Architectural Design Portfolio

Page 1

CLARE CUNNINGHAM CLAREACUNNHM@GMAIL.COM 0435633773
ARCHITECTURAL DESIGN PORTFOLIO BACHELOR OF DESIGN (ARCHITECTURE) QUEENSLAND UNIVERSITY OF TECHNOLOGY
Contents
Design
D Block Renovation - Electrical Documentation (2022) Mixed-Use Community Enterprise (2022) Mixed Use Housing for a 15 Minute City (2021) Colour and Light (2021) Urban Film Cafe (2021) Techincal Drawings (2021) 21st Century Pavilion (2021) Small Scale Construction (2020) Architectural
1 (2020) Environmental Principals (2020) Create and Represent (2019)

ELECTRICAL& LIGHTINGSCHEDULE

DISTRIBUTIONBOARD

SMOKEDETECTOR

EVACUATIONSPEAKERSURFACEMOUNTED ORRECESSED

DOUBLEPOWEROUTLET

DOUBLEPOWEROUTLET-WATERPROOF

DATAPOINT

DOUBLEDATAPOINT

PHONECONNECTION

TELEVISION

1WAY1GANGSWITCH

1WAY2GANGSWITCH

PENDANTLIGHT

DOWNLIGHT

FLOORMOUNTEDLIGHT

WALLMOUNTEDLIGHT

FLUROLIGHT

SUSPENDEDLEDLINEARLIGHT

SUSPENDEDLEDCIRCULARLIGHT

LEDSTRIPLIGHTING

RECESSEDNON-MAINTAINEDLED EMERGENCYLIGHT

SURFACEMOUNTEDEMERGENCYEXIT LIGHT

MDMOTIONDETECTOR

EXISTINGLIGHTINGLEGEND

EFL1SUSENDEDFLUORESCENT LUMINAIREWITHDIFFUSER

EFL2RECESSEDFLUORESCENT LUMINAIRE

EELEXISTINGEMERGENCYLIGHT EDLEXISTINGDOWNLIGHT

ANNOTATIONLEGEND

OUTDOORWATERPROOF OUTLET

SWITCHBOARDDIAGRAM

GPO'SP1

GPO'SP2

GPO'SP3

GPO'SP4

GPO'SP5

GPO'SP6

GPO'SP7

L1 L1 L1

CLASSROOM1LIGHTING

CLASSROOM2LIGHTING

STORAGE&MAKERSSPACELIGHTING

L2 L2

COMPUTER OUTLETS

GPO'SP8

GPO'SP9

GPO'SP10

GPO'SP11

GPO'SP12

GPO'SP13

GPO'SP14

GPO'SP15 GPO'SP16

L2

OUTDOORWATERPROOF OUTLET

GPO'SP17 GPO'SP18

GPO'SP19

GPO'SP20 GPO'SP21

L7

COMPUTERLAB1LIGHTING

COMPUTERLAB1LIGHTING

COMPUTERLAB2LIGHTING

COMPUTERLAB2LIGHTING

L2COMPUTERLAB1LIGHTING L2 L2 L2

COMPUTERLAB2LIGHTING

L2COMPUTERLAB2LIGHTING

COMPUTERLAB1LIGHTING L8HVACPUSHSWITCHES

L3STAFFOFFICE'SLIGHTING L4

STAFFROOMLIGHTING

L4STAFFROOMLIGHTING

L5STAFFMEETINGROOMLIGHTING

L7CLASSROOM3LIGHTING

CLASSROOM3LIGHTING

CLASSROOM4LIGHTING

L6COMMUNALOUTDOORAREALIGHTING L7 L7

CLASSROOM4LIGHTING

LED01 LED02 LED03 DL01 SUSPENDEDLED CIRCULARLIGHT SUSPENDEDLED LINEARLIGHT LEDSTRIPLIGHTING DOWNLIGHT EL EMERGENCYNONMAINTAINEDLED EMERGENCYLIGHT
LIGHTINGFIXTURESSCHEDULE
300 POWEROUTLET POWEROUTLETMOUNTING HEIGHT
P/L1 DISTRIBUTIONBOARD P=POWERCIRCUIT L=LIGHTCIRCUIT DRAWINGLEGEND PROPOSEDINSTALLATIONS EXISTING/TOREMAIN DEMOLISHED
2
DB4
SWITCHBOARDLEGEND LIGHTSWITCH FUSE FROMMAINSWITCHBOARD PHASEDESIGNATION MULTIPLESWITCHESTO THESAMESWITCHBOARD Scale Checkedby Drawnby Date Projectnumber2022.02 CLARECUNNINGHAM ELECTRICALCONSULTANT clare.cunningham@connect.qut.edu.au JOHNCES MECHANICALCONSULTANT john.ces@connect.qut.edu.au MIASQUIRE HYDRAULICCONSULTANT mia.squire@connect.qut.edu.au LUCIAO'DONNELL FIRESERVICESCONSULTANT lucia.odonnell@connect.qut.edu.au @A2 2GEORGEST,BRISBANECITY4000 LM 17/10/2022 12:48:56 PM 1100 ELECTRICALSERVICESCOVERSHEET LEVEL4DBLOCKRENOVATION QUEENSLANDUNIVERSITYOFTECHNOLOGY 18/10/2022 CC E-100 SHEETSCHEDULEE100SERIES E100:ELECTRICAL&LIGHTING E101:ELECTRICALDEMOLITIONPLAN E102:ELECTRICALRCP E103:ELECTRICALPLAN E104:ELECTRICALDETAILS NOTE: ALLLIGHTINGMUSTMEASURETOAMINIMUM OF160LUXINACCORDANCEWITHAS1680 INTERIORANDWORKPLACELIGHTINGTO ENSUREAWELLLITANDSAFEENVIRONMENT No.DescriptionDate ACONSULTANTISSUE20/09/2022 BTENDERISSUE04/10/2022 CCLIENTISSUE18/10/2022

NOTE:EXSITING FLOORINGTOBE REMOVEDAND REPLACED

NOTE:EXSITING FLOORINGTOBE REMOVEDAND REPLACED

NOTE:EXSITING FLOORINGTOBE REMOVEDAND REPLACED

ELECTRICAL& LIGHTINGSCHEDULE

DISTRIBUTIONBOARD

SMOKEDETECTOR

EVACUATIONSPEAKERSURFACEMOUNTED ORRECESSED

DOUBLEPOWEROUTLET

DOUBLEPOWEROUTLET-WATERPROOF

DATAPOINT

DOUBLEDATAPOINT

PHONECONNECTION

TELEVISION

1WAY1GANGSWITCH

1WAY2GANGSWITCH

PENDANTLIGHT

DOWNLIGHT

FLOORMOUNTEDLIGHT

WALLMOUNTEDLIGHT

FLUROLIGHT

SUSPENDEDLEDLINEARLIGHT

SUSPENDEDLEDCIRCULARLIGHT

LEDSTRIPLIGHTING

RECESSEDNON-MAINTAINEDLED EMERGENCYLIGHT

SURFACEMOUNTEDEMERGENCYEXIT LIGHT

MDMOTIONDETECTOR

EXISTINGLIGHTINGLEGEND

1 2 3 4 5 6 A B C D D413 DESIGNSTUDIO D415 DESIGNSTUDIO D416 DESIGNSTUDIO D417 STORE D414 STORE D412 STAFFOFFICE D411 STAFFOFFICE D410 STAFFOFFICE D409 COMPUTERROOM D408A BOARDROOM D408 COMPUTERROOM D407 COMPUTERROOM D405 COMPUTERROOM D401 STAFFOFFICE D499 PLANTROOM
AREATOREMAIN AREATOREMAIN AREATOREMAIN AREATOREMAIN 4720
DRAWINGLEGEND PROPOSEDINSTALLATIONS EXISTING/TOREMAIN DEMOLISHED Scale Checkedby Drawnby Date Projectnumber2022.02 CLARECUNNINGHAM ELECTRICALCONSULTANT clare.cunningham@connect.qut.edu.au JOHNCES MECHANICALCONSULTANT john.ces@connect.qut.edu.au MIASQUIRE HYDRAULICCONSULTANT mia.squire@connect.qut.edu.au LUCIAO'DONNELL FIRESERVICESCONSULTANT lucia.odonnell@connect.qut.edu.au @A2 2GEORGEST,BRISBANECITY4000 LM 17/10/2022 12:48:56 PM 1100 ELECTRICALSERVICES-DEMOLITIONPLAN LEVEL4DBLOCKRENOVATION QUEENSLANDUNIVERSITYOFTECHNOLOGY 18/10/2022 CC E-101 3 2 1 01245 10 No.DescriptionDate ACONSULTANTISSUE20/09/2022 BTENDERISSUE04/10/2022 CCLIENTISSUE18/10/2022
EFL1SUSENDEDFLUORESCENT LUMINAIREWITHDIFFUSER EFL2RECESSEDFLUORESCENT LUMINAIRE EELEXISTINGEMERGENCYLIGHT EDLEXISTINGDOWNLIGHT

