RD (SOUTH AREA)

PHASING AND COST SUMMARY

Great Rivers Greenway and the project partners concluded that the northern area should be prioritized as the first phase of implementation of Baltic Creek Greenway. That alignment connects existing trail infrastructure on both ends. When that section is implemented, it will connect the Dardenne Greenway to a multi-purpose trail leading to Veteran’s Tribute Park.

An order of magnitude implementation cost summary was developed for each of the recommended alignments based upon a process where segments of the various alignments were assigned a complexity level (low, med, high). For example, low complexity would be an off-road greenway and a high complexity greenway would be a road adjacent with major impacts to existing roadway utilities. Other cost items that were factored into the costs was the potential need for structures such as bridges and large retaining walls. Another category included in the cost summary was overhead and contingency. Cost summaries (in 2023 dollars) for each alignment are included. A detailed breakdown of the costs can be found in the appendix.

1 - NORTH AREA

NEXT STEPS

The Baltic Creek Greenway master plan identifies multiple alignment opportunities that provide a means to connect greenway users to outstanding destinations from the Dardenne Greenway to Veterans Tribute Park to the Katy Trail State Park. The next step in the Baltic Creek Greenway process is for Great Rivers Greenway, St. Charles County, and the project partners to formally adopt the master plan. This step will validate the plan, promote plan recommendations in further studies, support future grant funding opportunities and facilitate plan implementation through future capital investment budgets.

The northern area alignment is recommended as the highest priority phase for implementing the Baltic Creek Greenway. While this alignment is mostly within a utility corridor, intersections and roadway crossings will require further studies to determine feasibility, crossing alternatives, safety, and potential costs to implement. The next and most critical effort in making the northern area alignment a reality is working towards gaining the necessary easements with property owners, public agencies and utility companies.

Project partners can continue to build community support and enthusiasm for the master plan and work with Great Rivers Greenway to prioritize future Baltic Creek Greenway implementation. Through leveraging partnerships among all stakeholders the greenway can become a reality.

APPENDICES

• Appendix A - Detailed Cost Summary

• Appendix B - On-line Survey Results Data

• Appendix C - Project Partner & Committee Meeting PowerPoints

• Appendix D - Existing Condition Report (December 2022)

• Appendix E - Alignment Matrix Evaluations

• Appendix F - Community Engagement Plan

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Baltic Creek Greenway Report by Great Rivers Greenway - Issuu