Step by Step
HERE’S EVERYTHING YOU NEED TO KNOW ABOUT INSTALLING THE AQUALISA QUARTZTM WITH AN EASY 7 STEP GUIDE 1 1
Choose a convenient location for the QuartzTM Smart Valve, this can be sited up to 10 metres from the QuartzTM control just make sure it is accessible for future servicing. Secure the QuartzTM Smart valve and connect the hot and cold pipes.
2
Locate the rail and control position by using the template provided. Drill where stated.
3
Cut hole in the ceiling. Feed the cable and pipework through with the rail assembly and secure to the finished wall.
2
3
44