ARCHITECTURE PORTFOLIO

Page 1

ARCHITECTURE PORTFOLIO graseyla puspa a.

Life is about growing up

Hello!

I’m Graseyla Puspa Artanti, a college student at Gadjah Mada University. Having a family with teaching background never stop me from adoring how beautiful and great a building could be. With my curious personality, i manage to come to the point of learning how the architecture world work.

Learning architecture never been easy yet tiring, but it really gave me chance to know about myself more. In a hectic time, I tend to have a quick response and adapt to it well. I consider myself as someone who understand my responsibility and i can work well in a team or by myself.

CURRICULUM VITAE

IDENTITY

Name

: Graseyla Puspa Artanti

EXPERIENCES

KMTA WISWAKHARMAN

Date of Birth EDUCATION

Nationality

: Indonesian : June 8, 2002

SMA Negeri 1 Salatiga

2017-2020

Gadjah Mada University

Architecture Major 2020-now

current GPA : 3.49

SOFTWARE SKILLS

Revit

Sketchup

AutoCad

Corel Draw

Photoshop

CONTACTS email student email

Whatsapp

Line

: pgraseyla@gmail.com

: graseyla.puspa@mail.ugm.

ac.id

: 08816429556

: graseyyyy

Ÿ Member of public relations division (2021 & 2022)

PAGUYUBAN MAHASISWA ARSITEKTUR YOGYAKARTA

Ÿ Member of community services division (2021)

Ÿ Community services division coordinator (2022)

PART TIME DRAFTER

Ÿ Faculty of Engineering Assessment Electrical Survey Program (19 June 202231 December 2022)

TEACHING ASSISTANT

Ÿ Struktur Bangunan dan Konstruksi semester 2 (2021)

Ÿ Tektonika Arsitektur semester 3 (2022)

COMPETITIONS

Ÿ International Velux Award 2022 (participant)

Ÿ Sayembara Desain Interior SPASIAL 2022 "DIGI DATA" X SOMA by DEKORUMA (participant)

Ÿ Sayembara ACSENT 2022 (participant)

INTERNSHIP

Ÿ Hutama Karya Student Internship Program (9 January 2023 - 12 March 2023)

WANAWIYABAN

A Cultural Center where education and culture become its main function, as the purpose of spreading historical knowledge all over the communities. The building consist of green building aspects to improve the cool atmosphere with a lot of vegetation around the area.

Year : 2021

Type : Competition (participant)

Duration : 3 months

Teammates : Pua Victory and Bambang Irawan

Job description : make concept and architectural drawings

Kecamatan Kuta, Kabupaten Badung

The location of the site is at the east side of Sunset Road Street, that still a part of Kuta, Bali. Around this site is a high density area, dominated by business district such as hotel, café, restaurant, etc. This site is strategic and accessible because of it close position with arterial and collective roads.

SiteAnalysis

The position of the site is extend from north to south. The west side have high possibility to be very hot because of the direct sunlight every evening. But because of the buildings around the site are high majority buildings, this can be a chance of natural daylight for the building.

The surrounding area of the site is dominated by business areas. The site is also close to the main road that is accessible and easy to nd.

The site location is between 2 way trafc, so that the site entrance can be put at the south side of the site location, and the exit can be put at the north side. Shrubs are the dominant vegetation in the north and west area, while huge trees can be located at the west side.

SITE SITE
Jalan Arteri Jalan Kolektor Jalan Lokal Batas Kota/Kabupaten Gereja Tempat Belanja Hotel/Resort Café/Restaurant
Pagi Hari 07.00 Sore Hari 15.00 Siang Hari 12.00 Intensitas panas matahari sisi timur lebih kecil daripada sisi barat
Patung Dewa Ruci Sungai Perumahan Perumahan
In Out

Concept Planning

Sick Building Phenomenon

The cause

Bad quality air Hot weather

Solusi

Green Building Concept

Floor plans

Vegetation

Green Building Concept

Classical and monoton building design

Penyebab Solusi Solusi

Safe zone lack of freedom imaginative and free out from safe zone

Future Building

Thypology

Respon Lingkungan

Mid Rise

Material Sustainable material

Facade Double Skin Design

Basement

Building orientation Sunshade Material heat isolator Sunshade vertical Louvre West to east Daylight responses wind responses north and south side

