PUBLIC WORKS UPDATE

THESE DRAWINGS AN THE PROPERTY OF ARCHITECTS AND MAY OR USED FOR ANY P ARCHITECTS W AS INSTRUMENTS DOCUMENTS ARE NOT USE, AND THEREFOR THEY ARE SEALED,

PROGRESS ON MAJOR CAPITAL IMPROVEMENT PROJECTS

Copyrigh Consultant

DESIGNW

Landscape Archite Urban Design ·

PO B 128 Ma Su Stateline, N (775) 5

PLEASE Project

BURNT CE BEACH - P RECONST

665 Lakeshor Incline Village 89451

IVGID’s Engineering and Public Works team is making progress on a number of major capital improvement projects throughout the District including...

Job No: 20-018.1 Owner

INCLINE V GENERAL IMPROVEM DISTRICT

90% SCH DES REV

group, the new design will provide amenities for all to enjoy. The construction will require the pool to be closed the entire 2021 summer, but the beach areas will remain open to IVGID residents.

VIEW LOOKING EAST

Incline Creek Restoration Phase V Incline Village General Improvement District wins the TRPA’s Best in Basin award again! This project is a capstone of four restoration projects on Third and Incline Creeks in Incline Village. The project reduces erosion from stream banks with willow and alder revegetation and rock stabilization, and improves the water quality of Lake Tahoe by reducing fine sediment transport and restoring floodplain terraces. Perhaps most notable is the return of spawning fish to the creek, including sightings of native Lahontan cutthroat trout that are being reintroduced to Lake Tahoe. e,

nu

Ave

ton ing A 01 9 5 4 Arl th Suite , 89 7.29 NV .85 om no 75 a.c Re e: 7 .tsk on w ph ww

ou

5S

22

E AR NS Y IO SE D AT KIM DUCE E TH IFIC ER O EC YD PR UT SP SN RE HO T. E R D BE WIT EN ES FO AN TATE T NS TH Y SS NO SE E, AD LE GS F IN Y O AY RPO CO IC RE UN TED. AW RT D M PU TTEN RV D DR OPE AN Y RI F SE L AN LID,D DA E AN W O NA VA AN T ES PR TS R TS FI TH THE ITEC FO EC ENTS T NO NED 0 IT 02 CH ED CH RUM E NOORE SIG 2 AR R US AR ST AR EF , td O IN TS ER ED t, L AS MEN D TH SEAL igh CU AN ARE pyr DO E, EY Co US TH

nt

lta

su

Con

DE dscapan Des e

Lan Urb

S

ED

OS

OP

PR

KID

P HO ning KSand Plannning

OR

L

·

Tennis & Pickleball Center Remodel

Pla

NWhitectuTreourism66 t SIG Arc n x 56 tree ·

49

Bo et S 94 PO ark 3E a 8 8 M Suite evad 929 -5 N e, 588 telin 75) Sta (7

ig

12

E

R

E

Construction at the Tennis & Pickleball Center is well underway. Daniel Fraiman Construction has made significant progress towards completion and the project is on schedule to open to users this spring. Project improvements include new siding, stone wainscoting, circulation enhancements, an expanded deck, and renovations to the bathrooms, proshop, and self-serve kitchenette areas. Undergrounding the water service line and adding heat to the restrooms will allow operations to continue well into the fall season provided early season snowfall does not prevent play. C

Y

C

LE

AR N ED L T C OO TIO ject Pro RN - P UC BU ACH STR Blvd, BE CON shore e, NV e E g k R 5 La Villa P

LE

A

S

66 line Inc 451 89

0 E 8.1 AG -01 20 o: ILL EV r LIN AL ENT INC NER VEM E G PRO T IM TRIC DIS

bN

Jo

ne

Ow

IC AT M HE N SC IGNS RIPTION % DESVISIODE SC RE

OL

90

PO

TE

V

DA

RE

IVE

AT

Title TR US ILL AN PL

et

She

20

R

OS

OP

PR

ED

OL

PO

, 20

30

Recreation Center Upstairs Lobby Restroom Remodel BE TO OC e: o: Dat et N She

20

A 2021 Capital Improvement Project to remodel the upstairs men's and women's restrooms at the Recreation Center. Proposed improvements will include new tile, fixtures and partitions, as well as minor modifications to comply with modern ADA building codes. Ward-Young Architecture has been hired to complete the design and permitting. The project is scheduled to be publicly bid in March 2021 and constructed in late spring 2021. 0"

0'-0

10 1"=1 E:

0

H

5 SCAL AL

GIN

ORI

RT

NO

ADA PARK CONNECTOR PATH

Burnt Cedar Swimming Pool Improvement Project IVGID has retained TSK Architects to design and permit the Burnt Cedar Swimming Pool Improvement Project, which is in the final stages of design and is scheduled to start construction the first week of May 2021. The project includes full lap and kiddie pool replacement as well as a new pool deck and walking path to connect the east and west sides of the site. Through extensive collaboration with a community working

Slott Peak Court - Water Main Replacement A 2022 Capital Improvement Project, this project includes replacing aging steel water main in Slott Peak Court and miscellaneous water system improvements. IVGID Engineering

36 | IVGID Quarterly Incline Village General Improvement District

DATE

REV

Sheet Title

PERSPEC RENDERIN

Date: OCTOBER 30, Sheet No:


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
IVGID Quarterly April 2021 by CCMedia Publishing - Issuu