We are one of the UK’s most trusted names in specialist prefabrication pipework and steel fabrication. The key to our success is in maintaining the highest standards and consistency of delivery in everything we do. Our services include:
• Coded welding
• Prefabrication pipework
• Life-safety generator fuel systems
• Off site testing
• Specialist pipework and leak detection systems
• Mechanical installation, testing & commissioning
• Bespoke plant skid & tank fabrication
• Digital systems used in fabrication delivery
• Inspection & validation of mechanical systems for compliance
• Bespoke steel fabrication
We have our own fully equipped workshop, enabling us to carry out off-site fabrication of pipework delivered from our factory to site for installation.
Bells MES offers a comprehensive coded welding service. Our fabrication engineers have codings to BS EN standards in accordance with OFTEC and technical standards are regularly retested to ensure the highest possible quality of workmanship. Our experienced fabrication engineers can undertake commercial and industrial projects, either prefabricated in our factory or if necessary on site.
This covers a wide range of materials, thicknesses diameters and specifications, from complex steel fabrication to mission-critical pipeline repair.
Our Coded Welding BS-EN-ISO-15614-1 process include:
• Class 1
• TIG Welding
• MIG Welding
Physical checks, weld testing, logs & quality assurance procedures are easily available for our clients’ requirements.
Bells MES provide an extensive, high quality pipework service, which includes design, fabrication, quality management, logistics, installation, testing & commissioning. With our dedicated fabrication engineering team have great pride in delivering the highest quality service; always putting safety, quality, accuracy and customer satisfaction first.
Bells MES high pressure testing is carried out in accordance with HSE guidelines & manufacturers recommendations. Our work covers the breadth of commercial and industrial pipework including:
• Stainless steel pipework
• Mild steel pipework
• Carbon steel pipework
• Gas pipework
• Double-skin pipework
• Instrument small bore pipework
• Bracketry & supports
With over 25 years of experience in commercial and industrial steel fabrication, we have a reputation for delivering precision engineering to the highest possible standards.
We have the expertise to provide a complete, bespoke steel fabrication service from site surveys and design, calculations/analysis through to manufacture and install.
We are able to work in stainless and mild steel metal and can take on projects of any size including:
• Mezzanine floors
• Staircases
• Spiral staircases
• Ladders
• Platforms
• Architectural steelwork
• Structural steel work
• Riser flooring including GRP
Bells MES have successfully delivered a full design & build package for the generator system consisting of plant in basement level 3, a 25 Bar duplex transfer pump to level 41 supplying 6no. 1600 litre fire protected day tanks with another pump set.
This served the 6No. 11KV generators located on level 57 some 260m above street level, with over 300m of fill and dump line pipework installed within this iconic City of London landmark.
We worked closely with our client, other specialists & the professional team to ensure this design was technically compliant & that it was successfully signed off when the system was commissioned.
Bells MES scope included survey works, design, prefabrication, logistics, installation, testing & commissioning of plant skids which was to be located into an operational plantroom.
Our challenge, due to the ‘live’ systems & the restricted space within the plantroom was for us to survey, design & fabricate a bespoke plant skid to limit the space used to de-risk the delivery as well as connect into the existing systems.
The Chilled Water plant skids were fabricated and tested offsite at our Erith factory. The manufacture consisted of pumps, pressurisation, control panels, wiring, valves and associated ancillaries.
Bells MES install, connected to the existing live systems, filled, vented & carried out the water treatment in accordance with the BSRIA requirements with the client’s team to ensure water quality was achieved.
By fabricating off site this reduced working hours on site, managed the risks with working in a ‘live’ plantroom & deliver in accordance with the programme.
Bells MES working collaboratively with the client, design team &/ or our Bells Power Solutions team carried out the survey, design, off site pre- fabrication including quality assurance & testing inspection / sign off, delivery/ offload, installation, test & commission the systems on the following projects: -
Lime Street SKANSKA
New fuel system, manufacture/ install the access platforms, fire segregation of the electrical riser.
Athlone House London Guild
The new fuel system, including the generator ventilation & demonstrate the operation for sign off.
Conduit Sreet ISG Fuel system including controls & fire wire system for temp generator
St. Barts SKANSKA Fuel system, attenuation & ventilation system, step overs’ & existing genera tor shroud modifications.
Thermo Fisher Clinical Bouygues Energies & Services
Heat pumps, modification & upgrade of control systems, AHU chilled water system, MTHW system including hot tapping into ‘live’ systems.
UCLH-5 MACE Generator ventilation & fuel system including tanks, pumps, controls, pipe work, flue, logistics, installation test & commission
Virtus Slough (Data Centre) Bouygues Energies & Services Survey, deisgn, fabricate, install extension of existing fuel system including plant, control system & structural mezzanine floor with access.
OVH (Data Centre) OMTD
Site survey, fuel system design that met the client’s needs but keeping within the current regulations. Fully welded double skin fuel system pipe work, connecting two large bulk tanks up to x6 generators. Single skin fully welded pipe work with a communal header connected to each generator used for over fill protection back to the bulk tanks.
Prince of Wales Drive (POWD) Vital Energi
Belly tank vent modifications, generator positioning, ventilation & new fuel system.
London Fruit & Wall (Project Loop) Phoenix Modifications to fuel system including vent pipe, cooling system & ancillaries.
Chelsea Barracks MACE
Temporary & new generator fuel system delivered in phases in accordance with the clients programme.
“BMES were brilliant for us, they suggested improvements to our design and were also able to assist us in disposing of the old machinery, leaving us with a fantastic install, which allowed our project to complete on time and under budget.” - Andy Hinckley - SNG Ltd.
“We asked BMES to quote for both silencer and attenuation installation which included moving and rerouting some intricate pipework, they not only completed the installation on time to spec, but were able to suggest improvements to the pipework flow, which also gave us cost saving on the project. Very happy with all they did.” - Bob Oakley - Coopers DJ Ltd.
“Shane and Declan from BMES provided a excellent service, they performed our welding quickly and accurately, we were very happy with what they did. Would happily use them again.” - Dave Roberts - CBRE.
www.bellspowermes.co.uk 0203 259 0127
Declan Wells Bells MES Director declan.wells@bellsmes.com 07738 764865
Shane Regen Bells MES Director shane.regen@bellsmes.com 07872 409191
Bells MES is part of the Bells Power Group