ELECTRICAL& LIGHTINGSCHEDULE

DISTRIBUTIONBOARD

SMOKEDETECTOR

EVACUATIONSPEAKERSURFACEMOUNTED ORRECESSED

DOUBLEPOWEROUTLET

DOUBLEPOWEROUTLET-WATERPROOF

DATAPOINT

DOUBLEDATAPOINT

PHONECONNECTION TELEVISION

1WAY1GANGSWITCH

1WAY2GANGSWITCH

PENDANTLIGHT

DOWNLIGHT

FLOORMOUNTEDLIGHT

WALLMOUNTEDLIGHT

FLUROLIGHT

SUSPENDEDLEDLINEARLIGHT

SUSPENDEDLEDCIRCULARLIGHT

LEDSTRIPLIGHTING

RECESSEDNON-MAINTAINEDLED EMERGENCYLIGHT

SURFACEMOUNTEDEMERGENCYEXIT LIGHT

MOTIONDETECTOR

WP 150150150150150150150150150150150 150 300 300 300 WP WP 800 150 TV 300 300 P W 1200 800 150 MD MD MD DB4 GPO'STOBEFIXEDTOSKIRTING DB4 P1 DB4 P2 DB4 P3 DB4 P4 DB4 P5 DB4 P6 DB4 P7 DB4 P8 DB4 P9 DB4 P10 DB4 P11 DB4 P12 DB4 P13 DB4 P14 DB4 P15 DB4 P16 DB4 P17 DB4 P18 DB4 P20 DB4 P21 AREATOREMAIN AREATOREMAIN AREATOREMAIN AREATOREMAIN
PROPOSEDINSTALLATIONS EXISTING/TOREMAIN DEMOLISHED ANNOTATIONLEGEND 2 300 POWEROUTLET POWEROUTLETMOUNTING HEIGHT DB4 P/L1 DISTRIBUTIONBOARD P=POWERCIRCUIT L=LIGHTCIRCUIT Scale Checkedby Drawnby Date Projectnumber2022.02 CLARECUNNINGHAM ELECTRICALCONSULTANT clare.cunningham@connect.qut.edu.au JOHNCES MECHANICALCONSULTANT john.ces@connect.qut.edu.au MIASQUIRE HYDRAULICCONSULTANT mia.squire@connect.qut.edu.au LUCIAO'DONNELL FIRESERVICESCONSULTANT lucia.odonnell@connect.qut.edu.au @A2 2GEORGEST,BRISBANECITY4000 LM 17/10/2022 12:48:59 PM 1100 ELECTRICALSERVICES-FLOORPLAN LEVEL4DBLOCKRENOVATION QUEENSLANDUNIVERSITYOFTECHNOLOGY 18/10/2022 CC E-102 013245 10 No.DescriptionDate ACONSULTANTISSUE20/09/2022 BTENDERISSUE04/10/2022 CCLIENTISSUE18/10/2022
WP 2D MD DRAWINGLEGEND

ELECTRICAL& LIGHTINGSCHEDULE

DISTRIBUTIONBOARD

SMOKEDETECTOR

EVACUATIONSPEAKERSURFACEMOUNTED ORRECESSED

DOUBLEPOWEROUTLET

DOUBLEPOWEROUTLET-WATERPROOF

DATAPOINT

DOUBLEDATAPOINT

PHONECONNECTION

TELEVISION

1WAY1GANGSWITCH

1WAY2GANGSWITCH

PENDANTLIGHT

DOWNLIGHT

FLOORMOUNTEDLIGHT

WALLMOUNTEDLIGHT

FLUROLIGHT

SUSPENDEDLEDLINEARLIGHT

SUSPENDEDLEDCIRCULARLIGHT

LEDSTRIPLIGHTING

RECESSEDNON-MAINTAINEDLED EMERGENCYLIGHT

SURFACEMOUNTEDEMERGENCYEXIT LIGHT

WP MD Drawnby

Date Projectnumber2022.02 CLARECUNNINGHAM ELECTRICALCONSULTANT clare.cunningham@connect.qut.edu.au JOHNCES MECHANICALCONSULTANT john.ces@connect.qut.edu.au

NOTE: ALLLIGHTINGMUSTMEASURETOAMINIMUMOF160 LUXINACCORDANCEWITHAS1680INTERIORAND WORKPLACELIGHTINGTOENSUREAWELLLITAND SAFEENVIRONMENT MOTIONDETECTORSARETOWORKINCONJUNTION WITHHVACSYSTEMWHENSENSINGMOVEMENTFOR LIGHTINGANDA/C No.DescriptionDate ACONSULTANTISSUE20/09/2022 BTENDERISSUE04/10/2022 CCLIENTISSUE18/10/2022

MIASQUIRE HYDRAULICCONSULTANT mia.squire@connect.qut.edu.au LUCIAO'DONNELL FIRESERVICESCONSULTANT lucia.odonnell@connect.qut.edu.au @A2 2GEORGEST,BRISBANECITY4000 LM 17/10/2022 12:49:03 PM 1100

ELECTRICALSERVICES-REFLECTEDCEILINGPLAN LEVEL4DBLOCKRENOVATION QUEENSLANDUNIVERSITYOFTECHNOLOGY 18/10/2022 CC E-103 013245 10

1 2 3 4 5 6 A B C D LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 LED02 DL01 DL01DL01 DL01 DL01 DL01DL01 DL01 DL01 DL01DL01 DL01 DL01 DL01DL01DL01DL01 DL01 DL01 DL01 DL01DL01DL01DL01 DL01 DL01 DL01DL01DL01DL01 DL01 DL01DL01DL01 DL01DL01 DL01DL01 DL01 DL01DL01 DL01DL01 DL01DL01 LED01 LED01 LED01 LED01 LED01 LED01 LED01 LED03 LED03 LED03 LED03 LED03 LED03 LED03 3400 3400 340034003400 340034003400 3400 3400 3400 2400 2400 2400 2400 LED03BELOWJOINERYREFERTOE104 MD MD MDMD MD MD MD MD MDMD MD MD P P P P P P PP DB4 L1 DB4 L2 DB4 L3 DB4 L4 DB4 L5 DB4 L6 DB4 L7 DB4 L8 DB4 L9 DB4 L8 DB4 L8 DB4 L8 DB4 L8 AREATOREMAIN AREATOREMAIN AREATOREMAIN AREATOREMAIN
DRAWINGLEGEND PROPOSEDINSTALLATIONS EXISTING/TOREMAIN DEMOLISHED
MOTIONDETECTOR Scale Checkedby

