PROPOSED RESIDENTIAL DEVELOPMENT CONSULTATION MAGAZINE JUNE 2020


WELCOME Welcome to this online community consultation. This online community consultation has been prepared to inform and seek feedback concerning a proposed residential housing scheme being proposed at Bell’s Farm, Gransha Rd, Bangor. The site is positioned adjacent to and south of South Circular Road, west of Gransha Road, east of Bloomfield Shopping Centre and north of Meadowlands Court, Bangor. We warmly invite you to take time to absorb the work the applicant and their professional design team and technical team have prepared to date to support the preparation of a forthcoming planning application. A vital part of the pre-application process is to engage meaningfully with the local community to share our vision for the identified site and to invite your feedback. The feedback received will then be reflected upon and responded to in refining the detailed design as part of a formal planning application to Ards and North Down Borough Council.

2

|

BELL’S HILL, BANGOR

BELL’S HILL, BANGOR |

3


Aerial view of the site

INTRODUCTION In light of the current COVID-19 lockdown and social distancing restrictions, temporary pre application community consultation regulations were introduced, removing the legislative requirement for a public event but encouraging and providing guidance for alternative consultation measures. Due to this Clyde Shanks Ltd are using online tools to assist you to review, consider and provide feedback on our development proposals. Your feedback on the proposals is very much welcomed as all matters raised will be taken into consideration and reflected upon in the formal application submission. We will prepare a report, known as the PreApplication Community Consultation report (PACC report), summarising all of the feedback and how the design team has responded to this.

Gransha Road

Bloomfield Shopping Centre

BP PFS

This PACC report will be submitted as part of the planning application package to Ards and North Down Council.

4

|

BELL’S HILL, BANGOR

BELL’S HILL, BANGOR |

5


SITE CONTEXT The site is located within the urban area of Bangor, some 1.6 km to the south east of the town centre. Bangor is one of two main towns within the Ards and North Down Borough Council area. The site occupies an area of approximately 7 hectors. The majority of the site is agricultural land with two associated dwellings and a number of modern farm outbuildings. The site boundaries are a mix of hedging/fencing, while the land gently undulates rising from north to south. A small stream enters the site on its southern boundary and generally runs northwards before entering an existing conduit in the centre of the site. The site is bound by the South Circular Road to the north, Gransha Road to the east, the BP petrol filling station and spar retail provision to

the south along with the residential areas of Meadowlands and Rossdowan. Bloomfield Shopping Centre is positioned to the west of the site. The proposal will seek planning approval to deliver a total of 184no. high quality dwellings, which amounts to a break-down of 34no. detached dwellings, 66no. semidetached dwellings, 48no. townhouses and 36no. apartments. As part of the housing scheme, car parking provision for the units is included along with private and public open space, an equipped children’s play area and a cycle linkage out onto the Gransha Road.

View from Gransha Road Roundabout

Furthermore, an enhancement to the natural environment will be delivered through the provision of a wildlife corridor, while boundary trees will be retained where practicably possible. Gransha Road PFS

View from South Circular Road 6

|

BELL’S HILL, BANGOR

Bloomfield Shopping Centre BELL’S HILL, BANGOR |

7


LOCAL DEVELOPMENT PLAN AND PLANNING POLICY CONTEXT LOCAL DEVELOPMENT PLAN

Planning Policy Statement 21

Section 45 (1) of the Planning Act (Northern Ireland) 2011 requires that all planning applications have regard to the local development plan, so far as material to the application, and all other material considerations. Section 6(4) states that in making any determination where regard is to be had to the local development plan, the determination must be made in accordance with the plan unless material considerations indicate otherwise.

Sustainable Development in the Countryside

June 2010

The adopted Belfast Metropolitan Area Plan 2015 (BMAP) has been quashed as a result of a judgement in the court of appeal delivered on 18 May 2017. Its status accordingly reverts to draft BMAP, which was originally published in 2004. The draft version of BMAP (dBMAP) remains a material consideration and should be given appropriate weight. The adopted plan is the Ards and North Down Area Plan, however, it dates back to between 1984-1995 and is therefore significantly beyond its expected end date. The draft BMAP identifies the application site as being within the settlement development limit of Bangor and also zoned for residential development. There are a number of Key Site Requirements (KSRs) identified within the Draft BMAP relating to this site that should be considered as part of any development proposal. These include: •

Housing development shall be a minimum gross density of 25 dwellings per hectare and a maximum gross density of 35 dwellings per hectare;

a)

Planning and Environmental Policy Group

Revised Planning Policy Statement 15

‘Planning and Flood Risk’

Access shall be from Gransha Road with limited development, agreed with Roads Service; September 2014

BMAP (draft extract) 8

|

BELL’S HILL, BANGOR

A landscaped buffer 5-8 metres wide, of trees and hedges of native species, shall be provided on the western and southern boundaries of the site; and

The design layout shall include provision for cycle and pedestrian links to Gransha Road.

