ESI Statement of Qualifications_Westport Properties

Page 35

HEYBURN WASTEWATER TREATMENT PLANT H E Y B U RN , I D

SUB C O N T RAC T O R

P ROJ E C T OV E RVI EW

ESI is currently self-performing the installation of 156,000 lbs of reinforcing steel at the Heyburn WWTP. Services included: • Construction of a third clarifier in a 50-foot diameter concrete tank with a spiral sludge scrapper mechanism and scum skimming system • Construction of a RAS/WAS pump station building with two centrifugal RAS pumps and one progressive cavity WAS pump • Construction of a filtered effluent submersible pump station consisting of two manholes with two pumps each and two valve vaults • Construction of a UV disinfection building with two in-vessel UV reactors • Construction of a dewatering building with a screw press solids dewatering system

OWNER City of Heyburn

ENGINEERING C O N S U LTA N T HDR Engineering

ESICONST RU C TION .COM | 32


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
ESI Statement of Qualifications_Westport Properties by ESI Construction - Issuu