OUTDOORWATERPROOF OUTLET

SWITCHBOARDDIAGRAM

GPO'SP1

GPO'SP2

GPO'SP3

GPO'SP4

GPO'SP5

GPO'SP6

GPO'SP7

L1 L1 L1

CLASSROOM1LIGHTING

CLASSROOM2LIGHTING

STORAGE&MAKERSSPACELIGHTING

L2 L2

COMPUTER OUTLETS

GPO'SP8

GPO'SP9

GPO'SP10

GPO'SP11

GPO'SP12

GPO'SP13

GPO'SP14

GPO'SP15 GPO'SP16

L2

OUTDOORWATERPROOF OUTLET

GPO'SP17 GPO'SP18 GPO'SP19

GPO'SP20 GPO'SP21

L7

COMPUTERLAB1LIGHTING

COMPUTERLAB1LIGHTING

COMPUTERLAB2LIGHTING

COMPUTERLAB2LIGHTING

L2COMPUTERLAB1LIGHTING L2 L2 L2

COMPUTERLAB2LIGHTING

L2COMPUTERLAB2LIGHTING

COMPUTERLAB1LIGHTING L8HVACPUSHSWITCHES

L3STAFFOFFICE'SLIGHTING L4

STAFFROOMLIGHTING

L4STAFFROOMLIGHTING

L5STAFFMEETINGROOMLIGHTING

L7CLASSROOM3LIGHTING

CLASSROOM3LIGHTING

CLASSROOM4LIGHTING

L6COMMUNALOUTDOORAREALIGHTING L7 L7

CLASSROOM4LIGHTING

SWITCHBOARDLEGEND LIGHTSWITCH FUSE FROMMAINSWITCHBOARD PHASEDESIGNATION MULTIPLESWITCHESTO THESAMESWITCHBOARD HANGINGPOLE WIRING BOLTFIXINGTOBE DRILLEDINTO CONCRETECEILING LINEARLED LIGHTINGFIXTURE LIGHTINGTRANSFORMER LED03STRIPLIGHTINGPLATETOBE FIXEDTOUNDERSIDEOFTIMBER BENCH TIMBERBENCH Scale Checkedby Drawnby Date Projectnumber2022.02 CLARECUNNINGHAM ELECTRICALCONSULTANT clare.cunningham@connect.qut.edu.au JOHNCES MECHANICALCONSULTANT john.ces@connect.qut.edu.au MIASQUIRE HYDRAULICCONSULTANT mia.squire@connect.qut.edu.au LUCIAO'DONNELL FIRESERVICESCONSULTANT lucia.odonnell@connect.qut.edu.au @A2 2GEORGEST,BRISBANECITY4000 LM 17/10/2022 12:49:04 PM Asindicated ELECTRICALSERVICES-TYPICALDETAIL LEVEL4DBLOCKRENOVATION QUEENSLANDUNIVERSITYOFTECHNOLOGY 18/10/2022 CC E-104 1:10 1SuspendedLightingDetail 1:10 2OutdoorSeatingLEDDetail 013245 10 No.DescriptionDate ACONSULTANTISSUE20/09/2022 BTENDERISSUE04/10/2022 CCLIENTISSUE18/10/2022

Architectural design 3: dwelling

Mixed use housing for a 15 minute city

Year 3

The Hub

Based in the budding and upcoming town of Yarrabiliba, The Hub is an inclusive community program aiming to better improve mental wellbeing of the local population. Demographic information on the area presented that around 40% of residents within Yarrabilba suffer with high psychological stress, along with around 15% also struggling with socio-economic disadvantage. These factors became my main focus in creating an inclusive and free program that underpins mental wellbeing in the suburbs. I then researched available mental wellbeing resources within a 15-minute radius and found that general practitioners, psychologists and public green spaces were outside of this area. This information then created the foundation for the idea of The Hub, a public study/workspace, nursery and community garden all in one.

DAB201
Presentation
link: https://www.youtube.com/watch?v=-OJhBjCjv78

The Hub is located in Yarrabilba’s Wickham Rise estate on a 719m2 corner block, making entry to the site open and welcoming. The block also backs onto a green reserve across the road, creating a pleasing visual opportunity for the residents of the home and users of the Hub.

The Hub located to the north of the block and is accessible through the green space and designated Hub entry. In order to succinctly distinguish the hub from the residential dwelling, it has been slightly elevated above ground to take visual priority. The Hub has also been strategically placed in this position to shade parts of the nursery from the harsh midday sun, allowing users to remain in the garden for however long they desire whilst being protected from environmental elements.

The residential dwelling is located to the south west of the block at ground level, again visually differing itself from the Hub. A transportation storage area has also been discreetly placed around the corner of the home to emphasize privacy. The gold standard bedroom and bathroom are located to the south of the home, with the 2 other standard bedrooms and the study located in front. The bedrooms and study are visible from the public garden, although to create a sense of privacy tall bushes act as a shield to protect the rooms from noise, visibility and environmental aspects. From here, the living area, kitchen, dining area, laundry and entry to the shared storage space can be accessed. From the laundry, residents are able to access a private outdoor green space with a small shed, clothesline and undercover seating area.

Home The Hub

Colour and Light Year 3

Everyday Skin Interior

DTB210 Colour and Light required us to individually develop a brief and create a proposal in relation to the application of Colour and Light to a retail space in Indooroopilly Shopping Centre.

I chose to create a natural skincare,brand, Everyday Skin, therefore my aim was to create an organic, raw and welcoming environment by manipaulating colour and light within my retail environment. I was heavily influenced by the work of artist Richard Bawden and Johannes Itten in creating positive psychological impact within my retail fitout.

Programs used:

2
1:50 Shopfront
DTB210

This project required students to think about factors that were detrimental in the perception of colour and light. This included the research on colour harmony, contrast between pallets, lighting, materials, textures and many more. These elements were to embrace the organic and welcoming vibe of Everyday Skin to create an atmosphere relative to the brand’s intent. The fit out was designed in Revit then rendered in Lumion to add lighting effects in order to manipulate colour.

Inserts pops of colour into the store, creating a more welcoming and comforting atmosphere Sediments in Terrazzo reflect the customers natural skin’s state by showcasing its various impurities and markings Birch Timber (1, 5, 6) Creates a comforting sense of warmth Arched timber panels differ in brilliance to inform its order in a daily routine (morning to night, light to dark) Colour is symbolical of purpose therefore customers are subtly guided through the store which better improves spatial awareness Polished Concrete (2) Incorporates a sense of naturality relating directly back to the customers everyday skin • The dull, gray shade of concrete counteracts with the warm timber and colourful terrazzo to bring the store into a more calming state Terrazzo (3) • Highlights products on shelves • Attracts attention to products Toughened Glass (4) 1 2 3 4 5 6 1:100 Plan 1 2 3 4 5 6

I S O L A T E

DAB202 Architectural Design 4 challenged us to create a film that would become the basis for a film cafe in our choice of location around Brisbane. Once a model of our site and cafe were created, we were to compile a photo montage of our design within our chosen site.

Isolate is an urban escape from the busy rush of the city. Situated on the edge of Kangaroo Point, Isolate offers a unique cafe/cinema experience, whilst allowing the public to retreat and isolate from the city rush. Programs used:

Urban film: https://drive.google.com/file/d/11XOXcvBqsc-_Qp9LehjhC-GAIBFHsX5j/view?usp=sharing

cafe is split up into parts and is connected by a public boardwalk that looks over to the city. As the area had difficult pedestrain access, it was important to create ease of accessibility to connect each part of the cafe together.

