Skip to main content

CS: Hot Water and Heating System

Page 1

New hot water and heating system Sanctuary, Dove Cott House, Essex

Specifications • Disconnection and removal of the existing hot water cylinders to each flat • Installation of new HIUs to each flat • Installation of new LTHW pipework distribution from existing plant room secondary circuit to new LTHW distribution system and HIUs to each flat • All modifications to existing LTHW and MCW pipework in the plantroom • All modifications to the existing LTHW and CWS/ HWS for connection to the existing underfloor manifold and the HWS/CWS outlets and removal of the 2-port valves from the underground manifolds • Installation of TMVs to bathroom hot water outlets within the flat and communal room/WHB

• Insulation and boxing in of all new heating pipework distribution • Installation 600 ltr thermal vessel in the cleaner’s room and link to the existing 300 ltr thermal store in the plant room • All associated electrical works • Removal and safe disposal of all redundant materials • All associated general builders’ works • Flushing, and chemical cleaning • Water sampling

£250,000 value

Housing | Commercial | Heritage | Public Sector | Education


Turn static files into dynamic content formats.

Create a flipbook
CS: Hot Water and Heating System by Axis CLC - Issuu