BELL’S HILL, BANGOR |

9


RevA Introduction turning head and h/type change sites 87-89

JC

05-06

Ref|F4755-050-04-003 :: Scale 1:500 @ A0 :: Drawn|JC :: Date|May 2020 North

South Circular Road

L 153/154

PROPOSED DEVELOPMENT

K 145/146

13H3

J 135

13H4

J 136

J 137

K 147/148

K 149/150

L 155/156

L 157/158

K 151/152

J 138

12J3

The site has been analysed in terms of how best to create a quality residential environment. Consideration has been given to ensure that there is a positive frontage onto the Gransha Road and South Circular Road by having dwellings facing onto these vehicular routes.

12J2

0/161

12J1

12J0

M 159/16

13G 9

13G 2

3/164

14G 0

13G 1

I 141

12E4

J 119

M 162/16

H 144

I 142

6/167

M 165/16

H 143

13I0

J 118

9/170

M 168/16

12I9

I 1 17

12J5

J 117

I 2 17

12J6

J 116

12J7

12E8

E 115

Gran

17H8

17H7

17F5

17F6

17F4

17F3

E 114

J 113

sha Roa

17H9

J 112

J 111

18H0

H1 18

A 106

d

F 107

F 108 I 109

A 78

Equipped Play Area 'LEAP'

H2 18 I 110

J 77

H 183

J 76 C 79

H 184

J 75

98I 97I

A 105

G 104

J 74

G 103

96G

A 104

I 101

Site Access

95G

I 100

G 73 E 80

G 72

D 99 E 5

D 94

J 71

C 7

I 8

C 81

J 70 J 69

I 9

J 68

G 3 E 89

G 13

D 90

D 91

C 82

G 14

F 67 F 66

G 88

H 11

F 15

L 51/52

G 87

E 10

F 16

J 62 D 85

A 86

J 17

J 18

J 19

J 20

B 83

D 84

J 60

J 58

J 59

J 57

J 55

J 56

J 54

J 53 L 49/50

F 63

F 64

C 65

J 61

L 47/48

D 21 A 22

A 23

I 24

I 25

G 26

G 27

D 28

B 29

D 30

I 31

I 32

F 33

F 34

L 45/46 J 35

J 36

J 37

J 38

J 39

J 40

J 41

J 42 L 43/44

BELL’S HILL, BANGOR

F 1

H 12

|

F 2

10

A cycle linkage is provided as part of the proposal that will create permeability from the South Circular Road, through the residential scheme (running alongside in part the centralised open space) and out onto Gransha Road.

G 4

E 92

E 93

D 6

Proposed Site Layout

A centralised open space will be created for the benefit of residents to make it accessible to all, while an area for children’s play equipment has also been included. Within the centralised open space the aim was to make a feature of the existing stream.

It is proposed to include a mix of units in order to cater for everyone from one person households to large families. Generous gardens along with communal areas for apartments have been considered and included within the proposal. Sufficient separation distances to existing dwellings has also been provided for in order to prevent any unacceptable overlooking into existing properties. With regards to ecological matters mitigation is proposed to address the important ecological features on the site, while boundary vegetation is to be retained where possible.

BELL’S HILL, BANGOR |

11


*Semi-Detached Dwelling designed to appear as Detached

ILLUSTRATIVE STREETSCAPE

MATERIALS AND DESIGN

LIMINARY ST It is the intention for the materials to be high quality with the dwellings being finished in a mix of render and stone style for the elevations, while the roof covering would be a mix of tile and slate to provide interest.

The proposed layout will deliver 1 vehicular access and deliver cycle *Semi-Detached Dwelling linkages through the development outdesigned to appear as Detached onto the Gransha and South Circular roads.

With regards to the design of the dwellings this would be focused towards providing a rural feel to reflect the previous use of the site.

Please find below indicative street scene drawings and house types.

*Semi-Detached Dwelling designed to appear as Detached

ILLUSTRATIV

PRECEDENT IMAGERY

As can be seen, the proposed site plan will deliver a high-quality mix residential scheme that responds to the site features. The density will be respectful of the surrounding residential context and the KSR. It was also proposed evB :: NTS @ A2 :: Drawn|RS :: Date|May 2020 to retain where practical the natural boundary features and the delivery of a wildlife corridor.

