PUBLIC WORKS UPDATE
THESE DRAWINGS AN THE PROPERTY OF ARCHITECTS AND MAY OR USED FOR ANY P ARCHITECTS W AS INSTRUMENTS DOCUMENTS ARE NOT USE, AND THEREFOR THEY ARE SEALED,
PROGRESS ON MAJOR CAPITAL IMPROVEMENT PROJECTS
Copyrigh Consultant
DESIGNW
Landscape Archite Urban Design ·
PO B 128 Ma Su Stateline, N (775) 5
PLEASE Project
BURNT CE BEACH - P RECONST
665 Lakeshor Incline Village 89451
IVGID’s Engineering and Public Works team is making progress on a number of major capital improvement projects throughout the District including...
Job No: 20-018.1 Owner
INCLINE V GENERAL IMPROVEM DISTRICT
90% SCH DES REV
group, the new design will provide amenities for all to enjoy. The construction will require the pool to be closed the entire 2021 summer, but the beach areas will remain open to IVGID residents.
VIEW LOOKING EAST
Incline Creek Restoration Phase V Incline Village General Improvement District wins the TRPA’s Best in Basin award again! This project is a capstone of four restoration projects on Third and Incline Creeks in Incline Village. The project reduces erosion from stream banks with willow and alder revegetation and rock stabilization, and improves the water quality of Lake Tahoe by reducing fine sediment transport and restoring floodplain terraces. Perhaps most notable is the return of spawning fish to the creek, including sightings of native Lahontan cutthroat trout that are being reintroduced to Lake Tahoe. e,
nu
Ave
ton ing A 01 9 5 4 Arl th Suite , 89 7.29 NV .85 om no 75 a.c Re e: 7 .tsk on w ph ww
ou
5S
22
E AR NS Y IO SE D AT KIM DUCE E TH IFIC ER O EC YD PR UT SP SN RE HO T. E R D BE WIT EN ES FO AN TATE T NS TH Y SS NO SE E, AD LE GS F IN Y O AY RPO CO IC RE UN TED. AW RT D M PU TTEN RV D DR OPE AN Y RI F SE L AN LID,D DA E AN W O NA VA AN T ES PR TS R TS FI TH THE ITEC FO EC ENTS T NO NED 0 IT 02 CH ED CH RUM E NOORE SIG 2 AR R US AR ST AR EF , td O IN TS ER ED t, L AS MEN D TH SEAL igh CU AN ARE pyr DO E, EY Co US TH
nt
lta
su
Con
DE dscapan Des e
Lan Urb
S
ED
OS
OP
PR
KID
P HO ning KSand Plannning
OR
L
·
Tennis & Pickleball Center Remodel
Pla
NWhitectuTreourism66 t SIG Arc n x 56 tree ·
49
Bo et S 94 PO ark 3E a 8 8 M Suite evad 929 -5 N e, 588 telin 75) Sta (7
ig
12
E
R
E
Construction at the Tennis & Pickleball Center is well underway. Daniel Fraiman Construction has made significant progress towards completion and the project is on schedule to open to users this spring. Project improvements include new siding, stone wainscoting, circulation enhancements, an expanded deck, and renovations to the bathrooms, proshop, and self-serve kitchenette areas. Undergrounding the water service line and adding heat to the restrooms will allow operations to continue well into the fall season provided early season snowfall does not prevent play. C
Y
C
LE
AR N ED L T C OO TIO ject Pro RN - P UC BU ACH STR Blvd, BE CON shore e, NV e E g k R 5 La Villa P
LE
A
S
66 line Inc 451 89
0 E 8.1 AG -01 20 o: ILL EV r LIN AL ENT INC NER VEM E G PRO T IM TRIC DIS
bN
Jo
ne
Ow
IC AT M HE N SC IGNS RIPTION % DESVISIODE SC RE
OL
90
PO
TE
V
DA
RE
IVE
AT
Title TR US ILL AN PL
et
She
20
R
OS
OP
PR
ED
OL
PO
, 20
30
Recreation Center Upstairs Lobby Restroom Remodel BE TO OC e: o: Dat et N She
20
A 2021 Capital Improvement Project to remodel the upstairs men's and women's restrooms at the Recreation Center. Proposed improvements will include new tile, fixtures and partitions, as well as minor modifications to comply with modern ADA building codes. Ward-Young Architecture has been hired to complete the design and permitting. The project is scheduled to be publicly bid in March 2021 and constructed in late spring 2021. 0"
0'-0
10 1"=1 E:
0
H
5 SCAL AL
GIN
ORI
RT
NO
ADA PARK CONNECTOR PATH
Burnt Cedar Swimming Pool Improvement Project IVGID has retained TSK Architects to design and permit the Burnt Cedar Swimming Pool Improvement Project, which is in the final stages of design and is scheduled to start construction the first week of May 2021. The project includes full lap and kiddie pool replacement as well as a new pool deck and walking path to connect the east and west sides of the site. Through extensive collaboration with a community working
Slott Peak Court - Water Main Replacement A 2022 Capital Improvement Project, this project includes replacing aging steel water main in Slott Peak Court and miscellaneous water system improvements. IVGID Engineering
36 | IVGID Quarterly Incline Village General Improvement District
DATE
REV
Sheet Title
PERSPEC RENDERIN
Date: OCTOBER 30, Sheet No: