Lianjie Wu 16
10 11
D1 14 15
13 8
Structure Model Photo Photo credit: Ensamble Studio
8
4
12
3 5 9
7 8
1 2
4 Detail 1. Double T Connection 1. Double T 2. Steel guide rods 3. Pre-fab guide holes 4. Steel locking plates 5. Crane anchor points 6
5 6
4
5
5 2
3
1 3
2
D2 1
Super Structure 1. Stripe footing 2. Reinforced concrete retaining wall 3. Reinforced steel I beam 4. Pre-stressed concrete slab 5. Foundations 6. Hollow core slab 7. Concrete double T 8. Reinforced concrete pillars
Detail 2. Wall Detail 9. Reversed artesian beam (concrete) 10. Steel guide rods 11. Steel I beam truss 12. A-shape pillar (steel and concrete) 13. Artesian beam (concrete) 14. Steel vierendeel truss 15. Steel warren truss 16. Granite crowne stone
1. Concrete retaining wall 2. Steel reinforcements 3. Basement slab 4. Service area (pool pump) 5. Hollow core slab 6. pool concrete slab
Hemeroscopium House Structure Study 7 mega structural elements, including mega U-shape and I-shape reinforced concrete beam and steel trusses, were assemble on site within 7 days. The on-site assembly efficiency is achieved thanks to the engineered elements, while the domestic spaces are achieved following the aggregation rules. 17