1.Outdoor Cinema 2.Indoor cinema 3.C afe/Office 4.Kitchen 5.Store 6.Toilets 7.Public Boardwalk 1 2 3 4 5 6 7
The

DAB311 Technical Drawings

N10428321
Clare Cunningham

NOTES

ALL

ALL DRAWINGS TO COMPLY WITH NCC

ALL DRAWINGS TO BE APPROVED BY STRUCTURAL ENGINEER

ALL DIMENSIONS AND LEVELS ARE TO BE VERIFIED ON SITE BEFORE CONSTRUCTION OR FABRICATION

FFL LEVEL 1 9900 RL BASEMENT 3900 Entry Stairs 9100 362 300 362 800 7 Scale Checked by Drawn by Date Project number 1 : 20 31/05/2021 11:10:00 AM Slab to retaining wall 0001 DAB311 Assessment 2 13/05/21 CLARE CUNNINGHAM YASU SANTO DWG 1 1 : 20 Slab edge detail 1 200mm STEEL FRAMED WALL 362 COMMERCIAL REINFORCED CONCRETE FLOORING
800MMX350MM
1500MM COMPACTED ROCK FILL
300MM REINFORCED CONCRETE RETAINING WALL
REINFORCED SLAB EDGE
STORMWATER
CONCRETE TO BE FITTED WITH STRUCTURAL REBAR WATERPROOF TANKING MEMBRANE TO BE APPROVED BY ENGINEER
DRAIN FILTER

ALL CONCRETE TO BE FITTED WITH STRUCTURAL REBAR

NOTES ALL DRAWINGS TO COMPLY WITH NCC

ALL DRAWINGS TO BE APPROVED BY STRUCTURAL ENGINEER

ALL DIMENSIONS AND LEVELS ARE TO BE VERIFIED ON SITE BEFORE CONSTRUCTION OR FABRICATION

CANTILEVER TO BE CHECKED AND ASSESSED BY STRUCTURAL ENGINEER ON SITE

Level 1 Floorplan 9900 Basement 3900 FFL LEVEL 1 RL BASEMENT 1 1500MM COMPACTED ROCK FILL 900MM REINFORCED CONCRETE SLAB 300MM REINFORCED CONCRETE RETAINING WALL 300MM REINFORCED CONCRETE CANTILEVER FLOORING Scale Checked by Drawn by Date Project number 1 : 20 31/05/2021 11:10:06 AM Cantilever Detail 0001 DAB311 Assessment 2 13/05/21 CLARE CUNNINGHAM YASU SANTO DWG 2 1 : 20 Cantilever Detail 2
BASEMENT

NOTES

ALL GLASS TO BE UV PROTECTED AND SEALED STRUCTURAL

ALL CONCRETE TO BE FITTED WITH STRUCTURAL REBAR

ALL DRAWINGS TO COMPLY WITH NCC

ALL DRAWINGS TO BE APPROVED BY STRUCTURAL ENGINEER

STRUCTURAL STEEL COLUMN TO BE APPROVED BY ENGINEER

Scale Checked by Drawn by Date Project number 1 : 20 31/05/2021 11:10:11 AM Curtain Wall to Roof Detail 0001 DAB311 Assessment 2 13/05/21 Clare Cunningham Yasu Santo DWG 3 1 20 Curtain wall to Roof 3 EXTERIOR
INTERIOR MULLION 5MM TOUGHENED
COMMERCIAL
ALUMINIUM
3MM TOUGHENED GLASS ROOFING
MULLION
CURTAIN GLASS
GRADE SEALANT
FASTENER PLATE
STEEL COLUMN TO SUPPORT ROOF
35

NOTES

STEEL H FRAME COLUMN LOAD CAPACITY TO BE APPROVED BY ENGINEER

ALL CONCRETE TO BE FITTED WITH STRUCTURAL REBAR

ALL DRAWINGS TO COMPLY WITH NCC

ALL DRAWINGS TO BE APPROVED BY STRUCTURAL ENGINEER

ALL DIMENSIONS AND LEVELS ARE TO BE VERIFIED ON SITE BEFORE CONSTRUCTION OR FABRICATION

FFL LEVEL 2 17400 FFL LEVEL 3 20900 4 3 Scale Checked by Drawn by Date Project number 1 : 20 31/05/2021 11:10:17 AM Atrium Detail 0001 DAB311 Assessment 2 13/05/21 CLARE CUNNINGHAM YASU SANTO DWG 4 1 : 20 Atrium Detail 4
TEMPERED GLASS ATRIUM BALCONY
VOID
VOID 362MM REINFORCED STEEL FLOORING 300MM REINFORCED CONCRETE LOAD BEARING WALL
STEEL H FRAME COLUMN
LEDGEND ATRIUM
ATRIUM
LEVEL 1 LEVEL 2 LEVEL 3
FFL LEVEL 1 9900 FFL LEVEL 2 17400 13 DWG 13 6 4 5 300MM STEEL FRAMED LOAD BEARING CONCRETE WALL 300MM COMMERCIAL REINFORCED CONCRETE FLOORING COMMERCIAL STEEL FLOORING INTERNAL STRUCTURAL STEEL COLUMNS INTERNAL STRUCTURAL STEEL BEAMS STEEL H FRAME COLUMN Scale Checked by Drawn by Date Project number 1 : 20 31/05/2021 11:10:21 AM Structural Wall to Floor 0001 DAB311 Assessment 2 13/05/21 Clare Cunningham Yasu Santo DWG 5 1 20 Structural Wall to floor 5 ALL DRAWINGS TO COMPLY WITH NCC ALL DRAWINGS TO BE APPROVED BY STRUCTURAL ENGINEER NOTES

300MM STEEL FRAMED CONCRETE RETAINING WALLS

13 DWG 13 12 DWG 12 2450 2500 30596 37977
22445 4000 3960 7 6 1 2 4 5 A B C D E F H 3 11 DWG 11
300
IScale Checked by Drawn by Date Project number 1 : 100 1/06/2021 9:42:57 AM Basement Floorplan 0001 DAB311 Assessment 2 13/05/21 Clare Cunningham Yasu Santo DWG 6 1 : 100 Basement 6
2500x4000MM ELEVATOR SHAFT
800MM CONCRETE SLAB STEEL H FRAME COLUMNS
NOTES STEEL H FRAMES TO SUPPORT LOAD BEARING WALLS FROM LEVEL 1 CONCRETE FLOORING TO HAVE POLISHED FACADE 794M2 FLOOR SPACE

LEDGEND

VOID/OPENING

ALL DIMENSIONS AND LEVELS ARE TO BE VERIFIED ON SITE BEFORE CONSTRUCTION OR FABRICATION

ALL DRAWINGS TO COMPLY WITH NCC BUILDING CODES

ALL DRAWINGS TO BE APPROVED BY STRUCTURAL ENGINEER

13 DWG 1310 DWG 10 12 DWG 12 7 6 1 2 4 5 A B C D E F H 3 37927 4510 30708 22756 6091 9042 2500 2500 I 33647 3000
Scale Checked by Drawn by Date Project number 1 : 100 31/05/2021 11:10:29 AM Level 2 Floorplan 0001 DAB311 Assessment 2 13/05/21 CLARE CUNNINGHAM YASU SANTO DWG 8 1 : 100 Level 2 8 ATRIUM VOID ATRIUM VOID CANTILEVER VOID 200MM STEEL FLOORING STAIRWELL ENTRY 2500X4000MM ELEVATOR SHAFT