Void Vegetasi vegetations

Hemat Hemat Economi Resilience Confenience

Hemat

Material Maintanance Construction

Durable Materials Easy Maintanance Efective Circulation Universal

1st floor
2nd Floor 3rd Floor
POTONGAN C C’ POTONGAN B B’ POTONGANA-A Sections
Building elevation

RE - HANJA BUSSINESS HOTEL

Year : 2022

Type : Academic

Duration : 5 months

Team Member : personal

We can reach a great success by doing continuous effort on a regular basis. On the way of reaching success, one must have a good rest to recharge their energy. As a businessman that travel a lot, a business hotel must provide a good accommodations and relaxation places, so that they can have a great resting experience.

Re- Hanja Business Hotel choose convenience as the main highlight to optimizing a good facility and good care for its visitors. This hotel provide optimal room layout and simple space circulation, so that their time won’t be wasted, because for a businessman, minimal time consuming is also a way of reaching success.

Facility planning of this hotel is to provide a useful facility for business such as meeting rooms and ballroom. Meeting room is a crucial aspect for a lot of decision making on a business, as a result, this hotel provide many size of meeting rooms that visitors can choose depend on their needs. To enhance the effectiveness on these rooms, sometimes at the weekend, the unused meeting rooms can be changed its function to a huge ballroom and pre-function area so that it can also give income to the hotel. Therefor the meeting rooms use non- permanent walls to support this goal.

Nowadays, universal design is such a requirement that has to be fullled at designing a building. Therefor this hotel is also universal design measurement so the facility that provided at this hotel can also used by every visitors. The hotel provides disable rooms for people with disability at each oors. Besides, the way from the drop off area is also use ramps that aren’t slippery and save for people on a wheel chair.

This hotel is located at Kulon Progro main road that connect the city to Yogyakarta International Airport. Around the site we still can nd a vast forest, eld, and riceeld. We can nd the traditionality and countrylike feeling when we visit this place.

SITE CONTEXT RESPOND

Selection of wood materials for both interior and exterior is made to create a traditional impression but with a modern nish. To adjust to the site in the form of nishing the horizontal vertical elements of wood material and the shape of the sloping roof which was modied is to respond to the local climate.

The tower is south oriented, so that the east and the west side of the mass get a little portion of the sunlight

The entrance part is devided into 2 (from the main road and from the west road). The surrounding road is used for the re trucks.

The visitor view is opmimazed to the south side because the graet view of the hills and the forests. The view can be seen from the room balcony.

To respond the noise and view problem, the room wall is designed as a slanted wall to create the right angle to the most beautiful view.

The tower and the podium zone is devided as private and public with a clear sirculation zone.

DESIGN TRANSFORMATION Barat Selatan Timur 1 2 IN IN OUT DROPOFF JALAN KAMPUNG JALAN NASIONAL 3 5 massa podium untuk fungsi publik massa tower untuk fungsi publik massa tower untuk fungsi privat pengunjung massa tower untuk fungsi publik pegawai
4

Outdoor café dan minibar for the hotel visitors.

Signage hotel that can be uused as sign for the visitors.

Double wooden fasade that vertically applied for room shading

Entrance from the main road.

The adult and children’s swimming pool that eqquiped with pool deck for relaxation

Curtain wall at the rooftop lounge can be used to enjoy yhe view outside the hotel.

The material of the roof is galvalum with plain truss structure.

Entrance from west road

The room walls is designed to be slanted to give the room user a great experience of wathching the view outside the room, at the balcony. The slanted walls is also created to give some privation for the visitors.

ELEVATION

FLOOR PLANS

PANGGON GUYUB

Answer the problems of densely populated areas with a modern responses.

Year : 2023

Type : Academic

Duration : 2 months

Teammates : personal

Concept : LINKED

A Town that grow from communication, togetherness, and colaboration

Blimbingsari town especially on Bloc F is an sloping area near Blimbingsari Street.