AMILY

Indicative Street Scene

THE BELL FAMILY Ref|F4755-050-04-002SS~RevB :: NTS @ A2 :: Drawn|RS :: Date|May 2020

12

|

Dwelling designed to appear as Detached BELL’S HILL,*Semi-Detached BANGOR

SUBJECT TO PLANNING PERMISSION AND ALL OTHER STATUTORY APPROVALS

Alan Patterson Design LLP

PRECED

Indicative House Types

THE BELL FAMILY Ref|F4755-050-04-002SS~RevB :: NTS @ A2 :: Drawn|RS :: Date|May 2020

BELL’S HILL, BANGOR |

13


Street Scene 01 G 4

9

8

C 7 D 6

D 94

D 99

E 5

Site Access

I 100

I 101

95 G

A 104

01 A 105

FOR ILLUSTRATIVE PURPOSES ONLY.

96

Subject to Planning Permission and all other associated statutory approvals

G 103

G 104

H 184

H 183

Street Scene 01 G 4

F 108

F 107

D 99

Gra

H2 18

H1 18

nsha

Site Access

180H

G 4

J 111

J 112

167D9H

E 114

H 184

H 183

d

D 99

127

D 99

Gra

H 184

D 94

D 99

nsha

95 G J 113

Roa

G 103

120J

H1 18

J 96112

d

178H

I 109

02

H1 18

179H

127J

J 117

North 01

|

02

126J

J 118

J 119

North

134H

12 J

J 135

North

121J

J 135

J 136

J 137

J 136

J 137

132G

122J

133H

134H

NorthJ

J 135

J 136

137

J 136

J 137

Legend @ 1:500

02

Legend @ 1:500

Indicative Street Scene

02

02

Ref|F4755-050-04-004 :: Scale Not to scale :: Drawn|GB :: Date|June 2020

131G 132G

121J

J 135

Ref|F4755-050-04-004 :: Scale Not to scale :: Drawn|GB :: Date|June 2020

124E

120J

134H

Street Scene 02

130I

BELL’S HILL, BANGOR

120J

123J

177H

129I

Legend @ 1:500

133H

124E

121J

133H

125J

02

130I

122J

E 115

J 116

02

132G

120J

178H 128E

129I

123J

131G

01

122J

124E

180H

E 114

121J

123J

125J

J 119

132G

131G

134H

130I

J 119

J 111

J 112

J 113

01

129I

J 118

H2 18

Street Scene 02 133H

125J

F 108

F 107

128E

126J

J 117

A 106

14

127J

J 116

I 110

128E

J 118 177H

124E

120J

01 Street Scene 02

177H

126J J 117

E 115

129I

131G

J 116

179H

Street Scene 02

130I

J 119

178H

127J

122J

180H

123J

H 183

179H

E 115

E 114

H 184

J 112

J 113

125J J 118

180H

J 111

177H

128E

126J J 117

132G

121J

J 111

131G

E 114

d

Gra

G 104

H2 18

01

A 106

H1 18

Roa

F 107

A 105

I 110

I 109

F 108

J 116

H2 18

124E

183

D 6

178H

127J

130I

A 106

nsha

J 119H

E 5

F 108

F 107

179H

E 115

I 110

I 109

180H

J 111

J 112

J 113 E 114

129I

95 G

J 118

9

8

C 7

H 184

96

H1 18

d

125J

G 103

G 104

A 105

96

H 183

A 104

H2 18

A 106

Street Scene 02

G 103

126J

J 117

I 100

I 101

G 104

95 G

Roa

J 116

01

128E A 105

177H

nsha

D 94

01 J

178H

I 100

I 101 A 104

I 110

F 108

F 107

Gra

Site Access

9

8

C 7

E 115

E 5

A 104

96

I 109

Site Access

95 G

G 103

E 5

D 6

I 100

A 105

9

8

C 7

G 104

D 94

Roa

J 113

I 100

I 101 A 104

01

Street Scene 01

Street Scene 01

I 101

Subject to Planning Permission and all other associated statutory approvals

E 5

A 106

G 4

FOR ILLUSTRATIVE PURPOSES ONLY.

D 6

D 94

I 109

9

8

C 7

I 110

02

BELL’S HILL, BANGOR |

15


ENVIRONMENTAL MATTERS SUSTAINABLE LOCATION The site benefits from an Ulsterbus service that runs in both directions along the Gransha Road with easy access to Bangor town centre using this service. The surrounding area benefits from excellent pedestrian and cycle infrastructure with a fully integrated network of footways and cycle lanes with dropped kerbs on both sides of the road.