NOTES

STEEL H FRAME COLUMNS IN BASEMENT TO SUPPORT LOAD BEARING WALLS WITHIN LEVEL 1

LEVEL 2 & 3 ARE SAME WIDTH AS BASEMENT

ALL DIMENSIONS AND LEVELS ARE TO BE VERIFIED ON SITE BEFORE CONSTRUCTION OR FABRICATION

ALL DRAWINGS TO COMPLY WITH NCC BUILDING CODES

ALL DRAWINGS TO BE APPROVED BY STRUCTURAL ENGINEER

13 DWG 1312 DWG 12 7 6 1 2 4 5 A B C D E F H 3 I ATRIUM VOID CANTILEVER/ATRIUM VOID 200MM STEEL FLOORING ENTRY/EXIT STAIRWELL 2500X4000MM ELEVATOR SHAFT 2500 4000 2500 4000 31196 38577 23272 33971 31607 8982 3379 GLASS CURTAIN
LASS RAILING
WALL
VOID/OPENING LEDGEND
Scale Checked by Drawn by Date Project number 1 : 100 31/05/2021 11:10:38 AM Level 3 Floorplan 0001 DAB311 Assessment 2 13/05/21 Clare Cunningham Yasu
DWG 9 1 : 100 Level 3 9
Santo
FFL LEVEL 1 9900 FFL LEVEL 2
RL BASEMENT 3900 FFL LEVEL
Entry Stairs 9100 7 6 1 2 4 5 3 22445 5638 7138 3000 3000 25193 8959 BASEMENT HEIGHT LEVEL 1 HEIGHT LEVEL 2 HEIGHT LEVEL 3 HEIGHT 362 362 362 900 1500 900MM CONCRETE SLAB 1500MM ROCK FILL BUILDING HEIGHT 300MM CONCRETE RETAINING WALL STEEL
WATERPROOF TANKING MEMBRANE 10907 5600 3398 33997 STEEL H FRAME LOAD BEARING COLUMNS
WALL VOID/OPENING Scale Checked by Drawn by Date Project number 1 : 100 31/05/2021 11:10:41 AM West Section 0001 DAB311 Assessment 2 13/05/21 CLARE CUNNINGHAM YASU SANTO DWG 10 1 100 West Section 2 10 CANTILEVER LENGTH LEVEL 1 WALL OPENING WIDTH BUILDING LENGTH BASEMENT BASEMENT LENGTH BATHROOM WIDTH LEVEL 1 LEVEL 2 LEVEL 3
17400
3 20900 CEILING 23900
H FRAME COLUMNS IN BASEMENT TO SUPPORT LOAD BEARING WALLS WITHIN LEVEL 1 LEVEL 2 & 3 ARE SAME WIDTH AS BASEMENT ALL DIMENSIONS AND LEVELS ARE TO BE VERIFIED ON SITE BEFORE CONSTRUCTION OR FABRICATION ALL DRAWINGS TO COMPLY WITH NCC BUILDING CODES ALL DRAWINGS TO BE APPROVED BY STRUCTURAL ENGINEER RETAINING WALL AND FOOTINGS TO BE APPROVED BY ENGINEERS
NOTES

NOTES

LEVEL 2 & 3 ARE SAME LENGTH AS BASEMENT

ALL DIMENSIONS AND LEVELS ARE TO BE VERIFIED ON SITE BEFORE CONSTRUCTION OR FABRICATION

ALL DRAWINGS TO COMPLY WITH NCC BUILDING CODES

ALL DRAWINGS TO BE APPROVED BY STRUCTURAL ENGINEER

RL BASEMENT 3900
7 6 1 2 4 5 3 22445 10902 5638 7138 3000 3000 33657 25193 5600 2198 1500
FFL LEVEL 1 9900 FFL LEVEL 2 17400
FFL LEVEL 3 20900 CEILING 23900
Scale Checked by Drawn by Date Project number 1 : 100 31/05/2021 11:10:44 AM East Section 0001 DAB311 Assessment 2 13/05/21 CLARE CUNNINGHAM YASU SANTO DWG 11 1 : 100 East Section 11 1500MM ROCK FILL BASEMENT HEIGHT LEVEL 1 HEIGHT LEVEL 2 HEIGHT LEVEL 3 HEIGHT BATHROOM WIDTH BASEMENT LENGTH VOID/WALL OPENING WIDTH BUILDING LENGTH CANTILEVER LENGTH GLASS CURTAIN WALL GLASS CURTAIN ROOF 362MM REINFORCED CONCRETE FLOORING 300MM STEEL FLOORING BASEMENT LEVEL 1 LEVEL 2 LEVEL 3 BATH ENTRY WATERPROOF TANKING MEMBRANE AS PER ENGINEERS DETAIL STORMWATER DRAIN FILTER STORMWATER DRAIN FILTER STEEL H FRAME COLUMNS BUILDING HEIGHT

NOTES

RL
Entry
A B C D E F H I 37977 22745 5638 7138 3000 3000 6091 REINFORCED
RETAINING
362 1000 STORMWATER DRAIN FILTER REINFORCED
LOAD
ATRIUM VOID TOUGHENED GLASS PANELLED CURTAIN ROOF STEEL
Scale Checked by Drawn by Date Project number 1 : 100 31/05/2021 11:10:46 AM North Section 0001 DAB311 Assessment 2 13/05/21 CLARE CUNNINGHAM YASU SANTO DWG 12 1 100 North Section 12 BASEMENT LEVEL 1 LEVEL 2 LEVEL 3 STUDY ROOM 1 STUDY ROOM 2 STUDY ROOM 3 STUDY ROOM 4
FFL LEVEL 1 9900 FFL LEVEL 2 17400
BASEMENT 3900 FFL LEVEL 3 20900 CEILING 23900
Stairs 9100
CONCRETE
WALL
CONCRETE
BEARING WALL
H FRAME COLUMNS IN BASEMENT TO SUPPORT LOAD BEARING WALLS WITHIN LEVEL 1 LEVEL 2 & 3 ARE SAME WIDTH AS BASEMENT ALL DIMENSIONS AND LEVELS ARE TO BE VERIFIED ON SITE BEFORE CONSTRUCTION OR FABRICATION ALL DRAWINGS TO COMPLY WITH NCC BUILDING CODES ALL DRAWINGS TO BE APPROVED BY STRUCTURAL ENGINEER STEEL H FRAME LOAD BEARING COLUMN WATERPROOF TANKING MEMBRANE
RETAINING WALL AND FOOTINGS TO BE APPROVED BY ENGINEERS WALLS OF STUDY ROOMS TO BE LOAD BEARING

NOTES

STEEL H FRAME COLUMNS IN BASEMENT TO SUPPORT LOAD BEARING WALLS WITHIN LEVEL 1

LEVEL 2 & 3 ARE SAME WIDTH AS BASEMENT

ALL DIMENSIONS AND LEVELS ARE TO BE VERIFIED ON SITE BEFORE CONSTRUCTION OR FABRICATION

ALL DRAWINGS TO COMPLY WITH NCC BUILDING CODES

ALL DRAWINGS TO BE APPROVED BY STRUCTURAL ENGINEER

RL
Entry Stairs
A B C D E F H I BASEMENT LEVEL 1 LEVEL 2 LEVEL 3 32580 5638 7200 3000 3000 STUDY ROOM
STUDY ROOM 2 LOAD BEARING WALL OPENINGS 1500MM COMPACTED ROCK FILL 362 362 STEEL H FRAME COLUMNS
FFL LEVEL 1 9900 FFL LEVEL 2 17400
BASEMENT 3900 FFL LEVEL 3 20900 CEILING 23900
9100
3
BASEMENT WIDTH
GROOVED REINFORCED CONCRETE SLAB
COMMERCIAL STEEL FLOORING
Scale Checked by Drawn by Date Project number 1 : 100 31/05/2021 11:10:49 AM South Section 0001 DAB311 Assessment 2 13/05/21 CLARE CUNNINGHAM YASU SANTO DWG 13 1 : 100 SOUTH SECTION 13

This assessment piece, designing a 21st Century Pavilion involved students choosing an exemplar house and designing a secondary dwelling that underpinned elements of the 21st century.

Architectural design 3: dwelling

21st century pavillion

Year 3

Programs used:

I chose the Bligh House, a classic 60’s style home designed by Graham Bligh in the bushy surrounds of Kenmore. Functionality, freedom and refuge were my main elements in creating a multi-purpose tiny home/escape. 21st century design to me allows for creativity and innovation, arguably something that the Bligh House did not openly offer. Fo r its time, the Bligh House met the basic needs of users; a place of shelter and rest. Due to its simplicity, it could be argued that the home does not inspire innovation or propose the opportunity to ‘escape’. Presentation link:

DAB201
https://www.youtube.com/watch?v=xUsDfFmo5zk

Inspired by the 22m2 Apartment by ‘A Little Design’ architectural group, this design commemorates the classic 70’s style while creating a modern twist on 21st Century living. To me, 21st century design means creating an inclusive, compact and costefficient space that adheres to the wants and needs of a user audience without breaking the bank.