This area is habitated by local people and newcomers. Therefore, colaboration space is needed to connect people from various community, start from children, elderly, to students living there. To provide this good accomodation, there should be a good collaboration space with well developed facility to improve the togetherness and communication between communities.

Design Transformation

Elevating the mass as high as 2 m according to the area

Cut all four sides to grow some vegetation due to lack of vegetation on the site

Cut the mass crosswise to make connective road on the area

Reduce the center of the mass to make connection between masses, as well as a place for the collaboration space

Siteplan Situation
Kamar Orang Tua Dap KM Ruang Makan Ruang Keluarga Kamar Anak Ruang Tamu Warung Ruang duduk dan taman 3m 3m 2.6 m 8 m 8 m 7,2 m 2.6 m 2.6 m 2.6 m 2.6 m Kamar Kamar Kamar Kamar Kamar Kamar KM KM 1st Floor 2nd oor
Elevation
Floor Plan Front Elevation Side

Problems and Potensials

Analysis of Problems and Site Potential

1. The area continues to grow

2. Bloc F is located near sloping road and contour

The houses facing to narrow alley with no interesting view

1. There are many children in the area

2. The area lacks of play ground and chatting space

3. There are a lot of students

4. High potential area for commercial purposes

1. The lack of green spaces

2. The lack of vegetation in the area

1. The alley is too narrow to be passed by car

2. There are a lot of motorcycle park at the alley

3. Lack of safety

Signage

The early construction started from grid structure that will continuously developed depend on the requirements of the user

Analysis of Problems and Site Potential

1. Rearrangement of the building orientation

2. Road expansion

3. Add collaboration space for building view

1. Make play ground with sitting space for children and elderly

2. Make buildings with residential functions and food stalls

Design Responses

Make Green Open Space at some points Communal

Signage Security POS
parking space Balai desa

GONDANG WINANGOEN

From Sugar Factory to a Shopping and Retail Facility

Year : 2023

Type : Academic

Duration : 2 months

Teammates : personal

Concept of the Area Grid Connectivity

Commercial and educational functions are implemented in order to revive the area. These functions are implemented to increase income and attract visitors to come. Regional connectivity is shown through the application of grid connectivity around the area which will later can be developed according to the functional requirements of each zone.

d d skala gars U
d skala gars U
Komersial & Edukasional Entrance Plaza Komersial & Entertain Komersial, F&B Parkir
Retail, Shopping Centre, FC, Museum Entrance Plaza, TIC Gallery, Museum, Mini Open Café, F&B Parkir Lori d
Spot Foto Greenhouse An educational-based commercial area in the Gondang Winangoen heritage area by providing places that contain museums, galleries, shopping and retail areas, and F&B. This area prioritizes pedestrians and provides lorry access for visitors to go arround the area.

Building Functions

Performance stage

Museum & Shopping area

Grand entrance

Greenhouse

Retail Area

Ofce &

warehouse

Ticketing, Souvenir shop

Bridge Indoor Shopping area parks and pool

Parking area Shopping area

Siteplan Before After

Concept Design

Mixed- Used Adaptive- Reused

Conserve The Exsisting Structure & Mantain Original Atmosphere

Insert new function to attract people arround the area

Insert new contrast structure by using glass material to make people curious and visit the building. People can also sneak peek through the transparent glass about what is inside the building.

Giving grid connection through the exsisting building to give new exploration experience through the area

d LIVEN-UP THE D YING HERIT
GE
A
Make a place that worth spending money for
1 2 3 4

Design Transformation

d
d
Change the roof material to glass material for a better access of daylight to the building Change the old ofce area to retail shop
1 2 3 4
Memberikan konektivitas bangunan terhadap bangunan lain dengan menggunakan tangga maupun jembatan Change the building walls with glass material for new air path circulation 5 Change the wall to make new path between old and new building 6 Give new connector from new building to another buildings by stairs or bridges

Building Elevation Before After

Before After

Building Section

d d

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.