ACCESSIBLE SITE

LANDSCAPING

The proposal is positioned in an ideal location, which is in close proximity to Bangor’s transport infrastructure and networks in the form of the South Circular Road. Furthermore, the site is easily accessible to jobs, shops and services including other local amenities such as playing fields and churches.

Trees within the site will be retained as far as practicably possible and integrated within the layout with supplementary planting where necessary to ensure a soft and pleasing environment.

The appointed Roads Consultant RPS have designed the access location in accordance with the KSR and appropriate using design guidance. In addition, an assessment of the additional traffic generated by the development is being assessed.

A detailed landscaping plan and report will be prepared by a landscape architect. This will integrate existing trees on the site with a new planting scheme for the entire proposal.

FLOOD AND DRAINAGE ASSESSMENT An initial assessment has been undertaken regarding drainage for the proposed development and this site has also been reviewed in relation to flood protection standards. The assessment has confirmed that the site is not affected by any fluvial or coastal floodplain and that matters concerning reservoir flooding does not apply in this instance. With regards to surface water a Schedule 6 for consent to discharge to the watercourse, has been acquired and remains valid until September 2020. Further detail on drainage matters will accompany the planning application.

16

|

BELL’S HILL, BANGOR

BELL’S HILL, BANGOR |

17


NOISE AND AIR QUALITY

An initial assessment has been undertaken regarding noise and air quality for the proposed development in terms of its effects on the future occupiers of the dwellings. Once the assessments are completed, they will accompany the planning application submission.

ARCHAEOLOGY

A series of archaeological monitoring programmes of the site under licence has been undertaken over a sustained period of time by an appointed archaeologist. A total of 41no. test trenches were agreed and mechanically excavated under the strict supervision of Historic Environment Division (HED). The monitoring of the site has been carried out in order to establish whether there are any significant archaeological remains within the site that would be a constraint to the development. A preliminary report has been completed and this has concluded that out 40 out of the 41 test trenches contains no significant archaeological features. The remaining trench requires further archaeological mitigation and will be completed under the supervision of HED.

18

|

BELL’S HILL, BANGOR

ECOLOGY

A full suite of ecological surveys was commissioned and completed at the site in preparation for the submission of a planning application. This includes survey work to ensure that there would not be any adverse impact on protected species as a result of the development.

ROADS

The entire site will be solely accessed from Gransha Road with any necessary highway improvements that are required. As part of the planning application package A Transport Assessment Form (TAF) and Transportation Assessment (TA) will be completed. The TAF will inform DFI Roads of the increase in traffic, while the TA will include traffic and queue surveys of the surrounding highway network. It forms a comprehensive review of all the potential transport impacts of the proposed development with a strategy plan in terms of how to mitigate any adverse consequences.

GROUND CONDITIONS

A full contaminated lands assessment will be completed and submitted as part of the planning application package to identify any potential sources of contamination. Any proposed remedial work that is necessary would be clearly set out along with suggested methods on how to best deal with any contaminants found and would be controlled by way of planning conditions.

BELL’S HILL, BANGOR |

19


WHAT HAPPENS NEXT? We thank-you for taking time to review the content of this consultation and would be delighted if you would take the time to share your thoughts on what you have seen and the prospect of the proposed development proceeding through planning. Following the end of the consultation period (10th July 2020), your feedback will be taken into consideration in finalising the proposed development. A formal planning application will be submitted to Ards and North Down Borough Council. Once submitted, the opportunity for further public engagement in the decision making process will take place in the normal manner through the submission of representations to the Council following the application’s advertisement and neighbour notification procedures.

How to feedback and find out more

View from South Circular Road

On our website you can leave feedback, raise questions or leave your contact details should you require further assistance.

Phone us

If you wish to discuss the proposal you can also do so by telephone: 02890 434393 or 075 8765 8531

Write to us

If you wish to make comments or raise questions on the proposal you can also do so in writing by sending a letter to: Clyde Shanks Ltd 2nd Floor, 7 Exchange Place, Belfast BT1 2NA or Email: gavynsmyth@clydeshanks.com

Request Printed Format

If you would like to receive a printed copy of this magazine, we can post this out to you on request, including a feedback form for completion

Deadline

Please note all comments should be with Clyde Shanks ltd. no later than 10th July 2020.

View from Gransha Road

BELL’S HILL, BANGOR |

21


2nd Floor 7 Exchange Place Belfast BT1 2NA t | 028 9043 4393 clydeshanks.com