The dwelling is inclusive to various groups as it not only acts as a separate living space, but an office, studio, reading room and ‘getaway’ space. The desing is broad in use and can be utilised by not only members of the existing household but guests or even tenants such as an Air BnB.

The Pavilion is meant to be a place of refuge where the user is invited to take time out to read, work, create, and/or escape their main home.

1:20 Detailed Plan: Studio 1:20 Detailed Elevation: Studio
1:100 East Elevation 1:100 South Elevation 1:50 East Section Interior Vignette: Lounge

DAB212

Small scale building construction (year 2)

For this second year assessment, we were required to produce a set of construction drawings for a residential design in Petrie Terrace. This project created a basic understanding of the national construction code and other Australian residential building standards.

The design was to respond to site setbacks, drainage, material use, solar access, noise corridors, accessibility to visitable area and load bearing structure among others.

Programs used:

DN NORTH
SOUTH
1583 1000
SETBACK
TO
5 0 0 0 SETBACK
4 9 0
RUTLAND STREET S A I N T J A M E S S T R E E T MOUNTJOY STREET 43 44 45 46 47 CONTOUR LEVELS HOUSE GARAGE BALCONY 3847 HOUSE WIDTH GARAGE LENGTH 98 / 1000 507 / 1000 1 7 6 / 1 0 0 0 DOWNPIPE & GUTTER LOCATION DOWNPIPE & GUTTER LOCATION DOWNPIPE & GUTTER LOCATION PATH TO BE REMOVED FOR DRIVEWAY LANDSCAPING GARAGE WIDTH N E I G H B O U R I N G L O T ADDED LANDSCAPING 2 6 2 2 6 LOT LENGTH 10322 LOT WIDTH 2 3 5 8 0 HOUSE LENGTH Scale Checked by Drawn by Date Project number 1 : 200 15/10/2020 10:26:42 AM SITE PLAN 0001 13 MOUNTJOY STREET 2 OCTOBER, 2020 CLARE CUNNINGHAM MARK THOMSON DWG NO. 1 1 : 200 SITE PLAN 1 SEWER INFRASTRUCTURE NETWORK PIPELINES WATER NETWORK PIPELINES INFRASTRUCTURE
BOUNDARY WEST BOUNDARY
BOUNDARY EAST BOUNDARY
SETBACK FROM EAST BOUNDARY TO GUTTER
FROM WEST BOUNDARY
GUTTER
FROM NORTH BOUNDARY TO GUTTER
SETBACK FROM NORTH BOUNDARY TO GARAGE GUTTER
98 / 1000 507 1000 176 / 1000 98 1000 GUTTER GUTTER BALCONY ROOF GUTTER BALCONY ROOF DOWNPIPE DOWNPIPE DOWNPIPE CARPARK ROOF GUTTER EAST BOUNDARY 872 872mm ROOF OVERHANG 400mm BALCONY ROOF OVERHANG EAST BOUNDARY NORTH BOUNDARY WEST BOUNDARY SOUTH BOUNDARY 337 19218 350 980 38 2994 2156 306 994 7469 1333 90 976mm ENTRY ROOF OVERHANG www.autodesk.com/revit Scale 1:100 Checked by Drawn by Date Project number 15/10/2020 10:26:53 AM ROOF PLAN 0001 13 MOUNTJOY STREET 2 OCTOBER, 2020 CLARE CUNNINGHAM Checker DWG NO. 2 1 : 100 ROOF PLAN 2 NOTES ROOF TO BE CONSTRUCTED OF 0.42mm CORRUGATED METAL ROOF SHEETING
DN UP 2 3 4 5 6 7 A E D B C EAST BOUNDARY 1 NORTH BOUNDARY WEST BOUNDARY SOUTH BOUNDARY 5 m² STUDY 10 m² BED 2 10 m² BED 1 22 m² OUTDOOR LIVING 18 m² SITTING AREA 800 1300 1500 3010 4 m² WC 6 m² BATH 8 m² ENTRY 13 m² KITCHEN & DINING 7 m² LIVING 17450 2000 2120 3727 3490 3503 2147 3100 3100 2525 3422 1810 7802 4202 3000 1700 7302 3100 3602 1900 3087 5976 2175 1600 OUTDOOR PARKING DOWNPIPE DOWNPIPE ENTRY KITCHEN/DINING STUDY BED 1 BED 2 BALCONY OUTDOOR PARKING ENTRY STUDY 2080 RAMP WIDTH BATHL/LAUNDRY WC NORTH SETBACK BATH/LAUNDRY WC LIVING STAIRS SITTING OUTDOOR LIVING EAST SETBACK SITTING AREA BED 2 WEST SETBACK SOUTH SETBACK 4000 OUTDOOR DRAINAGE CHANNEL Scale Checked by Drawn by Date Project number 1 : 100 20/10/2020 1:28:52 PM DETAILED FLOORPLAN 0001 13 MOUNTJOY STREET 2 OCTOBER, 2020 CLARE CUNNINGHAM Checker DWG NO. 3 1 : 100 DETAILED FLOORPLAN 3 NOTES ALL ESSSENTIAL FEATURES ARE LOCATED ON LEVEL 1 IN ACCORDANCE WTIH AS 4299-1995 ADAPTABLE HOUSING SECTION 4.2 FOR DISABLED ACCESS OUTDOOR LIVING AREA DESIGNED IN ACCORDANCE PART 3.12.0.1 WITHIN THE NCC 2019 VOLUME 2 AMENDMENT 1 LAUNDRY IS LOCATED WITHIN BATHROOM ENTRY IS LEVEL WITH ROAD IN COMPLIANCE WITH AS4299-1995 ADAPTABLE HOUSING SECTION 4.3.1 ACCESSIBLE ENTRANCE

EAST BOUNDARY WEST BOUNDARY

CLERESTORY LIGHTING

1 : 100 North 4

ROOF OVERHANG 600mm CEILING HEIGHT ENTRY RAMP 100mm

GROUND LINE

500 600 500mm ROOF OVERHANG

2000 750 13

FFL LEVEL1 5100

800 1500 EAST SETBACK WEST SETBACK 3817 GARAGE HEIGHT DWG NO. 4

NORTH ELEVATION 0001

MOUNTJOY STREET 2 OCTOBER, 2020 CLARE CUNNNINGHAM Checker

2000 ENTRY RAMP WIDTH Scale

Checked by Drawn by Date Project number

7802 HOUSE WIDTH 100 1 : 100 20/10/2020 12:24:31 PM

ROOF PITCH 11000 RL CEILING 8600 A E D B C
ENTRY DOOR 3500
5900 ROOF PITCH HEIGHT
507
1000 98 1000 ROOF SLOPE
NOTES
GARAGE SLAB 100mm BELOW LEVEL 1 FOR DRAINAGE
RAMP 100mm ABOVE GARAGE SLAB
QDC BUILDING HEIGHT OF 5900mm OBTAINED (MAX 9m)
A E D B C
WEST
507
BALCONY ROOF OUTDOOR LIVING CUT AND FILL 100X100mm BLACKBUTT LOAD BEARING POST CLERESTORY LIGHTING GUTTER AND DOWNPIPE GLASS PANEL DECK RAILING 1500 DISTANCE FROM WEST BOUNDARY TO HOUSE DISTANCE FROM EAST BOUNDARY TO HOUSE
800 1300 Scale Checked by Drawn by Date Project number 1 : 100 15/10/2020 10:27:08 AM SOUTH ELEVATION
13 MOUNTJOY STREET
2020 CLARE CUNNINGHAM Checker DWG NO. 5 1 : 100 South 5 800MM WEST SETBACK FOR NONHABITABLE SPACES 1M MIN. WEST SETBACK FOR HABITABLE SPACES
FFL LEVEL 2 4000 FFL LEVEL1 5100 ROOF PITCH 11000 RL CEILING 8600 RL BALCONY ROOF 6800
ROOF PLAN 13500 EAST BOUNDARY
BOUNDARY
1000 98 1000
GUTTER & DOWNPIPE ROOF SLOPE CONCRETE RETAINING WALL LEVEL 1 GROUND LINE
0001
2 OCTOBER,
LEVEL 2
FFL LEVEL1
2 3 4 5 6 7 ROOF PITCH
RL CEILING
RL BALCONY ROOF 6800 1 NORTH BOUNDARY SOUTH BOUNDARY OUTDOOR PARKING GUTTER & DOWNPIPE 150X150mm BLACKBUTT POST OUTDOOR LIVING CLERESTORY LIGHTING 176 1000 BALCONY ROOF SLOPE 150X150mm BLACKBUTT POSTS CONCRETE RETAINING WALL ENTRY RAMP 100mm CUT & FILL GARAGE LENGTH 730 730 3915 2800 HOUSE HEIGHT 10567 HOUSE HEIGHT FROM SOUTH BOUNDARY 5823 100 3597 Scale Checked by Drawn by Date Project number 1 : 100 15/10/2020 10:27:13 AM EAST ELEVATION 0001 13 MOUNTJOY STREET 2 OCTOBER, 2020 CLARE CUNNINGHAM Checker DWG NO. 6 1 : 100 East 6 NOTES LIVING AREA WINDOW SILL 730mm ABOVE FLOOR LEVEL IN COMPLIANCE WITH AS4299 ADAPTABLE HOUSING SECTION 4.7.2 GROUND LINE
FFL
4000
5100
11000
8600
2 3 4 5 6 7
1 NORTH BOUNDARY SOUTH BOUNDARY 176 1000 OUTDOOR PARKING HEIGHT
CUT & FILL FOUNDATION FIBRE CEMENT EXTERIOR CLADDING 0.42mm CORRUGATED SHEET METAL ROOFING 600
17553 16076 600 3971 10508
976 976mm ENTRY ROOF OVERHANG Scale Checked by Drawn by Date Project number 1 : 100 15/10/2020 10:27:20 AM WEST ELEVATION 0001 13 MOUNTJOY STREET 2 OCTOBER, 2020 CLARE CUNNINGHAM Checker DWG NO. 7 1 : 100 West 7 NOTES BEDROOM SILL HEIGHT TO COMPLY WITH AS4299 SECTION 4.6.2 MAX SILL HEIGHT 600mm ABOVE FLOOR LEVEL
RL 0m 0 FFL LEVEL 2 4000 FFL LEVEL1 5100
ROOF PITCH 11000 RL CEILING 8600 RL BALCONY ROOF 6800
LOAD BEARING BLACKBUTT POST 150X150mm OUTDOOR LIVING GUTTER & DOWNPIPE BALCONY ROOF SLOPE
BEDROOM SILL HEIGHT FROM FLOOR
HEIGHT FROM SOUTH BOUNDARY

10614 OVERALL BUILDING HEIGHT FROM BOTTOM OF BLOCK

100mm STEPPED ENTRY RAMP 3629 BALCONY HEIGHT FROM BOTTOM OF BLOCK

1 LIVING LENGTH SITTING LENGTH OUTDOOR LIVING LENGTH

1 : 100 EAST SECTION 8

BATH WC LIVING 2000 2120 3542 BATH LENGTH

OUTDOOR PARKING 700

NOTES 100mm STEPPED RAMP TO BE CONSTRUCTED OF CONCRETE AND GLAZED RAILINGS FRAMING TO BE CONSTRUCTED OF CYPRUS PINE

RAMP 5040 CLERESTORY LIGHTING CONCRETE RETAINING WALL CUT & FILL

Level 6 2900 BEAMS 1455 SITTING AREA HEIGHT LEVEL 1 HEIGHT GROUND LINE

ROOF PITCH 11000 RL CEILING 8600 RL BALCONY ROOF 6800 SITTING AREA OUTDOOR LIVING GUTTER & DOWNPIPE 5823 5276

ROOF PLAN 13500 3500 4600 3746 OUTDOOR PARKING LENGTH WATER CLOSET LENGTH

100 RAMP 100mm ABOVE LEVEL 1 OUTDOOR DRAINAGE CHANNEL

FFL LEVEL1 5100

CONCRETE SLAB CONSTRUCTION

DWG NO. 8

950 950mm ENTRY ROOF OVERHANG Scale Checked by Drawn by Date Project number 1 : 100 20/10/2020 1:38:25 PM EAST SECTION 0001 13 MOUNTJOY STREET 2 OCTOBER, 2020 CLARE CUNNINGHAM Checker

2 3 4 5 6 7
RL 0m 0
FFL LEVEL 2 4000 NORTH BOUNDARY SOUTH BOUNDARY

CLERESTORY

BLACKBUTT TIMBER BOTTOM PLATE FRAMING

NORTH BOUNDARY SOUTH BOUNDARY STUDY BED 1 BED 2 OUTDOOR LIVING 3287 2525 3100 337 5823 OUTDOOR PARKING HEIGHT BUILDING HEIGHT FROM LEVEL 1 337mm BETWEEN

LIGHTING 350X600mm CONCRETE FOOTING 3100 BED 2 WIDTH 4138 HEIGHT OF ALL ROOMS ON LEVEL 1 2800 2422 OUTDOOR LIVING WIDTH 100mm STEPPED ENTRY RAMP 176 1000

FASCIA

& DINING ENTRY

RL CEILING 8600 RL BALCONY ROOF 6800 ENTRY WIDTH LIVING ROOM WIDTH STUDY WIDTH BED 1 WIDTH

FFL LEVEL1 5100 WIDTH FROM NORTH BOUNDARY TO HOUSE

number

HEIGHT FROM BOTTOM OF SLOPE TO BALCONY

2 3 4 5 6 7
1
GARAGE
FFL LEVEL 2 4000 AND LOT BOUNDARY
HEIGHT FROM BOTTOM OF SLOPE TO ROOF PITCH BALCONY HEIGHT
BALCONY GUTTER & DOWNPIPE
Scale Checked by Drawn by Date Project
1 : 100 20/10/2020 1:43:19 PM WEST SECTION
13 MOUNTJOY STREET
Checker DWG NO. 9 1 : 100 WEST SECTION 9
BLACKBUTT TIMBER DECKING CONCRETE RETAINING WALL
KITCHEN
1713 3424 2355 700
0001
2 OCTOBER, 2020 CLARE CUNNINGHAM

Window-Single_Hung-PlyGem_1500-Standard M_Fixed : 0610 x 1220mm Window Schedule Description HeightTypeWidth

10.38mm thick laminated glass, with full perimeter acoustically rated seals 12200610 x 1220mm 610 10.38mm thick laminated glass, with full perimeter rated seals 6100610 x 1220mm 1220 10.38mm thick laminated glass, with full perimeter rated seals 5660610 x 1220mm 2 1020 10.38mm thick laminated glass, with full perimeter acoustically rated seals 457Window-Sin gle_Hung-P lyGem_150 0-Standard

1829 NOTES BUILDINGS IN A CATEGORY 3 TRANSPORT NOISE CORRIDOR MUST HAVE A MINIMUM 35 RW FOR ALL WINDOW GLAZING IN COMPLIANCE WITH QDC MP 4.4

Scale
1 : 15 15/10/2020 10:27:36 AM WINDOW SCHEDULE
13 MOUNTJOY STREET
DWG NO. 10
457 1829 610 1220 M_Fixed : 1220X0610MM 610 1220
Checked by Drawn by Date Project number
0001
2 OCTOBER, 2020 CLARE CUNNINGHAM Checker

Description

Solid core timber not less than 45mm thick, fixed so as to overlap the frame rebate of the frame by not less than 10mm, with full perimeter acoustically rated seals.

2134 813

20320864 x 2032mm 864

20001500 x 2000mm 1500 10.38mm thick laminated glass, with full perimeter acoustically rated seals

Solid core timber not less than 45mm thick, fixed so as to overlap the frame rebate of the frame by not less than 10mm, with full perimeter acoustically rated seals.

Grand total: 7

20001700 x 2000mm 1700

DOOR SCHEDULE 0001

MOUNTJOY STREET 2 OCTOBER, 2020 CLARE CUNNINGHAM MARK THOMSON

Scale Checked by Drawn by Date Project number

M_Door-Double-Sliding: 1700X2000mm M_Single-Flush : 0864 x 2134mm M_Door-Interior-Double-Full Glass-Wood: 1500X2000mm 1 : 25 15/10/2020 10:27:41 AM
1500 13
2000 2000 1700 DWG NO. 11
NOTES
ALL DOORS TO OBTAIN A MINIMUM R VALUE OF 33 IN ACCORDANCE WITH QDC MP 4.4- BUILDINGS IN A TRANSPORT NOISE CORRIDOR
Door Schedule
HeightTypeWidth
CC DESIGNS
CC DESIGNS

CC DESIGNS

CC DESIGNS

CC DESIGNS

CC DESIGNS

CC DESIGNS

CC DESIGNS

Rationale - Site

BCC Part 9.3.8 of the Dwelling House (small lot code) AO7 informs that the minimum rear setback (North boundary) for a lot more than 25m in depth must be 6m minimum to the boundary line of the building.

Entry is a non-habitable space, therefore applies for the 0.5m

In accordance with BCC Part 9.3.8 of the Dwelling House (small lot code) AO6, the minimum side boundary setbacks of the property are between 0-1m. -1m minimum side boundary (West boundary) applies to a habitable space -0.5m side boundary (West boundary) for non-habitable spaces with a max. height of 3.5m that are located in the Low–medium density residential zone, Medium density residential zone or High density residential zone

FLOORPLAN

WEST BOUNDARY SOUTH BOUNDARY

NORTH BOUNDARY

DINING

BCC Part 9.3.8 of the Dwelling House (small lot code)

AO5 states that the minimum secondary street frontage (South boundary)for a small lot is 1.5m, with a 5.5m minimum street frontage for garages. The secondary street frontage applies to a lot with more than one frontage other than the primary frontage.

BCC Part 9.3.8 of the Dwelling House (small lot code) states that the minimum street frontage (South boundary) for a small lot is 3m to the nearest habitable space (outdoor living area)

DN UP 2
4 5 6 7
3
1
5 m² STUDY 10 m² BED 2 10 m² BED 1 22 m² OUTDOOR LIVING 18 m² SITTING AREA 800 1300 1500 4 m² WC 5 m² BATH 7 m² ENTRY 14 m² KITCHEN &
7 m² LIVING
EAST BOUNDARY 3041
5976
West boundary
South boundary East boundary North boundary

1

ROOF PITCH 11000 RL CEILING 8600 RL BALCONY ROOF 6800

FFL LEVEL1 5100

Level 6 2900 BEAMS 1455

2 SITTING AREA OUTDOOR LIVING GUTTER & DOWNPIPE 5823 5276 3500 4600 3746 OUTDOOR PARKING LENGTH WATER CLOSET LENGTH LIVING LENGTH SITTING LENGTH OUTDOOR LIVING LENGTH SITTING AREA HEIGHT LEVEL 1 HEIGHT GROUND LINE CLERESTORY LIGHTING CONCRETE RETAINING WALL CUT & FILL CONCRETE SLAB CONSTRUCTION 100mm STEPPED ENTRY RAMP 3629 BALCONY HEIGHT FROM BOTTOM OF BLOCK 10614 OVERALL BUILDING HEIGHT FROM BOTTOM OF BLOCK 100 RAMP 100mm ABOVE LEVEL 1 OUTDOOR DRAINAGE CHANNEL BATH WC LIVING 2000 2120 3542 BATH LENGTH OUTDOOR PARKING 700 950 950mm ENTRY ROOF OVERHANG Scale Checked by Drawn by Date Project number 1 : 100 20/10/2020 1:38:25 PM EAST SECTION 0001 13 MOUNTJOY STREET 2 OCTOBER, 2020 CLARE CUNNINGHAM Checker DWG NO. 8 NOTES 100mm STEPPED RAMP TO BE CONSTRUCTED OF CONCRETE AND GLAZED RAILINGS FRAMING TO BE CONSTRUCTED OF CYPRUS PINE 1 : 100 EAST SECTION 8

3 4 5 6 7
RL 0m 0
FFL LEVEL 2 4000 NORTH BOUNDARY SOUTH BOUNDARY
ROOF PLAN 13500
RAMP 5040

CC DESIGNS

Architectural design

1: explorations year 2

The task for this assessment was to design a conceptual pavilion inspired by a researched artist by including elements of their techniques and symbolism reflecting their original works. I created a pavilion that offered and experiential journey as my artist, Bronwyn Oliver, favoured the concept of experience and escape, often reflecting on her journeys through her work.

Dab101
https://www.youtube.com/watch?v=ArMVx2gtZrw Programs used:
Presentation:

Material application

Mirror

Mirror panels will be added to the smaller ‘waves’ at each of the entries of the pavilion. These mirror panels reflect the environment that the user is leaving behind before entering the pavilion. They leave behind the rush of the city to enter an experiential reflection space.

Chainmail

Chainmail will also be hung from the top of the pavilion, creating a weird and unusual experience in which the user can touch and feel what is above them.

Chainmail

At the entry/exit of the pavilion, chainmail will be draped along the ground to ‘lure’ the public into the pavilion. It also acts as some sort of fence that establishes a solid entry/exit of the pavilion. It is also an experiential factor that the public is able to touch and feel.

Welded Metal

The welded metal will be placed in the bigger ‘wave’ forms on the pavilion. I wanted the pavilion to be private, but not completely closed off from the outside world, therefore I added welded metal to create a “scribbled’ geometry effect so that it becomes increasingly difficult to see in/out.

North
section

QCreate Pavilion

The Botanica Festival is one of the thousand festivals that the Council helps deliver every year. It is a showcase of contemporary art installations in creating a greener Brisbane. THe festival is looking for an innovatave and sustianable design to be showcased at their 2021 event.

The primary obejctive of the QCreate Pavilion was to design not only a solid structure, but an experience that the audience can interact with. The pavilion is a contemporary and fun art installation that allows the viewer venture through to explore its meaning.

The concept of the Pavilion was derived from the notion of the eye. The entry of the pavilion resembles an eye emerging from the ground, representing spritual awakeness. Walking through the entry becomes an expereince for the audience as they are metaphorically taking a journey through the eye.

Botanica festival

IN MY SECOND YEAR OF THE FIRST SEMESTER, THE ARCHITECTURE COHORT STUDYING DAB211 WERE GIVEN THE UNIQUE OPPORTUNITY TO DESIGN A SUSTAINABLE AND CREATIVE PAVILION, MADE PREDOMINATELY FROM BAMBOO WHICH WOULD BE A GATHERING SPACE FOR THE 2021 BOTANICA FESTIVAL.

WE WERE REQUIRED TO RESEARCH A NUMBER OF ELEMENTS THAT WOULD EFFECT THE PERFORMANCE OF OUR DESIGN, ALONG WITH ADHERING TO USER PREFERENCES AND SAFETY REGULATIONS.

WE WERE ALSO REQUIRED TO CREATE A BASIC, YET DETAILED MODEL OF OUR DESIGN ON REVIT.

Environmental principles of architectural design year 2

DAB211

IN MY SECOND SEMESTER OF THE FIRST YEAR, WE WERE GIVEN THE TASK TO DESIGN AN OCCUPIABLE SPACE WITHIN A FEATURE WALL AT QUT. I WAS INSPIRED TO CREATE A SUSTAINABLE STUDY AREA THAT WOULD HAVE 2 LEVELS; A LOFT OFTEN USED AS A STUDY SPACE AND A SEATING AREA WITHIN THE GROUND FLOOR. WE WERE REQUIRED TO PRODUCE A SET OF TECHNICAL DRAWINGS ALONG WITH CREATING A 1:20 SCALED MODEL.

Programs used:

DyB113 Create and represent: materials year 1

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.